December 27, 2012
City of College Station
Mr. Alan Gibbs, P.E., CFM
City Engineer
P.O. Box 9960
College Station, TX 77842
AgibbsPcstx.Rov
VIA ELECTRONIC MAIL
Re: Oversize Participation — Creek Meadows
Mr. Alan Gibbs, P.E., CFM:
Creek Meadows, LP is in the process of improving the lift station system that services this development. The
proposed Construction Drawings, entitled "Creek Mead ows/Castlegate 2 — Forcemain & Gravity Sewer Improvements", will
accommodate a new discharge point for the lift station so that the ultimate required pumping capacity can be achieved
(currently 805 gpm). It is our understanding that the City of College Station would like to participate with these
improvements via Oversized Participation so that future sanitary sewer flows can be accommodated that would be
generated from the Wellborn annexed areas. We would recommend that the City participation be at a ratio of gpm. For
example, if the anticipated flow from the Wellborn area is 195 gpm then the City's participate would be at 19.5% (195 gpm
/ Total of 1000 gpm). Since the above referenced Construction Drawings do not adequately improve the lift station system
to its ultimate pumping capacity (i.e. additional wet well storage, new pumps & controls, etc...) then City OP would be
anticipated for future upgrades according to the recommend ratio method as those improvements are required/performed.
If this is acceptable please have CoCS PUD provide us with the desired contributing total GPM demand so that
proper modeling and cost estimating can be performed. Also, please provided us with any additional information,
procedures, or such that we -will need to perform or provided to help with the approval of this OP request.
Sincerely,
Creek Meadows Partners, LP, acting by
and through its authorized agent,
Oldham Goodwin Development, LLC