Loading...
HomeMy WebLinkAboutWater ReportD Indian Lakes SubdivIsio Phase XVII i MCCLURE & BROWNE, ENGINEERING/SURVEYING, INC. 1008 Woodcreek Dr., Suite 103 College Station, Tx. 77845 (979) 693-3838 Engineer Reg. No. F-458 1314 10th Street, Suite 210 Huntsville, Tx. 77320 (936) 294-9749 Survey Reg. No. 101033-00 WATER SYSTEM ANALYSIS for INDIAN LAKES PHASE 17 General Information Anticipated land use: Residential Anticipated number of lots: 19 lots Notes on surrounding development: This development is located near the existing Phase 12 of Indian Lakes in South Brazos County. Water System Analysis Primary water supply line: Existing 8" line on Matoska Ridge Drive Software model: PIPE2000 (Kentucky Pipe Network Model) Average daily flow: 28.5 gpd (all lots combined) Estimated fire demand: 1,000 gpm (at Junction J-12) Pipe material: PVC (C909) Regulated1tems Desigmed j Requirement Notes Min. Pressure (psi) _ _1 88.59 ; 20(min) j Fire flow conditions (J-12) Max. Velocity (fps) 6.58 j 12 (max) i Fire flow conditions (P-14) Conclusion: The proposed water system exceeds the requirements of TCEQ and the City of College Station Applicable Exhibits. Exhibit A Schematic Water System Layout Exhibit B Static Flow Model Output Exhibit C Fire Flow Model Output Indian Lakes, Phase 17 MBESI #10620039 Exhibit B Static Flow Conditions K Y P I P E 5 * * + + * * + + * + --- * Pipe Network Modeling Software * Copyrighted by KYPIPE LLC * Version 5 - February 2010 * * Date & Time: Fri Sep 20 15:59:54 2013 Master File : f:\1062 - clarke & wyndham inc\0039 - indian lakes phase xvii\docs\water report\static.KYP\static.P2K S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N A M E R1 42 (ft) (in) COEFF. LOSS COEFF. ____________________ -- P-1 VP-2 J-1 7830.00 _---___------_-___----- 8.00 140.0000 0.00 P-2 J-1 J-7 2199.52 12.00 140.0000 0.00 ..._. P-3 J-2 J-3 3660.00 12.00 140.0000 0.00 P-4 VP-1 J-3 1690.00 12.00 140.0000 0.00 P-5 J-4 J-2 1590.00 8.00 140.0000 0.00 P-6 J-5 J-4 5614.00 6.00 140.0000 0.00 P-7 J-6 J-5 220.00 6.00 140.0000 0.00 P-8 J-3 J-6 3088.00 6.00 140.0000 0.00 P-9 J-7 J-2 4360.48 12.00 140.0000 0.00 P-10 J-7 J-8 3387.00 8.00 140.0000 0.00 P-11 J-8 J-9 621.00 6.00 140.0000 0.00 ...... P-12 J-8 J-10 356.00 6.00 140.0000 0.00 P-13 J-9 J-11 322.00 6.00 140.0000 0.00 P-14 J-3 J-12 635.00 8.00 140.0000 0.00 P-15 7-12 J-13 656.00 8.00 140.0000 0.00 P-16 7-12 J-19 66.16 8.00 140.0000 0.00 P-17 J-13 J-17 565.00 6.00 140.0000 0.00 P-16 J-13 J-14 807.00 8.00 140.0000 0.00 " P-19 J-14 J-15 182.00 4.00 125.0000 0.00 P-20 J-14 J-16 302.00 4.00 125.0000 0.00 P U M P/L O S S E L E M E N T D A T A THERE IS A DEVICE AT NODE VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) 219.23 0.00 180.00 1500.00 77.61 3000.00 THERE IS A DEVICE AT NODE HEAD FLOWRATE (ft) (gpm) 219.23 0.00 180.00 1500.00 77.61 3000.00 N O D E D A T A (8) 75.00 75.00 75.00 VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) EFFICIENCY (5) 75.00 75.00 75.00 NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE ---------------------------------------------- (gpm) (ft) (ft) J-1 0.00 267.00 J-2 0.00 278.00 J-3 0.00 263.00 J-4 0.00 266.00 J-5 15.00 247.00 J-6 0.00 246.00 J-7 0.00 285.00 J-8 0.00 294.00 J-9 0.00 292.00 J-10 6.00 296.00 J-il 6.00 294.00 J-12 4.50 253.00 J-13 7.50 250.00 J-14 4.50 242.00 J-15 6.00 240.00 J-16 4.50 252.00 J-17 4.50 240.00 J-19 0.00 251.00 VP-1 ---- 258.00 258.00 VP-2 ---- 285.00 285.00 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 5 MAXIMUM AND MINIMUM VELOCITIES = 5 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5 S Y S T E M C O N F I G U R A T I O N NUMBER OF PIPES ...................(p) = 20 NUMBER OF END NODES ...............(j) = 18 NUMBER OF PRIMARY LOOPS ...........(1) = 1 NUMBER OF SUPPLY NODES ............(f) = 2 NUMBER OF SUPPLY ZONES ............(z) = 1 Case: 0 RESULTS OBTAINED AFTER 20 TRIALS: ACCURACY = 0.00001 S I M U L A T I O N D E S C R I P T I O N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E 41 02 LOSS LOSS VELD. 1000 1000 ---------------------------------------------------------------------------_ (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) P-1 VP-2 J-1 58.50 0.65 0.00 0.37 0.08 0.08 P-2 J-1 J-7 58.50 0.03 0.00 0.17 0.01 0.01 P-3 J-2 J-3 39.02 0.02 0.00 0.11 0.01 0.01 P-4 VP-1 J-3 0.00 0.00 0.00 0.00 0.00 0.00 P-5 J-4 J-2 -7.48 0.00 0.00 0.05 0.00 0.00 P-6 J-5 J-4 -7.48 0.04 0.00 0.08 0.01 0.01 P-7 J-6 J-5 7.52 0.00 0.00 0.09 0.01 0.01 2-6 J-3 J-6 7.52 0.02 0.00 0.09 0.01 0.01 P-9 J-7 J-2 46.50 0.03 0.00 0.13 0.01 0.01 P-10 J-7 J-8 12.00 0.01 0.00 0.08 0.00 0.00 P-11 J-8 J-9 6.00 0.00 0.00 0.04 0.00 0.00 P-12 J-6 J-10 6.00 0.00 0.00 0.07 0.00 0.00 P-13 J-9 J-11 6.00 0.00 0.00 0.07 0.00 0.00 P-14 J-3 J-12 31.50 0.02 0.00 0.20 0.03 0.03 P-15 J-12 17-13 27.00 0.01 0.00 0.17 0.02 0.02 P-16 J-12 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-17 J-13 J-17 4.50 0.00 0.00 0.05 0.00 0.00 P-18 J-13 J-14 15.00 0.01 0.00 0.10 0.01 0.01 P-19 J-1e J-15 6.00 0.01 0.00 0.15 0.04 0.04 P-20 J-14 J-16 4.50 0.01 0.00 0.11 0.03 0.03 P U M P/L 0 S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL *PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) (%) (Hp) (S) (S) (ft) ----------------------------------------------------------------------------------------------- Device "VP-1" is closed VP-1 0.00 0.00 245.41 0.0 75.00 0. 0.0 0.0 ** ** 33.2 VP-2 56.50 0.00 219.13 219.1 75.00 0. 0.0 0.0 ** ** 33.2 N 0 D E R E S U L T S NODE NODE NAME TITLE ___________ J-1 J-2 J-3 J-4 J-5 J-6 J-7 EXTERNAL HYDRAULIC NODE PRESSURE NODE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) ------------------------------------------------ 0.00 503.48 287.00 216.48 93.61 0.00 503.43 278.00 225.43 97.68 0.00 503.41 263.00 240.41 104.18 0.00 503.42 266.00 237.42 102.88 15.00 503.38 247.00 256.38 111.10 0.00 503.38 246.00 257.38 111.53 0.00 503.46 265.00 218.46 94.67 J-8 0.00 503.44 294.00 209.44 90.76 J-9 0.00 503.44 292.00 211.44 91.63 J-10 6.00 503.44 296.00 207.44 69.89 J-11 6.00 503.44 294.00 209.44 90.76 J-12 4.50 503.39 253.00 250.39 108.50 J-13 7.50 503.38 250.00 253.38 109.80 J-14 4.50 503.37 242.00 261.37 113.26 J-15 6.00 503.36 240.00 263.36 114.12 J-16 4.50 503.36 252.00 251.36 108.92 J-17 4.50 503.38 240.00 263.38 114.13 J-19 0.00 503.39 251.00 252.39 109.37 VP-1 ---- 503.41 258.00 245.41 106.34 VP-2 ---- 504.13 285.00 219.13 94.96 M A X I M U M A N D M I N I M U M V A L U E S P R E S S U R E S JUNCTION MAXIMUM JUNCTION MINIMUM NUMBER PRESSURES NUMBER PRESSURES --------------------- (Psi) --------------------- (Psi) J-17 114.13 J-10 89.89 J-15 114.12 J-11 90.76 J-14 113.26 J-8 90.76 J-6 111.53 J-9 91.63 J-5 111.10 J-1 93.81 V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) (ft/s) P-1 --- 0.37 --------------------- P-11 0.04 P-14 0.20 P-5 0.05 P-15 0.17 P-17 0.05 P-2 0.17 P-12 0.07 P-19 0.15 P-13 0.07 H L+ M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 --------------------- (ft/ft) (ft/ft) P-1 0.06 -------------------__ P-11 0.00 P-19 0.04 P-5 0.00 P-14 0.03 P-17 0.00 P-20 0.03 P-10 0.00 P-15 0.02 P-12 0.00 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 --"'---------------- (ft/ft) ------------"'------ (ft/£t) P-1 0.08 P-11 0.00 P-19 0.04 P-5 0.00 P-14 0.03 P-17 0.00 P-20 0.03 P-10 0.00 P-15 0.02 P-12 0.00 S U M M A R Y 0 F I N F L O W S A N D O U T F L O W S W INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE ------------------------------------------ VP-2 58.50 NET SYSTEM INFLOW = 58.50 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 58.50 ***** HYDRAULIC ANALYSIS COMPLETED ***** Exhibit C Fire Flow Conditions * * * * * * * * * * K Y P I P E 5 * Pipe Network Modeling Software * Copyrighted by KYPIPE LLC * Version 5 - February 2010 * Date & Time: Fri Sep 20 16:20:36 2013 Master File : f:\1062 - clarke & wyndham inc\0039 - indian lakes phase xvii\dots\water report\fire.KYP\fire.P2K S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE P I P E NODE NAMES NAM E $1 $2 ______P- -1 VP 2 -- 17-1 P-2 J-1 J-7 P-3 J-2 J-3 P-4 VP-1 J-3 P-5 J-4 J-2 P-6 J-5 J-4 P-7 J-6 J-5 P-8 J-3 J-6 P-9 J-7 J-2 P-10 J-7 J-8 P-11 J-8 J-9 P-12 J-8 J-10 P-13 J-9 J-11 P-14 J-3 J-12 P-15 J-12 J-13 P-16 J-12 J-19 P-17 J-13 J-17 P-18 J-13 J-14 P-19 J-14 J-15 P-20 J-14 J-16 CV -CHECK VALVE LENGTH DIAMETER ROUGHNESS I (ft) (in) COEFF. LOST ------------------------------"'--- 7830.00 6.00 140.0000 2199.52 12.00 140.0000 3660.00 12.00 140.0000 1690.00 12.00 140.0000 1590.00 8.00 140.0000 5614.00 6.00 140.0000 220.00 6.00 140.0000 3088.00 6.00 140.0000 4360.48 12.00 140.0000 3387.00 6.00 140.0000 621.00 8.00 140.0000 356.00 6.00 140.0000 322.00 6.00 140.000C 635.00 8.00 140.000C 656.00 8.00 140.0000 66.16 8.00 140.0000 565.00 6.00 140.000C 807.00 8.00 140.000C 182.00 4.00 125.000C 302.00 4.00 125.000C IINOR COEFF. i 00 1.00 1.00 1.00 1.00 1.00 .00 i.00 1.00 1.00 1.00 I.00 1.00 1.00 I.00 ).00 i.00 1.00 i.00 1.00 P U M P/L 0 S S E L E M E N T D A T A THERE IS A DEVICE AT NODE VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE (£t) (g=m) 219.23 0.00 180.00 1500.00 77.61 3000.00 THERE IS A DEVICE AT NODE HEAD FLOWRATE (ft) (gpm) 219.23 0.00 160.00 1500.00 77.61 3000.00 N 0 D E D A T A EFFICIENCY (6) 75.00 75.00 75.00 VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) EFFICIENCY M 75.00 75.00 75.00 NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE __-------___ (gpm) _________________________________ (ft) (ft) J-1 0.00 287.00 J-2 0.00 278.00 J-3 0.00 263.00 J-4 0.00 266.00 J-5 15.00 247.00 J-6 0.00 246.00 J-7 0.00 285.00 J-8 0.00 294.00 J-9 0.00 292.00 J-10 6.00 296.00 J-11 6.00 294.00 J-12 1004.50 253.00 J-13 7.50 250.00 J-14 4.50 242.00 J-15 6.00 240.00 J-16 4.50 252.00 J-17 4.50 240.00 J-19 0.00 251.00 VP-1 ---- 258.00 258.00 VP-2 ---- 265.00 265.00 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 5 MAXIMUM AND MINIMUM VELOCITIES = 5 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5 S Y S T E M C O N F I G U P. A T I O N NUMBER OF PIPES =20 NUMBER OF END NODES ...............(j) = 18 NUMBER OF PRIMARY LOOPS = NUMBER OF SUPPLY NODES ............(f) = 2 NUMBER OF SUPPLY ZONES ............(z) = 1 ------ ___O ----------------------------------- _____________----------------------- Case: RESULTS OBTAINED AFTER 6 TRIALS: ACCURACY = 0.00007 S I M U L A T I O N D E S C R I P T I O N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELD. 1000 1000 ---_-----__ _---___ (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) -- P-1 VP-2 J-1 ------_-__ 442.13 27.51 0.00 2.82 3.51 ___-___--- 3.51 P-2 J-1 J-7 442.13 1.07 0.00 1.25 0.49 0.49 P-3 J-2 J-3 387.57 1.40 0.00 1.10 0.38 0.38 P-4 VP-1 J-3 616.37 1.52 0.00 1.75 0.90 0.90 P-5 J-4 J-2 -42.56 0.07 0.00 0.27 0.05 0.05 P-6 J-5 J-4 -42.56 1.05 0.00 0.48 0.19 0.19 P-7 J-6 J-5 -27.56 0.02 0.00 0.31 0.08 0.08 P-8 J-3 J-6 -27.56 0.26 0.00 0.31 0.08 0.08 P-9 J-7 J-2 430.13 2.02 0.00 1.22 0.46 0.46 -- P-10 J-7 J-8 12.00 0.01 0.00 0.08 0.00 0.00 P-11 J-8 J-9 6.00 0.00 0.00 0.04 0.00 0.00 .... P-12 J-8 J-10 6.00 0.00 0.00 0.07 0.00 0.00 P-13 J-9 J-11 6.00 0.00 0.00 0.07 0.00 0.00 P-14 J-3 J-12 1031.50 10.71 0.00 6.58 16.87 16.87 P-15 J-12 J-13 27.00 0.01 0.00 0.17 0.02 0.02 P-16 J-12 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-17 J-13 J-17 4.50 0.00 0.00 0.05 0.00 0.00 P-18 J-13 J-14 15.00 0.01 0.00 0.10 0.01 0.01 --- P-19 J-14 J-15 6.00 0.01 0.00 0.15 0.04 0.04 P-20 J-14 J-16 4.50 0.01 0.00 0.11 0.03 0.03 P U M P/L O S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH .-.. NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. ..._.. (gpm) (ft) (ft) (ft) (%) (Hp) (S) (S) (ft) ----------------------------------------------------------------------------------------------- VP-1 616.37 0.00 211.67 211.7 75.00 0. 0.0 0.0 ** ** 33.2 VP-2 442.13 0.00 215.15 215.1 75.00 0. 0.0 0.0 ** ** .-. 33.2 N O D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE " NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE -------------- (gpm) -------"----_------------------------------ (ft) (ft) (ft) (psi) ,..._ J-1 0.00 472.64 287.00 185.64 80.44 .. _. J-2 0.00 469.55 278.00 191.55 83.00 J-3 0.00 468.15 263.00 205.15 88.90 J-4 0.00 469.48 266.00 203.48 88.17 J-5 15.00 468.43 247.00 221.43 95.95 J-6 0.00 468.41 246.00 222.41 96.38 --- J-7 0.00 471.57 285.00 186.57 80.85 J-8 0.00 471.55 294.00 177.55 76.94 J-9 0.00 471.55 292.00 179.55 77.61 J-10 6.00 471.55 296.00 175.55 76.07 J-11 6.00 471.55 294.00 177.55 76.94 J-12 1004.50 457.44 253.00 204.44 68.59 J-13 7.50 457.43 250.00 207.43 89.88 J-14 4.50 457.42 242.00 215.42 93.35 J-15 6.00 457.41 240.00 217.41 94.21 J-16 4.50 457.41 252.00 205.41 89.01 J-17 4.50 457.43 240.00 217.43 94.22 J-19 0.00 457.44 251.00 206.44 89.46 VP-1 ---- 469.67 256.00 211.67 91.73 VP-2 ---- 500.15 285.00 215.15 93.23 M A X I M U M A N D M I N I M U M V A L U E S P R E S S U R E S JUNCTION MAXIMUM JUNCTION MINIMUM NUMBER PRESSURES NUMBER PRESSURES (psi) (psi) J-6 96.38 J-10 76.07 J-5 95.95 J-11 76.94 J-17 94.22 J-8 76.94 J-15 94.21 J-9 77.81 J-14 93.35 J-1 80.44 V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) (ft/s) P-14 6.58 P-11 0.04 2-1 2.82 P-17 0.05 P-4 1.75 P-12 0.07 P-2 1.25 P-13 0.07 P-9 1.22 P-10 0.08 H L + M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) ------- (ft/ft) P-14 16.87 ------------------- P-il 0.00 P-1 3.51 P-17 0.00 P-4 0.90 P-10 0.00 P-2 0.49 P-12 0.00 P-9 0.46 P-13 0.00 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 --------------------- (ft/ft) (ft/ft) P-14 16.87 P-11 _-----_--- 0.00 P-1 3.51 P-17 0.00 P-4 0.90 P-10 0.00 P-2 0.49 P-12 0.00 P-9 0.46 P-13 0.00 S U M M A R Y 0 F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE _.--__--____-------___ ___- VP-1 616.37 -- VP-2 aa2.13 NET SYSTEM INFLOW = 1058.50 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1058.50 ***** HYDRAULIC ANALYSIS COMPLETED *****