Loading...
HomeMy WebLinkAboutElectric Load & Sewer Supply Demand SummaryUri 11: 3a pra University Lutheran (LCMS) • Chapel c& Student Center • All Nations Christian Center • Lutheran Student Fellowship November 13, 2001 TO: Bridgette George FROM: Rev Larry Krueger 315 College Main College Station, TX 77840 Phone/Fax (979) 846-6687 E-mail: ulctamu@txcybeccom (7A■ilil0i111:i[OW67:\7:\ilk.`fibi/�176YiJ»4'�7] %\�171.YiJu1 /\71_�1 Attached to this memo, please find the summaries for the ELECTRICAL LOAD DEMAND and SEWER/SUPPLY DEMAND for the building expansion at University Lutheran Chapel, 315 College Main. Brazos Valley Engineering completed these calculations. The calculations are based upon the now completed drawings for our building expansion. Please forward these Demand Summaries to the appropriate individuals as necessary. Thank you for your assistance. Visit our website: www2.txcyber.com/—ulctamu Serving The Aggieland Campus Community University Lutheran (LCMS) • Chapel & Student Center 315 College Main X 77840 • All Nations Christian Center Phone/ station, 84 Phone/Fax (979) 846-6687-6687 • Lutheran Student Fellowship E-mail: ulctamu@txcyber.com November 13, 2001 ELECTRICAL LOAD DEMAND ESTIMATE for Building Expansion At University Lutheran Chapel 315 College Main. LOAD SUMMARY: NEW BUILDING , 1,150 SF LOAD (WATTS) GENERAL RECEPTACLE CONNECTED 2,700 LIGHTING CONNECTED 7,412 HVAC CONDENSING UNITSMEAT PUMPS 19,918 ELECTRIC HEAT W/AHU 0 MOTOR LOADS, <40HP 0 MOTOR LOADS, >40HP 0 COOKINGMEATING EQUI 0 WATER HEATERS 0 MISCELLANEOUS 0 EXISTING SERVICE 24,800 25% CONTINUOUS LOAD 1,853 25% LARGEST MOTOR 2,490 TOTAL DEMAND 59,173 120 240 VOLTS 1 PH 247 Visit our website: www2.txcyber.com/—ulctamu Serving The Aggieland Campus Community University Lutheran (LCMS) • Chapel & Student Center 315 College Main X 77840 • All Nations Christian Center College Station, 84 Phone/Fax (979) 846-6687-6687 • Lutheran Student Fellowship E-mail: ulctamu@txcyber.com November 13, 2001 SEWER/SUPPLY DEMAND ESTIMATE for Building Expansion At University Lutheran Chapel 315 College Main. Y DESCRIPTION FU I MIN I MAX I AVG NEW SANITARY SEWER 33 10 GPD 11500 GP 30 GPD NEW DOMESTIC WATER 38 10 GPM 2fi.3 GPM <1 GPM NOTE 1. PLUMBING FIXTURE UNIT DEMAND INCREASE, NEGUGBLE SEE FIXTURE COUNT ON SITE ' - a js 3 SEWER/ SUPPLY DEMAND DETAIL SCALE: NTS Visit our website: www2.txcyber.com/ulctamu Serving The Aggieland Campus Community