Loading...
HomeMy WebLinkAboutStaff Comments(*W`Fq" CITY OF COLLEGE STATION Home ofTe A6M Univ iry' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 7. 2012 TO: Veronica Morgan, Mitchell & Morgan, LLP; via email: v(cDmitchellandmorgan.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: THE PLAZA REDEVELOPMENT GARAGE 1 & 3 (SP) Thank you for the submittal of your SITE PLAN - COMMERCIAL application. This project will be distributed to staff next week for their review. cc: Rick Arambulo, Woodridge College Station I (-IV); via email: rick(cDwoodridgecapital.com Bobby Finta, Humphreys & Partners Architects, LP; via email: bobby(cDhumphreys.com Amanda Wallis, Capstone Collegiate Communities; via email: awallis(cDcapstone-dev.com Case file no. 12-00500124 (*-l'' Grr ur co.i l'u Sr v I I, m /I .fT A&M U.,w ,- 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 27, 2012 TO: Veronica Morgan, PE, Mitchell & Morgan, LLP; via: v@mitchellandmorgan.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: The Plaza Redevelopment Garage 1 & 3 (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans; Fourteen (14) revised site plans; One (1) landscaping plan; Other documents, applications, and reports as specified in the comments. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact me at 979.764.3570. Attachments: Staff review comments PC: Rick Arambulo, Woodridge College Station I, LLC; via: rick(cDwoodridgecaPita 1.com Bobby Finta, Humphreys & Partners Architects, LP; via: bobby(cDhumphreys.com Amanda Wallis, Capstone Collegiate Communities; via: Awallis(cDCapstone-dev.com Case file #12-00500124 STAFF REVIEW COMMENTS NO. 1 Project: The Plaza Redevelopment Garage 1 & 3 (SP) — 12-00500124 PLANNING 1. Revise the site plan to include all buildings and improvements associated with Phase 1. Please note that the full review from all reviewing entities will occur once the complete plan is provided. 2. If Garage 3 and the public way stub to the Texas A&M System property are being relocated, submit the Concept Plan Minor Amendment application for staff's consideration. These changes will need to be approved by staff before site plan can be approved. 3. Provide building elevations for all proposed buildings via the submission of a Northgate Building Review application. As required in the PDD zoning ordinance, all buildings are to meet Unified Development Ordinance (UDO) Section 5.6.B.4 Building Design Standards. 4. Revise Vicinity Map to include smoke shop property. Reviewed by: Jason Schubert Date: June 20, 2012 LAN DSCA PI NG/STREETSCAPI NG 1. Provide a landscape plan meeting the standards LIDO Section 5.6.B.9 Landscape and Streetscape Standards, as amended through the PDD zoning ordinance. 2. Provide the following notes on the landscape plan: • Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. • Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. • All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Jason Schubert Date: June 20, 2012 ENGINEERING COMMENTS NO. 1 1. Site Plan Notes #9-10, with the minimum, average, and maximum water and sanitary sewer demands, need to be updated. 2. Please remove private storm sewer from future right-of-way. 3. Please clearly label all proposed utility and access easements. 4. Since the building layout has changed, please update the water and sewer demands in from the previously submitted water & sewer reports (if necessary). 5. Please submit a drainage report. 6. Label the size, material, and slope (if applicable) of all private water, sanitary, and storm sewer infrastructure. 7. Please show and label the isolation valves and add our standard isolation valve note. 8. Please provide a grading and erosion control plan. 9. Please provide a detail for the retaining wall and handrail. FYI... Retaining walls higher than 24" will require a building permit. 10.Is the swale shown on the adjacent property existing or proposed? Please provide additional information (i.e. flowlines, lining, etc.). 11. Please submit an NOI. 12. Please submit a TxDOT driveway permit application. Reviewed by: Erika Bridges SANITATION 1. Sanitation is ok with the parking garage phases. . Date: June 27, 2012 Reviewed by: Wally Urrutia Date: June 13, 2012 1101 Texas Avenue, P.O. Box 9960 1/ College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 23, 2012 TO: Veronica Morgan, PE, Mitchell & Morgan, LLP; via: v@mitchellandmorgan.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: The Plaza Redevelopment (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached; Four (4) revised site plans; One (1) landscaping plan; and Engineering and other documents and applications as described in the attached comments. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Rick Arambulo, Woodridge College Station I, LLC; via: rick(cDwoodridgecaPita 1.com Bobby Finta, Humphreys & Partners Architects, LP; via: bobby(cDhumphreys.com Amanda Wallis, Capstone Collegiate Communities; via: Awallis(cDCapstone-dev.com Case file #12-00500124 STAFF REVIEW COMMENTS NO. 2 Project: The Plaza Redevelopment (SP) - 12-00500124 PLANNING 1. Site plan approval will be conditioned on the property being platted/replatted before any Certificates of Occupancy or Completion are issued for the buildings. What is the expected time frame to submit the plat application? 2. Public Utility Easements and Public Access Easements are required for the public ways and the sidewalks on Texas Avenue and University Drive. These may be dedicated via plat. 3. Please note that the proposed right-of-way dedications are to be treated as existing right-of- way for review purposes. 4. Submit a complete Northgate Building Review application for review of the building fagades. 5. Parkland dedication in the amount of $1,646 per multi -family unit will be due with issuance of building permits that include the residential units. Preliminary discussions have occurred regarding obtaining parkland credit for previous units on the property. This is possible though none of the former fourplex units are located in the Phase 1 area and documentation has not been found regarding the former University Tower dorm paying parkland dedication. 6. Include the construction of the public way on the former Meadowland Street in the site plan sheets. 7. Provide the following information on the site plan: a. Total number of units and beds and subtotals for each building; b. Total amount of gross square feet of retail and subtotal for each building; c. Delineate the retail areas within building footprints; d. Amount of parking provided and calculations for amount required; e. Legend for line types; f. Revise Site Plan Note 5 to state Ordinance #2012-3400 and add Ordinance #2012- 3417 (smoke shop rezoning) and that Concept Plan was amended administratively in July 2012 as provided in City project #12-140; g. Revise Site Plan Note 12 to state that mitigation is required and proposed as per the traffic impact analysis submitted with the rezoning; and h. Curb detail. Show the following items on the site plan: a. Show improvements within University Drive (closing Meadowland median break, dual left turn lanes) and Texas Avenue right-of-way (extend center median to north); b. Public access easements to cover public ways and public sidewalks; c. The opening in the wall by clubhouse for pedestrians exiting Garage 1 to the south; d. Depict dog park area, sidewalk, and fencing, shown on landscape plan for that area; e. Fence around pool amenity area; f. Delineate outdoor seating areas; g. Radius of the centerline of 90-degree public way curve; h. Location of light poles as provided on electrical plans; and i. Additional bike racks shown on landscape plan, provide bike rack and pad details. The following comments are on behalf of Raymond Olsen, Deputy Fire Marshall: a. Provide fire lane pull of on University Drive by Building 3. b. For fire coverage of the back of Building 1 and Garage 1, obtain a fire lane easement from Hampton Inn property. c. Stripe the driveway from the public way along the former Meadowland Street to Garage 1 as fire lane to 100 feet in length from the public way. d. Reduce the fire lane length of the public way stub to the Texas A&M System property so that it is no more than 100 feet in length from the former Meadowland Street. 10. Extend the public way stub to Texas A&M System property to the property line and include temporary curbing with detail in the plans. 11. There is slight bend in the curb of the public way between the pool and 90-degree curve. Please straighten this portion of the public and realign sidewalk. 12. Show sight triangles looking left out of the public way intersections with Texas Avenue and University Drive. Please revise where improvements or plantings conflict with driver visibility. There is also concern regarding visibility through the site at the public way intersections. 13. Show proposed traffic control proposed on the site such as stop signs, stop bars, etc. 14. Sidewalk -related comments: a. The landscape plan shows that the sidewalks along Texas Avenue go up to back of the proposed curb while the site plan does not. Please reconcile. b. Provide sidewalk ramps across public way stub to Texas A&M System property for the sidewalks that connect the garages to University Drive. Also, stub that sidewalk up to the Phase 2 limits. c. Provide a minimum 8-foot sidewalk on each side of the public way stub to Texas A&M System property. d. Provide sidewalk ramps across rear Garage 1 driveway to connect the pool area to the Hampton Inn property along the former Meadowland Street. e. Show the sidewalk ramp switchback along Texas Avenue by the Hampton Inn property as depicted on the landscape plan and continue sidewalk to common property line with Hampton Inn. f. Provide sidewalks around pool amenity area to Building 1 and public way. g. As shown in the garage building plan, show rear egress ramp out of the back of Garage 1 and provide sidewalk to Texas Avenue. h. Provide minimum 12-foot sidewalks along Texas Avenue and University Drive. i. The sidewalk ramps across the public way that intersects Texas Avenue are too recessed from Texas Avenue to safely serve as the crosswalk ramps for Texas Avenue pedestrians. Please revise. j. The sidewalk connection to University Drive at southwestern corner of property should be redesigned to better accommodate bicycle movements from the garages and not need two separate sidewalks. k. The sidewalk ramp at University Drive and Texas Avenue is diagonal ramp which are not permitted. In addition, illustrate how the proposed ramp will tie into the crosswalk to get to the opposite side of the street. 15. Provide an explanation on how sanitation services will serve the property in a fashion that is acceptable to the Sanitation division. Contact Wally Urrutia to discuss 979-764-3841. 16. The landscape plan shows string lights across the public way between Buildings 2 & 3. These will be located above a public utility easement. At what height above the pavement are these lights expected to be located? 17. The landscape plan shows plantings adjacent to the electric transformer and switch gear. The electrical facilities will need to be screened though clearances will need to be provided around them. We should discuss further. 18. The landscape plan shows a low voltage transformer and plantings on the opposite side of the wall are blocking the pedestrian sidewalk exit from Garage 1. 19. Additional comments regarding the landscape plan provided in the residential building plans will be forthcoming. 20. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Reviewed by: Jason Schubert Date: July 20, 2012 ENGINEERING COMMENTS NO. 1 1. Please provide verification the all infrastructure associated with the old gas station were properly removed and disposed of. 2. Per Fire, the curb of the decel lane and pull-out on University Dr. will need to be marked as fire lane to serve portions of Building 2 and 3 that are not accessible from public ways. 3. Please provide water/fire flow and sanitary sewer letters verifying that the proposed development is in compliance with the master reports. 4. Please provide a drainage report. 5. Please provide plans for traffic control, pavement, street lighting and associated infrastructure/conduit, pavement striping, and signage. 6. Please submit Private Improvement in Public Right -of -Way (PIP) application for private improvements proposed within the public right-of-way. 7. Street lights, landscaping, irrigation, and any other private improvements proposed to be within the TxDOT ROW need to be included in the TxDOT permit plan submittal. 8. Please label and provide a detail for the end -of -road barricade. 9. Please show where the construction staging area will be located. 10. Provide details for the proposed retaining walls and landscape walls. FYI... Retaining walls 24-inches and higher will require building permits. 11. C1.02/1.03 - Please label isolation valves and add note on the plans that the fire suppression line shall have a lockable lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by College Station Utilities Director or his designee. 12. C1.02/1.03 - Label private water, sanitary sewer, and storm sewer lines with size, material, and slope (if necessary). 13. C1.02/1.03 - It appears that the buildings are encroaching into the PUEs where the meters are located. Please adjust meter and PUE locations to avoid the encroachment. FYI... Per Water Dept., meters should be at least 5-ft away from buildings. 14. C1.02/1.03 - All transformers should be located within PUEs. Please revise. 15. C1.02/1.03 - Provide a detail including flowlines for each storm sewer tie-in. 16. C1.02/1.03 - Please clearly label all storm sewer inlets and pipes as public or private. 17. C1.02 - Please move the proposed curb inlet on University Dr. outside of the curb return. 18. C1.02/1.03 - If any storm sewer is public, plan and profile drawings need to be provided. 19. C1.02/1.03 - Please label the proposed access easements. 20. C1.02/1.03 - Please add a note regarding maintaining access at all times to former Meadowland Street for existing businesses and residents. 21. C1.02/1.03 - Please label all private storm sewer inlet and pipe flowlines. 22. C1.02/1.03 - Since there are proposed point discharges and associated pipes on A&M property, permission will need to be granted by the University. 23. C1.02/1.03 - How will utilities along the back side of Building 1 and 3 be maintained long- term? 24. C1.02/1.03 - Could roof drains proposed to discharge onto A&M property be combined and discharged into the existing pipe? 25. C1.02/1.03 - Please add a note regarding stormwater management and construction sequencing. 26. C1.02/1.03 - Clearly label the limits of disturbance. 27. C1.02/1.03 - Please label the FDCs to indicate what building they serve. 28. C1.03 - The ROW dedication at the intersection of Texas and University needs to have a 25- ft radius. 29. C1.03 - Please move the irrigation meter along University Dr. next to Building 3 closer to the building. 30. C1.02/1.03 - Please remove private storm sewer from the ROW/PUEs. 31. C1.02/1.03 - Is the 30-inch storm pipe along University sized to handle the existing flows in the parallel 18-inch storm? If so, could the existing storm inlet be tied into the 30-inch and the 18-inch pipe abandoned? 32. C1.02/1.03 - Please verify that private sanitary sewer services will not be deeper than 3.5-ft deep. 33. C1.02 - The existing fire hydrant on University Dr. should be moved farther to the west to better serve the southwestern side of Building 3 in the fire lane pull off area. 34. C1.03 - The FDC for Garage #1 needs to be remoted out to the fire lane. 35. C1.02/1.03 - Please add a note or table with the each building size, material type, and fire flow requirement. 36. C1.02/1.03 - Please label all water meter sizes. 37. C1.02/1.03 - Add a note or table with the maximum water demands per building so that meter sizes can be verified. 38. C1.02/1.03 - Please provide single meters with vaults for the residential buildings rather than multiple meters. 39. C2.01/2.02 - Please verify that all contours are clearly labeled. 40. C2.01/2.02 - It appears that the maximum 6% slope along the fire lane is being exceeded in a couple of locations. Please revise. 41. C2.01/2.02 - Retaining walls and landscape walls need to be clearly labeled with several spot elevations for the top and bottom of the walls. 42. C2.01/2.02 - Please provide additional cross -sections for the retaining walls. 43. C2.01/2.02 - Please provide plan and profile drawings for the turn lanes, decel lanes, and median improvements. These will also need to be included in the TxDOT permit plan submittal. 44. C2.01 - Please verify that TC elevation along University Dr. correspond to the contours and Section BB profile. 45. C2.01/2.02 - Please provide a detail for the 5% ramp. 46. C2.01/2.02 - Provide a typical cross-section detail for the public way. 47. C2.02 - Where is Section JJ located? 48. C2.02 - Please provide additional cross -sections for Building 2 along Texas Ave. & University Dr. 49. C2.02 - The finished floor elevation for Garage #1 is different from that labeled on the cross - sections. 50. C2.01/2.02 - No retaining walls are permitted within PUEs. Please revise. 51. C2.01/2.02 - The maximum permissible grade is 4:1 in PUEs and 3:1 outside of PUEs. Please revise grading in areas where these limits are being exceeded. 52. FYI ... All PAEs and PUEs must be dedicated prior to issuance of any CO. 53. FYI ... TxDOT permits need to be approved prior to any work in TxDOT Right -of -Way. 54. FYI... Plans for stamping will need to be signed and sealed by the engineer. 55. FYI... Public infrastructure supporting development will need to be accepted prior to CO. 56. There should be a general note dictating construction hours since this project is adjacent to a hotel. Reviewed by: Erika Bridges Date: July 23, 2012 TRANSPORTATION 1. The following comments relate to the TxDOT driveway permit application: a. The partial site plan sheets do not match the overall site plan sheet. b. Please dimension the driveway throat length at driveway accessing University Dr. c. The Texas Ave median should be extended north pass the proposed driveway entrance. d. Please dimension taper and storage length for both right turn and left turn bays. e. No detail is illustrated for the left turn bay on University Dr. f. Please provide information on the closure of the median opening at the existing Meadowland St. access location and details on the closure of Meadowland St to University Dr. TxDOT comments will be further coordinated to reflect City of College Station transportation comments. Reviewed by: Joe Guerra, AICP, PTP, Transportation Planning Coord. Date: July 16, 2012 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 " Phone 979.764.3570 / Fax 979.764.3496 " MEMORANDUM November 15, 2012 TO: Veronica Morgan, Mitchell & Morgan, LLP; via: v(cDmitchellandmorgan.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: Plaza Redevelopment (SP) -Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached; Four (4) revised site plans; One (1) revised landscaping plan; and Engineering and other documents and applications as described in the attached comments. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Rick Arambulo, Woodridge College Station I, LLC; via: rick(cDwoodridgecapital.com Bobby Finta, Humphreys & Partners Architects, LP; via: bobby(cDhumphreys.com Amanda Wallis, Capstone Collegiate Communities; via: awallis(cDcapstone-dev.com Michael Rosenfeld, Woodridge College Station II, LLC; via: Michael(cDwoodridgecapital.com Case file #12-00500124 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 3 Project: Plaza Redevelopment (SP) - 12-00500124 PLANNING 1. Remove the proposed driveways along the public way of the former Meadowland Street that are for Phase 2 development (future Garage 4 and parking area for units on Hensel Street). 2. Provide a sidewalk and ramps along the public way for the sanitation yard area on North Park Section II Lot 5. 3. Widen the rear driveway and drive aisle to Garage 1 from the Meadowland public way to serve as a 26-foot wide aerial fire lane. 4. The crosswalk at the internal intersection of the public ways coming from Texas Avenue and University Drive needs to be relocated in front of the stop sign and stop bar. 5. As per the PDD zoning, provide a bus stop shelter and connecting sidewalks along University Drive between the driveway and the fire lane pull off area. 6. Revise the site plan and landscape plan to provide the ramp out of the north side of Garage 1 as shown on the building plans. The ramp serves as a second egress from Garage 1 and needs to be ADA accessible. Also, it needs to ramp down to the west as a ramp to the east conflicts with the landing and stairs coming out of Building 1. 7. On Sheet L6.14, there appears to be a column in the middle of the bicycle and pedestrian path between Building 3 and the switchgear at the southwest corner of this site. Please revise so there is at least an 8-foot wide unobstructed path. 8. On the site plan and Sheet C6.01, show the public ways as public access easements. 9. Provide a public access easement for the public way stub to the Texas A&M University System property. 10. Revise the sight triangle depicted for the public way to University Drive so that it is located behind the stop bar as done on Texas Avenue. 11.On the site plan and landscape plan, the concrete seating cubes along University Drive appear to be located in middle of mulch areas. Revise them to be in a paved surface area like the bike racks and as per the seating cube detail on Sheet L12.14. 12. Where more than 6-inches of untreated concrete is exposed, it need to be screened, treated, or covered. On Sheet C2.06, Section D-D appears to show where the building foundation is exposed for more than 6-inches. Revise this and other similar areas. 13.On Sheet C1.01, ghost -in or remove the improvements proposed in the Phase 2 area as these are not being reviewed or approved with Phase 1. 14. Provide labels for the 653 sq ft outdoor seating areas on Sheet C1.02 and C1.03, in addition to the labels on Sheet C1.01. 15. Revise the property lines to include the remaining portion of Meadowland Street that was abandoned earlier this year. 16. Label the CMU wall proposed around the north and west part of the pool area. 17. The measurement for the depth of a parking space is perpendicular to the drive aisle. Measures the handicap spaces by Garage 3 in this manner. Being 45 degree parking spaces, they are to be at least 21.1 feet deep. 18. Revise Site Plan Note 2 on Sheet C1.02 to include North Park Section II Lot 5 in the description. 19. On Sheet C1.02, revise General Construction Note 18 to refer to the lighting standards as Section 7.11 of the Unified Development Ordinance. 20. Provide a note that the sidewalk adjacent to Phase 2 buildings along the former Meadowland Street public way will be constructed with Phase 2. 21. Provide a note on the site plan that the property will needed to be replatted before Certificates of Occupancy (COs) are issued. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. 22. Please note that as the replat of the property will likely occur after site plan approval so the development permit will receive conditional approval stating that the public access easements for the public ways and Tx DOT sidewalks will need to be dedicated. The public utilities are already covered with a temporary blanket PUE. 23. Please note that the transformers provided for Phase 2 will need to be located further back from the public way along the former Meadowland Street to allow landscaping to be installed as screening in front of them and the necessary clearances still achieved. 24. Please note that the Northgate Building Review (architecture review) for this project will need to be approved concurrently with site plan. Staff has not received a separate response and revisions to the August 13'h staff comments. 25. As discussed at our November 15'h meeting/conference call, the question about the amount of or possible credit for parkland dedication fees is still being researched. Landscaping 26. Revise the landscape plan in accordance with the phone conversation held with Daniel Erlandson and City staff on October 22"'. This relates to landscaping and screening around the electric transformers and switch gear on the site. 27. Provide trees in grates at back of curb along the public way stub to Texas A&M University System property, along the parallel parking spaces by pool, and along the public way between Buildings 1 & 2. 28. All trees along the public ways, University Drive, and Texas Avenue are to be located in tree wells with grate or a raised tree well/planter. 29. Trees along University Drive are to be at least four -inches in caliper with trees in other areas along Texas Avenue and the public ways being at least three -inches in caliper. 30. Provide landscaping for the sanitation yard lot. This includes screening shrubs around the 9.5-foot tall wall and a streetscape tree out by the former Meadowland Street. 31. There are several plantings that are in mulched areas along Texas Avenue. Verify or make provision such that the mulch and the selected plant species will not migrate into the street. 32. It appears that trees are proposed in front of several of stop signs. Revise the landscaping to not interfere with adequate visibility to these signs. 33. Provide a note on the landscape plan that the string lights over the public way will not hang lower than 25 feet above ground and as per the Fire Marshall the lights must be low voltage. Respond to verify it meets this description and how the strings will be attached/anchored. 34. Detail 6 on Sheet L13.14 depicts the proposed handrail on top of the retaining walls. It appears that some of the grade changes are 30-inches or greater so the handrail shown is not sufficient to meet guardrail requirements in those areas. 35. Depict the future property line that will exist once the right-of-way dedications occur. 36. Revise the landscape plans to remove the pull off area on Texas Avenue north of the driveway as it is no longer provided. 37. It appears that the band of Brick Red "02" on the public way near Texas Avenue has not been revised to match the new location of the crosswalk. 38. Revise the sidewalks along the public way stub to the Texas A&M System property to be consistent with the sidewalk shown on the site plan. Also, on Sheet L6.14 some of the proposed sidewalk is located within the hatched Phase 2 area. 39. On Sheet L5.14, some labels and arrows are not correctly labeled or pointing. 40. Provide planting details for the tree wells/grates and planting beds. 41. Please note that many details in landscape plan reflect items such as the pool and other structures that require building permits and are not being approved with these plans. Reviewed by: Jason Schubert Date: November 14, 2012 Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. ENGINEERING COMMENTS NO. 3 1. (Repeat) Please provide water/fire flow and sanitary sewer letters verifying that the proposed development is in compliance with the master reports. 2. (Repeat) Please provide a drainage report. 3. (Repeat) Please provide plans for traffic control, pavement, street lighting and associated infrastructure/conduit, pavement striping, and signage. Please provide traffic control plan and pavement striping & signage (sheet C6.1 missing from set). 4. (Repeat) Please submit Private Improvement in Public Right -of -Way (PIP) application for private improvements proposed within the public right-of-way. 5. (Repeat) Street lights, landscaping, irrigation, and any other private improvements proposed to be within the TxDOT ROW need to be included in the TxDOT permit plan submittal. 6. (Repeat) Provide more specific details for the proposed retaining walls and landscape walls including material or block being used. FYI... Retaining walls 24-inches and higher will require building permits. The landscape plans are referencing the civil plans for details. Please provide additional information including details showing the footing and surrounding utilities (where applicable). 7. (Repeat) C1.02/1.03 - Please label isolation valves and add note on the plans that the fire suppression line shall have a lockable lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by College Station Utilities Director or his designee. The isolation valves should be at the edge of the PUE unless there is an obstruction. 8. (Repeat) C1.02/1.03 - It appears that the buildings are encroaching into the PUEs where the meters are located. Please adjust meter and PUE locations to avoid the encroachment. FYI... Per Water Dept., meters should be at least 5-ft away from buildings. On sheet L6.14, please verify that the "Fabric Shade Structure" is not over the PUE. 9. (Repeat) C1.02/1.03 - Since there are proposed point discharges and associated pipes on A&M property, permission will need to be granted by the University System. 10. (Repeat) C1.03 - Please move the irrigation meter along University Dr. next to Building 3 closer to the building. The irrigation meter will need to be within the right-of-way or in an easement. The meter can be moved to the other side of the proposed right-of-way line. 11. (Repeat) C1.02/1.03 - Is the 30-inch storm pipe along University sized to handle the existing flows in the parallel 18-inch storm? If so, could the existing storm inlet be tied into the 30- inch and the 18-inch pipe abandoned? The City does not want to maintain the dual storm sewer pipes within the right-of-way. The proposed 30-inch storm should be removed from the right-of-way and privately maintained. Also, the downstream capacity of the 30-inch pipe needs to be analyzed to verify that the system capacity is not being exceeded. The downstream system may need additional improvements. 12. (Repeat) C1.02/1.03 - Please verify that private sanitary sewer services will not be deeper than 3.5-ft deep. l verified with the Water Dept that the ends of the sewer services need to be no deeper than 3.5-ft. 13. (Repeat) C1.02 - The existing fire hydrant on University Dr. should be moved farther to the west to better serve the southwestern side of Building 3 in the fire lane pull off area. Fire has indicated that they will need this fire hydrant relocated to the "fire lane" area. The current location is not accessible as fire lane. 14. (Repeat) C1.02/1.03 - Add a note or table with the maximum water demands per building so that meter sizes can be verified. 15. (Repeat) C2.01/2.02 - Please provide plan and profile drawings for the turn lanes, decel lanes, and median improvements. These will also need to be included in the TxDOT permit plan submittal. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. 16. (Repeat) C2.01/2.02 - Please provide a detail for the 5% ramp. It looks like this is still shown as a ramp on the building plans. 17. (Repeat) C2.01/2.02 - Provide a typical cross-section detail for the public way. The typical cross-section should be similar to the City Standard Street Details showing the dimensions, pavement thickness, subgrade information, sidewalk widths, etc. 18. (Repeat) C2.02 - Please provide additional cross -sections for Building 2 along Texas Ave. & University Dr. Section views have been provided in several areas showing the edge of the building, grading, etc. Please provide typical sections along Building 2 as well. 19. (Repeat) C2.01/2.02 - No retaining walls are permitted within PUEs. Please revise. We are not comfortable with these structures being built in PUEs. If they cannot be avoided, we will need to discuss additional measures to protect City interests. 20. (Repeat) C2.01/2.02 - The maximum permissible grade is 4:1 in PUEs and 3:1 outside of PUEs. Please revise grading in areas where these limits are being exceeded. It appears that the maximum allowable 3:1 grade is still be exceeded in some areas which are not PUEs. 21. (Repeat) FYI ... TxDOT permits need to be approved prior to any work in TxDOT Right -of - Way. 22. C1.02 — Please update the FEMA note to reflect the current maps. 23. C1.04 — FYI ... The Home2 Suites site plan shows them utilizing the existing driveway to Meadowland. It also appears that the fire hydrant may be within the proposed driveway. You may want to coordinate with them on this and construction of the force main. 24. C1.04 — Please move the CMU wall and sanitation equipment in the sanitation yard from the PU E. 25. C1.02-1.04 — Please verify that all private street lights are outside of PUEs. 26. C2.01 — Section A -A shows the retaining wall more than a maximum 2-ft as labeled. Please revise. Also, please provide additional sections along this side of the building. 27. C2.01 — Section E-E is not showing a retaining wall, but the plans appear to show a retaining wall through that area. Please clarify. 28. C2.01-2.04 — Please label all Sections with helpful information such as the building, right-of- way, sidewalk, retaining walls, street, slopes, etc. 29. C2.04 — It appears that there is a proposed retaining wall at the future connection to the A&M property. Can the grades be adjusted to make this a viable future connection without a retaining wall? 30. C3.01 — Please include the construction staging area within the Erosion Control Plan. Reviewed by: Erika Bridges Date: November 14, 2012 Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. (*/" CITY OF COLLEGE STATION Home of Texas Ae4M UW niry' 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 16, 2013 TO: Veronica Morgan, Mitchell & Morgan, LLP; via: vamitchellandmorgan.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: Plaza Redevelopment (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review (please note that next Monday is a holiday so 10:00 a.m. on Friday applies): City of College Station Transmittal Letter, Memo providing written responses to all of staffs comments, Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached, and Engineering and other documents as described in the attached comments. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Rick Arambulo, Woodridge College Station I, LLC; via: rickawoodridgecapital.com Bobby Finta, Humphreys & Partners Architects, LP; via: bobby0humphrevs.com Amanda Wallis, Capstone Collegiate Communities; via: awallisacapstone-dev.com Michael Rosenfeld, Woodridge College Station II, LLC; via: MichaelOwoodridgecapital.com Planning 6, De elopmmt Se wes P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 na.gov/Aevservims STAFF REVIEW COMMENTS NO. 4 Project: Plaza Redevelopment (SP) - 12-00500124 PLANNING 1. Include the sidewalk ramps at the intersection of Hensel Street and the Meadowland public way in Phase 1. 2. Provide a crosswalk treatment at the end of the public way stub to the Texas A&M property in the same manner as other crosswalks in the development. Also, widen the ramps for the crosswalk to better serve bicycle traffic. 3. The access and utility easements along the former Meadowland Street are not as currently illustrated on the site plan or Sheet C6.01. Where the property is owned by the development, provide access and utility easements. Where the property is unclaimed or owned by another party, provide the volume and page of the abandonment document(s) for the access and utility easements that were retained with the abandonment(s). 4. The transformer in the sanitation yard is not fully located within an existing PUE. 5. Work with CSU Electrical to relocate the electrical pull box at end of public way stub to the TAMUS property out of the 8-foot pedestrian path along the edge of the development. The pull box will likely be converted to a switch gear in the future that would block the sidewalk. 6. With Phase 2, please note that the sidewalk along Meadowland public way should be 8 feet wide where that width can be accommodated. 7. If the electric transformers for Phase 2 will not be installed with Phase 1, gray -in these locations. Also, where possible move further back from the sidewalk to have clearance from the future screening shrubs. 8. The proposed gas meters along building are to be screened or relocated to reduce their visibility. 9. An enlarged building elevation was provided for Building I North Elevation. Verify that all areas (except parking garages) where more than 6 inches of a concrete building foundation is exposed are similarly treated (such as Sections DID and MM). 10. Based on discussions at the December 27'h meeting and the December 311 summary email from Bob Cowell, parkland dedication fees in the amount of $225 per multi -family unit for Phase 1 (307 unitsX$225=$69,075) will be due at building permit. Multi -family units in Phase 2 will pay the current $1,636 per unit fee minus a 50-unit credit for the 12 fourplexes and 2 homes demolished in 2011 along the former Meadowland St. Please confirm. 11. Please note that the drainage letter from TAMUS is required, or the drainage in that area be redesigned, before site plan can be approved in any form. 12. Please note that sheets C1.01-C1.04, C5.01, and C6.01 for site plan and 1-1.14-1-6.14 (minus L4.14) for landscape plan will be those stamped for compliance by Planning. These are the only sheets that will need to be provided separately from the full construction set. Other sheets will be stamped for compliance by Engineering, though there are others that will require a separate permit (such as irrigation plans, many of the site details in Sheets L11.14-L14.14) and these will not be stamped. Landscaping 13. The canopy trees along University Drive are to be at least 4-inch caliper and those on Texas Avenue are to be at least 3-inch caliper. Please revise. 14. As Legend item #12 is used in some places, it is unclear if some trees are still located in an at -grade planter instead of the required tree grate. Clarify the labels including for the two crape myrtles in front of the clubhouse. Label i ng/Notes/Formatti ng 15. On Sheet C1.01, revise the label for the location of FDC for Garage 1 to show the remoted location by the pool as shown on Sheet C1.02. Page 2 of 5 16. On Sheet C1.02, revise the number of Standard Surface Parks Provided in the Parking Requirements from 26 to 25 as one was space was removed with the change to parallel handicap spots. Also, revise the totals. 17. Revise the site plan sheets to conform to the landscape plan by stating decomposed granite (not mulch) is located with the planting beds along TxDOT right-of-way. 18. Label the roof drains for Buildings 1 & 3, similar to those to the TAM US property. 19. On Sheet C2.06, Section J-J is partial off the page. 20. On Sheet C5.01, revise the label for rear drive to Garage 1 from 23 feet (bc-bc) to 26 feet (bc-bc). Also, illustrate stop bar for center 3-way intersection. 21. On Sheet C6.01, use the same nomenclature to name the access and utility easements (i.e. not use both P.A.E and Public Access Easement). Also, label the public access easements along University Drive. 22. On Sheet L1.14, relocate "02" label for crosswalk at Texas Avenue driveway. 23. On the landscape plan, revise legend item "38" to refer to detail 5 (not 2) on Sheet L11. 24. Provide the following notes on the landscape plan: 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Jason Schubert Date: January 8, 2013 ENGINEERING COMMENTS NO. 4 1. (Repeat) C2.01 — Provide more specific details for the proposed retaining walls and landscape walls including material or block being used. FYI... Retaining walls 24-inches and higher will require building permits. The landscape plans are referencing the civil plans for details. Please provide additional information including details showing the footing and surrounding utilities (where applicable). Show all utilities in vicinity of retaining wall adjacent to A&M property on cross-section/detail. 2. (Repeat) C1.02/1.03 - Since there are proposed point discharges and associated pipes on A&M property, permission will need to be granted by the University System. Waiting on letter from University. 3. (Repeat) C1.02/1.03 - Add a note or table with the maximum water demands per building so that meter sizes can be verified. Based on a demand of 369 gpm, the Building 1 Retail/Club should require a 4" water meter. 4. (Repeat) C2.01/2.02 - No retaining walls are permitted within PUEs. Please revise. We are not comfortable with these structures being built in PUEs. If they cannot be avoided, we will need to discuss additional measures to protect City interests. Waiting on Developer's Liability & Maintenance Agreement. 5. (Repeat) C2.01/2.02 - The maximum permissible grade is 4:1 in PUEs and 3:1 outside of PUEs. Please revise grading in areas where these limits are being exceeded. It appears that the maximum allowable 3:1 grade is still be exceeded in some areas which are not PUEs. Please verify that the graded areas around sections GG and NN are not exceeding the max slopes. 6. (Repeat) FYI ... TxDOT permits need to be approved prior to any work in TxDOT Right -of - Way. Waiting on TxDOT Permit approval. 7. C2.03 — There is a label along the proposed turn lane that says (See ? Plans). 8. C3.01 — Please use 2012 City standard details. Page 3 of 5 9. C6.01 — Please verify that fire hydrants and other proposed new infrastructure are within existing or proposed PUE's. 10. C1.02/1.03 — Please add a stop bar and stop sign at the intersection of Hensel and the public way. 11. C1.02/1.03 — Please add note indicating that fire hydrants will be no more than 3-ft from the BOC. 12. C1.02/1.03 — Since some of the proposed site improvements will disturb access and service to neighboring businesses from the public way and along Texas Ave. (i.e. the Hampton), please provide an construction sequencing plan showing how access for customers, fire, and sanitation will be maintained throughout construction. FYI ... As discussed in previous meetings, fire access is especially critical for some of these businesses and must not be disturbed. 13. FYI ... Since the public right-of-way for Meadowland St. has been abandoned and only PUEs and PAEs remain, we will need to verify that the proposed public and private improvements on private property do not require special permission. This may include utility service reconnections, fire hydrants, etc. 14. FYI... Wash -out facilities for sanitation area still need to be submitted & reviewed. 15. FYI ... The drainage report indicates that certain downstream storm sewer pipes along Texas Ave. and University Dr. are undersized. These capacity issues will need to be discussed with TxDOT and potential offsite improvements may be needed. Reviewed by: Erika Bridges Date: January 14, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(cD_cstx.gov —Received 12-14-12 LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. —Still need load data for sanitation yard equipment and private street lighting. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. —Please verify that this is in place. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Page 4 of 5 If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. Developer installs pull boxes per CSU specs and design, Pull boxes provided by CSU. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: December 31, 2012 TRANSPORTATION (HDR Engineering Plans) 1. Sheets 3 & 4 Typical Sections — minimum lane widths equals 11'. Label typical sections for "Texas Ave" or "University Dr" with station limits. 2. Sheet 5 — Please provide horizontal alignment data with control data that can be located on the ground. End sidewalk label Sta 5+ 67.62 rt should indicate match existing or description of end treatment. 3. Sheet 6 & 7 Provide horizontal alignment data and control data information. 4. Sheet 8 & 9 Will sidewalk ADA ramp be removed and replaced or modified? 5. Sheet 9 & 10 Remove/Close Meadowland curb cut at intersection with University Dr. 6. Sheet 11 Diagonal cross hatch striping at approach to raised median should be 8" yellow with raised pavement markers. Crosswalk striping to remain or modified? Provide for dual right signage. 7. Sheet 13 ` white solid pavement marker should extend to left turn bay taper. 8. All sheets provide for raised pavement markers to accompany flush pavement markers. 9. Sheet 12 shows the Adopt -A -Street sign facing the wrong direction. 10. Double check that the new Way Finding signs on Texas Ave and University Dr won't be impacted by the project. 11. A note needs to be added to the plans stating if any signs are damaged during their removal and/or storage, they shall be replaced at the contractor's expense. 12. 1 (Troy) have other comments, but they were about Tx DOT signs and facilities that TxDOT should have input on. Reviewed by: Joe Guerra & Troy Rother Date: January 14, 2013 Page 5 of 5 (* F4" CITY OF COLLEGE STATION Home ofTe Ae4M UW.v iry' MEMORANDUM May 17, 2013 TO: Veronica Morgan, Mitchell & Morgan, LLP; via: v@mitchellandmorgan.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: Northpoint Crossing Leasing Trailer (SP) - Site Plan Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review: City of College Station Transmittal Letter, Memo providing written responses to all of staffs comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment), Four (4) revised site plans, and Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact *Planner Not Assigned* at 979.764.3570. Attachments: Staff Review Comments PC: Rick Arambulo, Woodridge College Station I; via: rick@woodridgecaptial.com Bobby Finta, Humphreys & Partners Architects, LP; via: bobby@humphreys.com Amanda Wallis, Capstone Collegiate Communities, via: awallis@capstoneemail.com P&DS Project No. 12-00500124 PLm.ixg eb Deoelapmens Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 a tcgovidevservices STAFF REVIEW COMMENTS No. 5 Project: Northpoint Crossing Leasing Trailer (SP) 12-00500124 PLANNING 1. Revise General Construction Note 18 to state the leasing trailer and associated improvements must be removed within 30 days of when a CO has been issued for the on - site clubhouse/leasing facility, instead of relocated to it. 2. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Reviewed by: Jason Schubert Date: May 10, 2013 ENGINEERING COMMENTS NO. 1 1. Please connect the water service to the fire hydrant lead or 8-inch line southeast of this lot rather than connecting to the 12-inch waterline. 2. A TxDOT Utility Permit is required for all utility work within the Tx DOT ROW. FYI ... This permit must be submitted electronically prior to site plan approval. 3. Label the slope on the sanitary sewer line. 4. Provide silt fence along the Hensel side of the property downstream of the parking lot. 5. Add the CoCS Sanitary Sewer Connection detail S7-01 and remove S6-01. 6. Label several spot elevations within the parking lot. 7. Provide a fire flow letter. 8. Note #2 should reference the 2012 B/CS Standards. Reviewed by: Erika Bridges Date: May 13, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(cDcstx gov. Electric Availability: Plan submitted for review shows electric service extended from existing overhead lines along the Texas Ave side of the property. Those lines are not part of the CSU electrical system and cannot be utilized to provide electrical service within CSU Certification area. Electric Service Location: Developer/Contractor will provide and install a temporary service pole with a meter in a range of 70' to 100' from the nearest existing CSU electric utility pole on the Knight's Inn side of the property. Service to the proposed leasing trailer will be extended from that point at the expense of the developer contractor. Coordinate exact location of pole with CSU representative prior to installation. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delay. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. EASEMENTS: Developer provides temporary blanket easement for construction purposes to be in effect for duration of the existence of the proposed leasing trailer. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 6. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 7. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 8. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: May 16, 2013 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: May 10, 2013