Loading...
HomeMy WebLinkAbout13-34_Page_22STAFF REVIEW COMMENTS NO, 1 Project: Castlegate II Community Center (Sp) — 13-00900034 PLANNING 1. An ADA accessible route will need to be provided from the primary entry of the building to the public sidewalk. A private sidewalk and ADA accessible route has been added. 2. Are parking lot lights proposed for the development? These will need to be place in such a manner to not impact the adjacent homes. No parking lot lights are proposed. 3. FYI, the public access easement will need to be filed prior to the park site plan being approved. Noted. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Noted. Reviewed by: Matt Robinson Date: 2/21/13 LAN DSCAPING/STREETSCAPING/BUFFER 1. With one of the driveways needing to be removed, the streetscape calculation will change (one of the curb cuts will not be subtracted out from the calculation). Driveway did not get removed per discussion with staff so the calculations did not change. Reviewed by: Matt Robinson Date: 2/21/13 TRANSPORTATION 1. The proposed driveways do not meet the minimum driveway spacing requirements of 175'. One driveway will need to be removed to meet spacing requirements. Driveway did not get removed per discussion with staff. Reviewed by: Joe Guerra Date: 2/21/13 ENGINEERING COMMENTS NO. 1 1. An elevation certificate will be required. Noted. 2. Please provide an engineer's estimate for public infrastructure (sidewalk). Estimate attached. 3. Please provide a certification that the plans have been designed according to City Standards. Certification letter attached. 4. Please add a note that this site is within the Spring Creek Sanitary Sewer Impact Fee Area. Note 12 added to Sheet C2. 5. Does the developer have majority ownership for the common areas? Will permission need to be obtained from the HOA for these changes to occur? These documents are being prepared and will be submitted separately.