August 28, 2013
Joe Schultz
Schultz Engineering, LLC
2730 Longmire, Suite A
College Station, Texas 77845
RE: REQUEST FOR ENCROACHMENT ACROSS THE ENDEVCO IOLA LATERAL PIPELINE
(SEMINOLE; LID #14; TRACT #BR-11; DB #6410)
LETTER OF NO OBJECTION — BRAZOS COUNTY, TEXAS
Dear Mr. Mr. Schultz:
Pursuant to your request on behalf of CastleGate II Subdivision (CG (l)'s proposed construction of an eight feet
(8') wide concrete sidewalk and a four -foot (4') high landscaping berm as per plans from Schultz Engineering,
LLC dated July 2013 (collectively referred to as ENCROACHMENT) crossing the Endeveo Iola Lateral pipeline,
please be advised that Seminole Pipeline Company as represented by its operator Enterprise Products Operating
LLC (COMPANY) hereby has no objection to the proposed ENCROACHMENT in consideration of CG II'S
agreement to the following requirements:
A minimum of 48 hours (excluding weekends and holidays) prior to commencing construction activities
relating to the Encroachment within twenty-five feet (25') of COMPANY'S pipeline, CG II shall notify, or
shall require and be responsible for its contractors, agents, and subcontractors to notify local One -Call by
dialing 811, as well as COMPANY'S Operations representative Vince Tabone at (713) 823.2120, so that
Mr. Tabone or his designated representative can be present during any approved construction
operations. The following language must be conspicuously displayed on all drawings depicting the
pipeline:
WARNINGI HIGH PRESSURE PIPELINE
Excavation and/or Construction Prohibited without Prior Written Permission From
Enterprise Products Operating LLC
2. CG II'S crossing(s) will be as close to ninety (90) degrees as possible to COMPANY'S pipeline, but not
less than forty-five (45) degrees. Approved construction within ten feet (10') of COMPANY'S pipeline and
facilities require physical verification of pipeline location prior to commencement of any work.
3. CG II'S concrete sidewalk will be constructed in such a way that a minimum vertical separation of three
feet (T) is maintained between the top of COMPANY'S pipeline and the top of the paved surface.
4. CG II'S landscape berm will be constructed in such a way that a maximum vertical separation of eight feet
(8') is maintained between the top of COMPANY'S pipeline and the finished grade. The COMPANY'S
representative will measure the finished grade of cover to ensure the maximum height is not exceeded.
5. CG II will not move construction equipment across COMPANY'S pipeline and/or rights -of -way without the
consent of COMPANY'S representative. A 72-hour notice is required before crossing the pipeline
with heavy equipment. Wherever CG II is approved to cross COMPANY'S pipeline and/or rights -of -way
with heavy equipment, CG II will place matting or other suitable material over the pipeline as determined
by COMPANY'S representative in the field at a perpendicular angle. All parallel movement of heavy
equipment shall maintain a safe distance of five feet (5') horizontal separation between COMPANY'S
pipeline and equipment. No large vibratory compaction equipment is allowed within the COMPANY'S
right-of-way, only walk -behind vibratory roller/compactor is allowed when working over COMPANY'S
Enterprise
Products
September 28, 2012
Joe Schultz
Schultz Engineering, LLC
2730 Longmire, Suite A
College Station, TX 77845
ENTERPRISE PRODUCTS PARTNERS L.P. ENTERPRISE PRODUCTS OPERATING LLC
ENTERPRISE PRODUCTS HOLDINGS LLC
(General Partner)
RE: REQUEST FOR ENCROACHMENT ACROSS THE ENDEVCO IOLA LATERAL
(SEMINOLE; LID #14; TRACT #BR-11; DB #5405)
LETTER OF NO OBJECTION — BRAZOS COUNTY, TEXAS
Dear Mr. Schultz:
Pursuant to your request on behalf of 3-13 Development (3-D)'s proposed construction of the Casllegate II
Subdivision project (referred to as ENCROACHMENT and described in detail below) crossing the
Endevco Iola Lateral pipeline, please be advised that Seminole Pipeline Company, LLC represented by
its Operator Enterprise Products Operating LLC (COMPANY) hereby has no objection to the proposed
ENCROACHMENT in consideration of ENTITY'S agreement to the following requirements:
1. ENTITY'S aforementioned Castlegate II Subdivision project as per plans from August 30, 2012
and received updated plans September 27, 2012 that will consist of two (2) twenty foot (20') wide
lanes separated by a six Inch (6") raised curb median, one (1) four Inch (4") thick by five feet (5')
wide concrete sidewalk and one (1) four inch (4") PVC drain pipe.
2. A minimum of 48 hours (excluding weekends and holidays) prior to commencing construction
activities relating to the Encroachment within twenty-five feet (25') of COMPANY'S pipeline, 3-13
shall notify, or shall require and be responsible for its contractors, agents, and subcontractors to
notify local One -Call by dialing 811, as well as COMPANY'S Operations representative Mark
Winford at (979) 830-5842, so that Mr. Winford or his designated representative can be present
during any approved construction operations. The following language must be conspicuously
displayed on all drawings depicting the pipeline:
WARNINGI HIGH PRESSURE PIPELINE
Excavation and/or Construction Prohibited without Prior Written Permission From
Enterprise Products Operating LLC
3. 3-D'S crossing(s) will be as close to ninety (90) degrees as possible to COMPANY'S pipeline.
COMPANY will require physical verification of pipeline location prior to commencement of any
work including open cut construction.
4. 3-D will place warning tape in accordance with American Public Works Association (APWA)
Uniform Color Code, shall be placed above the foreign utility, twelve inch (12") below the ground
and shall extend at least twenty feet (20') in such a manner that it would be unearthed before
damage could result to the pipeline.
5. 3-D'S aforementioned concrete road and concrete sidewalk crossing(s) will be Installed in such a
way that a minimum vertical separation of four feet (4') is maintained between the top of
COMPANY'S pipeline and the top of the paved surface(s).
P.O. BOX 4324 9420 WEST SAM HOUSTON PARKWAY NORTH
HOUSTON, TEXAS 77210-4324 HOUSTON. TEXAS 77064-6317
713.381.6500 w .enlerpriseproductsxom
6. 3-D will install the aforementioned PVC drain pipe across and over COMPANY'S pipeline In such
a way that a minimum vertical separation of twenty-four inches (24") between the top of
COMPANY'S pipeline and the bottom of 3-D'S drain pipe Is maintained.
3-D will not move construction equipment across COMPANY'S pipeline and/or rights -of -way
without the consent of COMPANY'S representative. COMPANY will require a minimum of 72
hours notice prior to crossing COMPANY'S pipeline with heavy equipment. Wherever 3-D is
approved to cross COMPANY'S pipeline and/or rights -of -way with heavy equipment, 3-D will
place matting or other suitable material over the pipeline as determined by COMPANY'S
representative in the field. No large vibratory compaction equipment is allowed within the
COMPANY'S right-of-way, only walk -behind vibratory roller/compactor is allowed when working
over COMPANY'S pipeline. 3-D will maintain a minimum of four feet (4') of cover over the top of
the COMPANY'S pipeline at locations where construction or maintenance activities will take place
over the pipeline.
8. 3-D may place excavated material inside COMPANY'S rights -of -way, but may not place such
material over COMPANY'S pipeline unless approved by COMPANY'S representative. No
equipment will be allowed to work over COMPANY'S pipeline unless approved by COMPANY'S
representative. COMPANY requires hand excavation to be performed within elghteen-inches
(18") plus half the diameter of COMPANY'S pipeline; however, at no point should mechanical
excavation be performed less than two feet (2') from COMPANY'S pipeline. All mechanical
digging equipment must have the teeth removed or barred with a plate welded across the teeth.
9. 3-D will not place large landscaping, including, but not limited to, trees and large shrubs with a
mature untrimmed height greater than eighteen inches (18") on COMPANY'S rights -of -way. No
light or utility poles, fences, buildings, houses, barns, garages, patios, swimming pools, reinforced
concrete slabs, or other permanent structures will be permitted on COMPANY'S rights -of -way.
10. Any and all use of COMPANY'S rights -of -way for temporary workspace and any and all crossings
of the subject pipeline must be approved by COMPANY'S representative in the field, provided,
however, that such approval shall not be unreasonably withheld. 3-D agrees to clean up and
repair all damages to COMPANY'S rights -of -way resulting from the work on or across
COMPANY'S rights -of -way. Any and all damage repairs and cleanup of COMPANY'S rights -of -
way will be subject to COMPANY'S acceptance.
11. 3-D may place and maintain utility markers on either edge of COMPANY'S pipeline rights -of -way
unless said markers interfere with landowner's or tenant's land use.
12, Within 120 days of the completion of the Encroachment across COMPANY'S rights -of -way, 3-D
will provide to COMPANY at the above address a reproducible as -built drawing of the crossing(s),
which shall include a distance of twenty-five feet (25') on each side of said crossing($) along with
depiction of elevations.
13. The existence of the Encroachment does not constitute a waiver of COMPANY'S express rights
under the COMPANY'S grant of easement or any other rights which may be implied by law or
equity.
Should you have any questions, please call me at (281) 887-3311 or contact me via e-mail at
kecham bers@eprod. com.
Regard,
4�_" �.—
Kasy E. Chambers
Encroachment Analyst
cc: Paul Lair
Rob Koenig
Vince Tabone
Jonathan Reyes
Ed Draus
Chris Morgan