Loading...
HomeMy WebLinkAboutStaff Comments(*�� CITY OF COLLEGE STATION Ho. ofTz A4M UW.v iry' MEMORANDUM March 27, 2013 TO: FROM: Jason Schubert, AICP Principal Planner SUBJECT: RV STATION (DVPL) I reviewed the above -mentioned DEVELOPMENT PLAT application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week (please note City offices will be closed on Friday, April 2911): As the owner of the property is a company, provide proof of authority for the signing individual to sign the application on behalf of the company, The Title Report provided is not current within 90 days as it is dated in 2006. Provide an updated Title Report or a Nothing Further Certificate to accompany the one provided, and Provide a current tax certificate for the 7.067-acre tract, one was only provided for the 4.495-acre tract. Please be aware that if this application is not completed before Monday, May 13, 2013, it will expire and a new application and fees will be necessary to continue the platting process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Case file No. 13-00900068 Plaeeixg&Deoebpm S.. P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gmidevservices (* F4" CITY OF COLLEGE STATION Home of Te A6M UW.v iry' MEMORANDUM March 27, 2013 TO: Mark Homeyer, RV Station Ltd., via: markah23@earthlink.net FROM: Jason Schubert, AICP Principal Planner SUBJECT: RV STATION (DVPL) I reviewed the above -mentioned DEVELOPMENT PLAT application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week (please note City offices will be closed on Friday, April 2911): As the owner of the property is a company, provide proof of authority for the signing individual to sign the application on behalf of the company, The Title Report provided is not current within 90 days as it is dated in 2006. Provide an updated Title Report or a Nothing Further Certificate to accompany the one provided, and Provide a current tax certificate for the 7.067-acre tract, one was only provided for the 4.495-acre tract. Please be aware that if this application is not completed before Monday, May 13, 2013, it will expire and a new application and fees will be necessary to continue the platting process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Kling Engineering & Surveying, via: skling@cectexas.com Case file No. 13-00900068 PLm.ixg ebD.4.pm Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gmidevservices (* F4" CITY OF COLLEGE STATION Homr ofT AdM U.ro ,,- MEMORANDUM April 5, 2013 TO: FROM: Jason Schubert, AICP Principal Planner SUBJECT: RV STATION (DVPL) Thank you for the submittal of the required documents for your DEVELOPMENT PLAT application. This project will be distributed to staff next week for their review. cc: Case file no. 13-00900068 Pkxxixg &Deve%pmmt Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gmidevservims (* F4" CITY OF COLLEGE STATION Homr ofT AdM U.ro ,,- MEMORANDUM April 5, 2013 TO: Mark Homeyer, RV Station Ltd, via: markah23@earthlink.net FROM: Jason Schubert, AICP Principal Planner SUBJECT: RV STATION (DVPL) Thank you for the submittal of the required documents for your DEVELOPMENT PLAT application. This project will be distributed to staff next week for their review. cc: Kling Engineering & Surveying, via, skling@cectexas.com Case file no. 13-00900068 Pkxxixg &Deve%pmmt Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 atcIlI v/Aevservims (*Orq" CITY OF COLLEGE STATION - Home of TexasA6M Univenky' MEMORANDUM April 17, 2013 TO: FROM: Matt Robinson, AICP, Senior Planner SUBJECT: Rv Station (Dvpl) - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, , 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat (IF GOING TO P&Z); One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal cacstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx..qov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Rv Station/Mark Homeyer, Kling, Stewart, P&DS Project No. 13-00900068 Planning err Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Rv Station (Dvpl) (13-00900068) PLANNING 1. The Comprehensive Plan designates the area as Urban and as such when platting the maximum block length is 660'. The proposed plat is exceeding this amount and will require a public street or public way to break block length. A public way consists of a 40' public access easement with a minimum drive width of 24' with 5' sidewalks on each side. Alternatively a waiver could be sought. If pursuing a waiver a $233 waiver fee will need to be submitted along with revised application pages (2 and 3) addressing questions related to the waiver. 2. Change title block from Development Plat to Final Plat and add lot and block number. 3. A 10/20' PUE is required at rear of property. 4. Provide a cross access easement to the Mary Ann Davis property to the northwest. 5. Add title or information after Mark Homeyer's name under the Certificate of Ownership and Dedication. Is he the owner or representative of RV Station, LTD.? 6. Show all existing easements on and adjacent to property. There are two 20' PUE's not labeled on the plat (v3496/p146 and v7685/p132) and two others referred to in the title report, 60' electrical easement v213/p105, and Wellborn Water v303/p346. 7. Please tie to a City of College Station monument. 8. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 9. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 10. The construction documents and reports are still under review and may affect the plat. Reviewed by: Matt Robinson Date: 4/10/13 %*4V CITY OF COLLEGE STATION Home of Texas A6MVnivenky' MEMORANDUM TO: FROM: 'Planner Not Assigned' SUBJECT: Rv Station (Dvpl) - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, , 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat (IF GOING TO P&Z); Parkland Dedication in the amount of $ must be submitted prior to the filing of the final plat; Easement Dedication Sheet for Temporary Turnaround (delete if not applicable); One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal cacstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Rv Station/Mark Homeyer, Kling, Stewart, Planning e3'Development Services P O BOX 99G0 •y AVENUE • COLLEGE STATION • TEXAS • 77842 P&DS Project' o. -o6J O S7G4.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Rv Station (Dvpl) (13-00900068) PLANNING 11. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 12. A temporary turnaround is required at (specific location) for Fire and Sanitation services: • An Easement Dedication Sheet and all necessary attachments must be submitted for review prior to the final plat being scheduled for a P&Z meeting; • The Temporary Turnaround Easement must be filed at the courthouse and the recording information included on the Final Plat prior to the plat being filed at the courthouse. 13. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 14. The construction documents and reports are still under review and may affect the plat. 15. Please be aware that each lot will be required to provide a minimum of two (2) trees of at least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No. 3222. Reviewed by: 'Planner Not Assigned' Date: ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(cD-cstx.gov. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date:4/12/13 SANITATION 1. Sanitation is o with this project. Reviewed by: Wally Urrutia Date: April 15, 2013 ENGINEERING COMMENTS NO. 1 — Final Plat 1. Please add a note that this property lies within the Alum Creek Sanitary Sewer Impact Fee Area. 2. Please provide a 20-ft PUE around the perimeter of the property. 3. All 10-ft PUEs for the proposed waterline need to have a minimum width of 15-ft. 4. Label the 20-ft PUE adjacent to the SH6 right-of-way with volume and page number. 5. FYI ... The proposed waterline across the front of the property is required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 6. FYI... Engineering construction documents are still under review and may affect the plat. Reviewed by: Erika Bridges Date: 4/19/13 ._ CITY TY OF COELEGF, STATION home ofTexasA&M University` MEMORANDUM June 11,2013 TO: Mark Homeyer, RV Station Ltd.; via: markah23 a)earthlink.net #" FROM: Jenifer Paz, Staff Planner - 1 SUBJECT: --RV STATION - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted, your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments / cc: Kling Engineering & Surveying; via: skling(o)cectexas.com ✓ Case file #13-00900068 Planning d Development Services P.O. BOX 9960 - 1 I01 TEXAS AWN13F • C0LL1;.GFS1_,M'10N • TFXAS • 77842 111 979 764.3570 • FAX. 979.764,3496 csbx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: RV STATION (FP) - 13-00900068 PLANNING 1. Revise the label to the access easement to state Public Way with the specified public access easement widths. 2. Remove the shading to the 15' PUE. 3. The minimum horizontal radius for a public way is 200'. Revise the public access easement and the line table accordingly. 4. Provide a note for the maintenance responsibility of Public Way/access easement. 5. Remove 'Tract' from the label on the plat. 6. The P&Z Certification should be titled "CERTIFICATE OF PLANNING AND ZONING COMMISSION" 7. Provide a new title report to clarify easements that are not located on the property. 8. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 9. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jenifer Paz Date: June 10. 2013 2of2 CITY OF COLLEGE STATFON Howe ofTcars A&M University" MEMORANDUM April 19, 2013 TO: Mark Homeyer, RV Station Ltd; via: markah23 anearthlink.net 4� ,/ FROM: Matt Robinson, AICP, Senior Planner SUBJECT: RV Station (Development Plat) - Final Plat Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 29, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24"x36" copies of the revised final plat; If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments / cc: Kling Engineering & Surveying; via: sklinctCcr�.cectexas.com V P&DS Project No. 13-00900068 Planning 26DevelopvtenkServices P.O. BOX 9960 • I101'1"IiXAS AVENUF. • C0I.11'CF.S'I NI ION •'TEXAS •'7M2 TI I.. 9'9.764.3570 • FAX. 979.76,1.3/06 csbt.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: RV Station (DVPL) (13-00900068) PLANNING 1. The Comprehensive Plan designates the area as Urban and as such when platting the maximum block length is 660'. The proposed plat is exceeding this amount and will require a public street or public way to break block length that is no more than 660' from the City Limit line (starting adjacent to lot 27 of South Oaks). The public street/public way will also need to project to the Mary Ann Davis property to the north. Alternatively a waiver can be sought. If pursuing a waiver a $233 waiver fee will need to be submitted along with revised application pages (2 and 3) addressing questions related to the waiver. 2. Change title block from Development Plat to Final Plat and add lot and block number. 3. Add title or information after Mark Homeyer's name under the Certificate of Ownership and Dedication. Is he the owner or representative of RV Station, LTD.? 4. Show all existing easements on and adjacent to property. There are two 20' PUE's not labeled on the plat (v3496/p146 and v7685/pl32) and two others referred to in the title report, 60' electrical easement v213/p105, and Wellborn Water v303/p346. 5. Please tie to a City of College Station monument. 6. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 7. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Matt Robinson Date: 4/10/13 ENGINEERING COMMENTS NO. 1 — Final Plat 1. Please add a note that this property lies within the Alum Creek Sanitary Sewer Impact Fee Area. 2. Please provide a 20-ft PUE around the perimeter of the property. 3. All 10-ft PUEs for the proposed waterline need to have a minimum width of 15-ft. 4. Label the 20-ft PUE adjacent to the SH6 right-of-way with volume and page number. 5. FYI ... The proposed waterline across the front of the property is required to be built or surety provided for it prior to the plat being scheduled for a P&Z meeting. 6. FYI... Engineering construction documents are still under review and may affect the plat. Reviewed by: Erika Bridges Date: 4/19/13 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: ehorton(a)cstx.gov. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date: 4/12/13 ra` CITY OF COLLEGE STATION Home ofTexxAt+M Univenhy' MEMORANDUM April 5, 2013 TO: Mark Homeyer, RV Station Ltd; via: markah23@earthlink.net✓ FROM: Jason Schubert, AICP Principal Planner SUBJECT: RV STATION (DVPL) Thank you for the submittal of the required documents for your DEVELOPMENT PLAT application. This project will be distributed to staff next week for their review. cc: Kling Engineering & Surveying; via; skling@ceetexas.com ✓ Case file no. 13-00900068 Planning d Development Services P.O. LIOX 9960 • 1101 TEXAS AVEN LIE • COLLEGE S'IArION • TEXAS • 77842 "ILL. 979.764.3570 • PAX. 979.764.3496 cstn.gov/devservices �Y CITY OF COi.i.r'.G13 STATION Home of7exw AdM University' MEMORANDUM March 27, 2013 TO: Mark Homeyer, RV Station Ltd.; via: markah23@earthlink.net FROM: Jason Schubert, AICP Principal Planner SUBJECT: RV STATION (DVPL) I reviewed the above -mentioned DEVELOPMENT PLAT application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal so that staff may conduct a thorough review. Please submit the following information by 10 a.m. on any Monday for review that week (please note City offices will be closed on Friday, M2$rh): As the owner of the property is a company, provide proof of authority for the signing individual to sign the application on behalf of the company; The Title Report provided is not current within 90 days as it is dated in 2006. Provide an updated Title Report or a Nothing Further Certificate to accompany the one provided; and Provide a current tax certificate for the 7.067-acre tract, one was only provided for the 4.495-acre tract. Please be aware that if this application is not completed before Monday, May 13, 2013, it will expire and a new application and fees will be necessary to continue the platting process. If you have any questions or need additional information, please call me at 979.764.3570. cc: Kling Engineering & Surveying; via: skling@cectexas.com Case file No. 13-00900068 Planning & Development Services P.O. BOX 9960. 1101 TEXAS AVENUE • COL.L.PGE STATION • TEXAS .77842 979.?64_ S70 • PAX. 979.7164.3496 cstx.gov/devservices