Loading...
HomeMy WebLinkAboutCertification Letter`®lySU L T14,0 zoos '> �`YrS i i15�� November 29, 2013 Erika Bridges, E.1T, Graduate Civil Engineer City of College Station Planning & Development Services 1101 Texas Avenue South College Station, Texas 77842 Re: CERTIFICATION LETTER LA QUINTA, COLLEGE STATION, TEXAS I hereby certify that I have reviewed the topographic survey and conducted a field investigation of the proposed flow patterns for storm water run-off of the remainder area (1.286 acres) of proposed La Quinta Hotel to the main stem of North Folk of Lick Creek. At build -out conditions available by zoning, restrictive covenant, or plat note, the storm water flows from the proposed hotel will not cause any increase in flooding conditions to the interior of proposed building structures, including basement areas, for storms of magnitude up through the 100-year event. Sincerely, ......................... _... s EDWARD FAGGETf Edward M Faggett, P.E. of ............. Engineer e01t.- -37209