Loading...
HomeMy WebLinkAboutTIArMMcCLURE & BROWNE, ENGINEERING/SURVEYING, INC. 1008 Woodereek Dr., Suite 103 - College Station, Tx. 77845 - (979) 693-3838 Engineer Reg. No. F-458 1314 10th Street, Suite 210 • Huntsville, Tx. 77320 - (936) 294-9749 Survey Reg. No. 101033-00 April 3, 2013 Teresa Rogers Staff Planner City of College Station P.O. Box 9960 College Station, Texas 77842 Re: Traffic Impact Analysis for Bridgewood Subdivision and Barron Crossing MBESI No. 10530014 & 10530027 Dear Teresa: This letter is intended to provide information to you regarding the proposed traffic conditions for the above referenced developments between William D. Fitch Parkway (S.H. 40) and future W.S. Phillips Parkway just south of Barron Road in College Station. This property will be separated into three distinct sites that each have separate access to William D. Fitch Parkway and the future W.S. Phillips Parkway. Since each site will have separate access points onto William D. Fitch Parkway and the future W.S. Phillips Parkway, each site will be considered as an independent site. According to the City of College Station's Unified Development Ordinance Section 7.13, if a site generates less than 150 trips during the peak hour a traffic impact analysis is not warranted. The first site will be Bridgewood Subdivision, a proposed residential development. This area will be developed into single-family detached residential lots. The lots will occupy approximately 50.7 acres. According to the Trip Generation Report; 8th Edition, published by the Institute of Transportation Engineers, the highest average peak hour trip rate is 2.74 trips/acre and occurs during the week between 4:00 p.m. and 6:00 p.m. Therefore, this property will only generate 139 trips during the peak hour. Based on this information, I conclude that a traffic impact analysis is not warranted for the Bridgewood Subdivision. The second and third sites will be within the Barron Crossing subdivision. Site 1 will have a maximum buildable square footage of approximately 78,000 square feet. Site 2 will have a maximum buildable square footage of approximately 47,000 square feet. Both sites will be developed as suburban commercial sites. Suburban commercial is similar to A-P and C-3 zoning, which according to Table 2 — Trip Generation: Non -Residential Uses located in Section 7.13 of the UDO, has a the maximum peak hourly trip rate of 1.55 trips per ksf. Therefore, Site 1 and Site 2 will generate 121 and 74 trips during the peak hour, respectively. Based on this information, I conclude that a traffic impact analysis is not warranted for either Site 1 or Site 2 at this time. If you have any questions, or need additional information, please don't hesitate to contact me. Sincerely, J Dale Browne, Jr., P7CkFM President FA1053 - Randy French10014 - Bridgewood Phase Mocs\TIA Letter for RZ.odt