Loading...
HomeMy WebLinkAboutStaff ReportCITY OF COLLEGE STATION FINAL PLAT for Great Oaks Phase 13 13-00900032 SCALE: Seven residential lots on approximately 9.2 acres LOCATION: Generally located west of Arboleda Drive in the Great Oaks Subdivision ZONING: A -OR Rural Residential Subdivision APPLICANT: Clint Cooper, BCS Rock Prairie PROJECT MANAGER: Morgan Hester, Staff Planner mhester@cstx.gov RECOMMENDATION: Staff recommends approval of the Final Plat. Planning &Zoning Commission Page 1 of 3 July 18, 2013 DEVELOPMENT HISTORY Annexation: March 2008 Zoning: A-O Agricultural Open upon annexation A -OR Rural Residential Subdivision in May 2008 Preliminary Plat: Preliminary Plats have been approved for Great Oaks in 2006, 2012, and a recent revision in 2013. Site Development: Vacant. Seven residential lots are proposed with this phase, ranging in size from 1.0 acre to 1.3 acres. COMMENTS Parkland Dedication: This development was Master Planned in the ETJ prior to parkland dedication requirements; therefore, no parkland dedication is required. Greenways: N/A Pedestrian Connectivity: At the time when Great Oaks was master planned, the tract was located in the ETJ; therefore, no sidewalks are proposed or required. Bicycle Connectivity: At the time when Great Oaks was master planned, the tract was located in the ETJ; therefore, no bicycle facilities are proposed or required. Impact Fees: N/A REVIEW CRITERIA 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The Comprehensive Plan designates this area as Restricted Suburban and the proposed lot sizes exceed with this land use. The proposed lots will have access from Arboleda Drive which connects to Great Oaks Drive, a future 2-lane Minor Collector on the Thoroughfare Plan and connect to Walnut Drive, a future Minor Collector located in the ETJ. 2. Compliance with Subdivision Regulations: The Final Plat complies with the applicable Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATIONS Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat Planning & Zoning Commission Page 3 of 3 July 18, 2013 CITY OF COLLEGE STATION FINAL PLAT for Great Oaks Phase 13 13-00900032 SCALE: Seven residential lots on approximately 9.2 acres LOCATION: Generally located west of Arboleda Drive in the Great Oaks Subdivision ZONING: A -OR Rural Residential Subdivision APPLICANT: Clint Cooper, BCS Rock Prairie PROJECT MANAGER: Morgan Hester, Staff Planner mhester@cstx.gov RECOMMENDATION: Staff recommends approval of the Final Plat. Planning &Zoning Commission Pagel of4 July 18, 2013 DEVELOPMENT HISTORY Annexation: March 2008 Zoning: A-O Agricultural Open upon annexation A -OR Rural Residential Subdivision in May 2008 Preliminary Plat: Preliminary Plats have been approved for Great Oaks in 2006, 2012, and a recent revision in 2013. Site Development: Vacant. Seven residential lots are proposed with this phase, ranging in size from 1.0 acre to 1.3 acres. COMMENTS Parkland Dedication: This development was Master Planned in the ETJ prior to parkland dedication requirements; therefore, no parkland dedication is required. Greenways: N/A Pedestrian Connectivity: At the time when Great Oaks was master planned, the tract was located in the ETJ; therefore, no sidewalks are proposed or required. Bicycle Connectivity: At the time when Great Oaks was master planned, the tract was located in the ETJ; therefore, no bicycle facilities are proposed or required. Impact Fees: N/A REVIEW CRITERIA 1. Compliance with Comprehensive Plan and Unified Development Ordinance: The Comprehensive Plan designates this area as Restricted Suburban and the proposed lot sizes exceed with this land use. The proposed lots will have access from Arboleda Drive which connects to Great Oaks Drive, a future 2-lane Minor Collector on the Thoroughfare Plan and connect to Walnut Drive, a future Minor Collector located in the ETJ. 2. Compliance with Subdivision Regulations: The Final Plat complies with the applicable Subdivision Regulations contained in the Unified Development Ordinance. STAFF RECOMMENDATIONS Staff recommends approval of the Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat Planning & Zoning Commission Page 3 of 4 July 18, 2013 Planning & Zoning Commission Page 4 of 4 July 18, 2013