Engineer's Estimate of Construction Costs
February 4, 2013
Item # Description I Unit Quantity I Unit Price Total
Pavine Construction
1 16" Reinforced Concrete Pavement I S.Y. 1 2051 $45.001 $9,225.00
Sewer Svstem Construction
2
Standard Manhole, 0-6 ft. deep
EACH
2
$2,200.001
$4,400.00
3
Trench Safety (sewer)
L.S.
1
$500.00
1 $500.00
Sewer System Subtotal
1 $4,900
Erosion Control Construction
Erosion Control Plan & Sedimentation Control (per Item
4
106) (includes monitoring, record keeping, grass seeding,
L.S.
1
$3,000.00
$3,000.00
and cleanup)
Erosion Control Subtotal $3,000
Construction Cost 1 $17,125