HomeMy WebLinkAboutDevelopment PermitDEVELOPMENT PERMIT
PERMIT NO. DP 13-32
Orrov Courcesrerioe FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
SITE ADDRESS:
Great Oaks
Terminus of Areboleda Or
Phase 13
DRAINAGE BASIN:
Alum Creek
DATE OF ISSUE: 6/26/2013
VALID FOR 24 MONTHS
OWNER:
CONTRACTOR:
Caldwell COmpanies
1700 Research Parkway #240
College Station, Tx 77845
TYPE OF DEVELOPMENT:
Clearing and Grading Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. Development shall not be used or occupied until Certificate of Occupancy is issued.
4. The permit will expire if no significant work is progressing within 24 months of issuance.
5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
11. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
12. Special Conditions:... TCEQ PHASE II RULES IN EFFECT
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor
Date
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date
DEVELOPMENT PERMIT
PERMIT NO. DP 13-32
Orrov Courcesrerioe FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
SITE ADDRESS:
Great Oaks
Terminus of Arboleda Dr
Phase 13
DRAINAGE BASIN:
Alum Creek
DATE OF ISSUE: 7/2113
VALID FOR 24 MONTHS
OWNER:
CONTRACTOR:
Caldwell Companies
1700 Research Parkway #240
College Station, Tx 77845
TYPE OF DEVELOPMENT:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. Development shall not be used or occupied until Certificate of Occupancy is issued.
4. The permit will expire if no significant work is progressing within 24 months of issuance.
5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
11. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
12. Special Conditions: —*TCEQ PHASE II RULES IN EFFECT... No work or connection to County maintained roads are
allowed without further coordination with the County Engineer. Secondary access point required prior to LOC.
the Contractor, hereby agree to comply with all conditions herein.
Contractor Date
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date
DEVELOPMENT PERMIT
PERMIT NO. DP 13-32
cnr or cnu.ece SrnrioN FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
w.An cadr,,.,n•+ RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Great Oaks Terminus of Areboleda Dr
Phase 13 DRAINAGE BASIN:
ATtn_
DATE OF ISSUE: 6/2612013 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Caldwell Companies
1700 Research Parkway #240
College Station, Tx 77845
TYPE OF DEVELOPMENT: Clearing and Grading Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. Development shall not be used or occupied until Certificate of Occupancy is issued.
4. The permit will expire if no significant work is progressing within 24 months of issuance.
5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
Insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
11, All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
12. Special Conditions: *** TCEQ PHASE II RULES IN EFFECT ***
the Contractor, hereby agree to comply with all conditions herein.
J
n actor Date
I hereby grant this permit for development. Contact -Lrdz f K O ifCi the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
Z_ �/6OiE
City Engineer/Represe tive Dates
♦ //�\� DEVELOPMENT PERMIT
PERMIT NO. DP 13-32
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
Crny of coi.ucr 8 RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
SITE ADDRESS:
Great Oaks
Terminus of Arboleda Dr
Phase 13
DRAINAGE BASIN:
�5 Greck
DATE OF ISSUE: 7/2113
VALID FOR 24 MONTHS
OWNER:
CONTRACTOR:
Caldwell Companies
1700 Research Parkway #240
College Station, Tx 77845
TYPE OF DEVELOPMENT:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. Development shall not be used or occupied until Certificate of Occupancy is issued.
4. The permit will expire if no significant work is progressing within 24 months of issuance.
5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
11. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
12. Special Conditions: ***TCEQ PHASE II RULES IN EFFECT*** No work or connection to County maintained roads are
allowed without further coordination with the County Engineer. Secondary access point required prior to LOC.
Q &slkz+r�the Contractor, hereby agree to
comply with all conditions herein,
Coi tutor Date
61
I hereby grant this permit for development. Contact 1,5k_0J &I) 11'(f, the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
�L,/ �% z113
City Engineer/Repres n ive Date
♦ /J�1 DEVELOPMENT PERMIT
PERMIT NO. DP 13-32
crrvorcoi.i.eccSsrrioN FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
�,. ,, .n;. RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
SITE ADDRESS:
Great Oaks
Terminus of Arboleda Dr
Phase 13
DRAINAGE BASIN:
fba's Grec le -
DATE OF ISSUE: 7/2/13
VALID FOR 24 MONTHS
OWNER:
CONTRACTOR:
Caldwell Companies
1700 Research Parkway #240
College Station, Tx 77845
TYPE OF DEVELOPMENT:
Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. Development shall not be used or occupied until Certificate of Occupancy is issued.
4. The permit will expire if no significant work is progressing within 24 months of issuance.
5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
11. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
12. Special Conditions: ***TCEQ PHASE II RULES IN EFFECT*** No work or connection to County maintained roads are
allowed without further coordination with the County Engineer. Secondary access point required prior to LOC.
Contractor
the Contractor, hereby agree to comply with all conditions herein.
Date
I hereby grant this permit for development. Contact ISrae i L�IJi h, _,�-1749# , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representati Date
♦ /J� DEVELOPMENT PERMIT
C 7/J PERMIT NO. DP 13-32
Crrvorcoi.i.ec:cSixri<s� FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
"-,,, .,.o,w,,k,.,,,. RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
SITE ADDRESS:
Great Oaks
Terminus of Areboleda Dr
Phase 13
DRAINAGE BASIN:
Alum Creek
DATE OF ISSUE: 6/26/2013
VALID FOR 24 MONTHS
OWNER:
CONTRACTOR:
Caldwell Companies
1700 Research Parkway #240
College Station, Tx 77845
TYPE OF DEVELOPMENT:
Clearing and Grading Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. Development shall not be used or occupied until Certificate of Occupancy is issued.
4. The permit will expire if no significant work is progressing within 24 months of issuance.
5. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
6. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
7. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
9. All disturbed areas will be re -vegetated prior to Letter of Completion or Certificate of Occupancy.
10. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
11. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
12. Special Conditions: *** TCEQ PHASE II RULES IN EFFECT ***
I, , the Contractor, hereby agree to comply with all conditions herein.
Contractor
Date
I hereby grant this permit for development. Contact , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
City Engineer/Representative
Date