Loading...
HomeMy WebLinkAboutCost EstimateIndian Lakes Subdivision, Phase XII Engineer's Estimate MBESI NO. 1062-0037 March 1, 2013 Item No. Description Unit Quantfly Estimated Total Unit Pce Paving Construction 1 Clearing/Grubbing Ac. 4.00 $2,500,00 $1Q,000.00 2 3 Excavation 2" HMAC (including prime coat) L.S. 1 ###$1 # ##### 30000 . ,0 $ 0 4 6" Lime Stabilized Subgrade (6-1.)S.Y. S.Y. 4,003 0 $30,000.0 5 6" Crashed Limestone Base 5,522 $4.50 $24,849.00 S.Y. 5,235 $11.00 $57,585.00 Paving Subtotal $168,468.50 Storm Drain Construction 6 18" RCP, ASTM C76, CL III L.F. 45 $30.00 $1,350.00 7 24" RCP, ASTM C76, CL III L.F. 105 $31.00 $3,255.00 8 Sloped End Treatment for 18" RCP EACH 2 $800.00 $1,600.00 9 Sloped End Treatment for 24" RCP EACH 4 ######## $4,000.00 Storm Drain Subtotal $10,205.00 10 8"PVC CL 200-C900 Water Pipe, non-structural backfdl L.F.440 $19,470.00 11 6" PVC CL 200-C900 Water pipe, non-structural backSll L.F. $13,000.00 12 4" PVC CL 200-C900 Water Pi , non-structural backfill L.F.0 $1,620.00 13 16" Steel Casing with Bore L.F. $4,000.00 14 16" Steel Casing L.F. $2,400.0015 US1,000.00$2,000.00 Fire Hydrant Assembly EACH $7,200.0016 S" Gate Valve 6" Gate Valve EACH $2,000.0017 18 2" Blow -off Assembly EACH 1 $800.00 19 Water Service, 1.5" Type K Copper (Short Side < 201) EACH EACH 1 3 $1,000.00 $1,00.00 $1 ,0 00.00 $,00.00 20 Water Service, l,5"TypeKCo (Long Side>20') EACH 2 $1,500.00 $3,000.00 21 Water Service, l" T K Co per (Short Side <20') EACH 1 $1,000.00 $1,000.00 Water Line Subtotal $SS,790.00 19 4'Wide Erosion Comm]Blanket as m�nulhctured North American Green) ` L.F. 2,583 $0.90 $2,324.70 20 Straw Bale Barrier EACH 13 $75.00 $975.00 21 Cellulose Fibermulch Seeding S.Y. 11,812 $0.50 $5,906.00 22 Construction Exit for Silt Control EACH 1 $1,500.00 $1,500.00 23 Silt Fence I F 1 1,150 1 $3.00 $3,450M Erosion Control Construction $14 155.70 TOTAL CONSTRUCTION COST $251,619 The above construction estimate is based on the engineer's preliminary opinion of Probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. e ., ......9,Tab 3 ,