Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
Reatta Corner Subdivision Infrastructure Engineer Estimate 9/4/2013 Item # Description Sanitary Items 1 Mobilization 2 Hydromuch 3 Sodding 4 Clearing and Grubbing 5 4' Std Manhole 6 8" PVC Sanitary Sewer Line 7 Connect to Existing System 8 Fence Repair Construction Costs Contingency Total Costs Quantity Units Unit Price Price 1 LS $5,000.00 $5,000.00 3180 SF $0.10 $318.00 360 SF $0.50 $180.00 1 LS $1,000.00 $1,000.00 4 EA $3,500.00 $14,000.00 318.47 LF $50.00 $15,923.50 1 EA $2,500.00 $2,500.00 1 LS $800.00 $800.00 $39,721.50 25% $9,930.38 $49,651.88 Reatta Corner Subdivision Infrastructure Engineer Estimate 9/4/2013 1 Mobilization 1 LS $5,000.00 $5,000.00 2 Hydromuch 3180 SF $0.10 $318.00 3 Sodding 360 SF $0.50 $180.00 4 Clearing and Grubbing 1 LS $1,000.00 $1,000.00 5 4' Std Manhole 4 EA $3,500.00 $14,000.00 6 8" PVC Sanitary Sewer Line 318.47 LF $50.00 $15,923.50 7 Connect to Existing System 1 EA $2,500.00 $2,500.00 8 Fence Repair 1 LS $800.00 $800.00 Construction Costs Contingency 25% $39,721.50 -Trj t-�;,