HomeMy WebLinkAboutStaff Comments- ,gay w, All- tr 4ti. (*11�` CITY OF, COLLEGE STATION Home of Zexx A6'M University' MEMORANDUM November 13, 2013 TO: David Petrakovitz via e-mail; dave.petrakovitz(cDgmail, com FROM: Matt Robinson, AICP, Senior Planner SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (SP) Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all page that each comment was addressed comment); Two (2) 24"x36" revised site plans; One (1) 24"x36" landscaping plan; of staffs comments (identify the specific on or the reason for not addressing the Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Matt Robinson at 979.764.3570. Attachments: Staff Review Comments PC: CSTX Hotels LLC, via e-mail; ManorinnCS aC2gmail.com'. David j Hildebrandt, Level 5, via e-mail; David. hildebrandt(Ja-level5ce.com MaryJo Stickel, Goodman Networks, via e-mail; MJStickel(�GoodmanNetworks.co P&DS Project No. 13-00900204 Planning & Development Services P.O. BOX 9960 • I10]'1'FXAS AVENUE COLLEGE [ EC E S'[A1ION TEXAS . 77842 979,764.3570 • FAX. 979.7643496 cstx.govldevservices STAFF REVIEW COMMENTS NO. 1 Project: AT&T Mobility Hx 3573 Brentwood (Sp-Wtt) 13-00900204 1. Please be aware that the monopole design as shown on Tower Elevation A2.0; is not meeting the City's definition of a stealth tower, which is defined as "a manmade tree, clock tower, church steeple, bell tower, utility pole, light standard, identification pylon, flagpole, or similar structure, that is camouflaged to be unrecognizable as a telecommunications facility, designed to support or conceal the presence of telecommunication antennas and blends into the surrounding environment." 2. Provide a general note on the site plan that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 3. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Matt Robinson Date: 11/5/13 LAN DSCAPING/STREETSCAPING/BUFFER 1. FYI, there are only 13 wax myrtles illustrated on the landscape plan. 2. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Reviewed by: Matt Robinson Date: 11/5/13 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: sweido(a)cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 4. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Meter pedestal will be within 10' of existing transformer and within easement boundaries. 4. CSU will furnish wire to meter pedestal. Owner is responsible for service to cell site. 5. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 6. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 11.5.2013 41,11' �8 CITY OF COLLEGE STATION Home of Texas A&M University' MEMORANDUM November 1, 2013 TO: David Petrakovitz via e-mail; dave. etrakovitz m 1.com 1/ FROM: Jason Schubert, AICP, Principal Planner #/ SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (SP) Thank you for the submittal of responses and additional information for your SITE PLAN - COMMERCIAL application. This project will be distributed to staff next week for their review. PC: CSTX Hotels LLC, via e-mail; ManorinnCS(a)gmail.com // David j Hildebrandt, Level 5, via e-mail; David. hildebrandt(c(..level5ce.com ✓ MaryJo Stickel, Goodman Networks, via e-mail; MJStickel(a)GoodmanNetworks com P&DS Project No. 13-00900204 Planning & Development Services P.O. BOX 9960 • I101 TEXAS AVENUE - GOLLLGE STATION • TEXAS - y'842 TF.I... 979 764.3170 - FAX. 979J64.349(i cstx.govldevservices CITY OF COLLEGE STATIION Homy v, fTa AdM Univmi*- MEMORANDUM October 4, 2014 �,�, i A , , i . z ?_& -2 O p(apt� TO: Larg DweMk, via e-mail; LDussack@WoodenOrchid.com 1 FROM: Molly Hitchcock, AICP, Assistant Director 49f •ll �tk �" � kw 3 6 03 So^r4i`' 11� SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (Site Plan) SPA�1� 77314 I reviewed the above -mentioned SITE PLAN - COMMERCIAL application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would allow additional service providers to locate on the tower. Completion of the declaration of needs and alternatives. Information documenting the status of alternatives is required. Please see the information provided below for more clarification of this submittal requirement: From Code of Ordinances Section 12-6.4X.6.g.9.: No new communications tower shall be permitted unless the applicant demonstrates to the reasonable satisfaction of the approving authority that no existing tower, building, structure, or alternative technology can accommodate the applicant's proposed antenna. The applicant shall submit information related to the availability of suitable existing towers, other structures or alternative technology that can accommodate the applicant's proposed antenna. The Administrator or approving authority may request information necessary to demonstrate that reasonable alternatives do not exist. The applicant must submit: a. The names, addresses, and telephone numbers of all owners of other towers or usable antenna support structures within a one-half (1/2) mile radius of the proposed new tower site, including City -owned property. b. A sworn affidavit attesting to the fact that the applicant made diligent, but unsuccessful, efforts to obtain permission to install or collocate the new facility on existing towers or antenna support structures located within one-half (%) Planning cr Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 mile radius of the proposed tower site. The affidavit shall spell out the efforts taken by the applicant. c. A description of the design plan proposed by the applicant to the City. The applicant must demonstrate the need for towers and why technological design alternatives, such as the use of microcell, cannot be utilized to accomplish the provision of the applicants tele-communications services. Please be aware that if this application is not completed before November 11, 2013, it will expire and a new application and fees will be necessary to continue the site planning process. If you have any questions or need additional information, please call me or Jason Schubert at 979.764.3570. PC: CSTX Hotels LLC, via e-mail; ManorinnCSCa)gmail.com David j Hildebrandt, Level 5, via e-mail; David.hildebrandt@level5ce.com MaryJo Stickel, Goodman Networks, via e-mail; MJStickel@GoodmanNetworks.com P&DS Project No. 13-00900204 ® a CITY OF COIJ.EGE STATION Home ofTew A&M University" MEMORANDUM October 4, 2014 TO: Larry Dussack, via e-mail; LDussack@WoodenOrchid.com FROM: Molly Hitchcock, AICP, Assistant Director SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (Site Plan) I reviewed the above -mentioned SITE PLAN - COMMERCIAL application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week: A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would allow additional service providers to locate on the tower. Completion of the declaration of needs and alternatives. Information documenting the status of alternatives is required. Please see the information provided below for more clarification of this submittal requirement: From Code of Ordinances Section 12-6.4X.6.g.9.: No new communications tower shall be permitted unless the applicant demonstrates to the reasonable satisfaction of the approving authority that no existing tower, building, structure, or alternative technology can accommodate the applicant's proposed antenna. The applicant shall submit information related to the availability of suitable existing towers, other structures or alternative technology that can accommodate the applicant's proposed antenna. The Administrator or approving authority may request information necessary to demonstrate that reasonable alternatives do not exist. The applicant must submit: a. The names, addresses, and telephone numbers of all owners of other towers or usable antenna support structures within a one-half ('/2) mile radius of the proposed new tower site, including City -owned property. b. A sworn affidavit attesting to the fact that the applicant made diligent, but unsuccessful, efforts to obtain permission to install or collocate the new facility on existing towers or antenna support structures located within one-half ('/2) Planning & Development Services P.O. BOX 9960 • 1 101 TEXAS AVENUE - COLLEGE STA7"ION • TEXAS •'7S42 TEL. 979.7164.3570 - PAX. 979.764.3496 mile radius of the proposed tower site. The affidavit shall spell out the efforts taken by the applicant. c. A description of the design plan proposed by the applicant to the City. The applicant must demonstrate the need for towers and why technological design alternatives, such as the use of microcell, cannot be utilized to accomplish the provision of the applicant's tele-communications services. Please be aware that if this application is not completed before November 11, 2013, it will expire and a new application and fees will be necessary to continue the site planning process. If you have any questions or need additional information, please call me or Jason Schubert at 979.764.3570. PC: CSTX Hotels LLC, via e-mail; ManorinnCS()gmall.com David j Hildebrandt, Level 5, via e-mail; David.hldebrandt@level5ce.com`� MaryJo Stickel, Goodman Networks, via e-mail; MJStickel@GoodmanNetworks.com P&DS Project No. 13-00900204