Loading...
HomeMy WebLinkAboutStaff CommentsENGINEERING REVIEW COMMENTS No. 1 Site: University Lutheran Chapel Reviewed: Drainage Report 1. Refer to Figure III-1 for the correct 100-year rainfall intensity. 2. Refer to Figure III-2 for the correct triangular hydrograph calculations. The base of the hydrograph is estimated as 3'Tc. Resubmit drainage report with corrections. Make amendments to the designed pond and/or outfall if necessary. Reviewed by: Spencer Thompson Date: July 26, 2000 ENGINEERING REVIEW COMMENTS No. 1 Project: Traditions (Dorm) Job Trailer, Shack and Parking Lot at University Lutheran Church 1. In calculating stormwater runoff, please use a minimum "time of concentration", Tc, as 10 minutes. 2. In calculating stormwater runoff, please use a "c" value more representative of the base material to be used in place of the present sod. 3. It is our understanding that the last sentence in your introduction is incorrect. This area, where the base material is being applied, will not be re -vegetated. It will be paved for the proposed Lutheran parking lot. Reviewed by: Spencer Thompson Date: 6-Jul-00