Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Home of TimAL+M Univerrity' MEMORANDUM December 14, 2012 TO: Jon Hall, via e-mail: ihallCc-)csisd.or4 FROM: Jason Schubert, AICP Principal Planner SUBJECT: CSISD HIGH SCHOOL (PP) Thank you for the submittal of your PRELIMINARY PLAN application. This project will be distributed to staff next week for their review. cc: Case file no. 12-00500264 Melissa Thomas, via e-mail: mthomas atessnerenaineering.com Planning & Development Services V.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATTC)N • TEXAS •17342 "PEL, 979.7(i4.3570 • I'AX. 979.764.3496 csbt.gov/devservices SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 19, 2012 ENGINEERING COMMENTS NO. 1 1. Please designate the boundary with a solid bold line. 2. Please clearly differentiate between public and private utilities. 3. Please label the contour elevations. 4. Please add a note stating whether the site lies within a FEMA designated floodplain and reference the FIRM panel number. 5. It is very difficult to differentiate between all of the linetypes. Please make sure everything is clearly labeled. It might also help to have multiple sheets, so all the information is not on a single sheet. Some information could also be omitted, for instance, we do not need to see striping on the football field. Removing some of these lines may make the plan easier to read. 6. What are the two rectangles west of the stadium? These were not labeled on the site plan either. 7. The boundary does not close. 8. Please label the detention pond. 9. Please tie a corner of the property to a City of College Station Monument. 10. Please label the creek. 11. Please show the base flood limits. 12. If the right-of-way for Victoria has already been dedicated, the boundary line should reflect this. The same applies for Barron, it appears the right of way is shown as less than 90'? 13. Please provide public access easements for the multi -use path. 14. A 20' public utility easement is required along the rear lot lines (opposite Victoria and Barron). Reviewed by: Danielle Singh Date: 12/19/12 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 2. Final Plat as submitted for review does not specifically show underground primary electric routes. Electric primary may be within the boundaries of the 15' PUE that runs from Victoria to Barron Rd and shows a water line route. This will need to be verified unless other documentation exists that shows electric primary has a separate PUE. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 12.21.2012