Fred/Mike,
We're almost ready to approve the plans! It looks like we only received 3 revised sets (Sheets 2, 2a, 3, 3b) rather than 7
total needed for stamping. Please submit 4 more as soon as possible.
I also noticed a couple of tiny things that I missed, so I would like to red-line/note it on the plans if the engineer is okay
with that:
1. On W-2, we will require 2-450 bends in place of the a 900 bend.
2. On W-2, the isolation valve should be shown on the 6-inch fire line rather than the domestic.
3. n Storm Line B, what type of connection will there be to the existing 18-inch? Jbox?
Finally, can you resend the cost estimate? It looks like this was a bad scan, so parts of it aren't legible when I print it
out. Thanks for your help! We will get these plans stamped and the development permit issued as soon as we get the
additional copies.
Thanks,
Erika
From: Fred Gatela rmailto:fil2can(&yahoo.coml
Sent: Tuesday, January 14, 2014 12:55 AM
To: Erika Bridges
Cc: mike pate[
Subject: Re: La quinta ...latest C3 & C3b
Erika,
Find attached copy of LQCS estimates for public water and storm drainage system.
Thanks.
Frederick Gatela Aff. M. ASCE
Project Manager
JRE Consulting, LLC
Cell: 972.415.1730
Office: 972.232.9731
Website: httn://www.ireconsultint7itc.com/
On Thursday, January 9, 2014 5:56 PM, Erika Bridges <ebddges(iDcstx.gov> wrote:
Fred,
o things I noticed:
• C3b —There needs to be a 0.1-ft drop across the manhole at the 5-ft inlet. For example, you may have
e following flowlines: FL_in=281.25 and FL_out=281.35.
• C2a — The 12-inch waterline is labeled as existing on Profile W-3. The 12-inch waterline along Graham
do s not extend across the entire property. (Please see the attached drawing.) The 12-inch waterline
extension needs to be included in the profile and cost estimate, as well.
Please let me know if you have any questions.
Thanks,
Erika
From: Fred Gatela fmailto:fil2cannc.vahoo.coml
Sent: Wednesday, January 08, 2014 4:43 PM
To: Erika Bridges
Subject: La quinta ...latest C3 & Cab
Erika,
Find attached latest C3 & C3b and use these for your partial review, thanks.
Frederick Gatela Aff. M. ASCE
Project Manager
JRE Consulting, LLC
Cell: 972.415.1730
Office: 972.232.9731
Website: http://www.ireconsuldngllc.com/
City of College Station
Home of Texas A&M University
p "WS-IaniunW:gysexa1 Jo aruoy
uollels a6allo:) to Al!:)
no •x}-6 so�MMM
966£-691 (6L6) :xel
L69£-69L (6L6) :aoylo
uo!lels a6apoD;o Al!D
saowas luawdolanaO )R 6u!uueld
Jauue!d leduuud
dOIV I:pagnyos uosec
uosef
'sNueyl
•suo!Isanb Aue aney noAl! Moul aw lal -I! an!aoaa lou op noAp lsap luoal ano yl!M do Mopol aseald -auop si l!
uagm suo!i!puoo ql!M 00 dwal pas!Aaa aqi to Ado:) a noA puas of pue sAep Sb aagioue aol Oo dwal ay; pualxa Aayl leyi palse !
•�u!ppnq ay}}o ap!s leyl �uole sgnags !euo!l!ppe ap!nad `�u!uaaaos awos ap!noad of •uo!le!nono ne alenbape aney pue
passaooe aq ueo i! os panowaJ Jawaolsueal ouloala aqi punoje aoual ayl aney of isaq seen i! pau!wjalap am legl ao!lou 11noA
•aalsdwnp Aq a!s!e anup to pua le paJo;s aae leyl al!s aqi wal sweaq laals anowaa (9
•aanoo punojS ys!!gelsa pue gioows aq of uo!lonjlsuoo 2wanp pagjnlslp seaae la!p apejg (S
•Alaadoid luaoefpe uo 9u!pnpui luawdo!anap to aalawuad woal s!agap uollonalsuoo pue yseJl aAowaa (b
"6ulppnq aglto ap!s legl Suole Su!deospuel !euo!i!ppe !!elsui pue jawaolsueji oploala punae aoual pooM anowaa (E
weld al!s jad se sjoea al!q n palaanul pue ped alajouoo !!elsu! pue � lennap!s luoal ui palleisui joei al!q anoway (Z
•sanup ssaooe ssoIo qloq to uo!leu!wial agi le 6ulgano Ajejodwal pelsui pue sdoislaagm anowad (I
:Oo dwal pas!Aaa ayl uo apnpu! of Nsap luoal ano pal!ewa i swal! Suiu'EwaJ ayl We @A@H -uoouaaile poo9
do Mollol 00 dwa} e;umO e-! :laafgng
gzegoad Jal!uuap',woo'ooyeA@o tigJAafgM, :30
woo-ooyeA@u E90SLwe, :oy
Ad 99 ZL 91 oZ'LZ 1!jdy'Aepuo!N :lue
vegngog uosep :wf
ljagn4og v
Jason Schubert
From: Jason Schubert
Sent: Monday, April 27, 2015 12:49 PM
To: Gina Bosquez; Brian Binford
Cc: Jennifer Prochazka; Donnie Willis, Madison Thomas; Amber M. Johnson
Subject: RE: Calling for CO - La Quinta
Madison and I reinspected the site on Friday. Please shorten the list of temp CO items to be as follows:
1) Remove wheelstops and install temporary curbing at the termination of both cross access drives.
2) Remove bike rack installed in front sidewalk and install concrete pad and inverted U bike racks as per site plan.
3) Remove wood fence around electric transformer and install additional landscaping along that side of the building.
4) Remove trash and construction debris from perimeter of development including on adjacent property.
5) Grade dirt areas disturbed during construction to be smooth and establish ground cover.
6) Remove steel beams from the site that are stored at end of drive aisle by dumpster.
I spoke with Mike Patel and Donnie regarding these. This list includes Donnie's remaining items, please extend the temp CO for
another 45 days.
Please email copy of revised Temp CO with conditions to Mike Patel at am75063@yahoo.com. They are expecting to get the
updated Temp CO today.
Thanks,
Jason
From: Jennifer Prochazka
Sent: Monday, April 13, 2015 3:06 PM
To: Gina Bosquez; Alan Gibbs; Amber M. Johnson; Ben Accurso; Benjamin Mccarty; Brenda Godfrey; Brenton Killion; Brian
Binford; Bridgette George; Brittany Caldwell; Carol Cotter; Carol Rodriquez; Crystal Derkowski; Daniel Graalum; Danielle Singh;
Donnie Willis; Eaphrame Thomas; Eric Dotson; Gilbert Martinez; Griselda Turek; Israel Koite; James Boykin; Jason Schubert;
Jessica Bullock; Jim Giles; Joyce Duda; Keith Tinker; Kevin Ferrer; Lance Norwood; Madison Thomas; Marisia Dominguez; Mark
Bombek; Matthew Marek; Matthew Matcek; Molly Hitchcock; Natasha Williams; Norman Herrick; Paul Schoenfeld; Pete Garcia;
Rachel Lazo; Ray W. Argersinger; Raymond Olson; Robin Krause; Rodney Harris; Samuel D. Weido; Sean Dwyer; Stephen A.
Maldonado Jr.; Stephen Maldonado; Stephen Smith; Tony Michalsky; Wally Urrutia; WalterJ. Jones; Weldon Davis
Cc: 'whtevr84@yahoo.com'; 'am75063@yahoo.com'
Subject: RE: Calling for CO - La Quinta
Planning ok for Temp CO with the following conditions when other divisions issues have been addressed:
-Construction equipment on site needs to be removed
-Construction roll -off dumpster needs to be removed
-Extra materials need to be removed from site
-Temporary curbing needed at the termination of both cross access drives
-Trash needs to be cleaned from perimeter of development
-Areas disturbed during construction need to be graded and ground cover established
-Silt fence needs to be removed when areas are fully vegetated
-Complete the canopy construction
-Bike racks need to be installed per the approved plans (approved bike racks are included in the City's Site Design Standards)
-Transformer on west side of building needs to be screened per the approved site plan
-Rear parking spaces are only 18 feet and need to maintain a 2-foot overhang onto the paved area. Mechanical equipment (A/C
units) should not protrude into this area.
Contractor on site indicated that 2 weeks would be enough time to complete the items.