Loading...
HomeMy WebLinkAbout13-34_Page_236. More documentation is needed for this encroachment into the floodplain. When was the common area filled? Our records show that the common area has received 2'-3' of fill from the contours on the Section 200 plans, but we do not show where this was approved. The fill in the common area was likely placed with the construction of the detention pond since the Section 201 Grading Plan does not show a channel or ditch in that area. 7. In the application under certifications in the Special Flood Hazard Area, you reference an approved drainage study for Castlegate II which demonstrates that no adverse impacts are created. I checked the drainage report for Pond A (section 220); it only references fill for the roadways. More documentation is needed to show that this development is not creating any adverse impacts. A report is attached address the impact of the fill placed in this area. • 8. In the drainage report for Pond A, the 100-year WSEL was 311.7 for a fully functioning outfall and 314.7 for a blocked outfall. It appears this development is filling into the pond area. Please provide a revised report justifying this. How will this affect adjacent properties? A report is attached describing the affects of the minor filling of the pond area and its effect on the adjacent properties. 9. Please show the proposed contours surrounding the building and the pond. Contours added to Sheet C3. 10. It appears some cover will be removed over the existing storm sewer pipes. Please verify that adequate cover will still be maintained. The pipes have adequate cover. Reviewed by: Danielle Singh FIRE 1. Will need a Knox Box on the building. Noted. 2. No other issues at this time. Noted. Reviewed by: Eric Dotson SANITATION 1. Sanitation is ok with this project. Noted. Date: 2/19/13 Date: 02/12/13 Reviewed by: Wally Urrutia Date: 2/13/13