Loading...
HomeMy WebLinkAboutSanitary Sewer AvailabilityrwwYFu�h�.4��L July 31, 2012 Retain Metcaff, P.E. Kent Loss, P.E. RME Consulting Engineers Philips Engineering P. O. Box 9253 4400 Castlegate Drive College Station, Texas 97842 College Station, Texas 7I845 Re: Sanitary Sewer Availability— Castlegate II and Greek Meadows Mr. Metcalf and Mc La>a This letter is In mama to your request for verification of sardtary sewer availability for the buiMnut subject subdivisions. Of course, both subdivisions are located within the City of College Station's sanitary sewer CON, and initial phases are already served with City sanitary sewer. City staff has modified and combined the downstream sewer trunk lines are adequate for the bullcuout of the subject subdivisions in accordance with the approved Preliminary Plats densities. Please note that the city modeling Indudes speclgc peaking factors accounting for larger service areas and measured diurnal patterns, arc. However, Pees developments should continue to utilize the peaking factors of 4 for the subdlvlslon line sizing. As previously dlacussed, the projected build -out demands of Creek Meadows will require further sanitary sewer Improvements. In general, the sanitary sewer Improvements include the design and construction of additional capacity to the avoiding Creek Meadows LM Station. These respective improvements include, but are not limited to, additional forced main capacity, addtiional pumping capacity, additional storage capacity, and potaMlal lift staden controllappurtenance modifications. Please feel free to conbct me ff you need any additional information Sincerely, "Alan Gibbs, .E., C.F.M. City Engineer Cc: Stephan A. Maldonado, RE P.O.90x9960 1101Tuns Avu+us C0u1ce9rdril Thi 77842 Immoc 979,764.3570 / Fa 979.764.3496 www.cetgov