Loading...
HomeMy WebLinkAboutDetention Pond No2 AnalysisDetention Pond No. 2 Analysis for Dove Crossing Subdivision Phase 8 College Station, Texas May,2007 Developer: Dove Crossing Development; LLC 1401 Sebesta Road College Station, TX 77841 (979) 693-6699 Prepared B1 ·: Civil Development, Ltd. 2033 Harvey Mitchell Parkway Sou th Col1 ege Station. Texas 77840 (979) 7()4-7743 ' CERTIFICATION I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this analysis for the Detention Pond No. 2 design for the Dove Crossing Subdivisioll -Pltase 8, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners hereof. ~ l(;~ G -;;;{5 , P.E. TABLE OF CONTENTS DETENTION POND NO. 2 ANALYSIS DOVE CROSSING SUBDIVISION -PHASE 8 CERTIFICATION ................................................................................................................................................................. I TABLE OF CONTENTS ....................................................................................................................................................... 2 LIST OF TABLES .................................................................................................................................................................. 2 INTRODUCTION .................................................................................................................................................................. 3 GENERAL LOCATION AND DESCRIPTION ................................................................................................................. 3 FLOOD HAZARD INFORMATION ................................................................................................................................... 3 DEVELOPMENT DRAINAGE PATTERNS ...................................................................................................................... 3 DRAINAGE DESIGN CRITERIA ....................................................................................................................................... 3 STORM WATER RUNOFF DETERMINATION -DETENTION PONDS .................................................................... 5 DETENTION POND DESIGN .............................................................................................................................................. 5 CONCLUSIONS ..................................................................................................................................................................... 6 APPENDIX A ......................................................................................................................................................................... 7 Detention Pond No. 2 Design Data & Ca/culations7 APPENDIX B ........................................................................................................................................................................ 12 Detention Pond No. 2 Post-Development HEC-1 Output EXHIBIT A ........................................................................................................................................................................... 23 Po st-Development Drainage Area Map -Detention Pond LIST OF TABLES TABLE 1 -Rainfall Intensity Calculations ................................................................................................. 4 TABLE 2 -Time of Concentration (tc) Equations ..................................................................................... 4 TABLE 3 -Pre-& Post-Development Drainage Area Data -HEC 1 ........................................................ 5 TABLE 4 -Drainage Area Parameters Summary -Detention Pond No. 2 Desi gn ................................... 6 2 DETENTION POND NO. 2 ANALYSIS DOVE CROSSING SUBDIVISION -PHASE 8 INTRODUCTION The purpose of this report is to provide the hydrological effects of the construction of Detention Pond No. 2 of the Dove Crossing Subdivision -Phase 8, and to verify that the proposed detention facility meets the requirements set forth by the Ci ty of Co llege Station Drainage Policy and Design Standards. GENERAL LOCATION AND DESCRIPTION The project is located on a portion of a 97.94 acre tract located south of Graham Road west of State Highway 6 in College Station, Texas. This report addresses Phase 8 of this subdivision, which is made up of 10.95 acres. The site is predominantly open space with a few scattered mesquite trees. The existing ground elevations range from Elevation 289 to Elevation 300. The general location of the project site is shown on the vicinity map in Ex hibit A. FLOOD HAZARD INFORMATION The project site is located in the Lick Creek Drainage Basin. No portion of this property is within a flood hazard area according to the Flood Insurance Rate Map prepared by the Federal Emergency Management Agency (FEMA) for Brazos County, Texas and incorporated areas dated February 9, 2000, panel number 48041C0201-D. DEVELOPMENT DRAINAGE PATTERNS Prior to development of the subdivision, the storm water runoff for Phase 8 flowed in a southerly direction across future phases of development of this subdivision until it leaves the property and enters the South Fork of Lick Creek on the adjacent tract, which ultimately flows into Lick Creek. Two detention ponds were constructed with previous phases of this subdivision, and the runoff from Phase 8 flows into Pond 2 shown on Exhibit A, "Drainage Area Map, Post- Development, Detention Pond." DRAINAGE DESIGN CRITERIA The design parameters for the detention facility analysis are as follows : • The Rational Method is utilized to detennine peak stom1 water runoff rates for the stom1 sewer design, and the HEC-1 computer program is utili zed to determine peak stom1 water runoff rates for the design of the detention ponds. • Design Stom1 Frequency Detention pond analysi s 5, l 0, 25, 50 and 100-year storm events • Runoff Curve Number (CN) -Detention Ponds The Brazos County Soil Survey shows the soils in the area to be classified as hydrologic Group D soils. The pre-development CN is based on no development on the site. The · post-development CN is based on development of Phases I , 2, 3, 4 & 8 of the subdi vi sion within the detention pond drainage areas. The CN calcu lati ons are found in Appendi x D. • Rainfall Intensity equations and valu es for Brazos County can be found in Table 1. • Time of Concentration, tc -Calculations are based on the method found in th e TR-55 publication. Refer to Table 2 for the equations and Appendix A for calculations. The runoff flow paths used for calculating the post-development times of concentration for the detention pond analysis are shown on Exhibit B (refer to Phase 1 Drainage Report for pre-development infom1ation), and the flow path used for the post-development times of concentration for the stom1 sewer design is found on Exhibit A. For smaller drainage areas, a minimum tc of 10 minutes is used to determine the rainfall intensity values. TABLE I -Rainfall Intensity Calculations Rainfall Intensity Values (in/hr) Storm tc = Event 10 min 1, 7.693 110 8.635 125 9.861 lso 11 .148 1100 11 .639 Brazos County: 51:::ear storm 10 1:::ear storm b = 76 b= 80 d= 8.5 d= 8.5 e= 0.785 e= 0.763 I = b I (tc+d)e I = Rainfall Intensity (in/hr) tc = U(V*60) le = Time of concentration (min) L = Length (ft) V = Velocity (ft/sec) 25 1:::ear storm 50 1:::ear storm 100 1:::ear storm b= 89 b= 98 b= 96 d= 8.5 d = 8.5 d= 8.0 e= 0.754 e = 0.745 e= 0.730 (Data taken from State Department of Hiqhwa1:::s and Public Transportation H1:::drau/ic Manual, page 2-16) TABLE 2 -Time of Concentration (tc) Equations Th e time of concentration was determined using methods found in TR -55, "Urb an Hydrology for Small Watersheds. " The equations are as follows: Time of Concentration: For Sheet Flow: For Shallow Concentrated Flow: Refer to Appendix A for calculations. Tc= T1(shee1 flow)+ T1(concen1ra1ed shcel flow) where: T1 =Travel Time, minutes where: T1 =travel time, hours n =Manning's roughness coefficient L = flow length, feet P2 = 2-year, 24-hour rainfall = 4.5" s = land slope, ft/ft T1 = LI (60*V) where: T1 =travel time, minutes V =Velocity, fps (See Fig 3-1 , App. A) L = flow length, feet STORM WATER RUNOFF DETERMINATION -DETENTION PONDS The peak runoff values were detem1ined in accordance with the criteria presented in the previous sections for the S, 10, 2S, SO, and 100-year stom1 events. The drainage areas for the post- development conditions for the detention pond analysis are shown on Exhibit A. Pre- development and post-development runoff information for the detention pond is summarized in Table 4. The pre-development drainages were shown on Exhibit B of the Phase I Drainage Report. TABLE 3 -Pre-& Post-Development Drainage Area Data -HEC I Area le Lag Area# CN (acres) (sq. mi.) (min) (hrs) Pre -105 27.96 0.0437 75.0 32.0 0.320 ---------------·----·- Post -305 40.32 0.0630 83.4 39.0 0.390 DETENTION POND DESIGN The development of this tract will increase the runoff due to the increase in impervious surfaces. The drainage system for the development must be designed so that there is not an increase in the peak runoff values at the locations where the runoff is discharged from this development. This has been accomplished by the constrnction of two detention ponds. The proposed detention ponds will serve Phases 1 thru 4 & Phase 8 of this development. The Developer has purchased additional land to the south of this property to constrnct a pemianent detention facility for the entire development. Exhibit B in the Phase 1 Drainage Report shows the pre-development drainage area (Area l OS) developed for this project, which flow into the detention pond. Exhibit A of this report shows the post-development drainage area (Area 30S) for this phase of the project. The following sections describe how the proposed drainage system for this project will control the runoff such that the pre-development peak runoff values are not exceeded. Detention Pond No. 2 -Drain age Areas 105 & 305 The location of the pond is shown on Exhibit A of this report. The proposed grading changes for the pond are also shown on Exhibit A and the Grading Plan in the construction drawings. The area-capacity data and the depth-discharge data for the pond are provided in Appendix A. The detention pond grading plan is shown in the construction drawings. The existing pond discharge pipe is a 42" HOPE pipe, SO feet in length. Rock riprap is located at the discharge end to control erosion. The pipe has a design slope of O.S%, with the upstream invert at Elevation 287.0. The to of the pond berm is at Elevation 292.S with a IO' top width and SH: IV side slopes, with the overflow spi llway at Elevation 9 1.0 with a l O' bottom width and SH: IV side slopes. 12" di ameter Pipes A & B have been added to allow discharge of the runoff in Channels S & 6, which have flowlines lower than Elevation 287.0, the flowline of the 42" pipe. Due to the discharge through these pipes, the 42" pipe does not adequately control th e peak runoff; therefore, a concrete outlet structure is being added to the upstream end of the 42" pipe. The outlet structure is a concrete box structure with a 2.S' wide by 3' tall rectangular opening with a flow line of 287.S. The peak flow out of the detenti on pond was determined by the HEC-1 program using the depth di scharge data for th e pond outlet structure as provided in Appendi x A. The area/capacity data for the pond is inclu ded in Append ix A as well. 90% of th e available pond storage volume was used fo r this analys is. As shown in Tabl e 4, the peak o utfl ow from the detenti on fac ility is less than the all owable peak outflow fo r the design storm event. Additionall y, the tab le presents th e max imum water surface in th e pond for each storm event, as well as th e amo unt of freeboard provided. TABLE 4 -Drainage Area Parameters Summary -Detention Pond No. 2 Design Detention Pond 2 Pre-Development Area 105 Os 0 10 0 2s Oso 0 100 Post-Development Area 305 (cfs) (cfs) (cfs) (cfs) (cfs) 1 Pre-Development -Area 105 53 66 86 102 118 2 Post-Development without Pond -Area 305 96 11 4 143 164 185 3 Post-Development out of Pond 53 64 80 92 105 Decrease in Peak Runoff (Line 1 minus Line 3) 0 2 6 10 13 4 Max. Water Surface in Pond (ft) 290.2 290.5 290.9 291 .2 291.4 5 Top of Pond Berm 292.5 292.5 292.5 292.5 292.5 Freeboard (ft) (Line 5 minus Line 4) 2.3 2.0 1.6 1.3 1.1 The pre-development HEC-1 output data can be found in th e Phase I Drainage Report. T he post- development HEC-l output is provided in Appendix B. The post-development flow and maximum water surface are from this HEC-1 output. CONCLUSIONS The construction of this project w ill increase the storm water ru noff from thi s site. The proposed storm sewer system should adequately control the runoff and release it into the detention ponds. The proposed detenti on ponds should adequate ly contro l th e peak post-development runoff so that it will not have any impact on the properti es downstream of this development. There is no increase in runoff to the east onto the adj acent property due to the reduction in the drainage areas fl owing to these areas after thi s development. There sho uld be no fl ood damage to downstream or adjacent landowners resulting from this development. APPENDIX A Detention Pond No. 2 Design Data & Calculations 7 Dove Crossing Subdivision Phases 1 -4 & 8 Detention Pond No. 2 Area-Capacity Data V = H * {[A1+A2 + (A 1*A2)1'1/3} V = volume, ft2 A= area, ft2 H = difference in elevation, ft POND NO. 2 Elevation Depth Area (ft) (ft) (ft2) 283.08 0.00 0 ·-------284.00 0.92 121 -·---------·-285.00 1.92 2,700 Area -Capacity Data Area Volume Cumulative Volume (acres) (ac-ft) (ac-ft) 0.000 0.000 0.000 ·----------. ---0.003 0.001 0.001 -----------0.062 0.026 0.027 90 % Cumulative Vo lume (ac-ft) 0.000 - 0.001 --0.024 ·-·-----· ·--- 286.00 2.92 6, 113 0.140 0.099 0.125 0.113 ------------·-· ---·---287.00 3.92 15,791 0.363 0.243 0.368 0.331 -··-------------288.00 4.92 35,313 0.811 0.572 0.940 0.846 -·-·---· -· ----------289.00 5.92 71690 1.646 1.000 1.940 1.746 ------------- 290.00 6.92 130,577 2.998 2.288 4.228 3.805 . -----------------. 291 .00 7.92 185,805 4.265 3.613 7.841 7.057 -------------·--------· 292.00 8.92 258,956 5.945 5.082 12.923 11 .631 Dove Crossing Subdivision Phases 1 -4 & 8 Pond 2 Elevation Discharge Data 12" Outlet Pipe A 12" Outlet Pipe B Outlet Structure2 42" Outlet Pipe 2.5' Wide Opening Elevation FL= 283.82 FL= 284.67 FL= 287.00 FL= 297.50 Depth Q Depth Q Depth Q Depth Q (ft) (ft) (cfs) (ft) (cfs) (ft) (cfs) (ft) (cfs) 283.08 0.00 0.00 -------- 284.00 0.12 0.10 ------ -- 285.00 1.12 2.80 0.33 0.30 ---- 286.00 2.12 4.90 1.33 3.20 -------287.00 3.12 6.00 2.33 5.10 ----0.00 0.00 ----288.00 4.12 7.00 3.33 6.20 0.5 2.7 1.00 5.90 -~-------289.00 5.12 7.80 4.33 7.20 1.5 13.8 2.00 21.50 ---290.00 6.12 8.60 5.33 8.00 2.5 29.6 3.00 45.00 ---------291 .00 7.12 9.30 6.33 8.70 3.5 65.9 4.00 65.60 292.00 8.12 9.90 7.33 9.40 4.5 139.8 5.00 87.00 1. 1 O' bottom width with 5: 1 side slopes wi th a crest elevation of 291 .0, n=0.035. 2. Top of Outlet Structure= 290.5 3. Outlet Structure discharge exceeds 42" Pipe capacity. Overflow Spillway 1 Total Discharge Depth Q (ft) (cfs) (cfs) ----0.00 ----0.10 ----3.1 0 ----8.10 ----11.10 ----15.90 ----28.80 ----46.20 ----83.60 1.00 31 .00 137.30 Dove Crossing, Phases 1 -4 & 8 SCS Curve Number Calculations Pond 2 -Post Development Drainage Area -305 Area -Ac . 43.37 sq . mi. 0.0678 Tc = 27 .0 Lag = L = 0.6Tc = 16.2min= 0.27 hrs Weighted Land Use Area -Ac. CN II CN Wooded-good Pasture-good Residential (1/8 acre) Water Total -CN II Average Runoff condition CN = CN I= 78 .8 ARC CN = CN I + 0.70(CN II -CN I) 1.27 77 2.3 4.49 80 8.3 37.26 92 79.0 0.35 98 0.8 43.37 90.4 86.9 APPENDIXB Detention Pond No. 2 Post-Development HEC-1 Output 12 HECl S/N: 1 343001909 HMVersion: 6.33 Data File: C:\WINDOWS \TEMP\-vbh316A.TMP POST-DEVELOPMENT ***************************************** *************************************** * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * MAY 1991 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.0.lE * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 05/18/2007 TIME 07:52:57 * * (916) 756-1104 * * * * ~~~************************************** *************************************** x x xxxxxxx xxxxx x x x x x x xx x x x x x xxxxxxx xx xx x xxxxx x x x x x x x x x x x x xxxxxxx xxxxx : : : : : : : : : : : : : : : : : : : : : : : : .................... . . . . . . . . . . . . . . . . . . . . : : : : : : : : x x xxx .......... . . . . . . . . . . : : : : : : : : : : Full Microcomputer Implementation by Haestad Methods, Inc. : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : 37 Brookside Road * Waterbury, Connecticut 06708 * (203) 755-1666 THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC -1 KNOWN AS HECl (JAN 73 ), HEClGS, HEClDB, AND HEClKW . THE DEFINITIONS OF VARIABLES -RTIMP-AND -RTIOR-HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF -AMSKK -ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN 77 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DSS :READ TIME SERIES AT DESIRED CALCULATION INTERVAL KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM LOSS RATE:GREEN AND AMPT INFILTRATION HEC-1 INPUT PAGE 1 LINE ID ....... 1 ....... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... 8 ....... 9 ...... 10 1 ID Dove Crossing Phase 1 -Post-Development 2 IT 1 300 3 IO 5 0 4 KK 305100 5 KM Drainge Area 305 6 KO 22 7 BA 0 .0678 8 PH 100 0 0 .88 1.95 4 .30 5.70 6.30 7.90 9 LS 86.9 10 UD 0.27 11 KK P2-100 12 KM Detention Pond 2 -100 year 13 KO 22 14 RS 1 ELEV 283 .08 15 SV 0 0.001 0 .024 0.403 0.331 0.846 1.746 3.80 5 7 .057 11.631 16 SE 283.08 284.0 285.0 286.0 287.0 288.0 289.0 290.0 291 .0 292.0 17 SQ 0 0.1 3.10 8.10 11.10 15 .90 28.80 46.20 83.60 137.30 18 SE 283.08 284.0 285.0 286.0 287.0 288.0 289 .0 290 .0 291.0 292 .0 19 KK 305-50 20 KM Drainage Area 305 21 KO 22 22 BA 0.0678 23 PH 100 0 0.81 1. 80 3.91 5.10 5.70 7.00 24 LS 86 .9 25 UD 0.27 26 KK P2-50 27 KM Detention Pond 2 -50 year 28 KO 22 29 RS 1 ELEV 283.08 30 SV 0 0.001 0.024 0 .403 0 .331 0 .846 1.746 3.805 7.057 11. 631 31 SE 283.08 284.0 285.0 286.0 287.0 288.0 289.0 2 90. 0 291.0 292.0 32 SQ 0 0 .10 3 .10 8.10 11 .10 15.90 28.80 46 .20 83.60 137.30 33 SE 283.08 284.0 285.0 286.0 287.0 288.0 289.0 290 .0 291.0 292 .0 34 KK 305-10 35 KM Drainage Area 305 36 KO 22 37 BA 0.0678 38 PH 10 0 0 .66 1.45 3.02 3.90 4 .30 5.20 39 LS 86.9 40 UD 0 .27 41 KK P2-10 4 2 KM Detention Pond 2 -10 year 43 KO 22 44 RS 1 ELEV 283 .08 45 SV 0 0 .001 0.024 0 .403 0 .331 0 .846 1.746 3.805 7.057 11.631 46 SE 283 .08 284 .0 285.0 286.0 287 .0 288.0 289.0 290.0 291.0 2 92. 0 47 SQ 0 0 .10 3 .10 8.10 11.10 15.90 28.80 46.20 83.60 137.30 48 SE 283 .08 284.0 285.0 286.0 287.0 288.0 289 .0 290.0 291.0 292.0 HEC-1 INPUT PAGE 2 LINE ID ....... 1. ...... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... 7 ....... 8 ....... 9 ...... 10 49 KK 305-25 50 KM Drainage Area 305 51 KO 22 52 BA 0.0678 53 PH 25 0 0 .74 1. 64 3.52 4.60 5.10 6.2 0 54 LS 86.9 55 UD 0.27 56 KK P2-25 57 KM Detention Pond 2 -25 year 58 KO 22 59 RS 1 ELEV 283.08 60 SV 0 0.001 0 .024 0.403 0.331 0.846 1.746 3 .805 7.057 11 .631 61 SE 283.08 284.0 285.0 286.0 287.0 288 .0 289 .0 290.0 291.0 2 92 . 0 62 SQ 0 0.1 3 .10 8.10 11.10 15.90 28.80 46.20 83.60 137.30 63 SE 283 .08 284.0 285.0 286.0 287 .0 288.0 289.0 290.0 291 .0 2 92. 0 64 KK 305-5 65 KM Drainage Area 305 66 KO 22 67 BA 0.0678 68 PH 5 0 0.60 1.32 2.68 3 .30 3 .70 4.40 69 LS 86.9 70 UD 0.27 71 KK P2-5 72 KM Detention Pond 2 -5 year 73 KO 22 74 RS 1 ELEV 283.08 75 SV 0 0.001 0.024 0.403 0.331 0.846 1.746 3.805 7.057 11.631 76 SE 283.08 284 .0 285.0 286.0 287 .0 288.0 289.0 290.0 2 91. 0 292 .0 77 SQ 0 0 .10 3 .10 8.10 11.10 15.9 28.8 46.20 83.60 137 .30 78 SE 283.08 284.0 285.0 286.0 287 .0 288 .0 289.0 290.0 291.0 2 92. 0 79 KK DP -2 80 KM Discharge Point No . 2 81 KO 22 82 HC 5 83 zz HECl S/N: 1343 001909 HMVersion: 6.33 Data File: C:\WINDOWS \TEMP\-vbh316A.TMP . ~4~~~•********************************** FLOOD HYDROGRAPH PACKAGE MAY 1991 VERSION 4.0.lE (HEC-1 ) * * * * * RUN DATE 05/18/2007 TIME 07 :52:57 * * ~~··~************************************ Dove Crossing Phase 1 -Post-Development IO IT OUTPUT CONTROL VARIABLES IPRNT I PLOT QSCAL HYDROGRAPH TIME DATA 5 PRINT CONTROL 0 PLOT CONTROL 0. HYDROGRAPH PLOT SCALE NMIN 1 MINUTES IN COMPUTATION INTERVAL IDA TE 1 0 STARTING DATE I TIME 0000 STARTING TIME NQ 300 NUMBER OF HYDROGRAPH NDDATE 1 0 ENDING DATE NDTIME 0459 ENDING TIME I CENT 19 CENTURY MARK COMPUTATION INTERVAL TOTAL TIME BASE 0.02 HOURS 4.98 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION FLOW STORAGE VOLUME SURFACE AREA TEMPERATURE SQUARE MILES INCHES FEET CUB IC FEET PER SECOND ACRE-FEET ACRES DEGREES FAHRENHEIT ORDINATES *************************************** * * * U.S . ARMY CORPS OF ENGINEERS * * HYDROLOGIC ENGINEERING CENTER * * 609 SECOND STREET * * DAVIS, CALIFORNIA 95616 * * (916 ) 756-1104 * * * *************************************** ~~~ *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * KK 3051 00 * * ************** 6 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 22 SAVE HYDROGRAPH ON THIS UNIT ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 300 LAST ORD INATE PUNCHED OR SAVED TIMINT 0.017 TIME INTERVAL IN HOURS v.r-.Lur:: EXCEEDS TABLE IN LOGLOG 0.01667 0.01667 6.00000 ~~* **k *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ll KK 13 KO ************** * P2-100 * * * ************** OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL HYDROGRAPH PLOT SCALE QSCAL 0. IPNCH IOUT ISAVl ISAV2 TI MINT 0 PUNCH COMPUTED HYDROGRAPH 22 SAVE HYDROGRAPH ON THIS UNIT 1 FIRST ORDINATE PUNCHED OR SAVED 300 LAST ORDINATE PUNCHED OR SAVED 0.01 7 TIME INTERVAL IN HOURS ~·~ *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 30 5-50 * * ************** ~ 1 c'.O OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL 0 . HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 22 SAVE HYDROGRAPH ON THIS UNIT ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 300 LAST ORDINATE PUNCHED OR SAVED TIMINT 0 .017 TIME INTERVAL IN HOURS ~-ub EXCEEDS TABLE IN LOGLOG 0.01667 0 .01667 6 .00000 ~*~ *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 26 KK 2 8 KO ************** * * P2-50 * * ************** OUTPUT CONTROL IPRNT I PLOT QSCAL IPNCH IOUT ISAVl ISAV2 TIMINT VARIABLES 5 0 PRINT CONTROL PLOT CONTROL 0. HYDROGRAPH PLOT SCALE 0 PUNCH COMPUTED HYDROGRAPH 22 SAVE HYDROGRAPH ON THIS UNIT 1 FIRST ORDINATE PUNCHED OR SAVED 300 LAST ORD INATE PUNCHED OR SAVED 0.017 TIME INTERVAL IN HOURS ·~· *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 3.J KK 36 KO ************** * * 305-10 * * * ************** OUTPUT CONTROL VAR IABLES IPRNT 5 PRINT CONTROL I PLOT QSCAL IPNCH IOUT ISAVl ISAV2 TIMINT 0 0. 0 22 1 300 0 .017 PLOT CONTROL HYDROGRAPH PLOT SCALE PUNCH COMPUTED HYDROGRAPH SAVE HYDROGRAPH ON THIS UNIT FIRST ORDINATE PUNCHED OR SAVED LAST ORDINATE PUNCHED OR SAVED TIME INTERVAL IN HOURS ·--::::<CEEDS TABLE IN LOGLOG 0 .01667 0 .01667 6.00000 ~~~ *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 41 KK * P2 -10 * * ************** 4 3 KO OUTPUT CONTROL IPRNT I PLOT QSCAL IPNCH IOUT ISAVl ISAV2 TIMINT VARIABLES 5 0 0. 0 22 1 300 0 .017 PRINT CONTROL PLOT CONTROL HYDROGRAPH PLOT SCALE PUNCH COMPUTED HYDROGRAPH SAVE HYDROGRAPH ON THIS UNIT FIRST ORDINATE PUNCHED OR SAVED LAST ORDINATE PUNCHED OR SAVED TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 4 9 KK * 305-25 * ************** 51 KO OUTPUT CONTROL VARIABLES I PRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL 0 . HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 22 SAVE HYDROGRAPH ON THIS UNIT ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 300 LAST ORDINATE PUNCHED OR SAVED TIMINT 0.017 TIME INTERVAL IN HOURS ·,·.~~us EXCEEDS TABLE IN LOGLOG 0 .01667 0.01667 6.00000 .. ~ *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 56 !<K * P2 -25 * * ************** 56 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT QSCAL IPNCH IOUT ISAVl ISAV2 TIMINT 0 PLOT CONTROL 0 . HYDROGRAPH PLOT SCALE 0 PUNCH COMPUTED HYDROGRAPH 22 SAVE HYDROGRAPH ON THIS UNIT 1 FIRST ORDINATE PUNCHED OR SAVED 300 LAST ORDINATE PUNCHED OR SAVED 0.017 TIME INTERVAL IN HOURS ~-· *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 64 KK * 305-5 * * * ************** 6 6 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 22 SAVE HYDROGRAPH ON THIS UNIT ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 300 LAST ORDINATE PUNCHED OR SAVED TIMINT 0.017 TIME INTERVAL IN HOURS VALU E EXCEEDS TABLE IN LOGLOG 0 .01667 0 .01667 6.00000 ~·* *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 71 KK P2-5 * * * ************** -~:o OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL I PLOT 0 PLOT CONTROL QSCAL o. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH I OUT 22 SAVE HYDROGRAPH ON THIS UNIT ISAVl 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 300 LAST ORDINATE PUNCHED OR SAVED TIMINT 0.017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 79 KK 81 KO ************** * * DP-2 * * * ************** OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL !PLOT 0 QSCAL 0. IPNCH 0 22 PLOT CONTROL HYDROGRAPH PLOT SCALE PUNCH COMPUTED HYDROGRAPH SAVE HYDROGRAPH ON THIS UNIT !OUT ISAVl ISAV2 TI MINT 1 FIRST ORDINATE PUNCHED OR SAVED 300 LAST ORDINATE PUNCHED OR SAVED 0.017 TIME INTERVAL IN HOURS RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE :) -~OUR 24-HOUR 72-HOUR HYDROGRAPH AT 305100 247. 2.78 50. 50. 50. 0 .07 ROUTED TO P2-100 105. 3.25 41. 41. 41. 0.07 :29~.39 3 .25 HYDROGRAPH AT 305 -50 222 . 2.78 44. 44 . 44. 0 .07 ROUTED TO P2-50 92. 3.27 36. 36. 36. 0.07 29i .l6 3.27 HYDROGRA PH AT 305-10 161 . 2.80 30. 30. 30 . 0.07 ROUTED TO P2-10 64. 3.27 24 . 24. 24. 0.07 290 .~7 3 .27 HYDROGRAPH AT 305-25 196. 2.80 38. 38 . 38. 0.07 ROUTED TO P2 -25 80. 3 .27 31. 31. 31. 0.07 :90 .90 3.27 HYDROGRAPH AT 305-5 139. 2.80 24. 24. 24. 0.07 ROUTED TO P2-5 53 . 3.27 20. 20. 20. 0.07 290 .19 3.27 5 COMBINED AT DP-2 394. 3.27 152. 152. 152. 0 .34 -·· NORMAL END OF HEC-1 *** EXHIBIT A Post-Development Drainage Area Map -Detention Pond 23