HomeMy WebLinkAbout13-34_Page_33RESPONSE TO ENGINEERING COMMENTS NO. 3
1. Please add a note stating that replaced landscape shall meet original approved
landscape requirements.
Note 13 was added to the plan.
2. Please provide a letter of acknowledgement.
A letter of acknowledgement is provided in this submittal
3. Please provide erosion control.
An erosion control plan is already accepted for this project. 8 copies of the
erosion control plan are included in this submittal.
4. If erosion control is planned to be shown on Utility Plan (Sheet C5), provide 8 copies for
approval stamp.
An erosion control plan is already accepted for this project. 8 copies of the
erosion control plan are included in this submittal.