Loading...
HomeMy WebLinkAbout12-78_Page_04CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. revoked if any false statements are made herein, must cease until permit is re -issued not be used or occupied until a Certificate of Occupancy is issued. ire if no significant work is progressing within 24 months of issuance. be required to fulfill local, state, and federal requirements. Ownerwill obtain or show necessary State and Federal Permits prior to construction including NOl and SWPPP. m Certificates will be provided with elevations certified during construction (forms at slab pre- struction. s-consent to City representatives to make reasonable inspections required to verify ation is required, including detention ponds proposed as part of this project, it shall be Aructed first in the construction sequence of the project Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken iris from construction, erosion, and sedimentation shall not be deposited in city streets, or cilities. All development shall be in accordance with the plans and specifications submitted to e City Engineer for the above named project. All of the applicable codes and ordinances of the on shall apply. conclusions contained in the attached plans and supporting documents will comply with the s of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified echnical Specifications, and Standard Details. All development has been designed in applicable codes and ordinances of the City of College Station and State and Federal (name or firm) Is authorized for bidding purposes iat final approval and release of plans and development for construction is contingent on on approved Development Permit. 2EE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR (T PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND :eere'Coe sErtfficationi 1. The project has been desig of theprojectwill be constru 2. 1 will obtain or can show co including NOI and SWPPP. require a sedimentation basi 3. The information and conclus current requirements of the Design Guidelines. All devel of the City of College' Station 4. I, THE ENGINEER, AGREE FOR THE DEVELOPMENT ACCU TE. Engin/hk'r Ui U y/o-2 Date n ed to ensure that stormwater mitigation, including detention ponds, proposed as part cted first in the construction sequence. mpliance with all necessary Local State and Federal Permits prior to construction Design will not preclude compliance with TPDES: i.e., projects over10 acres may n. ions contained in the attached plans and supporting documents comply with the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified opment has been designed in accordance with all applicable codes and ordinances and State and Federal Regulations. TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS PERMIT APPLICATION, ARE; TO THE BEST OF MY KNOWLEDGE, TRUE. AND 41�4n Date Page 4 of 11