HomeMy WebLinkAboutCost EstimateGREAT OAKS - PHASE 13 MBESI PROJ 9: 1028-0002-004 Engineer's Estimate of Construction Costs December 18, 2012 Item 4 Description I Unit I Quantity I Unit Price Total Paving Construction Site Preparation (includes clearing & grubbing, I removing/stockpiling gavel road, removal of existing Ac. 2.7 asphalt) $3,500.00 $9,590.00 2 Earthwork (Excavation and Embankment for Public ROW, L.S. t $18,000.00 $18,000.00 Common Area, and Lots+/- 3,000 CY) 3 6" Lime Stabilized Subgrade (6% by weight) S.Y. 4,767 $4.25 $20,259.75 4 6" Crushed Stone Base S.Y. 4,180 $11.00 $45,980.00 5 2" HMAC Pavement S.Y. 3,595 $11.00 $39,545.00 Paving Subtotal $133,375 Drainage System Construction 6 42" RCP Pipe L.F. 52 $75.00 $3,900.00 7 __ 42" RCPHeadwallw/wingwalls EACH 2 $3,000.00 $6,000.00 8 Concrete Monte L.F. _ 100 $30.00 $3,000.00 9 Rock Rip Rap S.Y. 41 $45.00 $1,845.00 Drainage System Subtotal $14,745 Water System Construction 10 8" PVC, C909 Cl 200, Water Line L.F. 97 $25.00 $2,425.00 11 8" Gate Valve EACH 2 $800,001 $1,600.00 _ 12 8"x8" Tee EACH 1 $300.00 $300.00 13 8" Anchor Coupling EACH 1 $300.00 $300.00 14 Fire Hydrant Assembly EACH 1 $3,600.00 $3,600.00 15 8"x45 Deg, M.J. Bend _ EACH 2 $300.00 $600.00 Water System Subtotal $8,825 Erosion Control Construction 16 Erosion Control Plan & Sedimentation Control (per Item 106) (includes monitoring, record keeping, grass seeding, and clean L.S. 1 $3,000.00 $3,000.00 17 Grass Seeding SY 8,250 $0.40 $3,300.00 18 Hay Bale (Silt Barriers) EACH 8 $50.00 $400.00 19 Headwall Protection EACH 2 $300.00 $600.00 20 Entrance/Exit EACH 1 $1,500.00 $1,500.00 Erosion Control Subtotal I $8,800 Construction Cost $165,745 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. P.E. Date t of 2 GREAT OAKS - PHASE 13 MBESI PROJ 0: 1028-0002-004 Engineer's Estimate of Construction Costs December 18, 2012 Item# Description I Unit I Quantity I Unit Price Total Paving Construction Site Preparation (includes clearing & grubbing, 1 removingistockpiling gravel road, removal of existing Ac. 2.7 asphalt) $3,500.00 $9,590.00 2 Earthwork (Excavation and Embankment for Public ROW, L.S. 1 $18,000.00 $18,000.00 Common Area, and Lots+/- 3,000 CY) 3 6" Lime Stabilized Subgrade (6%by weight) S.Y. 4,767 $4.25 $20,259.75 4 6" Crashed Stone Base S.Y. 4,180 $11.00 $45,980.00 5 2" HMAC Pavement S.Y. 3,595 $11.00 $39,545.00 Paving Subtotal $133,375 Drainage System Construction 6 42" RCP Pipe L.F. 52 $75.00 $3,900.00 7 42" RCP Headwall w/ wingwalls EACH _ 2 $3,000.00 $6,000.00 8 Concrete Flume L.F. 1 I00 $30.00 $3,000.00 9 IRockRipRap S.Y. 41 $45.00 $1,845.00 Drainage System Subtotal $14,745 Water System Construction 10 8" PVC, C909 CI 200, Water Line L.F. 97 $25.00 $2,425.00 11 8" Gate Valve EACH 2 $800.00 $1,600.00 12 8"x8" Tee EACH 1 $300.00 $300.00 13 8" Anchor Coupling EACH 1 $300.00 $300.00 14 Fire Hydrant Assembly EACH 1 $3,600.00 $3,600.00 15 8"x45 Deg, M.J. Bend EACH 2 $300.00 $600.00 Water System Subtotal $8,825 Erosion Control Construction 16 Erosion Control Plan & Sedimentation Control (per Item 106) (includes monitoring, record keeping, grass seeding, and cleanup) L.S. 1 $3,000.00 $3,000.00 17 Grass Seeding SY 8,250 $0.40 $3,300.00 18 Hay Bale (Silt Barriers) EACH 8 $50.00 $400.00 19 Headwall Protection EACH 2 $300.00 $600.00 20 Entrance/Exit EACH 1 $1,500.00 $1,500.00 Erosion Control Subtotal RR.Ron Construction Cost 1 $165,745 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. L. Robertson. P.E. Date I of 2 GREAT OAKS - PHASE 13 MBESI PROJ #: 1028-0002-004 Engineer's Estimate of Construction Costs June25,2012 Item# Description I that I Quantity I Unit Price Total Paving Construction Site Preparation (includes clearing & grubbing, I removing/stockpiling gravel road, removal of existing Ac. 2.7 asphalt) $3,500.00 $9,590.00 2 Earthwork (Excavation and Embankment for Public ROW, L.S. 1 $18,000.00 $18,000.00 Common Area, and Lots+/- 3,000 CY) 3 6" Lime Stabilized Subgrade (6%by weight) S.Y. 4,767 $4.25 $20,259.75 4 6" Crushed Stone Base S.Y. 4,180 $11.00 $45,980.00 5 2" HMAC Pavement S.Y. 3,595 $11.00 $39,545.00 _ Paving Subtotal $133,375 Drainage System Construction 6 42" RCP Pipe L.F. 52 $75.00 $3,900.00 7 42" RCP Headwall w/ wingwalls EACH 2 $3,000.00 $6,000.00 8 Concrete Flume L.F. 100 $30.00 $3,000.60 9 ___ Rock Rip Rap S.Y. 41 $45,00 $1,845.00 Drainage System Subtotal 1 $14,745 Water System Construction 10 8" PVC, C909 CI 200, Water Line L.F. 1 97 $25.001 $2,425.00 11 8" Gate Valve EACH 1 2 $800.00 $1,600.00 12 8"x8" Tee EACH l $300.00 $300.00 13 8" Anchor Coupling EACH 1 $300.00 $300.00 14 Fire Hydrant Assembly EACH 1 $3,600.00 $3,600.00 15 8"x45 Deg. M.J. Bend EACH 2 $300,001 $600.00 Water System Subtotal 1 $8,825 Erosion Control Construction 16 Erosion Control Plan & Sedimentation Control (per Item 106) (includes monitoring, record keeping, grass seeding, and cleanup L.S. l $3,000.00 $3,000.00 17 Grass Seeding SY 8,250 $0.40 $3,300.00 18 Hay Bale (Silt Barriers) EACH 8 $50.00 $400.00 19 Headwall Protection EACH 2 $300.00 $600.00 20 Entrance/Exit EACH _ _ 1 $I,500.00 $1,500.00 Erosion Control Subtotal U R00 Construction Cost $165,745 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase in cost. 41e L... ... a I of 2