HomeMy WebLinkAboutDrainage ReportDRAINAGE REPORT FOR INDIAN LAKES SUBDIVISION PHASE 12 Febuary, 2013 PREPARED FOR: SMILING MALLARD DEVELOPMENT, LTD. 3608 EAST 29" STREET BRYAN, TEXAS 77802 979-260-7000 MBESI No. 10620037 pmMcCLURE &c BROWNE ENGINEERING/SURVEYING, INC. 1008 Woodcreek Dr. Suite 103 College Station, 7x. 77845 (97s) a93-383a 1314 10tb Streat Sufta gap - Hwfsvnia, Tx_ pyaz Engineer Reg. N0_ F158 o - �sse� zs4 a>ys Survey Reg. No. 101033-00 Indian Lakes Subdivision, Phase 12 Stormwater Management Technical Design Summary Report MBESI No. 10620037 PART 1— Executive Summary Report Section 1 — Contact Information Project Designer: McClure and Browne Engineering and Surveying, Inc. 1008 Woodcreek Drive, Suite 103 College Station, TX 77845 979-693-3838 Project Developer: Smiling Mallard Development, Ltd. 3608 East 29' Street Bryan, Texas 77802 Section 2 — General Information and Project Location This development is the 12" phase of a 15 phase subdivision. Phase 12 consists of 11 lots. The phase is located in the Indian Lakes Village which is down Arrington Rd approximately 2 miles from the Arrington Rd. William D. Fitch Pkwy intersection. Phase 12 lies in the southeast portion of the subdivision at the intersection of Indian Lakes Dr and Matoska Ridge. The entire subdivision has been analyzed in the initial drainage report submitted in September, 2000. The development is entirely located within the city limits of College Station. The project site is in the Peach Creek watershed. According to the Flood Insurance Rate Maps for Brazos County, Texas and incorporated area, Map Number 48041CO350E effective May 16, 2012; no portion of this property is located in a 100-year flood hazard area. Culvert pipe and ditch sizing calculations are shown with this submittal. The culverts and ditches peak runoffs were found using the Rational Method. A runoff coefficient (c) of 0.50 was used for residential areas since all the lots have an area greater than I acre. The ditches along the proposed roadways are uniform throughout the project. The ditch profiles along Matoska Ridge and Kiowa Drive were determine using the largest ditch drainage area found for Phase XII. The culverts and ditches were analyzed using Hydraflow Express Extension for AutoCAD Civil 3D 2012 which utilizes Manning's Equation for the analysis. Section 3 —Reference Exhibit A Vicinity Map Exhibit B Excerpt from FEMA FIRM & BCS Watershed Map Exhibit C Culvert Pipe & Ditch Calculations Exhibit D Drainage Area Map Exhibit E Technical Design Summary Drainage Report 1 Indian Lakes, Phase 12 EXHIBITS Drainage Report Indian Lakes, Phase 12 EXHIBIT A Vicinity Map Drainage Report Indian Lakes, Phase 12 Vicinity Map EXHIBIT "A" VICINITY MAP /ND/AN L49ES PHASE X// COLLEGE STATION, HRAZOS COUNJY, TEXAS EXHIBIT B FEMA FIRM Map & BCS Watershed Map Drainage Report Indian Lakes, Phase 12 ET NANTNK 1p C`„e DRIVE P� Ge PPN� 10180000 FT Peach Creek South Tributary 14 ( ' Tributary 7.5 I Peach CrF, + my y + Tributa c o`n Peach Creek South Tributary 73 Peach Creek South Tributary 14.1 Peach Creek South Tributary 7.2 ZONE A 10175000 FT o= R�o P .yi a Peach Creek South ZONE A Tributary 8.2 i - Peaeh Creed South ZONE A R ZI Tributary 11 , Peach Creek Soot $ - S50„tG Tributary 12 South 1 L6 'F'eL Crev - 10170000 FT --- k Peagi ; 30" 30' 00" 96" 15' 00" Peach Creek South 765"'E 766nnn'"E y67a Peach Creek South Peach Creek South Tributary 10 Panther Branch Tributary 9 MAP SCALE 1"= 2000' 0 2000 4000 FEET METER M PANEL 0350E FIRM D FLOOD INSURANCE RATE MAP BRAZOSCOUNTY, ® TEXAS R AND INCORPORATED AREAS PANEL 350 OF 475 (SEE MAP INDEX FOR FIRM PANEL IAYO V CMUUNcomuNI Nomete Use%: me Map el mb shown beRM, Im ulm be mmJ then place, mapoe the laborS unxy um c hwm aeo%Na oe -I a Irm nc mppl.ep.- ., me sums. "m < u n ry ®� MAP NUMBER 46041C0350E F MAP REVISED aelt MAY 16,2012 Felenl C- m ene, Mm.,emeut Ageuey ,nap aoe subaN. to . n ap'a N Nation% m Map store at % - SECTION IX APPENDIX B — REGION'S WATERSHEDS 14.WO 7,000 0 14.000 Feet m: �pr '"may i Y _ WATERSHED BASIII NAME f t 1 ALUMCREEK " - 2 BEE CREEK3 FIRM CREEK 4 BRUSHY CREEK Y 5 BURTOIJ CREEK 7 COTTONWOO B _ 7 COTTONWOOD BRAIICH [ 8 I CREEK LICK CREEK 9 LICK CREEK 11 LITRE MCKSOH CREEK 11 PEACHCREEK 12 SPRIIIOCREEK _ 14 STE STILL CREEK W BRp11CH 1T THOWSEEK ". + 15 THOWSOHS BRANCH l ` 18 TURKEYCREEK CREEK 1T TURKEY CREEK 18 WHITES CREEK y� 1H WICK5011 CREEK 1" 21 WOLF PER CREEK Figure B-1: Watersheds of Bryan / College Station Region STORMWATER DESIGN GUIDELINES Page 4 of 24 APPENDIX B: REGION'S WATERSHEDS Effective February 2007 As Revised August2012 SECTION IX APPENDIX B — REGION'S WATERSHEDS '�- 0 4060 8,100 16,200 Figure B-12: Peach Creek Watershed Area STORMWATER DESIGN GUIDELINES Page 15 of 24 APPENDIX S: REGION'S WATERSHEDS Effective February 2007 As Revised August 2012 EXHIBIT C Culvert Pipe & Ditch Calculations Drainage Report Indian Lakes, Phase 12 EXHIBIT C-1 Rational Formula Drainage Area Calculations Indian Lakes Ph. XII J W � O W 0 J O LL z z d� a wa 9 f W ti 5� wi 5 wJ vz LL � o O 2K W > O >W >Q CW Ys f w > 0 O NO. AC. OA 0 W 0.5 n 0.9 OJ R OLL R R. O W > 41 J Q wr �_ Q N_ Q N O ? Q C00 0.29 0.p0 0.15 20.0 1.0 . 220.0 2.5 W. 2.1 i in 1.910.0 min INHr 833 09].] nMr cfs 1.1 InMr 86 aft 1.3 INHr 9.98 InB r 11.fi efs 1. Culvert2 2.8fi O.C6 2.88 0.00 1.44 346.0 Culvert3 t0.0� 312.0 3.0 L5 ]5 100 633 9:1 ]] 9.9.1 m 11.fi 10. S13 000 5.13 0.00 2.5] 3]4.0 100.' 2060 8.0 L5 fi.4 ID0 fi u`21.] 19J 8.6 22.1 99.6 2.3] 0.00 1.19 348.0 10.0'i 312.0 3.0 t5' T510.0 5.33 ]5 ]] 9d 8.8 11.6 29. 10.2 992 11.8 13. 02f M013 Drainage CalculaGonsnls Culvert Report rlyaratlaw Express Extension for AUtoCAD® Civil 3D®2012 by Autodesk, Inc. SD-1 Culvert - 25 year Invert Elev Dn (ft) = 261.04 Calculations Pipe Length (ft) = 44.50 Qmin (cfs) Slope (%) = 0.49 Qmax (cfs) Invert Elev Up (ft) = 261.26 Tailwater Elev (ft) Rise (in) = 18.0 Shape Span (in) = Circular = 18.0 Highlighted No. Barrels = 1 Qtotal (cfs) n-Value = 0.013 cfs) (cfs) Qpipe p (cfs) Culvert Type Culvert Entrance = Circular Concrete = Square edge w/headwall (C) Veloc Dn (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Veloc Up (ft/s) HGL Dn (ft) Embankment HGL Up (ft) Hw Elev (ft) Top Elevation (ft) = 263.78 Hw/D (ft) Top Width (ft) = 20.00 Flow Regime Crest Width (ft) = 20.00 Elea (ft) 26300 263.50 26300 262 M 26100 26150 261.p0 26050 SDA Culvert - 25 year Ulr6umrurvm - HGL - Embark Wednesday, Feb 20 2013 = 1.40 = 1.40 = (dc+D)/2 = 1.40 = 1.40 = 0.00 = 1.16 = 3.21 = 262.01 = 261.70 = 261.87 = 0.40 = Inlet Control Hw ❑errh (R) 274 224 174 124 0.74 014 -28 -0.76 K..MM1 H) Culvert Report Hydraflaw Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Wednesday, Feb 20 2013 SD-1 Culvert - 100 year Invert Elev Dn (ft) = 261.04 Calculations Pipe Length (ft) = 44.50 Qmin (cfs) = 1.70 Slope (%) = 0.49 Qmax (cfs) = 1.70 Invert Elev Up (ft) = 261.26 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) No. Barrels = 18.0 = 1 Qtotal (cfs) = 1.70 n-Value = 0.013 Qpipe (cfs) Qovertop (cfs) = 1.70 = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.37 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.39 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 262.03 HGL Up (ft) = 261.75 Embankment Hw Elev (ft) = 261.93 Top Elevation (ft) = 263.78 Hw/D (ft) = 0.45 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 20.00 t`.nD 2"M MM 26300 262.50 2UDD aim 261M 280M SD-1 Culvert -100 year - crmlarGulvert - MOL - EnOnflk Hw Depth (a) 2.74 224 174 124 0.74 024 -026 J 76 Reach (0) Culvert Report Hydraflow Express Extension for AUtoCAD® Civil 3D® 2012 by Autodesk, Inc. — SD-2 Culvert - 25 yr Invert Elev Dn (ft) = 246.97 Calculations — Pipe Length (ft) = 40.00 Qmin (cfs) Slope (%) = 2.22 Qmax (cfs) Invert Elev Up (ft) = 247.86 Tailwater Elev (ft) Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 250.70 Hw/D (ft) Top Width (ft) = 24.00 Flow Regime Crest Width (ft) = 24.00 Eln (R) SD-2 Culvert-25 yr Wednesday, Feb 20 2013 = 14.20 = 14.20 = (dc+D)/2 = 14.20 = 14.20 = 0.00 = 5.05 = 6.26 = 248.65 = 249.22 = 250.00 = 1.07 = Inlet Control rw De cfl1 MOO 249.G0 24Hw 247.00 Z48.00 t45D0 0 5 10 15 20 25 30 35 40 is cn cc GbmwercL&er - HGL - Embnnk -2.&5 a] Reach 1fll Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. SD-2 Culvert -100 yr Invert Elev Dn (ft) = 246.97 Calculations Pipe Length (ft) = 40.00 Qmin (cfs) Slope (%) = 2.22 Qmax (cfs) Invert Elev Up (ft) = 247.86 Tailwater Elev (ft) Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) No. Barrels = 1 Qpipe (cfs) n-Value = 0.013 Qovertop (cfs) Culvert Type = Circular Concrete Veloc Dn (ft/s) Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) HGL Up (ft) Embankment Hw Elev (ft) Top Elevation (ft) = 250.70 Hw/D (ft) Top Width (ft) = 24.00 Flow Regime Crest Width (ft) = 24.00 El. (n) $D-2 Culvert -100 yr Wednesday, Feb 20 2013 = 16.80 = 16.80 = (dc+D)/2 = 16.80 = 16.80 = 0.00 = 5.79 = 6.76 = 248.71 = 249.34 = 250.32 = 1.23 = Inlet Control ft De u%(0) 2W.Ob 24s.00 246.00 247.00 246.00 - 145.fl0 0 5 10 15 M 25 w 25 q0 45 50 55 60 �rzwim wuaal - ML - E01bMk 314 214 1.14 014 -086 -1.06 -280 Ruch V Culvert Report Hydreflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Wednesday, Feb 20 2013 SD-3 Culvert - 25 yr Invert Elev Dn (ft) = 240.04 Calculations Pipe Length (ft) = 63.80 Qmin (cfs) = 25.30 Slope (%) = 1.03 Qmax (cfs) = 25.30 Invert Elev Up (ft) = 240.70 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 25.30 No. Barrels = 1 Qpipe (cfs) = 25.30 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 8.25 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 8.05 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 241.92 HGL Up (ft) = 242.72 Embankment Hw Elev (ft) = 244.61 Top Elevation (ft) = 249.90 Hw/D (ft) = 1.96 Top Width (ft) = 24.00 Flow Regime = Inlet Control Crest Width (ft) = 24.00 a. (h) 253.00 246.00 249.00 2"= 24200 240 00 236m 24 in Culvert - 25 yr QFMIWGuhM MGL Embank Hw Depth (R) 9M 7.30 530 3.30 1.30 -070 4.70 Ree M), Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Wednesday, Feb 20 2013 SD-3 Culvert -100 yr Invert Elev Dn (ft) = 240.04 Calculations Pipe Length (ft) = 63.80 Qmin (cfs) = 29.90 Slope (%) = 1.03 Qmax (cfs) = 29.90 Invert Elev Up (ft) = 240.70 Tailwater Elev (ft) = (dc+D)/2 _ Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 29.90 No. Barrels = 1 Qpipe (cfs) = 29.90 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 9.62 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 9.52 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 241.97 HGL Up (ft) = 243.05 Embankment Hw Elev (ft) = 245.63 Top Elevation (ft) = 249.90 Hw/D (ft) = 2.47 Top Width (ft) = 24.00 Flow Regime = Inlet Control Crest Width (ft) = 24.00 E1" (rtJ SD-3 Culvert -100 yr Hw 0epah {ft, 2S000 24800 2450� 2M W 24100 01 240.00 239M 0 5 10 15 20 25 M 35 db 45 Sff 45 50 55 in 1c xn Glr[ular GWvert - HGL - Embank -2.70 BS P.eath tflf Channel Report HydraFlow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Control Ditch 25-yr Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 249.00 Slope (%) = 1.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 11.70 Elev (ft) zsz.aa 251.50 251.00 250.50 250.00 249.50 249.00 248.50 Section Wednesday, Feb 20 2013 Highlighted Depth (ft) = 0.99 Q (cfs) = 11.70 Area (sqft) = 3.92 Velocity (ft/s) = 2.98 Wetted Perim (ft) = 8.16 Crit Depth, Yc (ft) = 0.89 Top Width (ft) = 7.92 EGL (ft) = 1.13 Depth (ft) 3.00 2.50 2.00 1.50 1.00 - _ 0,50 0.00 _0.50 0 2 4 6 8 10 12 14 16 18 20 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Control Ditch 100-yr Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 249.00 Slope (%) = 0.85 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 13.80 Elev (ft) 252.00 251.50 251.00 250.50 250.00 249.50 -- 249.00 248.50 Section Wednesday, Feb 202013 Highlighted Depth (ft) = 1.08 Q (cfs) = 13.80 Area (sqft) = 4.67 Velocity (ft/s) = 2.96 Wetted Perim (ft) = 8.91 Crit Depth, Yc (ft) = 0.95 Top Width (ft) = 8.64 EGL (ft) = 1.22 Depth (ft) 3.00 2.50 2.00 1.50 1.00 0.50 0.00 -0.50 0 2 4 6 8 10 12 14 16 18 20 Reach (ft) EXHIBIT D Drainage Area Map Drainage Report Indian Lakes, Phase 12 EXHIBIT E Technical Design Summary Drainage Report hidian Lakes, Phase 12 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY The Cities of Bryan and College Station both require storm drainage design to follow these Unified Stormwater Design Guidelines. Paragraph C2 of Section III (Administration) requires submittal of a drainage report in support of the drainage plan (stormwater management plan) proposed in connection with land development projects, both site projects and subdivisions. That report may be submitted as a traditional prose report, complete with applicable maps, graphs, tables and drawings, or it may take the form of a 'Technical Design Summary". The format and content for such a summary report shall be in substantial conformance with the — description in this Appendix to those Guidelines. In either format the report must answer the questions (affirmative or negative) and provide, at minimum, the information prescribed in the "Technical Design Summary" in this Appendix. The Stormwater Management Technical Design Summary Report shall include several parts as listed below. The information called for in each part must be provided as applicable. In addition to the requirements for the Executive Summary, this Appendix includes several pages detailing the requirements for a Technical Design Summary Report as forms to be completed. These are provided so that they may be copied and completed or scanned and digitized. In addition, electronic versions of the report forms may be obtained from the City. Requirements for the means (medium) of submittal are the same as for a conventional report as detailed in Section III of these Guidelines. Note: Part 1 — Executive Summary must accompany any drainage report required to be provided in connection with any land development project, regardless of the format chosen for said report. Note: Parts 2 through 6 are to be provided via the forms provided in this Appendix. Brief statements should be included in the forms as requested, but additional information should be attached as necessary. Part 1 — Executive Summary Report Part 2 — Project Administration Part 3 — Project Characteristics Part 4 — Drainage Concept and Design Parameters Part 5 — Plans and Specifications Part 6 — Conclusions and Attestation STORMWATER MANAGEMENT TECHNICAL DESIGN SUMMARY REPORT Part 1 — Executive Summary This is to be a brief prose report that must address each of the seven areas listed below. Ideally it will include one or more paragraphs about each item. Name, address, and contact information of the engineer submitting the report, and of the land owner and developer (or applicant if not the owner or developer). The date of submittal should also be included. 2. Identification of the size and general nature of the proposed project, including any proposed project phases. This paragraph should also include reference to applications that are in process with either City: plat(s), site plans, zoning requests, STORMWATER DESIGN GUIDELINES Page 1 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY or clearing/grading permits, as well as reference to any application numbers or codes assigned by the City to such request. 3. The location of the project should be described. This should identify the Named Regulatory Watershed(s) in which it is located, how the entire project area is situated therein, whether the property straddles a watershed or basin divide, the approximate acreage in each basin, and whether its position in the Watershed dictates use of detention design. The approximate proportion of the property in the city limits and within the ETJ is to be identified, including whether the property straddles city jurisdictional lines. If any portion of the property is in floodplains as described in Flood Insurance Rate Maps published by FEMA that should be disclosed. 4. The hydrologic characteristics of the property are to be described in broad terms: existing land cover; how and where stormwater drains to and from neighboring properties; ponds or wetland areas that tend to detain or store stormwater; existing creeks, channels, and swales crossing or serving the property; all existing drainage easements (or ROW) on the property, or on neighboring properties if they service runoff to or from the property. 5. The general plan for managing stormwater in the entire project area must be outlined to include the approximate size, and extent of use, of any of the following features: storm drains coupled with streets; detention / retention facilities; buried conveyance conduit independent of streets; swales or channels; bridges or culverts; outfalls to principal watercourses or their tributaries; and treatment(s) of existing watercourses. Also, any plans for reclaiming land within floodplain areas must be outlined. 6. Coordination and permitting of stormwater matters must be addressed. This is to include any specialized coordination that has occurred or is planned with other entities (local, state, or federal). This may include agencies such as Brazos County government, the Brazos River Authority, the Texas A&M University System, the Texas Department of Transportation, the Texas Commission for Environmental Quality, the US Army Corps of Engineers, the US Environmental Protection Agency, et al. Mention must be made of any permits, agreements, or understandings that pertain to the project. 7. Reference is to be made to the full drainage report (or the Technical Design Summary Report) which the executive summary represents. The principal elements of the main report (and its length), including any maps, drawings or construction documents, should be itemized. An example statement might be: "One -page drainage report dated , one set of construction drawings L_sheets) dated and a -page specifications document dated comprise the drainage report for this project." STORMWATER DESIGN GUIDELINES Page 2 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 2 — Project Administration Start(Page 2.1) Engineering and Design Professionals Information Engineering Firm Name and Address: Jurisdiction McClure & Browne Engineering/Surveying, Inc. City: Bryan 1008 Woodcreek Drive, Suite 103 X College Station College Station, Texas 77845 Date of Submittal: (979)693-3836 Lead Engineer's Name and Contact Info.(phone, e-mail, fax): Other: Seffery L. Robertson, P.E. Cullen L. Harper, E.I.T. Supporting Engineering / Consulting Firm($): Other contacts: Developer / Owner / Applicant Information Developer / Applicant Name and Address: Phone and e-mail: Smiling Mallard Development, Ltd. (979) 846-4384 3608 East 29th Street Bryan, Texas 77802 Property Owner(s) if not Developer / Applicant (& address): Phone and e-mail: Project Identification Development Name: Indian Lakes, Phase 12 Is subject property a site project, a single-phase subdivision, or part of a multi -phase subdivision? Multi -phase Subdivision If multi -phase, subject property is phase 12 of 15 Legal description of subject property (phase) or Project Area: (see Section Il, Paragraph B-3a) Indian Lakes, Phase 12(18.48 Ac.) If subject property (phase) is second or later phase of a project, describe general status of all earlier phases. For most recent earlier phase Include submittal and review dates. The project is the 12th phase of a 15 phase subdivision. At this time the first phase has been built. Phase 1 was submitted in September, 2000 and consisted of 58 lots. The most recent phase submitted was Ph. 15. General Location of Project Area, or subject property (phase): Project site is located approximately 600 feet to the north of the intersection of Indian Lakes Drive and Matoska Ridge in College Station, Texas. In City Limits? Extraterritorial Jurisdiction (acreage): Bryan: acres. Bryan: College Station: College Station: 18.48 acres. Acreage Outside ETJ: STORMWATER DESIGN GUIDELINES Page 3 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 2 - Project Administration Continued (page 2.2) Project Identification (continued) Roadways abutting or within Project Area or subject property: Indian Lakes Drive Abutting tracts, platted land, or built developments: Indian Lakes, Phase 10 Named Regulatory Watercourse(s) & Watershed(s): Phase 12 is located in the Peach Creek Watershed. TributaryBasin(s): The nearest tributary is Peach Creek S. Tributary 7.2 (See FEMA Map 48041C0350E). Plat Information For Project or Subject Property (or Phase) Preliminary Plat File #: Name: Pending Approval Final Plat File #: Date: Status and Vol/Pg: Pending Approval If two plats, second name: File #: Status: Date: Zoning Information For Project or Subject Property (or Phase) Zoning Type: PD-x (22a. sa at. )Existing or Proposed? Existing Case Code: Case Date Status: Zoning Type: Existing or Proposed? Case Code: Case Date Status: Stormwater Management Planning For Project or Subject Property (or Phase) Planning Conference(s) & Date(s): Participants: Preliminary Report Required? Submittal Date Review Date Review Comments Addressed? Yes _ No _ In Writing? When? Compliance With Preliminary Drainage Report. Briefly describe (or attach documentation explaining) any deviation(s) from provisions of Preliminary Drainage Report, if any. STORMWATER DESIGN GUIDELINES Page 4 of26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY Part 2 — Project Administration Continued (page 2.3) Coordination For Project or Subject Property (or Phase) Note: For any Coordination of stormwater matters indicated below, attach documentation describing and substantiating any agreements, understandings, contracts, or approvals. Coordination —Dept. Contact: Date: Subject: With Other Departments of Jurisdiction City (Bryan or College Station) Coordination With Summarize need(s) & actions taken (include contacts & dates): Non jurisdiction City Needed? Yes No X Coordination with Summarize need(s) & actions taken (include contacts & dates): Brazos County Needed? Yes No X Coordination with Summarize need(s) & actions taken (include contacts & dates): TxDOT Needed? Yes No X Coordination with Summarize need(s) & actions taken (include contacts & dates): TAMUS Needed? Yes No X Permits For Project or Subject Property (or Phase) As to stormwater management, are permits required for the proposed work from any of the entities listed below? If so, summarize status of efforts toward that objective ins aces below. Entity Permitted Approved ? Status of Actions (include dates) US Army Crops of Engineers No X Yes _ US Environmental Protection Agency No X Yes _ Texas Commission on A Stormwater Pollution Prevention Plan must be Environmental Quality implemented prior to the start of construction No Yes x according to TMES General Permit No. TXR150000. Brazos River Authority No x Yes STORMWATER DESIGN GUIDELINES Page 5 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY Part 3 — Property Characteristics Start (Page 3.1) Nature and Scope of Proposed Work Existing: Land proposed for development currently used, including extent of impervious cover? Existing undeveloped land (Dense tree cover). Existing impervious cover is approximately 0 sf. Site — Redevelopment of one platted lot, or two or more adjoining Platted lots. Development — Building on a single platted lot of undeveloped land. Project Building on two or more Platted adjoining lots of undeveloped land. (select all applicable) Building on a single lot, or adjoining lots, where proposed plat will not form a new street (but may include ROW dedication to existing streets). — Other (explain): Subdivision x Construction of streets and utilities to serve one or more platted lots. Development Construction of streets and utilities to serve one or more proposed lots on Project lands represented by pending plats. Site proiects: building use(s), approximate floor space, impervious cover ratio. Describe Subdivisions: number of lots by general type of use, linear feet of streets and Nature and drainage easements or ROW. Size of This phase of the subdivision includes 11 lots. The development Proposed consists of approximately 1400 LF of streets with 16' PUE on each Project side of the streets ROW. Ex. I.C.=O sf (0%); Pr. I.C.= 104,000 sf (13%) Is any work planned on land that is not platted If yes, explain: or on land for which platting is not pending x No Yes FEMA Floodplains Is any part of subject property abutting a Named Regulatory Watercourse x (Section II, Paragraph B1) or a tributary thereof? No Yes Is any part of subject property in floodplain No x Yes Rate Ma 4804IC03SOR p area of a FEMA-regulated watercourse? Encroachment(s) into Floodplain Encroachment purpose(s): — Building site(s) — Road crossing(s) areas planned? _ Utility crossing(s) Other (explain): No x Yes If floodplain areas not shown on Rate Maps, has work been done toward amending the FEMA- approved Flood Study to define allowable encroachments in proposed areas? Explain. STORMWATER DESIGN GUIDELINES Page 6 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 3 — Propertv Characteristics Continued (Page 3.2) Hydrologic Attributes of Subject Property (or Phase) Has an earlier hydrologic analysis been done for larger area including subject property? Yes Reference the study (& date) here, and attach copy if not already in City files. x Indian Lakes Subdivision; September, 2000 Is the stormwater management plan for the property in substantial conformance with the earlier study? Yes x No If not, explain how it differs. No If subject property is not part of multi -phase project, describe stormwater management plan for the property in Part 4. If property is part of multi -phase project, provide overview of stormwater management plan for Project Area here. In Part 4 describe how plan for subject property will comply therewith. Do existing topographic features on subject property store or detain runoff? x No Yes _ Describe them (include approximate size, volume, outfall, model, etc). Any known drainage or flooding problems in areas near subject property? x No Yes Identify: Based on location of study property in a watershed, is Type 1 Detention (flood control) needed? (see Table B-1 in Appendix B) Detention is required. X Need must be evaluated. _ Detention not required. What decision has been reached? By whom? Detention study Performed by McClure & Browne during Phase 1. If the need for How was determination made? Type Detention must be evaluated: Detention was required and is provided for the entire Indian Lakes Subdivision. However, Phases 12 does not require any additional detention. STORMWATER DESIGN GUIDELINES Page 7 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 3 — Property Characteristics Continued (Page 3.3) Hydrologic Attributes of Subject Property (or Phase) (continued) Does subject property straddle a Watershed or Basin divide? X No _ Yes If yes, describesplits below. In Part 4 describe desi n conce t for handlin this. Watershed or Basin Lar er acreage Lesser acreage Above -Project Areas(Section II, Paragraph B3-a) Does Project Area (project or phase) receive runoff from upland areas? _ No X Yes Size(s) ofarea(s) in acres: 1) 2-7 F'c- 2) 3) 4) Flow Characteristics (each instance) (overland sheet, shallow concentrated, recognizable concentrated section(s), small creek (non -regulatory), regulatory Watercourse or tributary); Phase 12 receives overland sheet from the east from the existing gas line easement and from Ph. 10. Flow determination: Outline hydrologic methods and assumptions: The Rational Method was used for flow calculations and the post development land was treated as large acre residential tracts. Does storm runoff drain from public easements or ROW onto or across subject property? x No _ Yes If yes, describe facilities in easement or ROW: Are changes in runoff characteristics subject to change in future? Explain No upstream land is already developed. Conveyance Pathways (Section II, Paragraph C2) Must runoff from study property drain across lower properties before reaching a Regulatory Watercourse or tributary? No X Yes Describe length and characteristics of each conveyance pathway(s). Include ownership of property(ies). Runoff from Ph. 12 will leave the phase and travel approx. 350' through a well defined channel before reaching the tributary. The property is a future phase of the Indian Lakes Subdivision. STORMWATER DESIGN GUIDELINES Page 8 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 3 — Property Characteristics Continued (Page 3.4) Hydrologic Attributes of Subject Property (or Phase) (continued) Conveyance Pathways (continued) Do drainage If yes, for what part of length? % Created by? or easements _plat, instrument. If instrument(s), describe their provisions. exist for any part of pathway(s)? x No Yes Where runoff must cross lower properties, describe characteristics of abutting lower property(ies). (Existing watercourses? Easement or Consent aquired?) Pathway Areas Describe any built or improved drainage facilities existing near the property (culverts, bridges, lined channels, buried conduit, swales, detention ponds, etc). Nearby Drainage Facilities Do any of these have hydrologic or hydraulic influence on proposed stormwater design? x No _Yes If yes, explain: STORMWATER DESIGN GUIDELINES Page 9 of 26 APPENDIX. D: TECH, DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION M APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Start (Page 4.1) Stormwater Management Concept Discharge(s) From Upland Area(s) If runoff is to be received from upland areas, what design drainage features will be used to accommodate it and insure it is not blocked by future development? Describe for each area, flow section, or discharge point. Discharge(s) To Lower Property(ies) (Section II, Paragraph E1) Does project include drainage features (existing or future) proposed to become public via platting? x No _Yes Separate Instrument? x No Yes Per Guidelines reference above, how will runoff be discharged to neighboring — Establishing Easements (Scenario 1) property(ies)? Pre -development mas Release Scenario 2 ) _ Combination of the two Scenarios Scenario 1: If easements are proposed, describe where needed, and provide status of actions on each. (Attached Exhibit Scenario 2: Provide general description of how release(s) will be managed to pre -development conditions (detention, sheet flow, partially concentrated, etc.). (Attached Exhibit #_) Combination: If combination is proposed, explain how discharge will differ from pre - development conditions at the property line for each area (or point) of release. If Scenario 2, or Combination are to be used, has proposed design been coordinated with owner(s) of receiving property(ies)? No Yes Explain and provide documentation. STORMWATER DESIGN GUIDELINES Page 10 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.2) Stormwater Management Concept (continued) Within Project Area Of Multi -Phase Project Identify gaining Basins or Watersheds and acres shifting: Will project result in shifting runoff between Basins or between What design and mitigation is used to compensate for increased runoff Watersheds? from gaining basin or watershed? x No Yes How will runoff from Project 1. — With facility(ies) involving other development projects. Area be mitigated to pre - development conditions? 2 Establishing features to serve overall Project Area. Select any or all of 1, 2, 3. x On phase (or site) project basis within Project Area. and/or 3, and explain below. 1. Shared facility (type & location of facility; design drainage area served; relationship to size of Project Area): (Attached Exhibit #_) 2. For Overall Project Area (type & location of facilities): (Attached Exhibit #_) 3. By Phase (or site) Proiect: Describe planned mitigation measures for phases (or sites) in subsequent questions of this Part. Are aquatic echosystems proposed? No Yes In which phase(s) or project(s)? r Are other Best Management Practices for reducing stormwater pollutants proposed? a No Yes Summarize type of BMP and extent of use: — h rn .N 0 0 Z If design of any runoff -handling facilities deviate from provisions of B-CS Technical x Specifications, check type facility(ies) and explain in later questions. — Detention elements Conduit elements Channel features — Swales Ditches Inlets — Valley gutters _ Outfalls Culvert features Bridges Other S I URMWATER DESIGN GUIDELINES Page 11 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Desion Parameters Continued (Page 4.3) Stormwater Management Concept (continued) Within Project Area Of Multi -Phase Project (continued) Will Project Area include bridge(s) or culvert(s)? _ No x Yes Identify type and general size and In which phase(s). An 18" culvert is located at the Matoska Ridge and Indian Lakes intersection. 24" culverts are located at the Matoska Ridge and Kiowa Cove intersection and along Kiowa Cove at Sta. S+2S. All culverts are in Ph. 12. If detention/retention serves (will serve) overall Project Area, describe how it relates to subject phase or site project (physical location, conveyance pathway(s), construction sequence): Within Or Serving Subject Property (Phase, or Site) If property part of larger Project Area, is design in substantial conformance with earlier analysis and report for larger area? _ Yes No, then summarize the difference(s): Identify whether each of the types of drainage features listed below are included, extent of use, and general characteristics. Typical shape? Surfaces? vV-Shape Grass Steepest side slopes: Usual front slopes: Usual back slopes: yr 4:1 4:1 4:1 N x Flow line slopes: least 1. oo� Typical distance from travelway: 11 typical Varies greatest 4. oot (Attached Exhibit #) o y Z D N o Are longitudinal culvert ends in compliance with B-CS Standard Specifications? x Yes No, then explain: At intersections or otherwise, do valley gutters cross arterial or collector streets? �, } No _ Yes If yes explain: U � w N Are valley gutters proposed to cross any street away from an intersection? 0 _ No _ Yes Explain: (number of locations?) iu a T @ xl STORMWATER DESIGN GUIDELINES Page 12 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 APPENDIX D — TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concert and Design Parameters Continued (Page 4.4) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Gutter line slopes: Least Usual Greatest Are inlets recessed on arterial and collector streets? _ Yes _ No If "no', identify where and why. 3 N Z1 0 T N C NZ a €x 0 Will inlets capture 10-year design stormflow to prevent flooding of intersections (arteri with arterial or collector)? _ Yes _ No If no, explain where and why not. vviu meet size and placement prevent exceeding allowable water spread for 10-ye: design storm throughout site (or phase)? _ Yes _ No If no, explain. Sao curves: Are inlets placed at low points? Yes No Are inlets and conduit sized to prevent 100-year stormflow from ponding at greater than 24 inches? Yes _ No Explain "no" answers. r, � 11ilniw oe conramea in combination of ROW and buried conduit on whole length of all streets? _ Yes _ No If no, describe where and why. Do designs for curb, gutter, and inlets comply with B-CS Technical Specifications? Yes _ No If not, describe difference(s) and attach justification. Are any 12-inch laterals used? used. ripe runs between system I Typical _ access points (feet): Are junction boxes used at each bend? and why. Longest Yes _ No If not, explain where Are downstream soffits at or below upstream soffits? Least amount that hydraulic Yes _ No _ If not, explain where and why: grade line is below gutter line (system -wide): STORMWATER DESIGN GUI------------ DELINES Page 13 of 26 APPENDIX. TrTECH. DESIGN SUMMARY Effective February 2007 As Revised February 2oog APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainaae Concept and Design Parameters Continued (Page 4.5) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Describe watercourse(s), or system(s) receiving system discharge(s) below (D (include design discharge velocity, and angle between converging flow lines). U m 1) Watercourse (or system), velocity, and angle? U) C Culverts discharge into Unnaned Tributary to Peach Creek Tributary. Velocity V< 10 fps Q Angle in -line with existing defined chancels. aE 2) Watercourse (or system), velocity, and angle? c o 00 0 E °t (D N 3) Watercourse (or system), velocity, and angle? a �v � O m o -o n E For each outfall above, what measures are taken to prevent erosion or scour of mreceiving and all facilities at juncture? N T 1) Rock Rip Rap at discharge into defined channel. (6 ro 2) ur 0 3) Are swale(s) situated along property lines between properties? No Yes _ Number of instances: For each instance answer the following questions. Surface treatments (including low -flow flumes if an r,. E2 N N uJ cFlow line slopes (minimum and maximum): m a 0 d o Z Ouffall characteristics for each (velocity, convergent angle, & end treatment). dxl 3 v, < Will 100-year design storm runoff be contained within easement(s) or platted drainage ROW in all instances? _ Yes _ No If "no" explain: a 1 UnrvivvH I trc ULSIUN GUIDELINES Page 14 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.6) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Are roadside ditches used? No X Yes If so, provide the following: t Is 25-year flow contained with 6 inches of freeboard throughout ? X Yes w _No Are top of banks separated from road shoulders 2 feet or more? X Yes No _ Are all ditch sections trapezoidal and at least 1.5 feet deep? X No v _Yes For any "no" answers provide locations) and explain: All Ditches are V-shaped and at least 2- deep Elf If conduit is beneath a swale, provide the following information (each instance). Instance 1 Describe general location, approximate length: m > Is 100-year design flow contained in conduit/swale combination? Yes No "no" w If explain: — U 0 N Space for 100-year storm flow? ROW _ Easement— Width Swale Surface type, minimum Conduit Type and size, minimum and maximum X Ic c and maximum slopes: slopes, design storm: 0 1. D 0 t m A Inlets Describe now conduit is loaded (from streets/storm drains, inlets by type): C C f0 � L U � C � N i o Access Describe how maintenance access is provided (to Swale, into conduit): o `0 m o = c c a) Instance 2 Describe general location, approximate length: a°i N f6 c .'o Is 100-year design flow contained in conduit/swale combination? Yes No ° 2 If "no" explain: — m a c E 0 Space for 100-year storm flow? ROW _ Easement Width Swale Surface type, minimum _ Conduit Type and size, minimum and maximum m and maximum slopes: slopes, design storm: o a m Inlets Describe how conduit is loaded (from streets/storm drains, inlets by type): 3 0 N P Q Access Describe how maintenance access is provided (to swale, into conduit): J 1 vrtiwvvH I tK UtNUN GUIDELINES Page 15 of 26 APPENDIX. D. TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.7) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) If "yes" provide the following information for each instance: Instance 1 Describe general location, approximate length, surtacing: a o w N Is 100-year design flow contained in swale? Yes _No Is swale wholly within drainage ROW? —Yes _No Explain "no" answers: Access Describe how maintenance access is provide: zo v ox o Instance 2 Describe general location, approximate length, surfacing: a � oo E w ro 3 m Is 100-year design flow contained in Swale? Yes No Is swale wholly — ` o within drainage ROW? _Yes _ No Explain "no" answers: 30 00 = Access Describe how maintenance access is provided: U_ d Instance 3.4. etc. If swales are used in more than two instances, attach sheet providing all above information for each instance. "New" channels: Will any area(s) of concentrated flow be channelized (deepened, widened, or straightened) or otherwise altered? _ No Yes If only slightly shaped, see "Swales" in this Part. If creating side banks, information below. C1. provide No Will design replicate natural channel? _ Yes No If "no", for each instance oo. n _ describe section shape & area, flow line slope (min. & max.), surfaces, and 100-year w design flow, and amount of freeboard: a Instance 1: c y a� o Instance 2: a E o _ Z x Instance 3: ' m 0 U STORMWATER DESIGN GUIDELINES Page 16 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 - Drainage Concept and Design Parameters Continued (Page 4.8) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Existing channels (small creeks); Are these used? No Yes _ If" es" provide the information below. Will small creeks and their floodplains remain undisturbed? Yes No How many disturbance instances? Identify each plannocation_ ed l For each location, describe length and general type of proposed improvement (including floodplain changes): For each location, describe section shape & area, flow line slope (min. & max.), surfaces, and 100-year design flow. a d c o Watercourses (and tributaries)• Aside from fringe changes, are Regulatory 0 Watercourses proposed to be altered? _ No Yes Explain below. Submit full report describing proposed changes to Regulatory Watercourses. Address E existing and proposed section size and shape, surfaces, alignment, flow line changes, length affected, and capacity, and provide full documentation of ° analysis procedures and data. Is full report submitted? p Yes _ No If "no" explain: m c c UAll Proposed Channel Work, For all proposed channel work, provide information requested in next three boxes. If design is to replicate natural channel, identify location and length here, and describe design in Special Design section of this Part of Report. Will 100-year flow be contained with one foot of freeboard? Yes No If not, identify location and explain: Are ROW/ easements sized to contain channel and required maintenance space? Yes —No If not, identify location(s) and explain: STORMWATER DESIGN GUIDELINES Page 17 of 26 APPENDIX. D. TECH. DESIGN SUMMAW Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 - Drainage Concept and Design Parameters Continued (Page 4.9) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) How many facilities for subject property project? For each provide info. below. For each dry -type facilitiy: Facility 1 Facility 2 Acres served & design volume + 10% 100-yr volume: free flow & plugged Design discharge (10 yr & 25 yr) Spillway crest at 100-yr WSE? —yes _ no —yes —no Berms 6 inches above plugged WSE? _yes _ no _yes no _ Explain any "no" answers: m r For each facility what is 25-yr design Q, and design of outlet structure? Facility 1: 0 ZI Facility 2: X Do outlets and spillways discharge into a public facility in easement or ROW? Facility 1: _ Yes _ No Facility 2: _Yes —No If "no" explain: 0 0 a 0 N For each, what is velocity of 25-yr design discharge at outlet? & at s illwa ? (D Facility 1: & Facility 2: & Are energy dissipation measures used? _ No Yes Describe type and li location: 0 0 5 N N 2 For each, is spillway surface treatment other than concrete? Yes or no, and describe: Facility 1: Facility 2: For each, what measures are taken to prevent erosion or scour at receiving facility? Facility 1: Facility 2: If berms are used give heights, slopes and surface treatments of sides. Facility 1: Facility 2: STORMWATER DESIGN GUIDELINES Page 18 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 — SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY Part 4 - Drainage Concept and Design Parameters Continued (Page 4.10) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Do structures comply with B-CS Specifications? Yes or no, and explain if "no": Facility 1; U. n Facility 2: c -c o c 4:30 d o For additional facilities provide all same information on a separate sheet. Are parking areas to be used for detention? No What is —Yes maximum depth due to required design storm? Roadside Ditches: Will culverts serve access driveways at roadside ditches? No X Yes If "yes", provide information in next two boxes. Will 25-yr. flow pass without flowing over driveway in all cases? No _Yes _ Without causing flowing or standing water on public roadway? X Yes No _ Designs & materials comply with B-CS Technical Specifications? X Yes No Explain any "no" answers: C1. N C oAre culverts parallel to public roadway alignments x Yes _ No Explain: U N N N x `oa Creeks at Private Drives: Do private driveways, drives, or streets cross drainage m ways that serve Above -Project areas or are in public easements/ ROW? y Z No x Yes If 'yes" provide information below. _ How many instances? 2 Describe location and provide information below. Location1: The 24" culverts crossing under Kiowa Cove will serve approximately 2.7 acres from ex. Indian Lakes phases. Location 2: Location 3: For each location enter value for: 1 2 3 Design year passing without toping travelway? ioo ioo Water depth on travelway at 25-year flow? o . _01. Water depth on travelway at 100-year flow? o 0 For more instances describe location and same information on separate sheet. STORMWATER DESIGN GUIDELINES Page 19 of 2 AAPPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.11) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Named Reaulatory Watercourses I& Tributaries)• Are culverts proposed on these !a faclldies? X _ Yes, then provide full report documenting assumptions, criteria, analysis, computer programs, and study findings that support proposed design(s). Is report provided? _Yes _No If "no", explain: Arterial or Maior Collector Streets, Will culverts serve these types of roadways? N K y For each identify the _ No _Yes How man instances? am location and provide the information below. } Q Instance 1: Instance 2: xl°' 0 Instance 3: C 0 0 t Yes or No for the 100-year design flow: 1ZE 2 3 o Headwater WSE 1 foot below lowest curb top? m Spread of headwater within ROW or easement? E rn m Is velocity limited per conditions (Table C-11)? y Explain any "no" answer(s): o c � o N U 3 � a � o Minor Collector or Local Streets- Will culverts serve these types of streets? 0— No X Yes How many instances? a for each identify the 0 location and provide the information below: o' a Instance 1: 18" Culvert crosses Matoska Ridge. wInstance 2: 24" Culvert crosses Kiowa Cove near Matoska Ridge Int. cc o Instance 3: 24" Culvert crosses Kiowa Cove. r 4) m For each instance enter value, or "yes" / "no" for: 1 2 3 cDesign yr. headwater WSE 1 ft. below curb top? Yes Yes Yes `o 100-yr. max. depth at street crown 2 feet or less? Yes Yes Yes E Product of velocity (fps) & depth at crown = ? 0 0 (ft) 0 o Is velocity limited per conditions (Table C-11)? Yes Yes Yes Limit of down stream analysis (feet)? 10 10 10 Explain any "no" answers: J i VMMMAI CK ULNUN UUIDELINES Page 20 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.12) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) All Proposed Culverts: For all proposed culvert facilities (except driveway/roadside ditch intersects) provide information requested in next eight boxes. Do culverts and travelways intersect at 90 degrees? x Yes No If not, identify location(s) and intersect angle(s), and justify the design(s): Does drainage way alignment change within or near limits of culvert and surfaced approaches thereto? X No _ Yes If "yes" identify location(s), describe change(s), and justification: Are flumes or conduit to discharge into culvert barrel(s)? X No Yes If yes, identify location(s) and provide justification: Are flumes or conduit to discharge into or near surfaced approaches to culvert ends? No X Yes If "yes" identify location(s), describe outfall design treatment(s): C Concrete flumes are provided on each side of Kiowa Cove at the 24" Culvert O near Sta. 5+50 to prevent erosion. U : UI Is scour/erosion protection provided to ensure long term stability of culvert structural U components, and surfacing at culvert ends? x Yes —No If "no" Identify locations and provide justification(s): Will 100-yr flow and spread of backwater be fully contained in street ROW, and/or drainage easements/ ROW? X Yes _ No if not, why not? Do appreciable hydraulic effects of any culvert extend downstream or upstream to neighboring land(s) not encompassed in subject property? X No Yes If _ "yes" describe location(s) and mitigation measures: Are all culvert designs and materials in compliance with B-CS Tech. Specifications? X Yes _ No If not, explain in Special Design Section of this Part. a I UKlvlvvA I EK UESIGN GUIDELINES Page 21 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D — TECHNICAL DESIGN SUMMARY Part 4 — Drainage Conceit and Design Parameters Continued (Page 4.13) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Is a bridge included in plans for subject property project? No Yes _ If "yes" provide the following information. Names) and functional classification of the roadway(s)? What drainage way(s) is to be crossed? N N m V to A full report supporting all aspects of the proposed bridge(s) (structural, geotechnical, hydrologic, and hydraulic factors) must accompany this summary report. Is the report provided? _Yes _ No If "no" explain: is a Stormwater Provide a general description of planned techniques: :9? Pollution Prevention Plan (SW3P) Silt fence and inlet filtration will serve as the c7 estabshed for main protection against Stormwater pollution. The w project project construction? contractor shall use any other means necessary �p No x Yes throughout construction. Special Designs — Non -Traditional Methods Are any non-traditional methods (aquatic echosystems, wetland -type detention, natural stream replication, BMPs for water quality, etc.) proposed for any aspect of subject property project? x No _ Yes If "yes" list general type and location below. Provide full report about the proposed special design(s) including rationale for use and expected benefits. Report must substantiate that stormwater management objectives will not be compromised, and that maintenance cost will not exceed those of traditional design solution(s). Is report provided? _ Yes _ No If "no" explain: STORMWATER DESIGN GUIDELINES Page 22 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 - Drainacle Concept and Design Parameters Continued (Page 4.14) Stormwater Management Concept (continued) Within Or Serving Subject Property (Phase, or Site) (continued) Special Designs — Deviation From B-CS Technical Specifications If any design(s) or material(s) of traditional runoff -handling facilities deviate from provisions of B-CS Technical Specifications, check type facility(ies) and explain by specific detail element. Detention elements _ Drain system elements _ Channel features Culvert features _ Swales _ Ditches _ Inlets Outfalls Valley gutters _ Bridges (explain in bridge report) In table below briefly identify specific element, justification for deviation(s). Specific Detail Element Justification for Deviation (attach additional sheets if needed) 1) 2) 3) 4) 5) Have elements been coordinated with the City Engineer or her/his designee? For each item above provide "yes" or "no", action date, and staff name: 1) 2) 3) 4) 5) Design Parameters Hydrology Is a map(s) showing all Design Drainage Areas provided? x Yes No Briefly summarize the range of applications made of the Rational Formula: For the Rational Formula we assumed residential areas had a runoff coefficient of 0.5 for large residential or estate lots. What is the size and location of largest Design Drainage Area to which the Rational Formula has been applied? 5 ,13 acres Location (or identifier): SD-3 24 ^ culvert Q Kiowa a I UKmvvA I LK ULSIGN GUIDELINES Page 23 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 -Drainage Concept and Design Parameters Continued (Page 4.15) Design Parameters (continued) Hydrology (continued) In making determinations for time of concentration, was segment analysis used? x No _ Yes In approximately what percent of Design Drainage Areas? % As to intensity -duration -frequency and rain depth criteria for determining runoff flows, were any criteria other than those provided in these Guidelines used? x No _Yes If "yes' identify type of data, source(s), and where applied: For each of the stormwater management features listed below identify the storm return frequencies (year) analyzed (or checked), and that used as the basis for design. Feature Analysis Year(s) Design Year Storm drain system for arterial and collector streets Storm drain system for local streets Open channels Swale/buried conduit combination in lieu of channel Swales Roadside ditches and culverts serving them 2, 5,10, 25, 50,100 25 Detention facilities: spillway crest and its outfall Detention facilities: outlet and conveyance structure(s) Detention facilities: volume when outlet plugged Culverts serving private drives or streets Culverts serving public roadways Bridges: provide in bridge report. Hydraulics What is the range of design flow velocities as outlined below? Design flow velocities; 25 year Gutters Conduit Culverts Swales Channels Highest (feet per second) 8.25 Lowest (feet per second) 3.21 Streets and Storm Drain Systems Provide the summary information outlined below: Roughness coefficients used: For street gutters: NA For conduit type(s) RCP 0.013 HDPE 0.013 Coefficients: STORMWATER DESIGN GUIDELINES Page 24 of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 APPENDIX D — TECHNICAL DESIGN SUMMARY Part 4 - Drainage Concept and Design Parameters Continued (Page 4.16) Design Parameters (continued) Hydraulics (continued) Street and Storm Drain Systems (continued) For the following, are assumptions other than allowable per Guidelines? Inlet coefficients? —No —Yes Head and friction losses No Yes Explain any "yes" answer: In conduit is velocity generally increased in the downstream direction? _ Yes _ No Are elevation drops provided at inlets, manholes, and junction boxes? Yes No Explain any "no" answers: Are hydraulic grade lines calculated and shown for design storm? —Yes _ No For 100-year flow conditions? —Yes _No Explain any "no" answers: What tailwater conditions were assumed at outfall point(s) of the storm drain system? Identify each location and explain: Open Channels If a HEC analysis is utilized, does it follow Sec VI.F.5.a? _ Yes _ No Outside of straight sections, is flow regime within limits of sub -critical flow? x Yes No If "no" list locations and explain: Culverts If plan sheets do not provide the following for each culvert, describe it here. For each design discharge, will operation be outlet (barrel) control or inlet control? All culverts will be inlet controlled. Entrance, friction and exit losses: A 0.5 entrance and exit loss coefficients are used for sloped end treatments and square edged headwalls with wingwalls. Bridges Provide all in bridge report STORMWATER DESIGN GUIDELINES Page 25 of 26 APPENDIX. D TTECH. DESIGN SUMMARY Effective February 2007 As Revised February 2009 SECTION IX APPENDIX D - TECHNICAL DESIGN SUMMARY Part 4 — Drainage Concept and Design Parameters Continued (Page 4.17) Design Parameters (continued) Computer Software What computer software has been used in the analysis and assessment of stormwater management needs and/or the development of facility designs proposed for subject property project? List them below, being sure to identify the software name and version, the date of the version, any applicable patches and the publisher open office Calculator Spreadsheet Hydraflow Express Extension for AutoCAD Civil 3D 2012 Part 5 - Plans and Specifications Requirements for submittal of construction drawings and specifications do not differ due to use of a Technical Design Summary Report. See Section III, Paragraph C3. Part 6 — Conclusions and Attestation Conclusions Add any concluding information here: The Indian Lakes subdivision, Phases 12 will have no adverse impact to downstream properties and conforms to the overall subdivision report. Attestation Provide attestation to the accuracy and completeness of the foregoing 6 Parts of this Technical Design Summary Drainage Report by signing and sealing below. "This report (plan) for the drainage design of the development named in Part B was prepared by me (or under my supervision) in accordance with provisions of the Bryan/College Station Unified Drainage Design Guidelines for the owners of the property. All licenses and permits required by any and all state and federal regulatory agencies for the proposed drainage improvements have been issued or fall under applicable general permits." 3 (Affix Seal) 3 *Licrofe Tonal Engineer State of Texas PE No.`s STORMWATER DESIGN GUIDELINES -page of 26 APPENDIX. D: TECH. DESIGN SUMMARY Effective February 2007 As Revised February ENERGY TRANSFER GENERAL GUIDELINES FOR THIRD -PARTY CONSTRUCTION OR MAINTENANCE ACTIVITIES Houston Pipe Line Company L.P.and its affiliates and related companies ("HPL") are dedicated to the highest safety standards in the continued operation of their pipelines and facilities. Of utmost importance to HPL is the continued safety of the public and its pipeline and facilities during construction and other activities on, across, over or under its right-of-way. HPL is therefore pleased to provide these general guidelines ("Guidelines") for third -party construction, blasting, installation or modification of pipelines, underground utilities, roads, streets, driveways, ditches, drainage canals or any other type of temporary or permanent structure or obstruction or any other encroachment on, over, across, or paralleling, HPL's right-of-way (hereinafter referred to as "Crossing" or "Crossings"). These Guidelines are intended to be consistent with §756.123 of the Texas Health and Safety Code and are further based upon industry standards and practice. These Guidelines are merely guidelines and upon notification to HPL of a proposed Crossing, as required by the Texas Health and Safety Code, each proposed Crossing and its corresponding finalized plans and profile drawings will be evaluated by HPL and the third -party requesting such Crossing, pending final approval. 1. Notification a. The party requesting such Crossing shall use its best efforts to provide HPL with its finalized plans and profile drawings at least thirty days (30) days prior to any related construction or maintenance activity. The pipeline facility shall include, but is not limited to, rights -of -way, fee properties, easements, pipelines, meter and regulator buildings, and valve sites ("HPL Pipeline Facility" or "Facilities"). Unless otherwise agreed to by HPL in writing, no equipment shall enter onto HPL's Pipeline Facility unless an HPL representative is on location. b. No excavation shall occur in the vicinity of HPL's pipeline facility until: 1) In accordance with State approved Notification Centers, HPL shall be notified at least 48 hours in advance of any construction or maintenance activity. HPL currently utilizes the Texas Excavation Safety System (TESS) as its notification center. You must contact the TESS notification center at 811 or 1-800-344-8377, in addition to contacting HPL's field representative Steve Clements at (979) 820- 7146, before commencing any Crossing at or near HPL's Pipeline Facility; and 2) Unless otherwise agreed to by HPL in writing, an HPL inspector is on site to monitor the excavation activities. 2. Drawings for Proposed Construction or Maintenance Any proposed construction or maintenance activity in the vicinity of HPL's Pipeline Facility will require submittal of final plans and profile drawings for prior review and approval by HPL. One (1) copy of these drawings must be submitted to HPL's Encroachment Department located at 711 Louisiana Street, Suite 900, Houston, Texas 77002. All plans and drawings must show in detail, all of HPL's Pipeline Facility, its corresponding right-of-way, and any other landmarks that will assist HPL to determine the location of the proposed Crossing and the affects of the proposed construction or maintenance activity on HPL's Pipeline Facility. 3. Encroachment Agreement In certain instances, due to the type of Crossing required and the probable impact upon HPL's Facilities, An encroachment agreement may be necessary for proposed construction or maintenance within HPL's Pipeline Facility. HPL shall be responsible for preparing such encroachment agreement and shall bear the cost and expense in such preparation. Such encroachment agreement shall oudine the responsibilities, conditions, and liabilities of the parties and must be fully executed and in HPL's possession prior to commencing any construction activity. 4. Insurance Coverage In certain instances, due to the type of crossing required and the probable impact upon HPL's Facilities, HPL may require evidence of comprehensive general liability insurance coverage prior to any construction or maintenance activity in the vicinity of its Facilities. In the event that HPL requires evidence of comprehensive general liability insurance, HPL and/or its affiliates and related companies, whichever the case may be, shall be named as additional insured. 5. Crossing Pipelines with Heavy Equipment To protect HPL's pipelines or related Facilities from additional external loading, HPL may perform a field survey and an engineering study to determine the effects of any proposed activity over its pipelines or related Facilities. Mats, timber, bridges, or other protective materials deemed necessary and appropriate by HPL may be required and placed over HPL's pipelines or related Facilities for the duration of any loading. 6. Excavation, Cuts, or Fill near HPL's Pipeline Facility a. Unless otherwise agreed to by HPL in writing, an HPL representative will be on location prior to and during construction activity within HPL's Pipeline Facility. b. No heavy equipment of any type will be permitted to work directly over HPL's pipelines or related Facilities, unless otherwise agreed to in writing by HPL. c. All excavation within eighteen inches (18") of any pipeline will be performed by hand. At the discretion of HPL's onsite representative, excavators may be required to hand dig beginning at a distance greater than eighteen (18) inches. d. All excavations within APL's Pipeline Facility shall be backfilled with a minimum of eight (8) inch lifts of backfill material, clean and free from rock, trash, concerete, rubbish, or hazardous material and compacted to a minimum standard proctor density of 95% using mechanical compaction equipment. Soil backfill must be compacted to the satisfaction of the HPL onsite inspector so that settling does not occur. e. No grade cuts will be permitted within HPL's Pipeline Facility unless otherwise agreed to in writing by HPL and with HPL's representative on location. An engineering study may be performed to ensure that the lateral stability of HPL's pipelines or related Facilities are not affected. f. When boring under HPL's pipelines or related Facilities, the party with the approved Crossing plans and drawings shall expose a minimum of twenty-four (24) inches below the bottom of each pipeline to ensure vertical separation of not less than twenty-four (24) inches of clearance. Plan and profile drawings are required for all proposed borings. g. No fill shall be permitted within HPL's Pipeline Facility unless otherwise agreed to in writing by HPL. In no event, shall more than twenty-four inches (24") of earthen fill material, free from any rocks, trash, concrete, rubbish, rebar, hazardous materials, HPL., be permitted within HPL's Pipeline Facility, unless otherwise agreed to in writing by HPL. h. Earthen cover over HPL's pipelines shall be tbirty-six (36) inches or no less than what was originally there prior to any construction. In the event that HPL determines that a lesser cover will not increase the risk to the public or increase the risk of a break, leak, rupture or other damage to HPL's pipelines or related Facilities, HPL may allow a lesser earthen cover, in a minimum amount as determined solely within the discretion of HPL. i. No trash or debris shall be placed in any excavation or left in or on HPL's Pipeline Facility 7. Aboveground Appurtenances. Structures and Obstructions Unless otherwise agreed to in writing by UPL, no aboveground appurtenances, structures, or obstructions of a temporary or permanent nature shall be located within HPL's Pipeline Facility that, in any way, interfere with operating, maintaining, accessing, inspecting, repairing, modifying, replacing or relocating such Facilities. The appurtenances, structures, and obstructions include, but are not limited to, the following: buildings, structures, signage, utility poles, steel towers, guy wires, other structures supporting aerial lines, satellite dishes, manholes, catch basins, utility pedestals, transformers, fire hydrant, large spoils of earthen materials, decks, pools, boats, RV's, trailers, storage of hazardous or non -hazardous materials. 8. Proposed Pipe and Utility Lines a. General Guidelines: 1. For the safety of the public and to lessen the risk of a break, leak, rupture or other damage to HPL's Pipeline Facility and in furtherance of the Texas Health and Safety Code, HPL's Pipeline Facility shall be positively located by HPL before any Crossings are constructed or installed near HPL's Pipeline Facility. Unless otherwise agreed to in writing by HPL, HPL requires a minimum clearance of twenty-four (24) inches be maintained between HPL's pipeline (top, bottom, and sides) or related Facilities and any foreign line or facilities. 2. All foreign lines shall fully cross HPL's Pipeline Facility at an angle of not less than forty-five degrees (45°), or as near as possible thereto. Buried utility lines must be identified with permanent above -ground markers where lines enter and exit HPL's right-of-way, which rights to install and maintain the markers, shall be the responsibility of the foreign line owner. Longitudinal occupancy of HPL's Pipeline Facility will not be permitted. 3 3. No manholes, valves or other appurtenances will be permitted within HPL's Pipeline Facility_ 4. Vertical and horizontal bends shall be minimized within HPL's Pipeline Facility. 5. HPL's Pipeline Facility is cathodically protected. All other cathodically protected facilities that enter or cross HPL's Pipeline Facility must have test leads installed. Any inquiries for cooperative testing should be directed to the attention of HPL's Field Representative on location. 6. All underground utilities (other than residential telephone, cable TV and 24 volt DC power lines) may require plastic identification tape installed no closer than eighteen (18) inches above the line. b. Water or Forced Sewer Lines All water and sewer lines shall be either (1) ductile iron or steel casing (coated to protect it from IIPL's cathodic protection) or (2) encased plastic schedule 80 PVC for a minimum of 5-feet on either side of any HPL pipeline or related Facilities. Forced sewer lines shall have no piping connections located within 5-feet of any HPL pipeline or related Facilities or placed within HPL's pipeline easement. C. Communication, Power or Combustible Material Lines 1. All underground fiber optic cables, telephone and television cables (other than residential telephone and cable TV) crossing HPL's Pipeline Facility shall be either installed in rigid steel conduit or schedule 80 PVC conduit encased in orange concrete (4-inches thick in all directions) for the full width of the right-of- way. 2. All underground electric cables except 24 volt DC power lines (including single residential service drops) crossing HPL's facilities shall be either installed in rigid steel conduit or schedule 80 PVC conduit encased in red concrete (4-inches in all directions) for the full width of the right-of-way. 3. HPL recommends that all underground residential telephone, cable TV and 24 volt DC power lines be encased in plastic conduit for the full width of the right- of-way. 9. Proposed Roads, Streets, Driveways, Access ways and parking Lots a. Load stress will be calculated by HPL to determine if any protection of the pipeline is required for roadways, streets, driveways, access ways, HPL., planned to cross HPL's Pipeline Facility. In the event it is determined by HPL that the roadways, streets, driveways, access ways, HPL., will increase a risk to the public or increase a risk of a break, leak, rupture or other damage to HPL's Pipeline Facility, HPL may require, at the sole cost and expense of the party requesting such Crossing, the installation of protective material as may be deemed necessary by HPL to protect the public or HPL's Pipeline Facility. b. The preferred minimum earth cover over HPL's Pipeline Facility is forty-eight (48) inches at all roadways, streets, driveways, access ways, HPL., including adjacent ditch lines. In the event that HPL determines that a lesser cover will not increase a risk to the public or increase a risk of a break, leak, rupture or other damage to the pipeline or related Facilities, HPL may allow a lesser earth cover, in a minimum amount as determined solely within the discretion of HPL. In the event the required amount of cover is not obtainable as reflected in finalized plan and profile drawings, HPL may require the installation of protective material at no expense to HPL. Cover shall be measured from the top of HPL's pipeline to the surface of the road. c. Roads and streets crossing over HPL's Pipeline Facility shall cross at an angle of not less than forty-five degrees (45°), or as near as possible thereto. Crossings should be over straight pipe and at locations free of any crossovers. Longitudinal occupancy of the right- of-way will not be permitted. d. No parking areas or the like will be allowed on, over or across HPL's Pipeline Facility unless HPL determines that the parking areas, HPL. will not increase a risk or restrain access to its facilities, increase a risk to the public and/or increase a risk of a break, leak, rupture or other damage to the Facilities and the party requesting such Crossing installs, at its sole cost and expense, any protective material as deemed necessary by HPL to protect the public or HPL's Pipeline Facility. e. Permanent pipeline marker(s), provided by HPL, will be installed at all road crossings. 10. Disposal Systems No aerobic septic systems, septic tanks, liquid disposal systems, or hazardous waste disposal systems will be allowed on HPL's Pipeline Facility or within twenty-five (25) feet of HPL's Pipeline Facility, unless otherwise agreed to in writing by HPL. This will include, but is not limited to, affluent from sewage disposal systems, the discharge of any hydrocarbon substance, the discharge or disposal of any regulated waste, or any other discharge that may prove damaging or corrosive to HPL's Pipeline Facility. 11. Impoundment of Water a. In order to provide for the adequate maintenance and operation of HPL's Pipeline Facility, the impoundment of water on HPL's Pipeline Facility will not be allowed. b. Temporary soil erosion and sediment control devices and storm water detention basins/traps will not be permitted on HPL's Pipeline Facility unless otherwise agreed to in writing by HPL. 12. Blasting To the extent it impacts the lateral stability or otherwise endangers or interferes with the efficiency, safety, or convenient operation of HPL's Pipeline Facility, no explosive detonations will be permitted within 300-feet of HPL's Pipeline Facility without: (1) prior analysis and written approval from HPL and (2) HPL's representative on site during blasting. To determine if the detonation stresses will be detrimental to the safety of HPL's Pipeline Facility, information required to complete HPL's `Blasting Data Sheet" must be submitted to HPL for evaluation and approval no less than 30 days prior to the proposed date of blasting activity. The contractor performing the blasting will be required to verify by signature the proposed blasting plan. 13. Landscaping & Irrigation Systems Landscaping within HPL's Pipeline Facility is limited to lawn and low growing (less than three 3-feet at maturity), shallow rooted shrubbery. Unless otherwise agreed to in writing by HPL and the party requesting such Crossing in an encroachment agreement, planting of shrubbery and installation of irrigation systems within HPL's Pipeline Facility shall be at the risk of the landowner and, in any event, will not be permitted closer than five (5) feet from either side of IlPL's pipeline or related Facilities. Irrigation systems shall not be directly installed longitudinally over HPL's Pipeline Facility and shall not be buried deeper than 12-inches, regardless of location, from the surface of the ground within HPL's Pipeline Facility. No trees or crepe myrtles (unless dwarf variety) are permitted. 14. Pipeline Markers The party request such Crossing will ensure that all temporary and permanent pipeline markers installed by HPL are protected and maintained at all times during construction or Crossing related activity. Any permanent markers damaged or removed will be replaced by HPL at the sole expense of the parry requesting such Crossing. No work will be allowed to commence until, in the opinion of HPL, sufficient pipeline markers are in place. Unauthorized damage or removal of pipeline markers is punishable by Federal law. 15. Right of Ingress and Egress The party requesting such Crossing shall have the right to install fences on, over and across the Facilities, provided, however, that HPL shall have the unrestricted right of ingress and egress to its Facilities at all times. HPL, at its sole option and discretion, may require the party requesting such Crossing to install, at its sole cost and expense and for HPL's benefit, a walk gate at least three (3) feet in width for residential lots or gate at least twelve (12) feet in width for rural areas at each fence crossing. HPL shall provide a lock for such gate(s). Said gate(s) shall be installed as to provide HPL with ingress and egress access to its pipeline or related facilities and to minimize vehicular and equipment travel over HPL's pipeline or Facilities. The party requesting such Crossing shall be responsible for keeping the enclosed portion of HPL's pipeline or related Facilities free of any debris or trash. HPL's pipeline or related Facilities shall be positively located by HPL before any fences are constructed or installed near HPL's pipeline or related Facilities. Post hole excavations for fencing placed upon HPL's pipeline or related Facilities shall not be greater than a depth of eighteen inches (18") below the undisturbed grade level nor closer than five feet (5') horizontally from HPL's pipeline or related Facilities, unless approved in writing by HPL. No other excavations of any kind may be made in the pipeline or related Facilities without the prior written consent of HPL. 16. Statement Regarding Existing Rights NOTHING CONTAINED HEREIN SHALL BE CONSTRUED TO CONVEY, WAIVE, OR SUBORDINATE ANY OF HPL's EXISTING RIGHTS WHATSOEVER. SHOULD A CONFLICT EXIST WITH THE LANGUAGE CONTAINED IN ANY HPL ENCROACHMENT AGREEMENT, EASEMENT, OR PETITION IN CONDEMNATION AND THESE GUIDELINES, HPL's ENCROACHMENT AGREEMENT, EASEMENT, OR PETITION IN CONDEMNATION SHALL CONTROL AND BE DECISIVE OF THE ISSUE. 17. Statements Reaardina Guidelines for Construction and Maintenance Certain construction and maintenance activities may be reviewed and approved by HPL at one point in time, but not immediately installed or performed. Therefore, all construction and maintenance activities are subject to the Guidelines in affect at the time the work actually takes place. In addition, the guidelines described in this document represent those industry standards that HPL believes meet the minimum acceptable standards regarding third -party construction and maintenance activities in the vicinity of HPL's Pipeline Facility. Therefore, after review of the final plan and profile drawings, HPL may, in the event that IIPL determines the construction and maintenance activities will increase a risk to the public or increase a risk of a break, leak, rupture or other damage to HPL's Pipeline Facility, require fortifications in furtherance of the Texas Health and Safety Code. The party requesting such Crossing agrees to alter, modify or halt any construction activity, which in the sole opinion of HPL's, will increase the risk to the public or increase the risk of a break, leak, rupture or other damage to HPL's Pipeline Facility. All written correspondences and your final design plans are to he addressed to: Energy Transfer Company 711 Louisiana Street, Suite 900 Houston, Texas, 77002-5600 Attention: Encroachment Department [END]