HomeMy WebLinkAboutLetter Acknowledging City StandardsG•L
June 5, 2013
City of College Station
1101 Texas Avenue
College Station, Texas 77842
EAST TEXAS OFFICE
GOODWIN • LASITER INC. [936] 637-
� FAX [936] 637E330
330
ENGINEERS • ARCHITECTS • SURVEYORS
CENTRAL TEXAS OFFICE
[979] 776-9700
FAX [979] 776-3936
RE: LETTER ACKNOWLEDGING CITY STANDARDS
The Barracks II — Phase 103 & 104, College Station, TX
Dear Ms. Singh:
The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and
drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design
Guideline Manual except for the following:
• As agreed upon with City staff, structural backfill is not being provided for waterline constructed within
5' of proposed sidewalks, only under trash pads, sidewalks, and roadways;
I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in
accordance with the Bryan/College Station Standard Details.
Sincerely,
Chad Emmel, PE
Project Engineer
...........................
CHAD EMMEL
103495
4077 CROSS PARK DRIVE • SUITE 100 • BRYAN, TEXAS • 77602 • ctex@goodwinlaaiter.com TBPE #413
1509 S. CHESTNUT • SUITE 202 • LUFKIN, TEXAS • 75901 • admin@paodwlnlasiter.com W.161416140061Comsl2013-06-03 Lefler
Aoknmledging City Sfentlerds.dW
G•L
June 28, 2013
City of College Station
1101 Texas Avenue
College Station, Texas 77842
GOOOWIN • LASITER, INC.
ENGINEERS- ARCHITECTS• SURVEYORS
RE: LETTER ACKNOWLEDGING CITY STANDARDS
The Barracks II — Phase 103 & 104, College Station, TX
Dear Ms. Singh:
EAST TEXAS OFFICE
[936] 537-4900
FAX [936] 637-6330
CENTRAL TEXAS OFFICE
[979] 776-9700
FAX [679] 77B-3B3B
The purpose of this letter is to acknowledge that the construction plans for the water, sanitary sewer, streets and
drainage for the above -referenced project, to the best of my knowledge, do not deviate from the B/CS Design
Guideline Manual except for the following:
• As agreed upon with City staff, structural backfll is not being provided for waterline constructed within
5' of proposed sidewalks, only under trash pads, sidewalks, and roadways;.
• Proposed 8-inch sanitary sewer slope is 0.40% which is below B/CS guidelines but above TCEQ
minimum.
I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in
accordance with the Bryan/College Station Standard Details.
Sincerely, St".; :Tq
^ .
rr*:
r
CHAD EMMEL
r o
Chad Emmel, PE � �;:, 103495
Project Engineer rtrtot1sSpEN E
4077 CROSS PARK [DRIVE • SUITE 100 - BRYAN, TEXAS • 77BO2 • ctex@goodwinlasiter.com TBPE #413
1609 S. CHESTNUT • SUITE 202 • LUFKIN, TEXAS • 75901 • edmin@goodwinleaiteP.comW..'161416140061Cones12013-06-28 Latter
Acknowledging City Stendards,doc