HomeMy WebLinkAboutWater ReportWATER ANALYSIS
FOR
GREAT OAKS, PHASE 2
AND LOS P ALOMAS SUBDIVISION
KB
111
COLLEGE STATION, TEXAS
MAY 2006
~ESI# 1015 .. 0002
SUBM11TED BY:
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
1008 Woodcreek Drive, Suite 103 ·College Station, Texas 77845
(979) 693-3838 •Fax: (979) 693-2554 •Email: McClureBrowne@Verizon.net
Exhibit B
FIRE FLOW TEST PERFORMED
BY WELLBORN S. U.D.
DATE: MAY 18, 2006
PERFORMED BY: STEVEN CAST
WITNESSED BY: MICHAEL R. McCLURE
FLOW TEST RESULTS
NOZZLE SIZE: 2.5"
LOCATION: On Great Oaks Drive approx. 2100 feet north of the intersection of Rock Prairie
Road West and Great Oaks Drive
Pitot Reading: 4 7 psi
(GPM): 1150 (from chart)
Static PSI: 82 psi (measured at Lot 12, Block 2 of Great Oaks Subdivision, Phase 1)
Residual PSI: 48 psi
Exhibit B
FIRE FLOW TEST DATA
Great Oaks, Phase 2 and Los Palomas Subdivision
A 'I ...
WATER ANALYSIS
FOR
GREAT OAKS, PHASE 2
AND LOS PALO MAS SUBDIVISION
COLLEGE STATION, TEXAS
MAY 2006
MBESI# 1015.-0002
SUBMITTED BY:
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845
(979) 693-3838 ·Fax: (979) 693-2554 •Email: McClureBrowne@Verizon.net
WATER SYSTEM ANALYSIS
FOR
GREAT OAKS SUBDIVISION, PHASE 2
& LOS PALO MAS SUBDIVISION
General Information
Area encompassed by this phase:
Anticipated land use:
Anticipated number of lots:
Notes on surrounding development:
124 acres
Single family residential (Great Oaks)
and Duplex (Los Palomas Subdivision)
24 lots
The two subdivisions are bounded by Great Oaks
Phase 1 to the west, Jones-Butler Road to the east,
Quail Run Subdivision and property owned by
David Borsack to the north, and property owned by
Albert Ribisi and Grace Abbate to the south.
Water System Analysis
Primary water supply line:
Secondary water supply line:
Software model:
Estimated peak domestic demand:
Estimated fire demand:
Pipe material:
Most Hydraulically Remote Point:
Testing Method:
Water Model Parameters:
Existing 8" water line on Great Oaks Drive
Existing 4" line on Jones-Butler Road
PIPE2000 (Kentucky Pipe Network Model)
1.5 gpm per residential lot (per TCEQ
requirements)
1000 gpm
PVC (C909)
Node J-26 (See Exhibit A)
This is determined by calculating the lowest
pressure under static conditions.
Steven Cast with Wellbo~-....
fire flow test o ay 18, 20 ee Exhibit B). A
Pollard Hydr auge was used to measure
the flow at the existing fire hydrant located adjacent
to eat Oaks Drive. The reading on ~h was
47 · which corresponds to a flow of 1150 m
see Exhibit C). The static and residua pressure
was also measured at an adjacent residence as
shown on Exhibit A.
The model has been setup to analyze the "worst
case scenario". We have assumed that Great Oaks
Phase 2 and Los Palomas are fully developed and
we only have connections to the existing water
system at Great Oaks Drive and Jones-Butler Road.
The model will work under these conditions.
However as Great Oaks Phase 2 is developed,
Great Oaks Phase 2 and Los Palomas Subdivision
MBESI #1015-0002
Ref?u/ated Items
Min. Pressure (psi)
Ma-.,:. Velocity (fps)
Conclusion:
Applicable Exhibits:
Exhibit A
Exhibit B
Exhibit C
Exhibit D
Exhibit E
additional connections to the existing system will be
made. These connections will drastically increase
the pressures for the entire system during fire flow
conditions.
Designed I Requirement Notes
29.90 I 20 (min) · Fire flow conditions
10.42 I 12 (max) · Fire flmy conditions
The proposed water system exceeds the requirements of TCEQ
and the Cities of Bryan and College Station
Schematic Water System Layout
City of College Station Fire Flow Test Report 1
Pitot Gage Conversion Chart for Pollard Hydrant Flow Gauge
PIPE2000 Model Output for Great Oaks, Phase 2 and Los Palomas
Subdivision (static)
PIPE2000 Model Output for Great Oaks, Phase 2 and Los Palomas
Subdivision (fire)
Great Oaks Phase 2 and Los Palomas Subdivision
MBESI #1015-0002
.1,\ "'' Exhibit C MAY-18-2006 THU 01:26 PM Wel I born SUD FAX No. 9796901260 COMPUTATION TABLE Flowing C11pacities of Water-Free Flows Indicated in Gallons per Minute --------'··--~---·---· ·-:· .... ·-···---~ (I • (_ CoeffiefOOl..LIU__~-~R~ I I -Coefficient .88 Inlet Edge Square/Sharp . s--~ . Coeff'iciettt .771nlet Edge Square/Raised ·· Coefficient 1.1 for Open End Pipe ·. • All ResiJ/ts_.R01Jnded to Nearest 5 GPM • PITOT GAUGE 1>$1 1-112· .2" 2-112•: 80 2 B5 no i:..:U~:. ·1:i:r~-1:?0 ._, 240. 290 3-40 380 3 106 4 125 5 . 135 6 / .·7 a 9 150 180 175 180 220 246't 200 2BO 310 320 10 190 .3ll0 11 200 355 12 210 . 570 .13 220 . ~ '"· 230 . ~ 16 23S: .• . -· ·+15,. 16 24ci 430 17 .25ci .... 4"0. .18 19 20 22 24 26 28 30 s2· 3_4 36 36· . 40 ·: 42 44 46. ~ . 50 62 54· 255 .2155 . .270-285 295 S10 320 ... "455 '.4;65 .. ·'4iio .. 506 525 550 570 590 ·e10 6~ &46' 665 680 700 no 730 740 ieo . ns .785. . 800 .· 410 ·~o. 460 500. 530 655 580. 805 . 830 -~-·-670 ·690. 71b 730'. . ':n;o -·· ·790, 820. 860 89(), .920. i950 -~$.89:. . ·fo.1~ 1o.W . 1060 10!!0 1110 •• 1199 · 3• s-112• 245. 330 .. i4!f'· : :. 470.' "20 400. 545 690 635 690 no· 765 800 835 . 870 ·il10 . 956 ... ·985 .995 1020 1oso·· . .1oeo 1140 . 1.180 124Q 12So 1325 137o .1410 1.~ 1500 .. 1525 1610 1600 . f840 1870. 1715 .. 17-io 1no 18oo 570 . 865 ~ 74S 905 860 940 980 1040 10ll0· 1136 1185 1235 1275. 1315 1350 .1390 1430 1470 1660-1&w.; 1685 1745 1805 1660 1920 1!180 2Qo40 2075 2135 21'is· ·22315 i275 25$0 2370 .2410 .. 2600 ... 66 68 ·.330 S40 355 _365· .375 sao 395 400 'i10 420 430 435 445 "50 480 820 1210 1230 1250 12e0 . 18415 2510 .,. 435 615 . i40. 1370 9eo 1050 1140 1220 .1290 1380 1'120 1490 1550 · Hi10 1.86'1 1720 1no 1830 1870 1920 2020 2110. 2190 228o' 235o 2430 ~10 .2580 2650 2720 2780 2850 2920 2980 3040 3100 3180 3220 3280 :..112· .. . 55o .. 7?5 ·. .940, .· .. 1100 . 1220 . '1340 1440 15-40 . 1840 5~ silo 960 »11&) 1~ •1s20 1640 1780 1920 2000 6" . g8Q 1380 1670 11>60 2190 23So 2~35 2765 .. ... .2aeo 1730 212o· 3050 . 1800 , •. .2.220 . .31~' 1890 2.320 3340· 1960 2420 34~ 2040 . 2520 3625 . 2105 ........ ZbOO' .. 3745--2.feo · 2680 · · 3e6o · .. · 22as 216o . . 39'15 . :<!310 . . ··2s6i; .2e4o · '4090 .· 292<): ' 4205,·' . · 2430 . · . :Woo "320 25So ' . 3;00. . -~ . :'2aa_o · ·· . ~ .. · ~129; · .. .. '2770. . 3440 495o .. 2880. . 3560 5125. 2980 . 3000 3170 .. 3260 3350· 3"4o 35:ZQ 3610 3890 3770 3880 . 394o 4Q10 -4080 416o 3880 5295 3800-5470. 3920 .. 5640 4040 5615 .;.1eo 5990 4.240 6105 4360 .6275 4440 6390 4560 6585 4640 6680 4780 8850. 4840 . 69135. 4a20 7.080 5000 12.00 . 5120 7370 p, 002 .. . ·-~ .. JOSEPH G. POLLARD co.; INC. 200 A.TUl.Nnc AVENUE • NEW HYblE PARK. NY 11040 . ·TEL: B00-437·1148 .F"->(: 818·'148..0852 Rec e i v e d Ti me May. 18. 1 : 19PM WWW.Pollardwater.Com Exhibit C Pitot Gauge ConYersion Chart Great Oaks, Phase 2 and Los Palomas Subdivision
Exhibit D
(Static Flow Analysis)
KYPIPE4
University of Kentucky Network Modeling Software
Copyrighted by KPFS 1998
Version 1. 200 -01/26/2000
Date & Time: Fri May 19 15:52:27 2006
INPUT DATA FILENAME --------------F: \ 1015-S-l \0002-G-l \Docs\WATERM-1 \10150002. DT2
TABULATED OUTPUT FILENAME --------F: \1015-S-1 \0002-G-1 \Docs\WATERM-1 \10150002 .OT2
POSTPROCESSOR RESULTS FILENAME ---F: \1015-S-1 \0002-G-1 \Docs\WATERM-1 \10150002 .RS2
S U M M A R Y O F 0 R I G I N A L DATA
U N I T S S P E C I F I E D
FLOWRATE ............ -gallons/minute
HEAD (HGL) . . . . . . . . . . -feet
PRESSURE ......•..... -psig
P I P E L I N E D A T A
STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE
P I P E
N A M E
NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR
PU M
THERE
THERE
#1 #2 (ft) (in) COEFF. LOSS COEFF.
P-1 VP-1 J-8 683. 87 8. 07 120.0000 0 .00
P-10 J-10 J-8 878. 31 8. 07 120.0000 0. 00
P-11 J-9 J-10 302. 79 8.07 120. 0000 0.00
P-12 J-11 J-9 593.63 8. 07 120.0000 0 .00
P-13 J-11 J-19 332.29 8 .07 120.0000 o.oo
P-14 J-13 J-12 328 .14 8.07 120. 0000 o.oo
P-15 J-13 J-15 788. 02 6.07 120. 0000 0. 00
P-16 J-15 J-5 289.76 8.07 120. 0000 0.00
P-17 J-14 J-13 306.28 8.07 120.0000 o. 00
P-18 J-14 J-17 94 7. 39 6. 07 120.0000 0.00
P-19 J-17 J-15 302 . 65 8.07 120. 0000 0. 00
P-2 J-3 J-26 134. 82 8.07 120. 0000 0. 00
P-20 J-16 J-17 301. 98 8.07 120. 0000 o.oo
P-21 J-16 J-19 1152.42 6. 07 120. 0000 0. 00
P-22 J -19 J-14 294.76 8.07 120. 0000 0 . 00
P-23 J-12 J-5 631. 94 8 .07 120. 0000 0.00
P-24 J -12 J-22 474.24 8.07 120. 0000 0.00
P-25 J-20 J-18 626. 62 8.07 120. 0000 0.00
P-26 J -20 J-27 573. 36 6. 07 120. 0000 0. 00
P-27 J-22 J-20 869.68 8.07 120. 0000 0. 00
P-28 J-22 J-24 420. 58 8. 07 120. 0000 0.00
P-29 J-24 J-1 518. 20 8. 07 120. 0000 0.00
P-3 J-3 @ 146.41 8.07 120. 0000 o. 00
P-30 J-24 41. 66 8. 07 120. 0000 o. 00
P-31 J-26 649. 38 8. 07 120. 0000 o.oo
P-32 J-27 -3
305. 98 3. 07 120. 0000 o.oo
P-33 J-2 VP-2 110. 28 4.03
P-34 J-23 J-2
P-4 J-4 J-3
P-5 J-4 J-7
P-6 J-7 J-6
P-7 J-7 J-10
P-8 J-8 J-11
P-9 J -9 J-4
P/L 0 S S E L E M E N T DA
IS A DEVICE AT NODE VP-1
HEAD FLOWRATE
(ft) (gpm)
138.46 0. 00
130. 37 526.00
106. 08 1052. 00
IS A DEVICE AT NODE VP-2
HEAD FLOWRATE
(ft) (gpm)
184. 62 0. 00
166. 15 190. 00
110. 77 380 .00
4 69. 91
183. 58
740. 02
135. 43
389.10
312. 51
812. 60
T A
DESCRIBED BY
EFFICIENCY
(%)
1.00
1. 00
1.00
DESCRIBED BY
EFFICIENCY
(%)
1. 00
1. 00
1. 00
120. 0000
8 .07 120. 0000
8.07 120.0000
6. 07 120. 0000
8.07 120. 0000
8. 07 120.0000
8.07 120.0000
8.07 120. 0000
THE FOLLOWING DATA:
THE FOLLOWING DATA:
0. 00
0.00
0. 00
0.00
0.00
0. 00 o. 00 o.oo
(ID=
(ID-
1 I
21
ExhibitD
Static FlmY Water Model
Great Oaks, Phase 2 and Los Palomas Subdivision
Exhibit D
(Static Flow Analysis)
E N D N 0 D E D A T A
NODE
NAME
J-l
J-10
J-ll
J-12
J-13
J-14
J-15
J-16
J-17
J-18
J-19
J-2
J-20
J-21
J-22
J-23
J-24
J-25
J-26
J-27
J-3
J-4
J-S
J-6
J-7
J-8
J-9
VP-l
VP-2
NODE
TITLE
EXTERNAL
DEMAND
(gpm)
2. 2S
28. so
12.00
12.00
0. 00
l7 .25
S.25
25.50
21. 7S
3.00
21. 7S o.oo
12. 00
3. 7S
6. 7S
20.2S
4.50
0.00
20.2S
8.25
3.00
27.00
lS.00
0. 00
18.00
21. 7S
26.2S
0 U T P U T 0 P T I 0 N D A T A
JUNCTION
ELEVATION
(ft)
308. 00
297.00
292. 00
300. 00
296.00
294. 00
314.00
310. 00
31S.OO
310. 00
294. 00
308. 00
308. 00
292. 00
302. 00
308 . 00
309. 00
309.00
308. 00
297. 00
308. 00
30S. 00
310.00
298. 00
300. 00
290.00
299.00
290. 00
308. 00
EXTERNAL
GRADE
(ft)
290. 00
308. 00
OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT
S Y S T E M C 0 N F I G U R A T I 0 N
Case:
NUMBER OF PIPES .•••.••••.......... (p) = 34
NUMBER OF END NODES .•..••.•....... (j) • 27
NUMBER OF PRIMARY LOOPS ..••••..... ( l) • 6
NUMBER OF SUPPLY NODES ••.......... (f) •
NUMBER OF SUPPLY ZONES •..........• ( z) =
RESULTS OBTAINED AFTER 7 TRIALS: ACCURACY 0.00181
S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L)
P I P E L I N E R E S U L T S
STATUS CODE: XX -CLOSED PIPE
P I P E
N A M E
P-1
P-10
P-ll
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-2
P-20
P-21
P-22
P-23
P-24
P-2S
NODE NUMBERS
#1 #2
VP-1 J-8
J-10 J-8
J-9 J-10
J-ll J-9
J-11 J-19
J-13 J-12
J-13 J-15
J-15 J-5
J-14 J-13
J-14 J-17
J-17 J-lS
J-3 J -26
J-16 J-17
J-16 J-19
J-19 J-14
J -12 J-5
J -12 J-22
J-20 J -18
CV -CHECK VALVE
FLOWRATE HEAD MINOR LINE HL/
LOSS LOSS VELO. 1000
(gpm) (ft) (ft) (ft/s) (ft/ft)
14 .12 0. 01 0. 00 0. 09 0. 01
9. 68 0. 00 0.00 0. 06 0. 00
22 .0S 0. 01 o. 00 0 .14 o. 02
-20. 02 0. 01 0.00 0 .13 0. 01
10. 07 0.00 0. 00 0.06 0. 00
28.SS 0. 01 o.oo 0.18 0. 03
-12.07 0. 02 o. 00 0.13 0. 02
38.95 0. 01 0.00 0. 24 0. OS
16.48 0.00 0.00 0.10 0. 01
-l7.8S o. 04 0.00 o. 20 o.os
S6. 27 0. 03 0.00 0. 3S 0.10
-281. 38 0.26 0. 00 l. 76 l. 94
9S. 87 0. 08 o.oo o. 60 0.26
27 .57 0 .12 0.00 0. 31 0.11
lS. 88 0. 00 0. 00 0.10 0. 01
-23. 9S 0. 01 0. 00 O. lS 0. 02
40. so 0. 03 0.00 0.2S 0. 05
3.00 0. 00 0.00 0. 02 0. 00
ExhibitD
Static FlmY Water Model
Great Oaks, Phase 2 and Los Palomas Subdivision
Exhibit D
(Static Flow Analysis)
P-26 J-20 J-27 12.00 o. 01 o. oo o .13 0.02
P-27 J-22 J-20 27.00 0. 02 o. oo o .17 0.03
P-28 J-22 J-24 6. 75 o. oo 0.00 0. 04 0.00
P-29 J-24 J-l 1 2.25 o. 00 0. 00 0. 01 0.00
P-3 J-3 @ 148. 93 0. 09 0.00 0. 93 0.60
P-30 J-24 0.00 0.00 o.oo o .oo o.oo
P-31 J-26 -301. 63 l. 43 0.00 l.89 2.20
.
P-32 J-27 -3. 75 0. 02 0.00 0 .16 0.07
P-33 J-2 2 -321. 88 8. ll o.oo 8 .ll 73.56
P-34 J-23 J-2 -321. 88 l.17 o. oo 2. 02 2.49
P-4 J-4 J-3 -129.45 0. 08 o. 00 o. 01 o. 46
P-5 J-4 J-7 34.13 o .12 0.00 o. 38 0.16
P-6 J-7 J-6 0.00 0. 00 0.00 0.00 0.00
P-7 J-7 J-10 16.13 0. 00 0.00 o .10 0.01
P-8 J-8 J-11 2.05 0. 00 o. oo o. 01 0. 00
P-9 J-9 J-4 -68. 32 O. ll o. oo 0. 43 o .14
E N D N 0 D E R E S U L T s
NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE
NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE
(gpm) (ft) (ft) (ft) (psi) ------------------------------------------------------------------------------
J-1 2 .25 428. 41
J-10 28.50 428.45
J-ll 12.00 428.45
J-12 12.00 428. 43
J-13 o.oo 428.44
J-14 17 .25 428.45 qw 5.25 428.46
25.50 428. 57
21. 75 428.49
1
7
3.00 428. 39
J 21. 75 428. 45
J-2 o.oo 431. 52
J-20 12.00 428. 39
J-21 3. 75 428.35
J-22 6. 75 428.41
J-23 20.25 430. 35
J-24 4. 50 428.41
J-25 0.00 428.41
J-26 20.25 428 . 92
J-27 8 .25 428 . 37
J-3 3.00 428.66
J-4 27.00 428. 57
J-5 15. 00 428. 45
J-6 0.00 428.46
J-7 18 .00 428. 4 6
J-8 21. 75 428.45
J-9 26.25 428.46
VP-1 428.46
VP-2 439.63
NET SYSTEM INFLOW -336. 00
NET SYSTEM OUTFLOW = 0.00
NET SYSTEM DEMAND 336. 00
***** HYDRAULIC ANALYSIS COMPLETED •••••
308. 00 120.41
297. 00 131. 45
292. 00 136. 45
300. 00 128. 43
296. 00 132. 4 4
294. 00 134 .45
314. 00 114.46
310.00 118. 57
315.00 113. 49
310.00 118. 39
294.00 134.45
308 .00 123.52
308 . 00 120.39
292. 00 136.35
302. 00 126. 41
308. 00 122. 35
309.00 119. 41
309. 00 119. 41
308. 00 120. 92
297. 00 131. 37
308. 00 120. 66
305. 00 123. 57
310.00 118. 45
298. 00 130. 4 6
300. 00 128.46
290. 00 138.45
299. 00 129.46
290. 00 138.46
308. 00 131. 63
52 .18
56. 96
59.13
55.65
57 .39
58.26
49.60
CDP Low Pressure
58 .26
53.53
52 .17
59.09
54.78
53 . 02
51.74
51. 74
52.40
56.93
52.29
53.55
51.33
56. 53
55.66
60. 00
56.10
60. 00
57. 04
ExhibitD
Static Flow Water Model
Great Oaks, Phase 2 and Los Palomas Subdivision
Exhibit E
(Fire Flow Analysis)
KYPIPE
University of Kentucky Network Modeling Software
Copyrighted by KPFS 1998
Version 1.200 -01/26/2000
Date & Time: Fri May 19 16:10:48 2006
INPUT DATA FILENAME --------------F: \1015-S-1 \0002-G-1 \Docs\WATERM-1 \10150002. DT2
TABULATED OUTPUT FILENAME --------F: \1015-S-1 \0002-G-1 \Docs\WATERM-1 \10150002 .OT2
POSTPROCESSOR RESULTS FILENAME ---F: \1015-S-1 \0002-G-1 \Docs\WATERM-1 \10150002 .RS2
S U M M A R Y 0 F 0 R I G I N A L D A T A
U N I T S S P E C I F I E D
FLOWRATE ............ a: gallons/minute
HEAD (HGL) . . . • . . . . . . feet
PRESSURE ............ s psig
PIPELINE DATA
STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE
P I P E
NAME
NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR
P UM
THERE
THERE
P-1
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-2
P-20
P-21
P-22
P-23
P-24
P-25
P-26
P-27
P-28
P-29
P-3
P-30
P-31
P-32
P-33
P-34
P-4
P-5
P-6
P-7
P-8
P-9
#1 #2
VP"l
J-10
J-9
J-11
J-11
J-13
J-13
J-15
J-14
J-14
J-17
J-3
J-16
J-16
J-19
J-12
J-12
J-20
J-20
J-22
J-22
J-24
J-3
J-24
J-26
J-27
J-2
J-23
J-
J-4
J-7
J-7
J-8
J-9
J-8
J-8
J-10
J-9
J-19
J-12
J-15
J-5
J-13
J-17
J-15
J-26
J-17
J-19
J-14
J-5
J-22
J-2
J-3
J-7
J-6
J-10
;J-11
J-4
(ft) (in) COEFF. LOSS COEFF.
683.87 8. 07 120.0000 o. 00
878. 31 8. 07 120. 0000 0. 00
302. 7 9 8. 07 120. 0000 0.00
593. 63 8. 07 120.0000 0.00
332.29 8.07 120. 0000 0.00
328.14 8. 07 120. 0000 0. 00
788.02 6.07 120.0000 0. 00
289.76 8. 07 120. 0000 0 .00
306. 28 8. 07 120. 0000 o. 00
947. 39 6. 07 120.0000 0.00
302.65 8. 07 120. 0000 0. 00
134. 82 8 .07 120.0000 0. 00
301. 98 8. 07 120.0000 0 . 00
1152.42 6. 07 120.0000 0.00
294. 76 8. 07 120. 0000 0.00
631. 94 8. 07 120 .0000 0 .00
474.24 8. 07 120. 0000 0.00
626. 62 8. 07 120.0000 0. 00
573. 36 6. 07 120. 0000 0. 00
7 869.68 8. 07 120. 0000 0. 00
420.58 8.07 120. 0000 0.00
518 . 20 8. 07 120. 0000 0.00
146. 41 8. 07 120. 0000 0. 00
41. 66 8. 07 120. 0000 0.00
649.38 8. 07 120. 0000 0.00
305 .98 3.07 120. 0000 0.00
110. 28 4. 03 120. 0000 0.00
4 69. 91 8. 07 120. 0000 0.00
183.58 8. 07 120. 0000 0.00
740. 02 6. 07 120. 0000 0. 00
135.43 8. 07 120. 0000 o.oo
389.10 8.07 120. 0000 o.oo
312.51 8. 07 120. 0000 0.00
812. 60 8.07 120. 0000 0.00
P/L 0 S S E L EM E N T D A T A
IS A DEVICE AT NODE
HEAD FLOW RATE
(ft) (gpm)
138. 46 o.oo
130. 37 526.00
106.08 1052. 00
IS A DEVICE AT NODE
HEAD FLOWRATE
(ft) (gpm)
184.62 0. 00
166.15 190. 00
110. 77 380. 00
VP-1 DESCRIBED
EFFICIENCY
(%)
1.00
1.00
1.00
VP-2 DESCRIBED
EFFICIENCY
(%)
1.00
1. 00
1. 00
BY THE FOLLOWING DATA:
BY THE FOLLOWING DATA:
(I!F
(I!F
1)
2)
Exhibit E
Fire Flow Water Model
Great Oaks, Phase 2 and Los Palomas Subdivision
Exhibit E
(Fire Flow Analysis)
E N D N 0 D E D A T A
NODE
NAME
J-1
J-10
J-11
J-12
J-13
J-14
J-15
J-16
J-17
J-18
J-19
J -2
J-20
J-21
J-22
J-23
J-24
J-25
J-26
J-27
J -3
J -4
J-5
J-6
J-7
J-8
J-9
VP-1
VP-2
NODE
TITLE
EXTERNAL
DEMAND
(gpm)
,,. 2.25
28. 50
12. 00
12 . 00
o.oo
17. 25
5.25
25.50
1021.75
3 . 00
21. 75
0.00
12 .00
3. 75
6. 75
20 .25
4. 50
0.00
=:>20.25
8.25
3.00
27. 00
15. 00
0.00
18. 00
21. 75
26.25
JUNCTION
ELEVATION
I ft)
308. 00
297. 00
292. 00
300. 00
296. 00
294 . 00
314. 00
310. 00
315. 00
310. 00
294 . 00
308. 00
308. 00
292. 00
302. 00
308. 00
309. 00
309. 00
308 . 00
297.00
308 . 00
305. 00
310. 00
298.00
300 . 00
290. 00
299. 00
290.00
308 . 00
EXTERNAL
GRADE
(ft )
290. 00
308. 00
0 U T P U T 0 P T I 0 N D A T A
OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT
S Y S T E M C 0 N F I G U R A T I 0 N
NUMBER OF PIPES .•................. (p) 34
NUMBER OF END NODES ..•••..•••..•.• (j) 27
NUMBER OF PRIMARY LOOPS ..... ' .....• I 1) 6
NUMBER OF SUPPLY NODES ••....•..... (f)
NUMBER OF SUPPLY ZONES ............ ( z)
Case:
RESULTS OBTAINED AFTER 5 TRIALS: ACCURACY -0.00018
S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L)
P I P E L I N E R E S U L T S
STATUS CODE :
P I P E
N A M E
P-1
P-10
P-11
P-12
P-3
P-14
P-15
P-16
P-17
P-18
P-18
P-2
P-20
P-21
P-2'2
P-23
~-24
P-25
J-11
J-11
J-13
J-13
J-15
J-14
J-14
J-17
J-3
J-16
J-16
J-19
J-12
J-12
J -20
PI PE CV -CHECK VALVE
FLOWRATE HEAD MINOR LINE HL/
#2 ~ LOSS LOSS VELO. 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) --------------------------------------------------
J -8 92 .38 11.95 0.00 5. 78 17.47
J-8 -318.26 2.14 0.00 2.00 2.44
J-10 -171.14 0.23 0.00 1.07 0 .77
J-9 47.30 0.07 0. 04 0.00 0. 30
J -19 523.07 6.11 2.03 0. 00 3. 28
J -12 200.34 1.03 0 .34 0. 00 l. 26
J-15
J-5
J -13
J-17
J-15
J-26
J-17
J-19
J-14
J-5
J-22
J-18
96.78
-132. 84
297 .11
134. 93
-224.36
-373.13
662. 45
-52. 02
449.30
147.84
40. 50
3.00
0.85
0 .14
0.66
1. 89
0.39
0. 44
2.86
0.39
I. 36
0.37
0.03
0.00
0. 00
0.00
0.00
0.00
0. 00
o.oo
0.00
0. 00
0 . 00
0 . 00
0. 00
0.00
1. 07
0. 83
1. 86
I. 50
1. 41
2 . 34
4.15
0. 58
2. 82 d. 93
0. 25
0. 02
1. 08 o. 48
2 .14
2.00
I. 27
3.27
9. 47
0. 34
4. 61
0. 59
0. 05
0. 00
Exhibit E
Fire Flow Water Model
Great Oaks, Phase 2 and Los Palomas Subdivision
<}~
~ire Exhibit E
Flow Analysis)
P-26 J-20 J -27 12 . 00 0. 01 0. 00 O.JS 0. 02
P-27 J-22 J -20 27. 00 0.02 0. 00 0.17 0. 03
P-29 J-22 J-24 6. 75 o. 00 o.oo 0. Q4 0.00
P-29 J-24 J-1 \ 2.25 0. 00 0.00 0. 01 o.oo
P-3 J-3 J-16 ~ 635.93 1. 29 0.00 3.99 9. 79
P-30 J-24 J -25 0.00 0.00 0.00 0. 00
P-31 J-26 J-~ 2. 34 o.oo 2. 47 3. 61
P-32 -27 -21 3 0. 02 0.00 0.16 0. 07
P-33 J-2 VP-2 -413.63 12. 91 0. 00 10. 42 117.04 f-Hi gh Velocity
P-34 J-23 J-2 -413.63 1. 96 0.00 2.59 3 .96
P-4 J-4 J-3 265. 91 0. 32 0. 00 1. 67 1. 74
P-5 J-4 J-7 -100.62 0. 96 0. 00 1.12 1.16
P-6 J-7 J-6 0.00 0.00 0.00 0. 00 0. 00
P-7 J-7 J-10 -119.62 0.15 0.00 0. 74 0.39
P-9 J-9 J-11 592. 37 2 .33 0. 00 3.65 7 . 46
-9 J-9 J-4 192 .19 0. 79 0.00 ~ .21 o. 96
E N D N 0 D E R E S U L T S
NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE
NJ\ME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE
(gpm) (ft ) (ft) (ft ) (psi) ------------------------------------------------------------------------------
J-1 2.25 394.9B
J-10 2B.50 3B9.49
J-11 12.00 3B9. 29
J-12 12.00 3B4. 91
J-13 0.00 3B5.24
J-14 17.25 3B5. 90
J-15 5.25 384. 39
J-25.50 3B6. B7
-17 1021 . 3B4.
J-lB /! J-19
J-2
J-20 Ju-> 12.00
J-21 3 .7S
J-22 6. 75
J-23 20 .25
J-24 4. 50 3B4 . BB
J-25 0.00 3B4.BB
J-26 20.25 3BB . 59
J-27 B.2S 3B4 .BS
J-3 3.00 3BB .1S
J-4 27 .00 3BB. 47
J-S lS.00 3B4 . S3
J-6 0.00 3B9. 33
J-7 18. 00 3B9. 33
J-9 21.7S 391. 62
J-9 26.2S 3B9.2S
VP-1 403.S7
VP-2 40S. 70
NET SYSTEM INFLOW • 1336.00
NET SYSTEM OUTFLOW = 0.00
NET SYSTEM DEMAND = 1336. 00
***** HYDRAULIC ANALYSIS COMPLETED *****
30B. 00 76.BB
297. 00 92.4B
292. 00 97 .29
300. 00 B4 .91
296.00 B9.24
294.00 91. 90
314.00 70 . 39
310. 00 76. B7
B4 .79
30B. 00 76. B6
292. 00 92. B2
302. 00 B2.BB
30B.OO B2. 93
309.00 75.BB
309. 00 75.BB
30B. 00 B0.59
297. 00 B7 .BS
30B .00 BO.lS
30S.OO B3.47
310. 00 74.53
29B. 00 91.33
300. 00 B9. 33
290. 00 101. 62
299. 00 90.25
290.00 113. S7
30B. 00 97. 70
33. 31
40. OB
42.16
36. 79
3B. 67
39. B2
30. 50
33.
29. 90 f-Low Pressure
32.44
40.41
36. 74
33. 31
40. 22
35.91
35. 94
32. BB
32. BB
34. 92
3B. 07
34. 73
36.17
32.30
39. SB
3B. 71
44. 04
39.11
49.21
42. 34
7
Exhibit E
Fire Flow Water Model
Great Oaks, Phase 2 and Los Palomas Subdivision
. ,·
Flow Ana lys1s
For
Sanitary Sewer Improvements
To
Las Palomas Subd1v1s1on
Brazos County, Texas
* Revised May I 5 , 200G *
The purpose of the analysis provided herewith 1s to determine the sanitary sewer
loading supplied by the construction of the Las Palomas Subd1v1s1on and verify
that the proposed I 2 " diameter sanitary sewer line was adequately "sized" for
the anticipated sanitary sewer loading.
Proposed sanitary sewer improvements to the above referenced project consist
of the installation of 2 ,970 lineal feet of I 2 " diameter sanitary sewer line to be
constructed off-site and I ,272 feet of I 2" sanitary sewer line to be
constructed on-site. The off-site portion of the improvements begins at a point
adjacent to the west side of Old Wellborn Road approximately 332 feet
northwest of the intersection of Cam Road with Old Wellborn Road. The
proposed I 2" diameter off-site sanitary sewer line will begin at a tie-in to a
manhole proposed to be built as part of I 8" diameter sanitary sewer line
improvements currently being constructed by the City of College Station. The
proposed I 2" diameter off-site sanitary sewer improvements end at a point
approximately 28 feet southwest of the most northerly corner of the proposed
Las Palomas Subd1v1s1on near a point at which the I 2" diameter sanitary sewer
Imes enters the subject project. The proposed I 2 " diameter on-site sanitary
sewer continues approximately I ,272 feet to a point near the southwest line of
the Las Palomas Subd1v1s1on (See attached Sanitary Sewer Construction Plans,
Sheets SI , S2, S3, and S4).
Future extensions of the proposed I 2 " diameter sanitary sewer line with both
"pumped" force mains and gravity flow Imes are at this time are probable which
would provide sanitary sewer service to an as yet undetermined amount of
add1t1onal property.
A projection of the peak sanitary loading 1s rationalized as follows:
Per Final Plat of Las Palomas Subd1v1s1on , 27 duplex lots are proposed with two
dwelling units per duplex lot yields 54 dwelling units. Assuming each dwelling unit
houses 2.G7 occupants a total of 144 residents 1s arrived at. 144 residents at
I 00 gallons per day equates to 14,400 gallons per day. We then provide a
peaking factor of four (4) which brings the ant1c1pated peaked flow rate to 57,
GOO gallons per day.
' r·
A ten percent ( l 0%) infiltration consideration 1s calculated and added-in to the
peaked base flow to achieve the design loading of 59,040 gallons per day.
A flow rate of 59,040 gallons per day 1s equivalent the 0.091 cubic feet per
second.
The full flow capacity of an l 2 " d iameter sanitary sewer line based on Manning's
Equation with a slope of 0.40% grade and n=O.O I 3 1s 2 .253 cubic feet per
second with a full flow velocity of 2 .87 feet per second.
Utilizing the peak design flow rate of 0 .091 cubic feet per second, the given
sanitary sewer line slope of 0.40 %, n=O.O 13, and included Table 7 -14 from
Handbook Of Hydraulics, Brater And King , Sixth Ed1t1on , the depth of flow of
0. I 0 feet can be estimated with a corresponding velocity of 2.22 feet per
second.
The design loading calculated above accounts for approximately 4% of the
available capacity of t he proposed I 2 " diameter sanitary sewer line constructed
at a grade of 0.40 %.
Worki ng backwards based on the full flow capacity of 2.253 cubic feet per
second presented above the proposed I 2 " diameter sanitary sewer line would
allow for the 27 duplex lots proposed with the development of Las Palomas
Subd1v1s1on as well as enough reserve capacity for approximately I , 27 I
additional 2.G7 resident dwelling uints while providing for I 0% infiltration. The
full flow capacity of 2 .253 cubic feet per second assumes a no surcharging
cond1t1on within the proposed 8 " diameter sanitary sewer line.
7-64 HANDBOOK OF HYDRAULICS
Table 7-13. Values of K for Circular Channels in the Formula
K Q= -DHs~ n
D = depth of water d = diameter of channel
D
d .00 .01 .02 .03 .04 .05 .06 .07 .08 .09
----------------------
.0 15.02 10.56 8.57 7.38 6.55 5.95 5.47 5.08 4.76 .1 4.49 4.25 4.04 3.86 3.69 3.54 3.41 3.28 3.17 3.06 .2 2.96 2.87 2.79 2.71 2.~3 2.56 2.49 2.42 2.36 2.30 .3 2.25 2.20 2.14 2.09 2.05 2.00 1.96 1.92 1.87 1.84 .4 1.80 1.76 1.72 1.69 1.66 1.62 1.59 1.56 1.53 1.50
.5 1.470 1.442 1.415 1.388 1.362 1.336 1.311 1.286 1.262 1.238 .6 1.215 1.192 1.170 1.148 1.126 1.105 1.084 1.064 1.043 1.023 .7 1.004 .984 .965 .947
.8 .821
.928 .910 .891 .874 .856 .83E .804 .787 .770 .753 .736 .720 .703 .687 .670 .9 .654 .637 .621 .604 .588 .571 .553 .535 .516 .496
1.0 .463
Table 7-14. Values of K' for Circular Channels in the Formula
K' Q = -d~~s}" n
D = depth of water d = diameter of channel
D -.00 .01 .02 .03 .04 .05 .06 .07 .08 .09 d ----------------------
.o .00007 .00031 .00074 .00138 .00222 .00328 .00455 .00604 .OQ775 .1 .00967 .Oll8 .0142 .0167 .0195 .0225 .0257 .0291 .0327 .0366 .2 .0406 .OHS .0492 .0537 .0585 .0634 .0686 .0738 .0793 .08•19 .3 .0907 .0966 .1027 .1089 .ll53 .1218 .1284 .1352 .1420 .1490 .4 .1561 .1633 .1705 .1779 .1854 .1929 .2005 .2082 .2160 .2238
.5 .232 .239 .247 .255 .263 .271 .279 .287 .295 .303 .6 .311 .319 .327 .335 .343 .350 .358 .366 .373 .380 .7 .388 .395 .402 .409 .416 .422 .429 .435 .441 .447 .8 .453 .458 .463 .468 .473 .477 .481 .485 .488 .491 .9 .494 .496 .497 .498 .498 .498 .496 .494 .489 .483
1.0 .463
STEADY UNIFOIL\I FLOW IN OPEN CHANNELS 7-65
Table 7-15. Values of K for Parabolic Channels in the Formula
K Q = -m~8~ n
D -depth of water T = top width of channel
D -.00 T .01 .02 .03 .04 .05 .06 .07 .08 .09
----------------------
.o 75.59 37.77 25.16 18.85 15.05 12.52 10.71 9.35 8.28
.1 7.43 6.73 6.15 5.65 5.23 4.86 4.53 4.24 3.99 3.76
.2 3.55 3.36 3.19 3.04 2.89 2.76 2.64 2.52 2.42 2.32
.3 2.226 2.140 2.059 1.984 1.912 1.845 1.782 1.72'..: 1.665 1.611
.4 1.560 1.511 1.465 1.421 1.379 1.339 1.301 1.265 1.230 1.197
.5 1.165 1.134 1.105 1.077 1.050 1.024 .999 .975 .952 .929
.6 .908 .887 .867 .848 .829 .811 .794 .777 .761 .745
.7 .730 .715 .701 .687 .674 .661 .648 .636 .624 .613
.8 .601 .590 .580 .570 .560 .550 .540 .531 .522 .514
.9 .505 .497 .489 .481 .473 .466 .458 .451 .444 .438
1.0 .431
Table 7-16. Values of K' for Parabolic Channels in the Formula
K' Q = n T"s>o
D = depth of water T = top width of channel
D .00 .01 T .02 .03 .04 .05 .06 .07 .08 .09
----------------------
.0 .00035 .00111 .00219 .00353 .00511 .00691 .00891 .01110 .01347
.1 .0160 .0187 .0215 .0245 .0276 .0308 .0342 .0376 .0412 .0448
.2 .0486 .0524 .0563 .0603 .0643 .0684 .0726 .0768 .0811 .0854
.3 .0898 .0942 .0987 .1032 .1077 .1123 .1168 .1215 .1261 .1308
.4 .1355 .1402 .1450 .1497 .15'15 .1593 .1641 .1689 .1737 .1786
.5 .183 .188 .193 .198 .203 .208 .213 .218 .223 .228
.6 .232 .237 .242 .247 .252 .257 .262 .267 .272 .277
.7 .282 .287 .292 .297 .302 .307 .312 .317 .322 ,327
.8 .332 .337 .342 .347 .352 .357 .361 .366 .371 .376
.9 .381 .386 .391 .396 .401 .406 .411 .416 .421 .426
1.0 .431
AGGIELAND BUILDERS, L.L.C.
May 3, 2006
Josh Norton
1401 Sebesta Road ,..., College Station, TX 77845
Tel: (979) 693-6699 ,..., Fax : (979) 695-2941
tonyjones@txcyber.com
Engineering Department
City of College Station
1101 Texas Avenue
College Station, TX 77840
Dear Josh,
This letter is to confirm Aggieland Builders, L.L.C. is accepting full financial and maintenance
responsibility for whatever measures need to be taken to allow our sanitary sewer main extension
to operate and comply with State law until the CIP project is extended and the connection is
made. The "Steeplechase Sanitary Sewer Main Phase 1" has been brought to the west side of the
railroad tracks to an ending man hole. Phase 2 has been bid and approved by the City Council to
contract with Elliott Construction to perform all work. Elliott is awaiting the contract from the
City of College Station and has confirmed that the necessary tie-in man hole for our off-site
sanitary line will be completed within thirty days after start of construction.
We anticipate no delay in our connecting to the City's sanitary sewer line but are accepting fu ll
responsibility to make all connections to the City Staffs satisfaction.
ony J
President/Manager
Aggieland Builders, L.L.C.
MAY -U 4 -2 0 0 6 THU 0 4 : 1 7 PM We i I bo rn SUD FA X No. 979 6901 260 p, 002/002
°Wu.BORN SPECIAL UTILITY DrsTRICT
May 5, 2006
Judge Sims
300 East 26°' Street
Suite 114
Bryan, Texas 77803
Dear Judge Sims:
Board of Directors
Jerry Ran•om, Pr11•1denl
Gary Spence, Vice Preskhml
Charles Robe~on. Treeaurer
There Ml Schehrn, Secretary
A.P. Boyd
Kerineth Qcxxtmen
Macy He.ton
John Winder
Jeck Wln•low
The proposed development of twenty-seven duplexes located on IGN Road are within Wellborn
Special Utility District's service area. The District will supply water for this subdivision upon
completion of the required line ~tension.
Should you have any questions or need further information, please do not hesitate to contact me.
Sincerely,
General Manager
Wellborn Special Utility District
P.O. Box 250 • 4118 GREENS PRAIRIE Ro .• WHLBORN, TX 77881 • PHONE {979) 690-9799 • FAX (979) 690-1260
0'-2.:f
5-/7,-0'
/;;>: z....)
AGREEMENT FOR A PRIVATE DRAINAGE EASEMENT
FOR THE PURPOSE OF CREATING AW ATER DETENTION AREA
STATE OF TEXAS
COUNTY OF BRAZOS
}
}
}
KNOW ALL MEN BY THESE PRESENTS
This agreement for a private drainage easement is entered into by and between David S.
Borsack ("Borsack") and Anthony L. Jones ("Jones") on the following conditions:
1. "Jones" agrees to construct at his sole cost a drainage detention pond on a 39.873
acre tract owned by "Borsack" lying and being situated in the Crawford Burnett
League -Abstract No. 7, Brazos County, Texas. The 39.873 acre tract being a part
of a sixty-three (63) acre tract conveyed by Joseph Machos to F. N. German by
deed dated December 10, 1947 recorded in Volume 133 , Page 333 of the Deed
Records of Brazos County, Texas (DRBCT).
2. The drainage detention pond is to meet the appropriate governmental standards of
the City of College Station and Brazos County.
3. The detention pond proposed to be constructed, per design by Earl Havel for this
agreement, should provide adequate storm water detention for the 29.89 acres of
the Borsack property. The mowing of the detention pond area will be the
responsibility of the owners of the 8.77 acre tract to the south and adjacent of the
Borsack tract for a period of three (3) years or until the development, of any kind,
has been initiated on the Borsack property, whichever occurs first.
4. Said Private Drainage Easement being more particularly described by metes and
bounds as follows:
Beginning at Yi'' diameter rod found marking the south comer of said 39.873 acre
tract and also marking the west comer of the Las Palomas Subdivision. Same Vz"
iron rod also lying on the northeast line of the now or formerly L. J. Kurz Trust No.
2 208.25 acre tract (1562114);
Thence N 48 Degrees 49'50" W along the southwest line of said 39.873 acre tract
and the northeast line of same L. J. Kurz Trust No. 2 208.25 acre tract for a
distance of 145.06 feet to a Vz" diameter iron rod set to mark the west comer of said
Private Drainage Easement;
Thence N 42 Degrees 51 ' 21" E across same 39.873 acre tract for a distance of
676.76 feet to a Vi" diameter iron rod set to mark the north comer of said Private
Drainage Easement;
/Cv-J
Thence S 47 Degrees 08' 39" E for a distance of 145 .00 feet to a Yi'' diameter iron
rod set to mark the east comer of said Private Drainage Easement. Same 'h"
diameter iron rod also lying on the southeast line of the aforesaid 29.873 acre tract
and the northwest line of aforementioned Las Palomas Subdivision;
Thence S 42 Degrees 51' 21 " W along same southeast line on 39.873 acre tract and
the northwest line of said Las Palomas Subdivision for a distance of 673.49 feet to
the PLACE OF BEGINNING and continuing 2.25 acres of land, more or less.
5. The addresses for notice of the parties hereof are as follows:
David S. Borsack
108 Mile Drive
College Station, Texas 77845
Anthony L. Jones
1401 Sebesta Road
College Station, Texas 77845
6. This agreement shall be governed by the laws of the State of Texas and shall be
binding upon the parties hereto and their successors and assigns.
EXECUTED effective April {_3 , 2006.
STATE OF TEXAS
COUNTY OF BRAZOS
BY:
BY:
This instrument was acknowledged before me on
by David S. Borsack.
This instrument was acknowledged before me on the k day of _..._,rY\iU'-""'""'!v+----' 2006,
by Anthony L. Jones. f n ~ (\ I . ~
CHRIS KREMER
Notary Public! S!ate of Texas
My Comm1ss1on Expires
February l 5, 2009
\lJ1\M? t1Wh~
Notary Public, State of Texas