HomeMy WebLinkAbout06-112_Page_0414. The location and de; ption with accurate dimensions, bear s or deflection angles and radii,
area, center angle, degree of curvature, tangent distance ante length of all curves for all of the
following: (Show existing items that are intersecting or contiguous with the boundary of or
farming a boundary with the subdivision, as well as, those within the subdivision).
Existing Proposed
[� Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp
turn around unless they are shorter than 100 feet.
[� Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s
sufficient to meet Thoroughfare Plan.)
Street offsets and/or intersection angles meet ordinance.
Alleys.
E� Fl� Easements.
Ej- A number or letter to identify each lot or site and each block.
Greenbelt area/park linkages/parkland dedication ( All proposed dedications must be
YN
reviewed by the Parks and Recreation Board prior to P & Z Commission consideration.)
15. Construction documents for all public infrastructure rawn on 24" x 36" sheets and properly
sealed by a Licensed Texas Professional Engineer at include the following:
Street, alley and sidewalk plans, profiles and sections. One sheet must show the
overall street, alley and/or sidewalk lay t of the subdivision. (may be combined with
other utilities).
Sanitary sewer plan and profile ho ing depth and grades.. One sheet must show the
overall sewer layout of the sub i sion. (Utilities of sufficient size/depth to meet the
utility master plan and any future growth areas.)
Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing
depth and grades. One sheet must show the overall water layout of the subdivision.
(Utilities of sufficient size/depth to meet the utility master plan and any future growth
areas.)
�] Storm drainage system plan with contours, street profile, inlets, storm sewer and
drainage channels, with profiles and sections. Drainage and runoff areas, and runoff
based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design,
channel lining design & detention if used. One sheet must show the overall drainage
layout of the subdivision.
Detailed cost estimates for all public infrastructure listed above sealed by Texas P. E.
Drainage Report.
[ Erosion Control Plan (must be included in construction plans).
nI� 16. All off -site easements necessary for infrastructure construction must be shown on the final plat
with a volume and page listed to indicate where the separate instrument easements were filed.
Separate instrument easements must be filed prior or concurrently with Final Plat.
17. Are there impact fees associated with this development? ❑ Yes 3'90—
Impact fees for R-1, R-2, & R-3 zoned final plats, must be paid prior to filing.
[]� 18. Will any construction occur in TexDOT rights -of -way? ❑ Yes a1vo
If yes, TexDOT permit must be submitted along with the construction documents.
NOTE:
1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to
filing the plat at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NO[) must be submitted
prior to issuance of a development permit.