HomeMy WebLinkAboutFire Flow AnalysisrMMcCLURE & BROWNE, ENGINEERING/SURVEYING, INC. 1008 Woodcreek Dr., Suite 103 -College Station, Tx. 77845 (979)693-3838 Engineer Reg. No. F-458 1314 101h Street. Suite 210 • Huntsville, Tx. 77320.(936) 294-9749 Survey Reg, No. 101033-00 February 27, 2013 Erika Bridges, PE City of College Station Dear Erika, The attached exhibits are updates to the Fire Flow Analysis for the Falcon Point Subdivision on Dartmouth Drive in College Station. During the design of the site plan for this project it became necessary to install a fire hydrant on the 8" line that runs along the south border of the property. This analysis shows how the existing and proposed water lines perform during a fire flow event. According to Exhibit C, all pipes meet the velocity and pressure requirements of the City of College Station. Therefore we determine that the addition of the proposed fire hydrant will have no adverse impacts on the water infrastructure in the area. If you have any questions, please do not hesitate to contact me. Sincerely, Jeff Robertson Vice President -Engineering EXHIBIT B STATIC FLOW * * * * * * * * * * K Y P I P E 5 * * Pipe Network Modeling Software * * Copyrighted by KYPIPE LLC * Version 5 - February 2010 * Date & Time: Wed Feb 27 16:39:28 2013 Master File : f:\1062 - clarke & wyndham inc\0031 - holleman - dartmouth plat\docs\10620031-stat.KYP\10620031-stat.P2K S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N A M E #1 #2 (ft) (in) COEFF. LOSS COEFF. ------------------------------------------------------------------------------- P-1 VP-1 J-5 75.00 6.00 125.0000 0.00 P-2 J-3 J-1 100.00 8.00 125.0000 0.00 P-3 J-4 J-6 463.07 8.00 125.0000 0.00 P-4 J-2 VP-2 15.00 6.00 125.0000 0.00 P-5 J-1 J-2 437.00 8.00 125.0000 0.00 P-6 J-5 J-4 137.00 8.00 125.0000 0.00 P-7 J-6 J-3 252.93 8.00 125.0000 0.00 P U M P/L 0 S S E L E M E N T D A T A THERE IS A DEVICE AT NODE VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) M 258.46 0.00 75.00 235.38 1455.00 75.00 175.15 2910.00 75.00 THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (8) 249.23 0.00 75.00 230.77 1500.00 75.00 182.58 3000.00 75.00 N 0 D E D A T A NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) -------------------------------------------------------------- J-1 0.00 271.00 J-2 0.00 272.00 J-3 26.00 271.00 J-4 52.00 269.50 J-5 0.00 269.50 J-6 26.00 271.00 VP-1 ---- 270.00 270.00 VP-2 ---- 271.00 271.00 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 4 MAXIMUM AND MINIMUM VELOCITIES = 4 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 4 S Y S T E M C O N F I G U R A T I O N NUMBER OF PIPES ...................(p) = 7 NUMBER OF END NODES ...............(j) = 6 NUMBER OF PRIMARY LOOPS ...........(1) = 0 NUMBER OF SUPPLY NODES ............(f) = 2 NUMBER OF SUPPLY ZONES ............(z) = 1 ______________________________ Case: 0 RESULTS OBTAINED AFTER 19 TRIALS: ACCURACY = 0.00000 S I M U L A T I O N D E S C R I P T I O N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE P I P E NODE NUMBERS N A M E #1 #2 (ft/ft) ---------------------------------- P-1 VP-1 J-5 P-2 J-3 J-1 P-3 J-4 J-6 P-4 J-2 VP-2 P-5 J-1 J-2 P-6 J-5 J-4 P-7 J-6 J-3 CV -CHECK VALVE FLOWRATE HEAD MINOR LINE HL+ML/ HL/ LOSS LOSS VELD. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) -------------------------------------------------- 104.00 0.09 0.00 1.18 1.21 1.21 0.00 0.00 0.00 0.00 0.00 0.00 52.00 0.04 0.00 0.33 0.08 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 104.00 0.04 0.00 0.66 0.30 0.30 26.00 0.01 0.00 0.17 0.02 0.02 P U M P/L O S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL *PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (£t) (8) (Hp) ($) ($) (ft) --------------------------------------------------------------------------------------- ----------------- VP-1 104.00 0.00 258.29 258.3 75.00 0. 0.0 0.0 ** * 33.2 Device "VP-2" is closed VP-2 0.00 0.00 257.11 0.0 75.00 0. 0.0 0.0 ** ** 33.2 N O D E R E S U L T S NODE NODE NAME TITLE J-1 J-2 J-3 J-4 J-5 J-6 VP-1 VP-2 EXTERNAL HYDRAULIC NODE PRESSURE NODE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) ------------------------------------------------ 0.00 528.11 271.00 257.11 111.42 0.00 528.11 272.00 256.11 110.98 26.00 528.11 271.00 257.11 111.42 52.00 528.16 269.50 258.66 112.08 0.00 528.20 269.50 258.70 112.10 26.00 528.12 271.00 257.12 111.42 ---- 528.29 270.00 258.29 111.92 ---- 528.11 271.00 257.11 111.42 M A X I M U M A N D M I N I M U M V A L U E S P R E S S U R E S JUNCTION MAXIMUM JUNCTION NUMBER PRESSURES NUMBER (psi) MINIMUM PRESSURES (psi) J-5 112.10 J-2 110.98 J-4 112.08 J-1 111.42 VP-1 111.92 J-3 111.42 J-6 111.42 VP-2 111.42 V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) --------------------- (ft/s) _______________ __ 1.18 P-7 0.17 P-6 0.66 P-3 0.33 H L+ M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) ----__ (ft/ft) _____________________ P-1 1.21 P-7 0.02 P-6 0.30 P-3 0.08 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 (ft/ft) _____________ (ft/ft) --------------------- P-1 1.21 P-7 0.02 P-6 0.30 P-3 0.08 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE ____________________________________________ VP-1 104.00 NET SYSTEM INFLOW = 104.00 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 104.00 ***** HYDRAULIC ANALYSIS COMPLETED ***** EXHIBIT C FIRE FLOW ANALYSIS * * * * * * * * * * K Y P I P E 5 * * Pipe Network Modeling Software * * Copyrighted by KYPIPE LLC * Version 5 - February 2010 * * Date & Time: Wed Feb 27 16:52:02 2013 Master File : f:\1062 - clarke & wyndham inc\0031 - holleman - dartmouth plat\docs\10620031-fire.KYP\10620031-£ire.P2K S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N A M E #1 #2 (ft) (in) COEFF. LOSS COEFF. _ P-1 VP-1 --------------------------------------- J-5 75.00 6.00 125.0000 0.00 P-2 J-3 J-1 100.00 8.00 125.0000 0.00 P-3 J-4 J-6 463.00 8.00 125.0000 0.00 P-4 J-2 VP-2 15.00 6.00 125.0000 0.00 P-5 J-1 J-2 437.00 8.00 125.0000 0.00 P-6 J-5 J-4 137.00 8.00 125.0000 0.00 2-7 J-6 J-3 253.00 8.00 125.0000 0.00 P U M P/L 0 S S E L E M E N T D A T A THERE IS A DEVICE AT NODE VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (8) 258.46 0.00 75.00 235.38 1455.00 75.00 175.15 2910.00 75.00 THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) HEAD FLOWRATE EFFICIENCY (ft) (gpm) M 249.23 0.00 75.00 230.77 1500.00 75.00 182.58 3000.00 75.00 N O D E D A T A NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) -------------------------------------------------------------- J-1 0.00 271.00 J-2 0.00 272.00 J-3 0.00 271.00 J-4 927.00 269.50 J-5 0.00 269.50 J-6 927.00 271.00 VP-1 ---- 270.00 270.00 VP-2 ---- 271.00 271.00 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 4 MAXIMUM AND MINIMUM VELOCITIES = 4 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 4 S Y S T E M C O N F I G U R A T I O N NUMBER OF PIPES ...................(p) = 7 NUMBER OF END NODES ...............(j) = 6 NUMBER OF PRIMARY LOOPS ...........(1) = 0 NUMBER OF SUPPLY NODES ............(f) = 2 NUMBER OF SUPPLY ZONES ............(z) = 1 ______________________________ Case: 0 RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY = 0.00000 S I M U L A T I O N D E S C R I P T I O N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE P I P E NODE NUMBERS NAME #1 #2 (ft/ft) ---------------------------------- P-1 VP-1 J-5 P-2 J-3 J-1 P-3 J-4 J-6 P-4 J-2 VP-2 P-5 J-1 J-2 P-6 J-5 J-4 P-7 J-6 J-3 CV -CHECK VALVE FLOWRATE HEAD MINOR LOSS LOSS (gpm) (ft) (ft) LINE HL+ML/ HL/ VELD. 1000 1000 (ft/s) (ft/ft) 1085.95 6.97 0.00 11.88 92.90 92.90 -768.05 1.20 0.00 4.90 12.05 12.05 158.95 0.30 0.00 1.01 0.65 0.65 -768.05 0.73 0.00 8.71 48. 91 48. 91 -768.05 5.27 0.00 4.90 12.05 12.05 1085.95 3.14 0.00 6.93 22.89 22.89 -768.05 3.05 0.00 4.90 12.05 12.05 P U M P/L 0 S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) M (Hp) ($) ($) (ft) --------------------------------------------------------------------------------------- ----------------- VP-1 1085.95 0.00 245.04 245.0 75.00 0. 0.0 0.0 ** 33.2 VP-2 768.05 0.00 243.69 243.9 75.00 0. 0.0 0.0 ** ** 33.2 N 0 D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) ------------------------------------------------------------------------------ J-1 0.00 508.89 271.00 237.89 103.08 J-2 0.00 514.15 272.00 242.15 104.93 J-3 0.00 507.68 271.00 236.68 102.56 J-4 927.00 504.94 269.50 235.44 102.02 J-5 0.00 508.07 269.50 238.57 103.38 J-6 927.00 504.63 271.00 233.63 101.24 VP-1 ---- 515.04 270.00 245.04 106.18 VP-2 ---- 514.89 271.00 243.89 105.68 M A X I M U M A N D M I N I M U M V A L U E S P R E S S U R E S JUNCTION MAXIMUM NUMBER PRESSURES (psi) --------------------- JUNCTION MINIMUM NUMBER PRESSURES --------------------- (psi) VP-1 106.18 J-6 101.24 VP-2 105.68 J-4 102.02 J-2 104.93 J-3 102.56 J-5 103.38 J-1 103.08 V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) (ft/s) P-1 12.32 P-3 1.01 P-4 8.71 P-2 4.90 P-6 6.93 P-5 4.90 P-7 4.90 P-7 4.90 H L+ M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) --------------------- (ft/ft) --------------------- P-1 92.90 P-3 0.65 P-4 48.91 P-2 12.05 P-6 22.89 P-5 12.05 P-7 12.05 P-7 12.05 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 (ft/ft) --------------------- (ft/ft) --------------------- P-1 92.90 P-3 0.65 P-4 48.91 P-2 12.05 P-6 22.89 P-5 12.05 P-7 12.05 P-7 12.05 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE -------------------------------------------- VP-1 1085.95 VP-2 768.05 NET SYSTEM INFLOW = 1854.00 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1854.00 ***** HYDRAULIC ANALYSIS COMPLETED ***** _OSOU SlqOI6_ UOIIB130SSV_»*m__,m,A ■F m \ I§ 7 ® 7 »Izla z z a % 6 36Vam_3ZN _3dA !iN3 mOVI «o s a _a McCLURE & BROWNE, ENGINEERING/SURVEYING, INC. 1008 Woodaeek Dr., Sute 103 College Station, Tx. 77845 (979) 693-3838 Engineer Reg. No. F458 1314 10th Street, Suite 210 Huntsville, Tx. 77320 (936) 294-9749 Survey Reg. No. 101033-00 February 4, 2013 Ms. Erika Bridges, PE City of College Station Post Office Box 9960 College Station, TX 77842 Re.: FIRE FLOW Falcon Point Condos MBESI No. 1000-0243 Dear Ms. Bridges: The purpose of this letter is to inform you that the proposed Falcon Point Condos project meets the assumptions made in the water report for the Falcon Point subdivision. The proposed flow and pressures will be adequate to serve this project. Sincerely, ii l eft obe son, PE Project Engine F\1059 - Edelweiss Gartens Venture\0008 - Edelweiss Gartens Phase 13\Correspondence\LetterAcknowledging City Standards.wpd is-' � a-4-13 q'S(o R{L