Loading...
HomeMy WebLinkAboutCost EstimateFalcon Point Condos MBESI PROJ #: 1000-0243 Engineer's Estimate of Construction Costs February 4, 2013 Item # Description I Unit Quantity I Unit Price Total Pavine Construction 1 16" Reinforced Concrete Pavement I S.Y. 1 2051 $45.001 $9,225.00 Sewer Svstem Construction 2 Standard Manhole, 0-6 ft. deep EACH 2 $2,200.001 $4,400.00 3 Trench Safety (sewer) L.S. 1 $500.00 1 $500.00 Sewer System Subtotal 1 $4,900 Erosion Control Construction Erosion Control Plan & Sedimentation Control (per Item 4 106) (includes monitoring, record keeping, grass seeding, L.S. 1 $3,000.00 $3,000.00 and cleanup) Erosion Control Subtotal $3,000 Construction Cost 1 $17,125 JEFFERY !_. ROBERTSON i w ; 94745 • � <{CENSE�'��' 1 of lz- z6r� 9•'S� PX