Loading...
HomeMy WebLinkAboutCost EstimateIndian Lakes Phase 17 MBESI PROJ #: 1062-0039 Engineer's Opinion of Probable Construction Costs September 9, 2013 Item # I Description I Unit I Quantity I Unit Price I %/f tl7,letal/ Paving Construction 1. I Site Preparation (includes clearing &grubbing) Ac. 4.20 $1,500.00 $6,300.00 2 Earthwork (Excavation and Embankment for Public ROW, Common Area and Lots +/- 16,500 C L.S. 1 $99,000.00 $99,000.00 3 6" Lime Stabilized Subgrade 6% by weight) S.Y. 10,389 $4.00 $41,556.00 4 6" Crushed Stone Base S.Y. 9,796 $10.50 $102,858.00 5 2" HMAC Pavement S.Y. 8,027 $11.50 $92,310.50 Paving Subtotal $342,025 Drainage Svstem Construction 6 18" RCP Pipe, ASTM C-76, CL III) (Structural Backfiil) L.F. 55 $55.00 $3,025.00 7 24" RCP Pipe, ASTM C-76, CL III Structural Backfill L.F. 248 $75.00 $18,600.00 8 Rock Rip Rap S.Y. 80 $40.00 $3,200.00 9 Safety End Treatment for 18" RCP EACH 2 $900.00 $1,800.00 10 SafeV End Treatment for 24" RCP EACH 8 $1,000.00 $8,000.00 Drainage System Subtotal $34,625 Water Svstem Construction 11 8" PVC, C909 C1200, Water Line, L.F. 1,434 $27.00 $38,718.00 12 6" PVC, C909 C1200, Water Line L.F. 596 $25.00 $14,900.00 13 4" PVC, C909 C1200 Water Line L.F. 474 $21.00 $9,954.00 14 14" Steel Casing L.F. 30 $80.00 $2,400.00 15 8" Steel Casing L.F. 30 $40.00 $1,200.00 16 8" M.J. Gate Valve EACH 4 $1,200.00 $4,800.00 17 6" M.J. Gate Valve EACH 1 $900.00 $900.00 18 4" M.J. Gate Valve EACH 1 $900.00 $900.00 19 8"x8" M.J. Tee EACH 1 $350.00 $350.00 20 8"x6" M.J. Tee EACH 1 $350.00 $350.00 21 8"x4" M.J. Tee EACH 1 $350.00 $350.00 22 8" M.J. Anchor Coupling EACH 5 $350.00 $1,750.00 23 6" M.J. Anchor Coup ing EACH 1 $350.00 $350.00 24 4" M.J. Anchor Coupling EACH 1 $350.00 $350.00 25 8"x6" M.J. Reducer EACH 1 $350.00 $350.00 26 8"x4" M.J. Reducer EACH 1 $350.00 $350.00 27 8" M.J. Bend EACH 2 $350.00 $700.00 28 6" M.J. Bend EACH 4 $250.00 $1,000.00 29 Fire Hydrant Assembly EACH 3 $3,600.00 $10,800.00 30 Blow -off Assembly EACH 3 $1,000.00 $3,000.00 31 Water Service, 1.5" type K Copper, !on side >_ 20' EACH 3 $1,500.00 $4,500.00 Water System Subtotall $97,972 Erosion Control Construction Erosion Control Plan & Sedimentation Control (per Item 32 106 includes monitorin record keepin , and cleanu L.S. 1 $4,000.00 $4,000.00 33 Grass Seeding SY 13,766 $0.36 $4,955.76 34 Headwall Protection EACH 4 $200.00 $800.00 35 Entrance/Exit EACH i $1500.00 $1,500.00 Erosion Control Subtotal $11,256 Construction Cost $485,877 1 of 2