HomeMy WebLinkAboutCity Infrastructure Inspection NoticeCITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 1/28/13
To: Alan Gibbs
From: Mandi Alford
RE: SUDDENLINK MEDIA - HVAC ADDITION
MP 12-266)
Location: 201 QUALITY CIRCLE
❑
Public Water Lines/Fire Hydrants
❑
Public Sanitary Sewer
❑
Public Storm Sewer
❑
Public Streets
❑ Engineer's Estimates Attached
❑
Public Detention Facility
❑ Construction Plans Attached
❑
Driveway Connection to Public Street
® Site Plan Attached
❑
Private Construction within easement
❑
® No Inspection Required
Comments:
CITY INFRASTRUCTURE
INSPECTION NOTICE
Date: 1/28/13
To: Diane Broadhurst
From: Mandi Alford
RE: SUDDENLINK MEDIA - HVAC ADDITION
MP 12-266)
Location: 201 QUALITY CIRCLE
❑
Public Water Lines/Fire Hydrants
❑
Public Sanitary Sewer
❑
Public Storm Sewer
❑
Public Streets
❑ Engineer's Estimates Attached
❑
Public Detention Facility
❑ Construction Plans Attached
❑
Driveway Connection to Public Street
® Site Plan Attached
❑
Private Construction within easement
❑
® No Inspection Required
Comments: