Loading...
HomeMy WebLinkAboutDevelopment Permit♦ /J\� DEVELOPMENT PERMIT PERMIT NO. 13-154 crrvoFCOLLEGE srnnuN FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Common Area Sidewalk Dalton Ln Castlegate II Section 202 DRAINAGE BASIN: Common Area A & B Alum Creek DATE OF ISSUE: 9/16/2013 VALID FOR 24 MONTHS OWNER: CONTRACTOR: 3-D Development 4490 Castlegate Dr College Station, Tx 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: *** TCEQ PHASE II RULES IN EFFECT*** Contractor Signature the Contractor, hereby agree to comply with all conditions herein. Date Phone number YE -mail I hereby grant this permit for development. Contact I� rn 17� , the Public Works Inspector assigned to this p oiect 24 hours prior to beginning construction for scheduling required Inspections. q//4 /7 2 City Engineer/Represents' a Date r T ♦�� DEVELOPMENT PERMIT C PERMIT NO.13-154 CI IN CoucccSTATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA N."'rueU 1_ RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Common Area Sidewalk Dalton Ln Castlegate II Section 202 DRAINAGE BASIN: Common Area A & B Alum Creek DATE OF ISSUE: 9/16/2013 VALID FOR 24 MONTHS OWNER: CONTRACTOR: 3-D Development 4490 Castlegate Dr College Station, Tx 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 6. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: *** TCEQ.PHA E II RULES IN EFFECT ***5j1hwal k eon_ w4.13LA, U ina g� 5e6 IPIp 13-1vo 1 1 s' n I, the Contractor, hereby agree to comply with all conditions herein. Phone number Z 17- Date E-mail I hereby grant this permit for development. Contact L reLd ko ' , the Public Works Inspector assigned t this project 24 hours prior to beginning construction for scheduling required Inspections. City Engineer/Representative Date T /J\1 DEVELOPMENT PERMIT PERMIT NO. 13-154 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA crry � u.rIgm 'f IuN Jq ft[ RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Common Area Sidewalk Dalton Ln Castlegate II Section 202 DRAINAGE BASIN: Common Area A & B Alum Creek DATE OF ISSUE: 9/16/2013 VALID FOR 24 MONTHS OWNER: CONTRACTOR: 3-D Development 4490 Castlegate Dr College Station, Tx 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. SpecialConditions: *** TCEO,PNA E II RULES IN EFFECT 4-Jk con_-* ov)4. BVAin�aFIP3-1(P I, A/ ►aLM the Contractor, hereby agree to comply with all conditions herein. Arab ,Lz�l rs/ J 17-17 Contractor Signature Date IV Phone number E-mail I hereby grant this permit for development. Contact LS rq-d % the Public Works Inspector assigned Y this project 24 hours prior to beginning construction for scheduling required Inspections. ,1__ 9 //!a City Engineer/Repp entative Date %— DEVELOPMENT PERMIT PERMIT NO. DP 12-105 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA crrr or couecesr°"ON RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Castlegate II Section 202 Terminus of Norwich Drive DRAINAGE BASIN: Peach Creek DATE OF ISSUE: 7/12/2012 VALID FOR 24 MONTHS OWNER: CONTRACTOR: 3-D Development, LLC 4490 Castlegate Drive College Station, Texas 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. Development shall not be used or occupied until Certificate of Occupancy is issued. 4. The permit will expire if no significant work is progressing within 24 months of issuance. 5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. 6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy. 10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 11. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 12. Special Conditions: *** TCEQ PHASE II RULES IN EFFECT *** I, the Contractor, hereby agree to comply with all conditions herein. Contractor Date I hereby grant this permit for development. Contact I S r,1.2 0 1"1r, , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. City Engineer/Representati Date