HomeMy WebLinkAbout12-78-1_Page_04CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1, No workof any kind may start until a permit is issued,
52. The permit may be revoked If any false statements are made herein..
3. If revoked, ail work must cease until permit is re -Issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire. if no significant work is progressing within 24 months of issuance.
`6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including N01 and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including :detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply,`
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
'. Design Guidelines Technical Specifications, and Standard Details. All development has been designed In
accordance with all applicable codes and ordinances of the :City of College Station. and State and Federal
Regulations,
12. Release of plans to (name or firm) Is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13.; I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
?ACURATE.
ELOP ENT' PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
n s)Date
Ertification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCUR TE.
Engln ,er ( /, s --
f Date
Page4 of it