Loading...
HomeMy WebLinkAboutSewer Sysytem Report and Water ReportSewer System Report for The Barracks II Subdivision Section 200 College Station, Texas March 2013 Prepared By: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 F-12327 SCHULTZ ENGINEERING. LLC. GENERAL INFORMATION The Barracks II Subdivision Section is a 108-acre development in the area generally bounded by Wellborn Road on the east, Holleman Drive South on the west, Cain Road to the north and Rock Prairie Road to the south. It is zoned PDD and is comprised of a mixture of residential and commercial land uses as shown on Exhibit A. There are 425 residential lots planned for the site and 25.3 acres of commercial property. The area surrounding the site is generally undeveloped, with the exception of three residential developments adjoining the tract on the south. The area between Cain Road and Rock Prairie Road is described as General Suburban in the City's Comprehensive Plan, which implies that it is likely to develop in a similar manner as The Barracks II Subdivision Sections 100, 101, 102 and 300 have been completed or are under construction. Section 200 is unchanged from the Preliminary Plat and will add 28 new lots. Sewer service to the area is provided by 18" and 12" lines running along Old Wellborn Road and along the south property line of The Barracks II Subdivision. These lines will be the primary outfall for this development, but they are also intended to serve other adjoining tracts in the same sewer basin. These adjoining areas are identified as: CSISD Tract -23 .50 acres Mayo Tract -24.99 acres Turner Tract (partial) -15.08 acres Barger Tract (partial) -18.06 acres All four of these tracts are presently zoned A-0. Only the Mayo Tract and the Turner Tract affect this portion of the Sewer System. Design Criteria: Primary Sewer Outfall: Section 10 l -8" sewer line at existing terminus of Hayes Drive Domestic Demand: Avg. Pop Density: Average Flow: Peaking Factor: Pipe: Applicable Exhibits: Conclusion: 2.67 people per lot l 00 gpd/cap or 267 gpd per lot 4 PVC D3034 SDR 26 Exhibit A -Overall Sewer System Layout Exhibit B -Sanitary Sewer Analysis Spreadsheet The sewer system shown in Exhibit A has been laid out using the criteria in the Bryan/College Station Design Guidelines and TCEQ. It is analyzed assuming peak flow conditions when this portion of the subdivision is fully developed. The spreadsheet in Exhibit B shows all lines depicted in Exhibit A to be capable of carrying the flows that come to them under these conditions. This analysis will be used as the basis for all subsequent sewer line designs in the subdivision. The system will function as intended as long as the line sizes and slopes are equal to or greater than those shown herein. It should be noted that any significant additional flow from off-site sources will likely exceed the capacity of several lines, so careful study is advised of any changes to the contributing area. Water System Report for The Barracks II Subdivision Section 200 Brazos County, Texas March 2013 Prepared By: TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 979.764.3900 F-12327 SCHULTZ ENGINEERING, LLC. General Information Location: General Note: Land Use: Section 200 is located southeast of Section 100 of the Barracks II Development. The Barracks II Subdivision is a 108-acre development located midway between Rock Prairie Road and Cain Road in south College Station. It is bounded on the west by Holleman Drive South and on the east by Old Wellborn Road. The water lines to serve these 28 residential lots will be a 8" along Towers Parkway, a 6" line along Iron Horse Drive and a 6" & 8" line along Hayes Drive. The 8" line along Towers Parkway will connect to the 12" line that was constructed in Section 100. The 8" line along Hayes will connect to the 8" line that was constructed in section 101. Single family residential Design Criteria/ Analysis Primary Water Supply: Existing 12" water line along Deacon Drive. Existing System Pressure Tests: Flow Hydrant -See Appendix A Flowrate: 1,190 gpm Static Pressure: 75 psi Residual Pressure: 55 psi Exhibits: Exhibit A -Water Layout Appendix A-Hydrant Flow Test Results Appendix B -WaterCAD Analysis Summary-Domestic Demand Appendix C -WaterCAD Analysis Summary-Fire Flow Demand@ FHl Appendix D -WaterCAD Analysis Summary-Fire Flow Demand @FH2 Fire Flow: Domestic Use 1,000 gpm for Single Family Residential 1.5 gpm per lot for Single Family Residential Section 201 -28 Lots= 42 gpm Future Development (Section 202)-22 Lots= 33 gpm Future Development (Section 201) -28 Lots = 42 gpm Total Domestic Demand= 117 gpm The proposed 8" & 6" water lines are in accordance with the BCS Water Design Guidelines. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, (1117 gpm) which produced the lowest pressure in the system. Conclusion Summary of Calculations Pressure 73.2 Domestic Demand Min. Velocity Max .75 Pressure 45.9 Domestic Demand & Fire Min. Hydrant 1 Velocity Max 7.69 Pressure 49 Domestic Demand & Fire Min. Hydrant 2 Velocity Max 7.13 The minimum pressure (45.9 psi) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number 1. The Max Velocity for this system occurs at the same demand when the velocity in Pipe P-7 has a velocity of 7 .69 fps. All of these pressures exceeds the 20 psi and 3 5 psi minimum pressure requirements, respectively. The maximum pipe velocities are less than 12 fps. The proposed 8" and 6" water lines meet or exceed all of the design criteria for the City of College Station and the Wellborn Special Utility District. It will provide adequate water pressure, flowrate and velocity for both domestic and fire flow demands. EXHIBIT A WATER LAYOUT APPENDIX A FLOW TEST REPORT Appendix A GOODWIN -LASITER, INC. TBPE # F-413 Water System Flow Test Report Date: 2/12/2013 Water System Owner: We/lbQm SUD ------------------------0 eve Io pm en t Project: fhe Barracks II-Phase WJ Flow Test Location: Intersection Cu/fen/Capps Nozzle srze (in): 2.5 --------------~ Pitot Reading (psi): 50 Flowrate (gpm): 1,190 ~-----------------------Pressure Guage location: Cullen/Nayes ----------------------~ Static (psi};; 75 -------------------------. Residual (psi}t 55 Discharge Coef: C:· Flowrate. Flormufa: c = discharge coef. d = orifice size (In) p = pltot pres$ure (psij 0.9 This flow test was· conducted In accordahce with NFPA 291. Th!!~~~~ ~or 9l<Ci!~~.IJ!.l\J~~~!ll;~esign standards a !'low requrrements of the City and the State ofTellas\: • ' . . . -:~}:!.; . . --:."\'O"i:')~h, '·;,:·b:- ·. ~ -..... , .......... .,~' ·:·.' "' .. .,r.• •· ,_, t .... ., Report Prepared by: ·-k · '~/ * ··.... •1 ·• · f* :' : .... ,, signature , •.f . ... * l r······~······~·,··,·····,~···.······1· John Rusk, PE ~· .. :·~.9.~.~ .. ~.~.~~ .. r-·l prlnttdnom~ '•t\°\ 87884 .{$: ,o..c-··~1ceH!»~~ .. ·~ .I' '\f .r$i"''••:"f:.~0~ Others Present: Mike Marks, Contractor '''°~~~-; ;,qi'£./ '.i.o 13 2 Operators, Wellborn SUD APPENDIX B PIPE & JUNCTION ANALYSIS-DOMESTIC FLOW Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-12 P-13 P-res Length (ft) 831 457 1,053 119 79 186 85 670 287 76 75 18 269 44 Appendix B WaterCAD Analysis Summary Pipe Analysis -Domestic Demand Size (in) Material Hazen- Williams C 8 PVC 150 8 PVC 150 12 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 6 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 WaterCAD Analysis Summary Junction Analysis -Domestic Demand Junction Junction Elevation Demand Pressure (gpm) (psi) EX-FH 306.97 0 74.6 J-2 304 0 75.8 J-3 303.27 0 76.1 J-4 309.37 0 73.4 J-5 309.5 0 73.4 J-6 310 0 73.2 J-7 309.57 36 73.3 FH-1 309.36 18 73.4 J-9 305 18 75.3 J-10 304.48 0 75.6 J-11 305.21 24 75.2 J-12 304.6 15 75.5 FH-2 304.67 6 75.5 Flow Velocity (gpm) (ft/s) 117 0.75 49 0.31 49 0.14 49 0.31 49 0.31 36 0.23 13 0.15 -5 0.05 -23 0.26 24 0.15 -15 0.17 -62 0.39 -68 0.43 117 0.75 APPENDIXC PIPE & JUNCTION ANALYSIS-FIRE FLOW FH-1 & DOMESTIC FLOW Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-12 P-13 P-res Length (ft) 831 457 1,053 119 79 186 85 670 287 76 75 18 269 44 Appendix C WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-1) Size (in) Material Hazen- Williams C 8 PVC 150 8 PVC 150 12 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 6 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-1) Junction Junction Elevation Demand Pressure (gpm) (psi) EX-FH 306.97 0 56.8 J-2 304 0 51.9 J-3 303.27 0 50.7 J-4 309.37 0 47.6 J-5 309.5 0 47.2 J-6 310 0 46.7 J-7 309.57 36 46.9 FH-1 309.36 1,018 45.9 J-9 305 18 50.1 J-10 304.48 0 51.3 J-11 305.21 24 51 J-12 304.6 15 51.3 FH-2 304.67 6 51.3 Flow Velocity (gom) (ft/s) 1,117 7.13 714 4.55 714 2.02 714 4.55 714 4.55 36 0.23 678 7.69 -340 3.86 -358 4.07 24 0.15 -15 0.17 -397 2.54 -403 2.58 1,117 7.13 APPENDIX D PIPE & JUNCTION ANALYSIS-FIRE FLOW FH-1 & DOMESTIC FLOW Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-12 P-13 P-res Length (ft) 831 457 1,053 119 79 186 85 670 287 76 75 18 269 44 Appendix D WaterCAD Analysis Summary Pipe Analysis -Fire Flow Demand (FH-2) Size (in) Material Hazen- Williams C 8 PVC 150 8 PVC 150 12 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 6 PVC 150 6 PVC 150 6 PVC 150 8 PVC 150 6 PVC 150 8 PVC 150 8 PVC 150 8 PVC 150 WaterCAD Analysis Summary Junction Analysis -Fire Flow Demand (FH-2) Junction Junction Elevation Demand Pressure (gpm) (psi) EX-FH 306.97 0 56.8 J-2 304 0 51.9 J-3 303.27 0 52 J-4 309.37 0 49.3 J-5 309.5 0 49.2 J-6 310 0 49 J-7 309.57 36 49.1 FH-1 309.36 18 49.1 J-9 305 18 50.4 J-10 304.48 0 50.4 J-11 305.21 24 50 J-12 304.6 15 50.3 FH-2 304.67 1,006 50.3 Flow Velocity (gpm) (ft/s) 1,117 7.13 229 1.46 229 0.65 229 1.46 229 1.46 36 0.23 193 2.19 175 1.99 157 1.79 24 0.15 -15 0.17 118 0.76 -888 5.67 1,117 7.13