MEMORANDUM
November 13, 2013
TO: David Petrakovitz via e-mail; dave.petrakovitz(cDgmail, com
FROM: Matt Robinson, AICP, Senior Planner
SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (SP)
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all
page that each comment was addressed
comment);
Two (2) 24"x36" revised site plans;
One (1) 24"x36" landscaping plan;
of staffs comments (identify the specific
on or the reason for not addressing the
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Matt Robinson at 979.764.3570.
Attachments: Staff Review Comments
PC: CSTX Hotels LLC, via e-mail; ManorinnCS aC2gmail.com'.
David j Hildebrandt, Level 5, via e-mail; David. hildebrandt(Ja-level5ce.com
MaryJo Stickel, Goodman Networks, via e-mail; MJStickel(�GoodmanNetworks.co
P&DS Project No. 13-00900204
Planning & Development Services
P.O. BOX 9960 • I10]'1'FXAS AVENUE COLLEGE [ EC E S'[A1ION TEXAS . 77842
979,764.3570 • FAX. 979.7643496
cstx.govldevservices
STAFF REVIEW COMMENTS NO. 1
Project: AT&T Mobility Hx 3573 Brentwood (Sp-Wtt) 13-00900204
1. Please be aware that the monopole design as shown on Tower Elevation A2.0; is not
meeting the City's definition of a stealth tower, which is defined as "a manmade tree, clock
tower, church steeple, bell tower, utility pole, light standard, identification pylon, flagpole, or
similar structure, that is camouflaged to be unrecognizable as a telecommunications facility,
designed to support or conceal the presence of telecommunication antennas and blends
into the surrounding environment."
2. Provide a general note on the site plan that all roof and ground -mounted mechanical
equipment shall be screened from view or isolated so as not to be visible from any public
right-of-way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building architecture and
scale to maintain a unified appearance.
3. Provide a general note on the site plan that states the following: Exterior building and site
lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The
light source shall not project below an opaque housing and no fixture shall directly project
light horizontally. Fixtures will be mounted in such a manner that the projected cone of light
does not cross any property line.
4. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
Reviewed by: Matt Robinson Date: 11/5/13
LAN DSCAPING/STREETSCAPING/BUFFER
1. FYI, there are only 13 wax myrtles illustrated on the landscape plan.
2. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, rights -of -way, and adjacent property disturbed during
construction.
Reviewed by: Matt Robinson Date: 11/5/13
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version
of plat and / or site plan as soon as it is available. Email to: sweido(a)cstx.gov
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This
information is critical for CSU to accurately determine the size and number of transformers,
and other equipment, required to provide service to the project. Failure to provide load data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks.
3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within
existing easements.
4. If easements are existing, the developer will be responsible for locating easements on site to
insure that electrical infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Meter pedestal will be within 10' of existing transformer and within easement boundaries.
4. CSU will furnish wire to meter pedestal. Owner is responsible for service to cell site.
5. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
6. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 11.5.2013
41,11'
�8
CITY OF COLLEGE STATION
Home of Texas A&M University'
MEMORANDUM
November 1, 2013
TO: David Petrakovitz via e-mail; dave. etrakovitz m 1.com 1/
FROM: Jason Schubert, AICP, Principal Planner #/
SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (SP)
Thank you for the submittal of responses and additional information for your SITE PLAN -
COMMERCIAL application. This project will be distributed to staff next week for their review.
PC: CSTX Hotels LLC, via e-mail; ManorinnCS(a)gmail.com //
David j Hildebrandt, Level 5, via e-mail; David. hildebrandt(c(..level5ce.com ✓
MaryJo Stickel, Goodman Networks, via e-mail; MJStickel(a)GoodmanNetworks com
P&DS Project No. 13-00900204
Planning & Development Services
P.O. BOX 9960 • I101 TEXAS AVENUE - GOLLLGE STATION • TEXAS - y'842
TF.I... 979 764.3170 - FAX. 979J64.349(i
cstx.govldevservices
CITY OF COLLEGE STATIION
Homy v, fTa AdM Univmi*-
MEMORANDUM
October 4, 2014 �,�, i A , , i . z ?_& -2 O p(apt�
TO: Larg DweMk, via e-mail; LDussack@WoodenOrchid.com 1
FROM: Molly Hitchcock, AICP, Assistant Director 49f •ll �tk �" � kw
3 6 03 So^r4i`' 11�
SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (Site Plan) SPA�1� 77314
I reviewed the above -mentioned SITE PLAN - COMMERCIAL application and determined it to
be incomplete. The following is the preliminary list of items needed to complete the submittal so
that staff may conduct a thorough review. Please submit the following information by 10 a.m. on
any Monday for review that week:
A letter addressed to the City declaring an intent and willingness to construct a
proposed tower that would allow additional service providers to locate on the
tower.
Completion of the declaration of needs and alternatives. Information
documenting the status of alternatives is required. Please see the information
provided below for more clarification of this submittal requirement:
From Code of Ordinances Section 12-6.4X.6.g.9.:
No new communications tower shall be permitted unless the applicant
demonstrates to the reasonable satisfaction of the approving authority that no
existing tower, building, structure, or alternative technology can accommodate
the applicant's proposed antenna. The applicant shall submit information
related to the availability of suitable existing towers, other structures or
alternative technology that can accommodate the applicant's proposed
antenna. The Administrator or approving authority may request information
necessary to demonstrate that reasonable alternatives do not exist. The
applicant must submit:
a. The names, addresses, and telephone numbers of all owners of other towers or
usable antenna support structures within a one-half (1/2) mile radius of the
proposed new tower site, including City -owned property.
b. A sworn affidavit attesting to the fact that the applicant made diligent, but
unsuccessful, efforts to obtain permission to install or collocate the new facility
on existing towers or antenna support structures located within one-half (%)
Planning cr Development Services
P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842
TEL. 979.764.3570 • FAX. 979.764.3496
mile radius of the proposed tower site. The affidavit shall spell out the efforts
taken by the applicant.
c. A description of the design plan proposed by the applicant to the City. The
applicant must demonstrate the need for towers and why technological design
alternatives, such as the use of microcell, cannot be utilized to accomplish the
provision of the applicants tele-communications services.
Please be aware that if this application is not completed before November 11, 2013, it will expire
and a new application and fees will be necessary to continue the site planning process.
If you have any questions or need additional information, please call me or Jason Schubert at
979.764.3570.
PC: CSTX Hotels LLC, via e-mail; ManorinnCSCa)gmail.com
David j Hildebrandt, Level 5, via e-mail; David.hildebrandt@level5ce.com
MaryJo Stickel, Goodman Networks, via e-mail; MJStickel@GoodmanNetworks.com
P&DS Project No. 13-00900204
® a
CITY OF COIJ.EGE STATION
Home ofTew A&M University"
MEMORANDUM
October 4, 2014
TO: Larry Dussack, via e-mail; LDussack@WoodenOrchid.com
FROM: Molly Hitchcock, AICP, Assistant Director
SUBJECT: AT&T MOBILITY HX 3573 BRENTWOOD (Site Plan)
I reviewed the above -mentioned SITE PLAN - COMMERCIAL application and determined it to
be incomplete. The following is the preliminary list of items needed to complete the submittal so
that staff may conduct a thorough review. Please submit the following information by 10 a.m. on
any Monday for review that week:
A letter addressed to the City declaring an intent and willingness to construct a
proposed tower that would allow additional service providers to locate on the
tower.
Completion of the declaration of needs and alternatives. Information
documenting the status of alternatives is required. Please see the information
provided below for more clarification of this submittal requirement:
From Code of Ordinances Section 12-6.4X.6.g.9.:
No new communications tower shall be permitted unless the applicant
demonstrates to the reasonable satisfaction of the approving authority that no
existing tower, building, structure, or alternative technology can accommodate
the applicant's proposed antenna. The applicant shall submit information
related to the availability of suitable existing towers, other structures or
alternative technology that can accommodate the applicant's proposed
antenna. The Administrator or approving authority may request information
necessary to demonstrate that reasonable alternatives do not exist. The
applicant must submit:
a. The names, addresses, and telephone numbers of all owners of other towers or
usable antenna support structures within a one-half ('/2) mile radius of the
proposed new tower site, including City -owned property.
b. A sworn affidavit attesting to the fact that the applicant made diligent, but
unsuccessful, efforts to obtain permission to install or collocate the new facility
on existing towers or antenna support structures located within one-half ('/2)
Planning & Development Services
P.O. BOX 9960 • 1 101 TEXAS AVENUE - COLLEGE STA7"ION • TEXAS •'7S42
TEL. 979.7164.3570 - PAX. 979.764.3496
mile radius of the proposed tower site. The affidavit shall spell out the efforts
taken by the applicant.
c. A description of the design plan proposed by the applicant to the City. The
applicant must demonstrate the need for towers and why technological design
alternatives, such as the use of microcell, cannot be utilized to accomplish the
provision of the applicant's tele-communications services.
Please be aware that if this application is not completed before November 11, 2013, it will expire
and a new application and fees will be necessary to continue the site planning process.
If you have any questions or need additional information, please call me or Jason Schubert at
979.764.3570.
PC: CSTX Hotels LLC, via e-mail; ManorinnCS()gmall.com
David j Hildebrandt, Level 5, via e-mail; David.hldebrandt@level5ce.com`�
MaryJo Stickel, Goodman Networks, via e-mail; MJStickel@GoodmanNetworks.com
P&DS Project No. 13-00900204