HomeMy WebLinkAboutStaff Report(*0rq"
Crry OF COLLEGE STATION
PRELIMINARY PLAN
for
Pebble Creek Ph 7C & 7D
13-00900103
SCALE: 134 lots on 84.4 acres
LOCATION: 1320 Royal Adelade Loop, generally located east of Pebble Creek
Parkway and south of Pebble Creek Phases 7A & 7B
ZONING: R-1 Single -Family Residential
APPLICANT: Davis Young, Pebble Creek Development
PROJECT MANAGER: Teresa Rogers,S taff Planner
trogers@cstx.gov
PROJECT OVERVIEW: This request is for a Preliminary Plan of 134 lots on 84.4 acres. A
Master Preliminary Plan was approved for Pebble Creek
Development in August 1996 and the Preliminary Platfo r Phase 7
was approved in 1998. At that time, the Planning & Zoning
Commission allowed the delay of construction for Pebble Creek
Parkway until Phase 7C was developed. That Preliminary Plat
has since expired, requiring the applicant to resubmit a
Preliminary Plan application. Phases 7C & 7D include all of the
land that was previously proposed as Phase 7C. A portion of
Pebble Creek Parkway will be constructed with Phase 7D. Phases
7A, 7-131, and 7-132 were final platted in August 1999 and January
2003, January 2005 respectively.
RECOMMENDATION: Staff recommends approval of the Preliminary Plan.
Planning & Zoning Commission Pagel of 4
September5, 2013
Planning & Zoning Commission _ Page 2 of 4
September 5, 2013
DEVELOPMENT HISTORY
Annexation:
Zoning:
Site development:
COMMENTS
October 1983 and December 1994
A-O Agricultural Open (upon annexation) R-1 Single -Family
Residential (2004)
vacant
Water:
The subject property will be served by City of College Station.
There are existing 8 inch water mains located adjacent to the site.
Public waterlines will be required to be extended through the site
in accordance with the B/CS Unified Design Guidelines with
platting.
Sewer:
The subject property will be served by City of College Station.
There is an existing 16 inch sanitary sewer line adjacent to the site
which will provide service to the site. Public sanitary sewer lines
will be required to be extended through the site in accordance with
the B/CS Unified Design Guidelines with platting.
Off -site Easements:
No off -site easements are being proposed at this time.
Drainage:
The site is located within the Alum Creek watershed. The
property is bordered to the north by Alum Creek Tributary 3 and
to the south by Alum Creek. Development of the subject tract will
be required to meet the City's Storm Water Design Guidelines.
Flood Plain:
A portion of this property is located in FEMA designated floodplain
per panel 48041 C0350E.
Greenways:
No greenway dedication is required or proposed.
Pedestrian Connectivity:
A 10-foot multi -use path is being proposed adjacent to Pebble
Creek Parkway. The multi -use path will be located within
dedicated city parkland. In addition, sidewalks will be constructed
along both sides of all proposed local streets.
Bicycle Connectivity:
See comment for pedestrian connectivity.
Streets:
Phases 7C & 7D will have access to the future extension of
Pebble Creek Parkway, a major collector. In addition, there will be
access to Royal Adelade Drive, a local street, which will be
extended from Phase 7B and conned to St. Andrews Drive.
Oversize Request: A 12 inch water main will be required to be extended through the
property as shown in the City's Master Utility Plan.
Parkland Dedication Fees: Parkland dedication fees have already been dedicated with
previous development of the Pebble Creek Subdivision.
Planning & Zoning Commission Page 3 of 4
September 5, 2013
Impact Fees: N/A
REVIEW CRITERIA
1. Compliance with Comprehensive Plan and Unified Development Ordinance: The
subject property is designated Restricted Suburban on the Comprehensive Plan Future
Land Use and Character Map. The proposed subdivision lots average approximately
14,000 square feet, which is consistent with this designation.) n addition, the applicant is
proposing a multi -use path adjacent to Pebble Creek Parkway, consistent with the Bicycle,
Pedestrian, and Greenways Master Plan.
2. Compliance with Subdivision Regulations: The proposed Preliminary Plan is in
compliance with the Subdivision Regulations contained in the Unified Development
Ordinance.
STAFF RECOMMENDATION
Staff recommends approval of the Preliminary Plan.
SUPPORTING MATERIALS
1. Application
2. Copy of Preliminary Plan
Planning & Zoning Commission Page 4 of 4
September 5, 2013
STAFF REPORT
Item: Consideration of a Preliminary Plat of Pebble Creek Phase 7 containing 174 acres and 305
single family lots, south of the existing subdivision and including the extension of Pebble Creek
Parkway. (98-333)
Applicant: The Wallace Group, Inc for Pebble Creek Development, Co.
Item Summary: The Land Use Plan shows the area as medium density single family with a
density range of 3 to 6 dwelling units per acre. The plan is for 305 single family lots to be
developed over 3 phases. The gross density will be 1.7 dwelling units per acre and the net density
(excluding rights -of -way) will be 2.7 dwelling units per acre. The development will extend Pebble
Creek Parkway as a major residential collector to the south and is consistent with the Thoroughfare
Plan. Royal Adelade Drive, a residential collector street, will be looped through the subdivision
providing two access points to the subdivision from Pebble Creek Parkway. Phase 7A and 7B will
be constructed as a 160 lot single access subdivision. At the tin19 Phrase 7C is developed, Pebble
Creek Parkway will be extended and provide another point of access.
The subdivision is bounded to the north by Pebble Creek Golf Course, to the east and southeast by
Lick Creek Park, and to the southwest by undeveloped future phases of Pebble Creek Subdivisions.
The extension of Pebble Creek Parkway will provide another point of access to the existing Lick
Creek Park. The Parks and Recreation Department is proposing to extend the bike trail in Pebble
Creek Parkway (see item background) through the Lick Creek Park between this development and
the creek south of this development.
Item Background: The subdivision is in general conformance with the revised Master
Preliminary Plan approved on August 6, 1996, by the Planning and Zoning Commission.
Parldand dedication requirements for this and previous sections of the development was
accomplished by dedicating an approximate 170 feet wide strip along Pebble Creek Parkway. As
part of the development of early phases of Pebble Creek, the developer was required to construct a
bike path within a portion of this area. This bike path is intended to connect Lick Creek Park with
the linear greenbelt that runs north toward Carter Creek. The bike path north of this section and to
the south of Murfield Court was built and subsequently removed by the applicant. Staff previously
contacted the developer and informed them of the need to re -construct and extend the bike path at
the time the next phase was proposed. A norther portion of this city owned park land has been
closed off to public access by the Pebble Creek golf course development with signs stating "private
property."
Budgetary & Financial Summary: There is no oversize participation requested at this time.
Staff Recommendations: Staff recommends approval with the conditions listed below as well as
conditions underlined in this report.
• The property is re -zoned to R-I
• The Phasing Line separating Phase 7A and 7B be extended between Lot I and 2 of Block 41.
o:\group\deve_ser\stfrpt\98-333.doc
• The Phasing Line separating Phase 7B and 7C be extended to center on the lot lines
-- • The inclusion of Pebble Creek Parkway and associated hike and bike trail in Phase 7C.
Related Advisory Board Recommendations: N/A
Commission Action Options:
The Commission acts as a recommending body on the question of preliminary plats pending an
ordinance change directed by Council giving sole authority for plat approval to the Commission.
The options regarding the plat are approval as submitted, approval with conditions, or denial.
Defer action or table only at applicant's request.
Supporting Materials:
1. Location Map
2. Application
3. htfrastructure and Facilities Information
4. Notification Information
5. Copy of Preliminary Plat
o:\group\deve_ser\stfrpt\98-333.doc
Water: A 12 inch trunk line will be extended through the subdivision within the Pebble
Creek Parkway right-of-way as part of the development. 8 and 6 inch mains will be
constructed within the subdivision to the service the individual lots.
Sewer: 6 inch service lines will be constructed within the subdivision and will connect to
the existing 16 and 18 inch trunk lines adjacent to the subdivision.
Streets: plus plan shows the extension of Pebble Creek Parl quay as _ a north - south
r _..
maj9rcollector and is consistent vyith the Thoroughfare Plan. The developer w7I also
construct five"tbru and seventeen cul-de-sac streets. The streets located in phases Band
C have not been named as required by the Subdivision Regulations. The applicant
should name these streets at this time. The intersection of Royal Adelade and a cross
street with a cul-de-sac is slightly off set, The re -alignment of this intersection should
be investigated. The applicant has agree to this request at the time of final platting of
Phase 7B.
Off -site Easements: Not applicable
Sidewalks: Will be provided on both sides of all collectors and one side of all residential
streets. The Commission has the discretion to require sidewalks on cul-de-sacs if
"needed to provide through pedestrian access." With several of these cul-de-sacs
backing up to Lick Creek Park, the Commission may desire to exercise this discretion.
Drainage: The applicant is proposing to use enclosed stone sewers systems to convey
the stormwater runoff. As currently proposed there are 13 locations at which stormwater
is discharged across the park property. To minimize impacts to the parks and
comply with city Drainage Policies, these systems should be consolidated and piped
to the center line of the creeks . A median with an open channel is proposed for one
street. The channel should be enclosed to minimize maintenance. In discussions with
the applicant , their only reason for having the median was to allow open channel
drake. Given that they will have to enclose the channel, they would like to delete the
median.
Flood Plain: The subdivision is located in the fork of Lick Creek and Alum Creeks. A
portion of 98 lots are located within the flood plains of these creeks and minor
tributaries. The applicant is proposing to fill several lots to provide a buildable area on
the lots. The fell must he in compliance with the Drainae Policies and permitting
must be done prior to final n1at:aaproval. Drainage easements are proposed for all
Oversize request: See Budgetary and Financial Summary Section.
Parkland Dedication: Previously dedicated with earlier phases of Pebble Creek.
o:\group\deve_serlsffrpt\98-333.doc
The subdivision is located adjacent to Lick Creek Park. Because of this proximity to the
park, it maybe desirable to have at least one internal access point between the park and
subdivision. In discussions with the Parks Director, the has stated that he did not have a
concern if we did not have access from 1 or 2 points since it is not a neighborhood park.
This may be an item the Commission would desire to discuss.
Impact Fees: Not applicable
NOTIFICATION:
Legal Notice Publication(s): Not applicable
Advertised Commission Hearing Dates(s): Not applicable
Advertised Council Hearing Dates: Not applicable
Number of Notices Mailed to Property Owners Within 200': Not applicable
Response Received: Not applicable
o:\groupldeve_ser\st&pt\98-333.doc
I
The signs may vary from regulations. t yl lTJ\ J
The Commissioners were satisfied with the overall plan and were in favor of the trail systems
throughout the neighborhood.
AGENDA ITEM NO. 5: Consideration of a Master Preliminary Plat of 47 acres in the
Steeplechase Subdivision, Phases 1, 2, & 3, located along the east side of Wellborn Road and
including the extension of Navarro and West Ridge; and consideration of a Final Plat of Phase 1.
(98-332 & 98-243)
Senior Planner McCully presented the staff report. She explained that the preliminary plat shows the
portions of the Master Plan that have already been approved for rezoning to R-2 Duplex, C-1 General
Commercial, and C-N Neighborhood Commercial. The plat shows the development to occur in three
phases. The Final Plat of Phase I includes the eastern third of the duplexes, the park, and extensions of
Navarro and West Ridge at each end of the duplex blocks. Staff recommended approval of both the
Preliminary Plat and Final Plat as submitted.
Mr. Karl Vargo, 2902 Cortez Court, asked if the owner had already sold the land to the developers and
if an environmental report had been done. Mr. Mike McClure, Project Engineer, said that the report
had been completed. Staff did not address Mr. Vargo's concerns due to the fad that they were not city
requirements.
Commissioner Rife moved to approve both the Preliminary Plat and Final Plat as submitted.
Commissioner Parker seconded the motion, which passed (6-0). Commissioner Garner abstained from
this item.
AGENDA ITEM NO. 6: Consideration of a Preliminary Plat of Pebble Creek Phase 7 containing
174 acres and 305 single family lots, south of the existing subdivision and including the extension
of Pebble Creek Parkway. (98-333)
Assistant City Engineer Morgan presented the staff report. She explained that the Land Use Plan shows
the area as medium density single family with a density range of 3 to 6 dwelling units per acre. The plan
is for 305 single family lots to be developed over 3 phases. The extension of Pebble Creek Parkway as
a major residential collector to the south is consistent with the Thoroughfare Plan. This extension will
provide another point of access to the existing Lick Creek Park. The Parks and Recreation department
is proposing to extend the bike trail in Pebble Creek Parkway through the Lick Creek Park between this
development and the creek south of this development.
Staff recommended approval with the following conditions:
• Rezone the property to an appropriate residential classification.
• Clarify the phase line between Phases 7A and 7B and between 7B and 7C.
• Include Pebble Creek Parkway and associated bike and bike trail in Phase 7C.
• Name streets.
• Investigate realignment of the intersection of Royal Adelade and a cross street with the Final Plat for
Phase 7B.
• Drainage systems should be consolidated and piped to the center line of the creeks.
P&Zmlnutes December 3, 1998 Page 4oj5
• The Channel should be enclosed to minimize maintenance.
• Provide access to Lick Creek Park through Subdivision: (Discretionary)
,Mr. Jed Walker, Project Engineer, explained that he did not want the plat to be held up contingent upon
providing access to Lick Creek Park, although he would be willing to discuss this at a time closer to the
platting process. They have concern with how to develop this access and would like this discussed
finther prior to cormnitment.
Commissioner Kaiser expressed his concern for the lots along the floodplain. Development is not
allowed within the floodplain, he felt that property owners would build fences along the property lines
which would be a violation.
Ms. Morgan explained that the property owners would be able to build fences along the floodplain line
but not the property line. Mr. Walker said that they could add a restriction in the deed restrictions to
address fences in the floodplain.
Commissioner Kaiser moved to table this request until applicant can work with staff to resolve some of
the issues and conditions expressed by staff. This item could not be tabled.
Commissioner Rife moved to approve the Preliminary Plat with all staff comments and the condition to
work wrt'7i staff to resolve problems with providing access to Lick Creek Park, Commissioner Mooney
seconded the motion which passed unopposed (7-0).
AGENDA ITEM NO. 6: Other Business.
There was no other business.
AGENDA ITEM NO.7: Adjourn.
Commissioner Parker moved to adjourn the meeting of the Planning and Zoning Commission.
Commissioner Maloney seconded the motion which passed unopposed (7-0)