Loading...
HomeMy WebLinkAboutStaff CommentsJune 10, 2013 TO: FROM: SUBJECT: CITY OF COLLEGE STATION Home of TexasA6M Univeniry' MEMORANDUM John Rusk, P.E.; jrusk@goodwinlasiter.com Jason Schubert, AICP Principal Planner THE BARRACKS II PH 103 & 104 (FP) Thank you for the submittal of your FINAL PLAT - RESIDENTIAL application. This project will be distributed to staff this week for their review. cc: Heath Phillips Investments, via: heath@barrackstownhomes.com Chad Emmel, P.E., Goodwin-Lasiter, Inc., via: cemmel@goodwinlasiter.com Case file no. 13-00900111 Planning err Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices (* F4" CITY OF COLLEGE STATION Hom ofT.A&MU hiv ty' MEMORANDUM June 17, 2013 TO: John Rusk, P.E.; irusk(r),goodwinlasiter.com FROM: Matt Robinson, AICP, Senior Planner SUBJECT: THE BARRACKS II PH 103 & 104 (FP) Staff reviewed the above -mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. One (1) 24'k36" copy of the revised final plat, Parkland Dedication in the amount of $36,875 must be submitted prior to the fling of the final plat, One (1) Mylar original of the revised final plat (required after P&Z approval), and One (1) copy of the digital file of the final plat on diskette or e-mail to: p d s d i g i t a I su b m i tta I0, c stx.g ov. Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. PC: Heath Phillips Investments, via: heathObarrackstownhomes.com Chad Emmel, P.E., Goodwin-Lasiter, Inc., via: cemmelOgoodwinlasiter.com P&DS Project No. 13-00900111 Attachments: Staff Review Comments P/xxxixg &Dcve%pmmt Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • FAX. 979.764.3496 atx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: The Barracks II Ph 103 & 104 (Fp) (13-00900111) PLANNING 1. The front lot width of lots 17 & 18, Block 16 do not measure out to the width listed. Please revise. 2. Community Parkland dedication and development fees of $36,875 will be due prior to filing of the final plat. With the platting of these 59 lots, there is 127 lot credit remaining for neighborhood park development fees. 3. Provide volume and page number for all existing easements. 4. Provide ownership information for all platted lots. 5. Change the Planning & Zoning Commission certification from "Approval" to "Certificate". 6. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 7. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Matt Robinson ENGINEERING COMMENTS NO. 1 Date: 6/14/13 1. The development permit is currently being reviewed and could affect the final plat. 2. The boundary does not appear to close. 3. C9 in the curve table does not match the field notes. 4. The contours and any existing conditions/infrastructure does not need to be shown on the final plat. 5. Please add labels showing the existing street pavement width. The pavement itself does not need to be shown. 6. Please add 10' rear easements along Block 17. 7. Please label the volume and page number of the existing private drainage easement in Phase 300. 8. Some of the lots have varying width labels though the property lines are parallel. Please check lots lots 21 &22 Block 18, and lots 18&19, block 17. 9. Once phase 102 is filed, that information should be shown on this plat as well. Reviewed by: Danielle Singh Date: 6/14/2013 GENERAL ELECTRICAL COMMENTS 1. This area is not served by College Station Utilities. Reviewed by: Sam Weido Date: 6.11.2013 ADDRESSING 1. The proposed street names have been preliminarily approved and will be re -verified prior to filing any plats to ensure no duplicate street names are being created within Brazos County. Reviewed by: Robin Krause Date: 6/11/2013 (* 01F,41 CITY OF COLLEGE STATION Home vfT.A&M Uahv nlry' MEMORANDUM June 24, 2013 TO: John Rusk, P.E., Goodwin-Lasiter, Inc., via: jrusk@goodwinlasiter.com FROM: Danielle Singh, P.E., Assistant City Engineer SUBJECT: Engineering Document Comments for The Barracks II Ph. 103&104 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Heath Phillips Investments, via: heath_ supedorstructures@yahoo.com Chad Emmel, P.E., Goodwin-Lasiter, Inc., via: cemmel@goodwinlasiter.com P&DS Project No. 13-00900111 Planning 6, Developm Serviem P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77942 TEL. 979.764.3570 • PAX. 979.764.3496 a tcgovidevsenrices ENGINEERING COMMENTS NO. 2 1. The Technical Design Summary for the drainage report appears to have printed without the information you filled out. 2. For the PIP, please indicate if previous mailbox locations will be utilized or if a mailbox needs to be added for these phases. 3. For the PIP, a removal fee of $450 will need to be paid prior to approval. 4. On sheet C1.0, please make sure to specify that the steel plate on the sidewalk box drain should be Neenah or approved equal. 5. Please reconfigure the driveway for Lot 24, Block 18. 1 am concerned about the safety of the backing maneuver and also the additional parking in the ROW. 6. Light poles should not be located behind dumpsters. In previous phases, the light pole location was altered in the field. I would recommend moving the light pole to one of the drainage ways. This will exceed the maximum spacing, but will allow better light projection onto the street. 7. On sheet C1.2, please remove your post hole detail as it does not match the details shown in the sign standard detail. 8. Please add a stop bar at on Airborne Avenue at Deacon Drive. 9. Please add ramps crossing Airborne Avenue at Foxtrot Way. This will allow easier access to the parks. 10. Please add the block ranges for the street signs. Robin Krause rkrause(cD_cstx.gov can provide this information. 11. On sheet C1.3, the raised pavement markers on the 8" white stripe should be Type 11 C-R. The raised pavement markers on the double yellow should be Type 11 A -A. 12. Pavement markings should be Type 1. 13. On sheet C2.1, please divert the drainage around the dumpster pads instead of through the center. 14. ADA requires perpendicular curb ramps to have detectable warning within 5' of the curb line. It appears that curb ramps at the alley may exceed this. 15. While not required by the City, it may be advisable to add additional protection in some areas where the drop off behind the sidewalk may be steep. 16. On sheet C2.5, please move the valve at station 1+48.43 to the opposite side of the tee. A valve is required on both ends of the steel casing. Moving this valve would allow it to serve both requirements. 17.On Foxtrot Way, the grade should not exceed 2% for the first 25' approaching the intersection measured from the intersecting street back of curb. 18. Also, when the difference in grades exceeds 1 % a curve is required. Please revise the vertical alignment of Foxtrot Way. 19. A gate valve is required within 70' of a temporary dead end on a 12" waterline. The valve at station 7+72.91 can be moved to serve both purposes. 20. At SSMH 5, the soffits of the pipe should be matched when changing size. 21. The letter acknowledging City Standards should be updated to include utilization of minimum TCEQ slopes of the sanitary sewer line instead of the minimum City slopes. 22. The remaining development permit fee is $5,465.54. Reviewed by: Danielle Singh Date: 6/24/2013