Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Planning d Dem*pmem Seevien 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 26, 2013 TO: Wallace Phillips IV, via e-mail: dustyphillips52(cDyahoo.com FROM: Danielle Singh, Assistant City Engineer SUBJECT: Engineering Document Comments for Castlegate II Section 203 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: 3-D Development, LLC, via email: dustyphillips52(cDyahoo.com Schultz Engineering, via e-mail: loeschultz84(cDverizon.net Case File No. 13-163 CITY OF COLLEGE STATION Planning d Dem*pmem Seevien 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 26, 2013 TO: Wallace Phillips IV, via e-mail: dustyphillips52(cDyahoo.com FROM: Danielle Singh, Assistant City Engineer SUBJECT: Engineering Document Comments for Castlegate II Section 203 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: 3-D Development, LLC, via email: dustyphillips52(cDyahoo.com Schultz Engineering, via e-mail: loeschultz84(cDverizon.net Case File No. 13-163 CITY OF COLLEGE STATION Planning d Dem*pmem Seevien 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 26, 2013 TO: Wallace Phillips IV, via e-mail: dustyphillips52(cDyahoo.com FROM: Danielle Singh, Assistant City Engineer SUBJECT: Engineering Document Comments for Castlegate II Section 203 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: 3-D Development, LLC, via email: dustyphillips52(cDyahoo.com Schultz Engineering, via e-mail: loeschultz84(cDverizon.net Case File No. 13-163 ENGINEERING COMMENTS NO. 2 1. The remaining development permit fee is $5,421.26. 2. After reviewing these plans further, we can issue a development permit prior to construction of the 12" sanitary sewer line. However, acceptance of this infrastructure will be dependent on the construction of the 12" sanitary sewer line downstream of this development. 3. On sheet 2, the bike lane striping should not continue across intersections. Please break the striping at each intersection. 4. Please show the sanitary sewer extension to the adjacent property as shown on the preliminary plan. 5. The street signs should be as follows: • 2600 Cartington Ct. @ Etonbury Ave. 4200 • 2600 Chillingham Ct. @ Etonbury Ave. 4200 • 4300 Odell Ln. @ Etonbury Ave. 4200 (north side of intersection) • 4400 Odell Ln. @ Etonbury Ave. 4300 Reviewed by: Danielle Singh Date: 8/23/2013 ENGINEERING COMMENTS NO. 2 1. The remaining development permit fee is $5,421.26. 2. After reviewing these plans further, we can issue a development permit prior to construction of the 12" sanitary sewer line. However, acceptance of this infrastructure will be dependent on the construction of the 12" sanitary sewer line downstream of this development. 3. On sheet 2, the bike lane striping should not continue across intersections. Please break the striping at each intersection. 4. Please show the sanitary sewer extension to the adjacent property as shown on the preliminary plan. 5. The street signs should be as follows: • 2600 Cartington Ct. @ Etonbury Ave. 4200 • 2600 Chillingham Ct. @ Etonbury Ave. 4200 • 4300 Odell Ln. @ Etonbury Ave. 4200 (north side of intersection) • 4400 Odell Ln. @ Etonbury Ave. 4300 Reviewed by: Danielle Singh Date: 8/23/2013 (*orq" CITY OF COLLEGE STATION Hom ofT.Ac4MU.,.ty- MEMORANDUM TO: Wallace Phillips IV, via e-mail: dustvohillips52(r),vahoo. cam FROM: Jason Schubert, AICP, Principal Planner SUBJECT: CASTLEGATE II SEC 203 (FP) Thank you forthe submittal of your FINAL PLAT - RESIDENTIAL application. This project will be distributed to staff next week for their review PC: 3-D Development, LLC; via e-mail: dustvphillips520,vahoo.com Joe Schultz; via e-mail: ioeschultz840,verizon. net P&DS Project No. 13-00900163 Plnoxixg e4D.4.pm Sml . P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csu.gov/devservices (*orq" CITY OF COLLEGE STATION Hom ofT.Ac4MU.,.ty- MEMORANDUM TO: Wallace Phillips IV, via e-mail: dustvohillips52(r),vahoo. cam FROM: Jason Schubert, AICP, Principal Planner SUBJECT: CASTLEGATE II SEC 203 (FP) Thank you forthe submittal of your FINAL PLAT - RESIDENTIAL application. This project will be distributed to staff next week for their review PC: 3-D Development, LLC; via e-mail: dustvphillips520,vahoo.com Joe Schultz; via e-mail: ioeschultz840,verizon. net P&DS Project No. 13-00900163 Plnoxixg e4D.4.pm Sml . P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csu.gov/devservices (*/" CITY OF COLLEGE STATION Hom ofT. At4M Uxhvx D' August 19, 2013 TO: Wallace Phillips IV, via e-mail: dustvphillips52Qvahoo. cam FROM: Matt Robinson, AICP, Senior Planner SUBJECT: CASTLEGATE II SEC 203 (FP) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 26, 2013, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24'k36" copy of the revised final plat, One (1) 24'k36" grading and erosion control plan, Thirteen (13) 11"x17" copies of the revised final plat, Parkland Dedication in the amount of $20,000 must be submitted prior to the fling of the final plat, One (1) Mylar original of the revised final plat (required after P&Z approval), and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdioitalsubmittaI0,cs1x. qoy. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www. cstx. g oy/pZ Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: PC: 3-D Development, LLC; via e-mail: dustvphillips520,vahoo.com Joe Schultz; via e-mail: ioeschultz840,verizon. net P&DS Project No. 13-00900163 Staff Review Comments Pkxxixg &Deve%pmmt Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 csa.gov/Aevservims STAFF REVIEW COMMENTS NO. 1 Project: Castlegate II Sec 203 (FP) (13-00900163) PLANNING Community Parkland Dedication fees of $20,000 will be due upon filing of the final plat. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Matt Robinson Date: 8/12/13 ENGINEERING COMMENTS NO. 1 The development permit is currently under review and could affect the final plat. On the preliminary plan, a sanitary sewer (with an easement) is shown between Lots 7&8, Block 35. Where will the adjacent tract get access to sanitary sewer? FYI- the text for Block 35 is overlapping other text, making it difficult to read. Please show the ROW for Odell Lane in Section 201. The plans for the 12" sanitary sewer line through this section have not yet been approved. The sanitary sewer line will need to be built and accepted before the sanitary sewer line for this section can connect to the 12" line. Reviewed by: Danielle Singh Date: 8/19/2013 (*t14" CITY OF COLLEGE STATION Planning d Develapn=ent Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 August 26, 2013 TO: Wallace Phillips IV, via e-mail: dustyphllllps52Ca)Vahoo.com V FROM: Danielle Singh, Assistant City Engineer SUBJECT: Engineering Document Comments for Castlegate II Section 203 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: 3-D Development, LLC, via email: dustyphillips52(cyahoo.com Schultz Engineering, via e-mail: loeschultz84(Qverizon.net , Case File No. 13-163 V ENGINEERING COMMENTS NO. 2 1. The remaining development permit fee is $5,421.26. 2. After reviewing these plans further, we can issue a development permit prior to construction of the 12" sanitary sewer line. However, acceptance of this infrastructure will be dependent on the construction of the 12" sanitary sewer line downstream of this development. 3. On sheet 2, the bike lane striping should not continue across intersections. Please break the striping at each intersection. 4. Please show the sanitary sewer extension to the adjacent property as shown on the preliminary plan. 5. The street signs should be as follows: • 2600 Cartington Ct. @ Etonbury Ave. 4200 • 2600 Chillingham Ct. @ Etonbury Ave. 4200 • 4300 Odell Ln. @ Etonbury Ave. 4200 (north side of intersection) • 4400 Odell Ln. @ Etonbury Ave. 4300 Reviewed by: Danielle Singh Date: 8/23/2013