Loading...
HomeMy WebLinkAbout13-34_Page_05The following CERTIFICr IONS apply to development in Sl,�cial Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* AA \ Fyn (� 1^ a ror•✓ A. I, o S 4p h 1 " J ��w��f certify, as demonstrated in the atNeked drainage study, that the alterations or development covered by this permit, shall not: (1) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; c_crNC-s .4e L-L (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by of di nance in Section 5.11.3a of Chapter 13 Code of Ordinances. 2- Engineer Date Initial * If a platting -status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, J 0 f tj-1, P• certify to the following: (1) that any nonresAntial or multi -family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments. Engineer Date 1/11 Page 5 of 11