Loading...
HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION CITY ENGINEER DATE: CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF CA.�7 rGfitf 1T Dear Sir: ;�ZZ The purpose of our letter is to request that the following listed impr em lnts�,be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by and by their subcontractors as indicated by signatures below. WORK COMPLETED Owner: 3-tb tcveioe, A4 Lu, Phone Number: R i9 &qO 7d5-0 Address: 0/r10// Ca5he Co (LU 54 /,,, 7X ? 7 SqS` 'WARRANTY DATE II - at-t� Contractor: LP Ve,elgo t-L(- Phone Number: el Z q & id- ZdSO Address: ggq0 (fie S I 'T-K 71 Sri 5- Signature: Signature: /r>/ ACCEPTANC & APPROVAL QW-Rer ,sentative t Engineer Revised IM107 PLAT FILED v'/AOFFSITE ESMTS FILED TEMP BLANKET ESMT FILED —ENO OTHER ESMTS NEEDED SCHULTZENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No.12327 CASTLEGATE 11 SUBDIVISION - PARK A Engineer's Estimate of Construction January24,2013 Item Description Unit Estimated Quantity Unit Price Total Site Preparation & Grading 1 Mobilization& Construction Staking LS 1 $1,250.00 $ 1,250.00 2 Site Preparation LS 1 $1,000.00 $ 1,000.00 3 ISite Grading LS t $750.001 750.00 4 ISift Fence, Construction Exit, and Erosion & Sediment Control I LS I I $700.001 700.00 Park Features 5 Shelter -Slab, Framing, Roof, Masonry and Electrical Work LS 1 $27,500.00 $ 27,500.00 6 Table LS 1 $1,200.00 $ 1,200.00 7 Grill LS 1 $450.00 $ 450.00 8 Drinking Fountain FA 1 $5,000.00 $ 5,000.00 9 Trash Receptacle LS 1 $600.00 $ 600.00 10 Park Benches EA 2 $1,000.00 $ 2,000.00 11 Bike Rack EA 1 $600.00 $ 600.00 12 Concrete Sidewalk -4"thick SF 233 $4.20 $ 978.60 13 Sidewalk Trench Drain EA I $750.00 $ 750.00 Electrical 14 jArea LED Lights & Poles FA 2 $3,200.00 $ 6,400.00 15 lElechical Work&Meter Pole LS 1 $1,500.00 $ 1,500.00 16 1 I" Electrical Conduit I LF 1 80 $3.50 $ 280.00 Irrigation System 17 Ilifigation System I LS I 1 $950.00$ 950.00 Water & Sewer Service 18 I" Water Service (Connect to Existing Service) LS I ] $300.001 $ 300.00 19 P Water Service Line LF 73 $&50 S 474.50 20 Water Line Fittings & Hose Bibs IS 11 $100.00 $ 100.00 21 Water Meter LS 1 $500.00 $ 500.00 22 Sewer Service for Water Fountain LS 1 1 $900.001 $ 900.00 Landscape 22 Non -Canopy Trees (>L25" Caliper) FA 4 $100.00 $ 400.00 23 Canopy Trees (>2.5" Caliper) EA 2 $250.00 $ 500.00 24 Tree Barricade Fencing LF 100 $2.50 $ 250.00 25 jBermuda Grass Seeding (Inside Disturbed Area Limits) I SY 1 4501 $0.30 $ 135.00 Site Preparation & GradinSubtotal S 3,700.00 Park Features Subtotal $ 39,078.60 Electrical Subtotal S 8,180.00 Irrigation System Subtotal S 950.00 Water& Sewer Service Subtotal S 2,274.50 lAndsca eSubtotal $ 1,28.5.00 Performance & Payment Bonds 3 % $ 1,664.D4 TOTAL CONSTRUCTION 1 $ 57,132.14 F-12327 SCHULTZ ENGINEERING, LLG; l3 Page 2 of 2