Loading...
HomeMy WebLinkAboutWater ReportWATER REPORT .; GREAT OAKS PHASES 13, & 14 College Station, Texas JUNE 2013 MBESI# 1028-ooO2 pmMcCLURE & BROWNE, ENGINEERING/SURVEVING, INC. 1008 Woodcreek Dr, Suite 103 College Station, Tx. 77845 .(979) 693-3838 Engineer Reg. No. F-458 1314 10th Street, Suite 210 Huntsville, Tx. 77320 (936) 294-9749 Survey Reg. No. 101033-00 WATER SYSTEM ANALYSIS FOR GREAT OAKS SUBDIVISION, PHASE 13-14 General Information Area encompassed by this phase: 124 acres Anticipated land use: Single family residential (Great Oaks) Anticipated number of lots: 24 lots Notes on surrounding development: The subdivision is bounded by Great Oaks Phase 1 to the east and south, Quail Run Subdivision, and property owned by the Kavanaugh Family to the west. Water System Analysis Primary water supply line: Existing 8" water line on Great Oaks Drive, Arboleda Drive, and Walnut Road Software model: PIPE2012 (Kentucky Pipe Network Model) Estimated peak domestic demand: 1.5 gpm per residential lot (per TCEQ requirements) Estimated fire demand: 1000 gpm Pipe material: PVC (C900) Most Hydraulically Remote Point: Node J-26 (See Exhibit A) This is determined by calculating the lowest pressure under static conditions. Testing Method: Wellborn S.U.D. performed the fire flow test on May 13, 2013. A Pollard Hydrant Flow Gauge was used to measure the flow at the existing fire hydrant located at the intersection of Great Oaks Drive and Arboleda Drive. The reading on the gauge was 70 psi which corresponds to a flow of 1450 gpm. Water Model Parameters: The model has been setup to analyze the "worst case scenario'. We have assumed that Great Oaks Phase 13/14 are fully developed and we only have connections to the existing water system at Great Oaks Drive. The model will work under these conditions. However as the remainder of the Great Oaks Subdivision is developed, additional connections to the existing system will be made. These connections will increase the pressures for the entire system during fire flow conditions. Great Oaks Phase 13/14 MBESI #1028-0002 Re elated Items Designed I Requirement I Notes Min. Pressure (psi 68.4 _ 20 (min) ; Fire flow conditions (J-7) Max. Velocity (fps) 6.50 12 (max) I Fire flow conditions (P-3) Conclusion: The proposed water system exceeds the requirements of TCEQ and the Cities of Bryan and College Station Applicable Exhibits: Exhibit A Schematic Water System Layout Exhibit B PIPE2000 Model Output for Great Oaks, Phase 2 and Los Palomas Subdivision (static) Exhibit C PIPE2000 Model Output for Great Oaks, Phase 2 and Los Palomas Subdivision (fire) Y1 "y�,}1Ali r Great Oaks Phase 13/14 MBESI 41028-0002 J8 Junction Location p� Pressure Source Location EXHIBIT A —HATER WATER MAP ® s� �,� a sae• Exhibit B Static Flow Conditions * * * * * * * * * * K Y P I P E 5 * * * Pipe Network Modeling Software * * * Copyrighted by KYPIPE LLC * Version 5 - February 2010 * * Date & Time: Fri Jun 28 10:36:05 2013 Master File : f:\1028 - caldwell companies\0002 - great oaks phases 13- 14\docs\gol314-stat.KYP\go1314-stat.P2K S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NAMES LENGTH N A M E 41 #2 (£t) -------------------------------------------- P-1 VP-1 J-5 1660.00 P-2 J-2 J-1 1881.00 P-3 J-2 J-3 586.00 P-4 J-3 J-4 600.00 P-5 J-3 J-7 80.00 P-6 VP-1 J-2 578.00 P-7 J-5 J-1 558.00 P-8 J-7 J-8 800.00 P-9 J-8 J-6 351.13 P U M P/L 0 S S E L E M E N T D A T A DIAMETER ROUGHNESS MINOR (in) COEFF. LOSS COEFF. ------------------------------- 8.00 140.0000 0.00 4.00 140.0000 0.00 8.00 140.0000 0.00 8.00 140.0000 0.00 8.00 140.0000 0.00 8.00 140.0000 0.00 8.00 140.0000 0.00 6.00 140.0000 0.00 4.00 140.0000 0.00 THERE IS A DEVICE AT NODE HEAD FLOWRATE (ft) (gpm) 196.15 0.00 161.54 1500.00 71.19 3000.00 N 0 D E D A T A VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) EFFICIENCY M 75.00 75.00 75.00 NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE -------------------------------------------------------------- (gpm) (ft) (ft) J-1 10.50 291.00 J-2 10.50 316.00 J-3 0.00 314.00 J-4 7.50 323.00 J-5 10.50 295.00 J-6 3.50 301.00 J-7 4.50 314.00 J-8 3.25 307.00 VP-1 ---- 313.00 313.00 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 4 MAXIMUM AND MINIMUM VELOCITIES = 5 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5 S Y S T E M C O N F I G U R A T I O N NUMBER OF PIPES ...................(p) = 9 NUMBER OF END NODES ...............(j) = 8 NUMBER OF PRIMARY LOOPS ...........(1) = 1 NUMBER OF SUPPLY NODES ............(£) = 1 NUMBER OF SUPPLY ZONES ............(z) = 1 Case: 0 RESULTS OBTAINED AFTER 8 TRIALS: ACCURACY = 0.00001 S I M U L A T I O N D E S C R I P T I O N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE P I P E NODE NUMBERS HL/ N A M E #1 #2 1000 (ft/ft) 0.01 0.00 0.01 0.00 0.00 0.03 0.00 0.01 0.01 P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 -------------- VP-1 J-5 J-2 J-1 J-2 J-3 J-3 J-4 J-3 J-7 VP-1 J-2 J-5 J-1 J-7 J-8 J-8 J-6 CV -CHECK VALVE FLOWRATE (gpm) 19.53 1.47 18.75 7.50 11.25 30.72 9.03 6.75 3.50 P U M P/L 0 S S E L E M E N T R E S U L T S HEAD MINOR LINE HL+ML/ LOSS LOSS VELD. 1000 (ft) --------------------------- (ft) (ft/s) (ft/ft) 0.02 0.00 0.12 0.01 0.00 0.00 0.04 0.00 0.01 0.00 0.12 0.01 0.00 0.00 0.05 0.00 0.00 0.00 0.07 0.00 0.01 0.00 0.20 0.03 0.00 0.00 0.06 0.00 0.00 0.00 0.08 0.01 0.00 0.00 0.09 0.01 INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) M (Hp) ($) ($) (ft) ------------------------------------------------------------------------------- ------------------------- VP-1 50.25 0.00 196.09 196.1 75.00 0. 0.0 0.0 ** ** 33.2 N 0 D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD (gpm) (ft) (ft) (£t) --------------------------------------------------------------------- J-1 10.50 509.07 291.00 218.07 J-2 10.50 509.08 316.00 193.08 J-3 0.00 509.07 314.00 195.07 J-4 7.50 509.07 323.00 186.07 J-5 10.50 509.07 295.00 214.07 J-6 3.50 509.06 301.00 208.06 J-7 4.50 509.07 314.00 195.07 J-8 3.25 509.06 307.00 202.06 VP-1 ---- 509.09 313.00 196.09 M A X I M U M A N D M I N I M U M V A L U E S P R E S S U R E S JUNCTION MAXIMUM JUNCTION MINIMUM NUMBER PRESSURES NUMBER PRESSURES (psi) (psi) J-1 94.50 J-4 80.63 J-5 92.76 J-2 83.67 J-6 90.16 J-7 84.53 J-8 87.56 J-3 84.53 V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/3) -- ------- (ft/s) ---------- P-6 0.20 P-2 0.04 P-1 0.12 P-4 0.05 P-3 0.12 P-7 0.06 P-9 0.09 P-5 0.07 P-8 0.08 P-8 0.08 H L+ M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) --------------------- (ft/ft) --------------------- P-6 0.03 P-4 0.00 P-9 0.01 P-7 0.00 P-1 0.01 P-2 0.00 P-3 0.01 P-5 0.00 P-8 0.01 P-8 0.01 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 PRESSURE (psi) 94.50 83.67 84.53 80.63 92.76 90.16 84.53 87.56 84.97 1 (ft/£t) ------------ 0.03 0.01 0.01 0.01 0.01 S U M M A R Y O F I N F L O W S A N D P-4 P-7 P-2 P-5 P-8 (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE ---------------------------------- VP-1 50.25 NET SYSTEM INFLOW = 50.25 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 50.25 (ft/ft) 0.00 0.00 0.00 0.00 0.01 O U T F L O W S ***** HYDRAULIC ANALYSIS COMPLETED ***** Exhibit C Fire Flow Conditions * * * * * * * * * * K Y P I P E 5 * * Pipe Network Modeling Software * * * Copyrighted by KYPIPE LLC * Version 5 - February 2010 * * Date & Time: Fri Jun 28 10:38:53 2013 Master File : f:\1028 - caldwell companies\0002 - great oaks phases 13- 14\docs\gol314-fire.KYP\gol314-fire.P2K S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N A M E #1 #2 (ft) (in) COEFF. LOSS COEFF. ------------------------------------------------------------------------------- P-1 VP-1 J-5 1660.00 8.00 140.0000 0.00 P-2 J-2 J-1 1881.00 4.00 140.0000 0.00 P-3 J-2 J-3 586.00 8.00 140.0000 0.00 P-4 J-3 J-4 600.00 8.00 140.0000 0.00 P-5 J-3 J-7 80.00 8.00 140.0000 0.00 P-6 VP-1 J-2 578.00 8.00 140.0000 0.00 P-7 J-5 J-1 558.00 8.00 140.0000 0.00 P-8 J-7 J-8 800.00 6.00 140.0000 0.00 P-9 J-8 J-6 351.13 4.00 140.0000 0.00 2 U M P/L 0 S S E L E M E N T D A T A 1-6.4 :7al ai6W.1m7a0toow3rAB11 HEAD FLOWRATE (ft) (gpm) 196.15 0.00 161.54 1500.00 71.19 3000.00 N 0 D E D A T A VP-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) EFFICIENCY M 75.00 75.00 75.00 NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) -------------------------------------------------------------- J-1 10.50 291.00 J-2 10.50 316.00 J-3 0.00 314.00 J-4 7.50 323.00 J-5 10.50 295.00 J-6 3.50 301.00 J-7 1004.50 314.00 J-8 3.25 307.00 VP-1 ---- 313.00 313.00 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 4 MAXIMUM AND MINIMUM VELOCITIES = 5 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5 S Y S T E M C O N F I G U R A T I O N NUMBER OF PIPES ...................(p) = 9 NUMBER OF END NODES ...............(j) = 8 NUMBER OF PRIMARY LOOPS ...........(1) = 1 NUMBER OF SUPPLY NODES ............(f) = 1 NUMBER OF SUPPLY ZONES ............(z) = 1 Case: 0 RESULTS OBTAINED AFTER 6 TRIALS: ACCURACY = 0.00004 S I M U L A T I O N D E S C R I P T I O N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELD. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) ------------------------------------------------------------------------------- P-1 VP-1 J-5 99.72 0.37 0.00 0.64 0.22 0.22 P-2 J-2 J-1 -78.72 7.91 0.00 2.01 4.20 4.20 P-3 J-2 J-3 1018.75 9.66 0.00 6.50 16.48 16.48 P-4 J-3 J-4 7.50 0.00 0.00 0.05 0.00 0.00 P-5 J-3 J-7 1011.25 1.30 0.00 6.45 16.26 16.26 P-6 VP-1 J-2 950.53 8.38 0.00 6.07 14.50 14.50 P-7 J-5 J-1 89.22 0.10 0.00 0.57 0.18 0.18 P-8 J-7 J-8 6.75 0.00 0.00 0.08 0.01 0.01 P-9 J-8 J-6 3.50 0.00 0.00 0.09 0.01 0.01 P U M P/L 0 S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL *PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) M (Hp) ($) ($) (ft) ------------------------------------------------------------------------------- ------------------------- VP-1 1050.25 0.00 178.27 178.3 75.00 0. 0.0 0.0 ** ** 33.2 N 0 D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) ------------------------------------------------------------------------------ J-1 10.50 490.79 291.00 199.79 86.58 J-2 10.50 482.89 316.00 166.89 72.32 J-3 0.00 473.23 314.00 159.23 69.00 J-4 7.50 473.23 323.00 150.23 65.10 J-5 10.50 490.90 295.00 195.90 84.89 J-6 3.50 471.92 301.00 170.92 74.06 J-7 1004.50 471.93 314.00 157.93 68.43 J-8 3.25 471.92 307.00 164.92 71.47 VP-1 ---- 491.27 313.00 178.27 77.25 M A X I M U M A N D M I N I M U M V A L U E S P R E S S U R E S JUNCTION MAXIMUM JUNCTION MINIMUM NUMBER PRESSURES NUMBER PRESSURES (psi) (psi) J-1 86.58 J-4 65.10 J-5 84.89 J-7 68.43 VP-1 77.25 J-3 69.00 J-6 74.06 J-8 71.47 V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY --------------------- (ft/s) --------------------- (ft/s) P-3 6.50 P-4 0.05 P-5 6.45 P-8 0.08 P-6 6.07 P-9 0.09 P-2 2.01 P-7 0.57 P-1 0.64 P-1 0.64 H L+ M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) (ft/ft) P-3 16.48 P-4 0.00 P-5 16.26 P-8 0.01 P-6 14.50 P-9 0.01 P-2 4.20 P-7 0.18 P-1 0.22 P-1 0.22 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 (ft/ft) -------- (ft/ft) ---- ------------- P-3 16.48 P-40.00 P-5 16.26 P-8 0.01 P-6 14.50 P-9 0.01 2-2 4.20 P-7 0.18 P-1 0.22 P-1 0.22 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE -------------------------------------------- VP-1 1050.25 NET SYSTEM INFLOW = 1050.25 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1050.25 ***** HYDRAULIC ANALYSIS COMPLETED *****