Loading...
HomeMy WebLinkAboutWater ReportsWAL*MARTWATERSUPPLY SITE SURVEY WAL*MART STORE #1150 1815 BROTHERS BLVD. COLLEGE STATION TX 77845 TEST DATE: 01/03/08 Report was revised at the request of the Civil Engineering Consultant to address updated city requirements. No new flow test was performed, since the date of the existing flow test is less than one year old. SUMMARY STATEMENT This report provides the current available water supply for the proposed expansion of the Wal-Mart # 1150 located at 1815 Brothers Blvd. in College Station, TX, with a Finish Floor Elevation (FFE) of 274.6 ft AMSL. Required fire sprinkler supply for this 195 prototype is 1400 gpm @ 33 psig and 2000 gpm @ 41 psig. Required domestic water supply is 139 gpm @ 45 psig. SUMMARY OF RESULTS (AS DESIGNED) Fire line Base of Riser (BOR) static pressure at FFE: Fire line BOR residual pressure at FFE: Fire line BOR residual pressure at FFE: Safety Factor Used in Minimum Target Demands: Backflow Preventer Required: Assumed 8 inch Wilkins 350A outside in a vault 87.47 psig 82.27 psig@ 1400 gpm 74.88 psig@ 2000 gpm 5.0 psig Domestic BOR static pressure at FFE: 82.97 psig Domestic BOR residual pressure at FFE: 71.99 psig@ 139 gpm Backflow Preventer Required: Assumed 3 inch Watts 909 inside building with 2-inch water meter. SUMMARY OF RES UL TS (FIRE FLOW REQUIREMENTS) Code Basis for Design Bryan I College Station Unified Design Design Guidelines, 2008 Required Fire Flow at 20 psi and Duration 2500 gpm (total) from two adjacent hydrants CONTACT INFORMATION Backflow Prevention Contact Name: Pete Garcia Title: Environmental Technician Address: 1601 Graham Road College Station, TX, 77845 Phone: (979) 764-3663 Fax: (979 764-3452 City Representative present during test: Fire Department Contact Name: Steve Smith Title: Deputy Fire Marshal Address: 300 Krenek Tap Road College Station, TX, 77842 Phone: (979) 764-6273 Fax: (979) 764-3403 Name: Charles Willis Title: Maintenance Supervisor Water Department Contact Name: Charles Willis Title: Maintenance Supervisor Address: 1601 Graham Road College Station, TX 77845 Phone: (979)764-3435 Fax: (979) 764-3452 Please consult with the Fire Protection Engin eer-of-Record to discuss design options prior to site layout. REGISTRATION STATEMENT I, Ricky N. Terrell, a registered Professional Engineer in the State of Texas, do hereby certify that this water flow test is a true and correct survey for the project location for the date and time of the testing, based on flow test data provided by Charles Wi llis. It is understood that the water supply infonn ation supplied in this report will become the design basis for the water based fire suppression systems (fire sprinkler and hose station). Original Report Date: 0I/14/0f: Pag~ I or -l Revised : 0911 2/08 WAL*MART WATER SUPPLY SITE SURVEY WAL*MART STORE #1150 1815 BROTHERS BLVD. COLLEGE STATION, TX 77845 EXISTING CONDITIONS Site TEST DATE: 01/03/08 The site is located at the north side of the inytersection of Brothers Boulevard and Longmire Drive. An existing 8 inch water line is located along the south side (rear) of the Wal-Mart store and it supplies an 8 inch fire service lead-in to the building. Existing water mains are being abandoned or modified at the front and rear of the building, to allow for construction of new building additions. The arrangement of these lines in the immediate vicinity of the property is contained on Attachment #1 -Water Line Layout, provided by Doucet & Associates, Inc. Water System The City of College Station uses a combination system of both elevated tanks and direct pumping into the distribution grid. Water is pumped from their wells to their 8 million gallons ground storage, and then into the distribution system with excess going into the 5 million gallons of elevated storage. The volume of the elevated storage tank within the closest proximity to the site is 3 million gallons and is 1.3 miles away. This tank has a maximum water level elevation of 522 ft. AMSL, and a minimum water level elevation of 477 ft. AMSL. At the tim e of the test, the water level elevation was 508.5 ft. AMSL. Four pumps service this area with a capacity of 30,000 gpm -three at 8,000 gpm and one at 6,000 gpm . The water system has backup pumps and backup power. WATER FLOW TEST RESULTS (Flow test data was provided by Charles W illis, Maintenance Supervisor for the City of College Station Water Department, who conducted the testing. No personnel associated with Ricky N. Terrell, P.E. were present during testing.) Flow for the test was made utilizing the hydrant located approximately 55 ft. from the south-west corner of the existing Wal-Mart Store. Static and residual pressures were taken at the hydrant located approximately 85 ft. from the south-east corner of the existing Wal-Mart Store. Flow and Gauge hydrant locations are indicated on Attachment #1. One 2-1 /2 inch hydrant butt was opened and a pitot reading of90 psi was received, with a discharge coefficient of 0.90. This resulted in a total flow of 1590 gpm at a residual pressure of 102 psi. Static pressure before and after testing was 104 psi. The static and residual pressure was taken at an elevation of approximately 276 ft., AMSL, which is 1.4 ft. above the finish floor elevation of the store (274.6 ft., AMSL). Please see enclosed Attachment #2 and Attachment #3 for a graphical representation of this test and for necessary calculations. This test is effective at the base of the pressure hydrant for friction loss purposes. The test was conducted at 11: 19 a.m . local time. HYDRAULIC CALCULATIONS Based upon the size of the building area, and its current classification as a Type II-B structure, per Appendix B of the International Fire Code 2006 Edition, the required flow rate would be 2000 gpm at 20 psi from the remote hydrants on the property shown on Attachment #1. However, per the Bryan I College Station Unified Design Guidelines, 2008, the fire flow requirement for commercial projects is 2500 gpm at a minimum of 20 psi residual pressure, which may be split between two adjacent fire hydrants within 600 feet of each other. Fire flow calculations were performed using the two remote hydrants north of the building, as indicated on Attachment# 1, with a flow of 1250 gpm from each hydrant. The city system can be considered a reliable supply, with respect to duration requirements. This acceptability is based on the capability of the water supply to provide the required base ofriser (sprinkler + hose allowance) supply of 2000 gpm for the required 2 hour duration, per NFPA 13. Adjusting to the lowest city pressures available from the water system (at minimum elevated tank water level) results in a 13 .64 psi deduct and is included with the calculations. For domestic calculation purposes, demand requirements for a 195 prototype were used. In addition, loss through a :2 inch Sensus SRH compound water meter was used. Since the domestic lead-in is not indicated on Attachment # 1, it i~ assumed th at it will be at th e same general location as the fire service lead-in; therefore, the calculations indicat~ identical pipe lengths for both services. Pipe lengths used in the calculations include equivalent lengths of fittings, and all new and existing pipes are assumec to be cement-lined ductile iron, except for the domestic lead-in, which is assumed to be Type K Copper. Calculation~ Origina l Report Date: 0 II14/08 R~visccl: 09/ 12/08 l'agc 2 or~ WAL*MART WATER SUPPLY SITE SURVEY WAL*MART STORE #1150 1815 BROTHERS BLVD. COLLEGE STATION , TX 77845 TEST DATE: 01/03/08 are based on the water line layout provided by Joe Grasso of Doucet & Associates, Inc. on 09/09/08, included as Attachment #1 . (Hand-written notes on Attachment #I are by Ricky N. Terrell, P.E.) BACKFLOW PREVENTION REQUIREMENTS Backflow prevention infonnation provided by Pete Garcia, Backflow Prevention Contact. All devices must be approved by the University of Southern California (USC) and installed per USC manual for orientation and installation. Fire line: A double check type backflow preventer would be required on the water line to the sprinkler system. The existing backflow preventer is outside in a vault. For the purposes of this report, an 8 inch Wilkins 350A was used for calculations. Domestic: A reduced pressure type is required inside the building, in addition to the water meter. For the purposes of this report, a 3 inch Watts 909 was used for calculations. Irrigation: Double check or PVB is required on irrigation. Must be tested by an entity registered with the City of College Station and the original test report must be given to the city. CONCLUSIONS FIRE WATER SUPPLY: The available public water supplies combined with the planned 8 inch fire protection lead-in arrangement as shown on Attachment# I, should yield a base of riser supply, downstream of an assumed Wilkins 350A 8 inch double check backflow preventer of 87.47 psi static and 1400 gpm flowing at a 82.27 psi residual. The calculated residual pressure is 74.88 psig @ 2000 gpm. This exceeds both minimum target demands of 1400 gpm at 33 psi and 2000 gpm at 41 psi. Minimum target demands include a 5 psig safety factor. DOMESTIC SUPPLY: The avai lable public water supplies combined with the planned domestic water line sizing and arrangement as shown on Attachment # 1, should yield a domestic supply at the stub-up above the finish floor, downstream of an assumed Watts 909 3 inch reduced pressure backflow preventer and a 2 inch Sensus, SRH, compound meter of 82.97 psi static and 139 gpm flowing at a 71.99 psi residual. This exceeds the target demand of 139 gpm at 45 psi for a 195 prototype rear entry. See Attachment #3 for a graphical representation and for necessary calculations. FIRE FLOW: The available public supplies combined with the existing main sizing and arrangement, as shown on Attachment #1, should yield a combined fire hydrant flow rate of2500 gpm (1250 gpm from each of two hydrants) as indicated on Attachment# l. The resulting residual pressure maintained at FH I is 73.8 psi, and at FH2 is 76.2 psi. This exceeds the requirements of both the 2006 International Fire Code, Appendix B, and the Bryan I College Station Unified Design Guidelines, 2008. During fire flow conditions, the maximum flow velocity in the underground mains (not including the 6 inch hydrant laterals) is 8.71 feet per second (fps). See Attachment #4 for calculations. Origi1wl R~pon Da te 0It14/08 R.:viscd: OlJ/ I ~/OX Pagi.:: 3 nl' 4 WAL*MART WATER SUPPLY SITE SURVEY WAL *MART STORE #1150 1815 BROTHERS BLVD. COLLEGE STATION, TX 77845 INFORMATION REQUIRED IN SITE WATER FLOW TEST AND REPORT TEST DATE: 01/03/08 This checklist is provided to assure that the site water flow test report includes all Wal-Mart required infonnation and must be included in the Water Report. (X) Wal -Mart store and project number (X) Seal and signature of the Professional Engineer. (X) Sprinkler contractor cannot conduct test. (X) The City Fire Marshal or another city representative was present during test. (X) Pressure test hydrant separate from flowing hydrant. (X) Date and time of test provided. (X) Water main size shown. (X) Water main pipe type shown. (X) Hydrant butt diameter shown. (X) Pitot pressure shown. (X) Hydrant coefficient shown. (X) Hydrant elevation shown. (X) Building pad elevation shown (X) Static pressure shown. (X) Residual pressure shown. (X) Statement provided as to any proposed improvements to City's water system and date. (X) Complete calcul ations, including water system model calculations (if applicable). (X) Complete N -1.85 Graph. (X) Provide sketch of area showing all water lines, project building, test location with test and flowing hydrants identified. (X) Cover page certification. (X) Cover page summary statement. (X) Fire Department Contact, Water Department Contact, and Cross Connection Control (Backflow Prevention) Authority contact name and phone number (if applicable). (X) Local jurisdiction sprinkler design safety factor indicated (if applicable). (X ) This Checklist completed and included in report. Checked By: ~·P~ Eddie Powelf Ori ginal Repnn Date: (I 1114108 Revised: 09112/(J}; 09/11 /08 Date l'age 4 or 4 ATTACHMENT# 2 WATER SUPPLY FLOW TEST For: Wal*Mart Supercenter #11 50 FIRE LINE Location: 1815 Brothers Blvd. College Station, TX Static: 104.0 psi Residual: 102.0 psi Date: 01/03/08 Pitot: 90.0 ·psi ·Flow: 1590 .gpm Time: 11 :19 AM Nozzle: (1) 2-1/2 inch hydrant outlet Cd : 0.9 Gauge Hydrant Location: South East rea r side of the store Flow Hydrant Location: South West rear side of the store Hydrant Elevation: 276 .00 'Ft. AMSL (BOR) Elevation: 274.60 Ft. AMSL Test Performed By.: Charles Willis • Company: Colleqe Station Utilities Backflow Preventer Size I Mfg. I Model: Assumed 8" Wilkins 350A Type: Double Check Backflow Preventer Location: In a vault outside Base of Riser (BOR) Calculations: TARGET DEMANDS Static Residual Residual 1. Target Demand Flow (gpm 0 1400 2000 2. Available Pressure at Target Demand Flow psi 104.00 102.42 100.94 3. Elevation Adjustment CBOR el.-Hvd el. x .433) psi) 0.61 0.61 0.61 4. Friction Loss in Piping to BOR psi) "See Attached Cales" 0.00 -4.12 -8.53 5. Base of Riser Supply Upstream of Backflow Preventer (psi 104.61 98.91 93.02 6. Backflow Preventer Loss and Preload psi) -3.50 -3.00 -4.50 7. Base of Riser Suoolv Downstream of Backflow Preventer (psi) 101.11 95.91 88.52 8. Low Tank Level I City Pressure Adjustment (psi) -13.64 -13.64 -13.64 9. Pressure Available at.Base of Riser Supply :psi 87.47 82.27 74.88 ' < 150 140 r-- DESIRED DEMAND NOTES: r-- 130 r-- I Flow Test r-- 120 I Alternate (1): 2000 gpm @41 psi r-- 1/ 110 I/ r-- Alternate (2): 1400 gpm@ 33 psi r-- r-- 100 90 #9 Above I vv ~-~-= 80 r--CJ) ---e: 70 -r---Cll -r---:; 60 --Ill ---gi 50 .... 141 psi at I 0.. 40 I 30 " 20 " ' 10 ,....._ 133psi at I 0 1200 1600 1900 2200 2500 2700 2900 3100 3300 3500 3700 3900 Flow IGPM) Graph X 1.85 General Calculation Program Job -2500 Fire Flow Date -09/11/08 File -G:\119\11934\F\Wa ter Flow Report\091208 r eport\BOR1400.wx1Time - 09:20 :30 AREA CALCULATED -HEAD FLOW SUMMARY Actual Req . De l ta Actual Req . Delt a I D K-factor Flow Flow Flow . Pre s s . Press . Press BOR n/a 1400 .00 1400.00 0 .00 0 .000 Pt 0.000 0 .000 Total K Factors . 0 Total Fixed Flows . 1 Sum Actual Fl ow. 1400 .00 Sum Required Flow . 1400.00 Sum Delta Flow 0 .00 Max Delta Flow 0.00 Max Delta Pressure 0.000 AREA CALCULATED -COMPLE TE SUMMARY Start Finish Diam. Star t No r ma l Pf Elev/Fixed Flow Vel Point Point Pr e s . Pres . Pres . BOR <-UG7 8.270 0 .000 3 .408 2 .165 1400. 00 8 .36 UG2 <-UG3 8 .270 6 .297 0 .003 0 .000 127.69 0.76 UG3 <-UG4 8 .270 6 .300 0.225 0 .000 127 .69 0.76 UG4 <-UG8 8 .270 6 .525 0.364 0.00 0 373.52 2.23 UG2 -> UG9 8 .270 6 .297 -0 .104 0.000 127 .69 -0.76 UG9 -> UG l O 8 .270 6 .1 92 -0 .061 0.000 127 .69 -0 .76 UG4 -> UG5 8 .270 6 .525 -0 .314 0 .000 245.82 -1 .47 UG5 -> UG6 18 .490 6 . 211 -0 .004 0 .000 245 .82 -0 .29 UG6 -> UGlO 8.270 6 .207 -0 .075 0 .000 245 .82 -1 .47 UGlO -> UG7 8.270 6 .132 -0 .558 0 .000 373.52 -2.23 UG7 <-UG8 8.270 5 .574 1 .315 0 .000 1026.48 6 .13 UG8 <-SRC 8 .270 6 .889 0 .001 -2 .772 1400.00 8 .36 System Demand Pressure 4 .118 f FRICf!DN LOS5 Total Flow 1400.000 Ricky N. Terrell, P.E. Page 2500 Fire Flow Date Fitting Legend Abbrev. Name y, :y. w. 1)1, 2 2Y, 3 3Y, 4 5 6 8 10 12 14 16 18 20 24 ----··-- E 90' Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 F 45' Elbow 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 G Generic Gate Valve 0 0 0 0 0 2 2 3 4 5 6 7 8 10 11 13 T 90' Flow Thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 II t;:;::;::;u1 t;j I r1uw 0UI 1111 ldl y -0 I f-\1\IUf-\r\U Ricky N. Terrell, P.E. 2500 Fire Flow Node Elevation No. SOR 0.0 UG2 -5.0 UG3 -5.0 UG4 -5.0 UG9 -5.0 UG5 -5.0 UG6 -5.0 UG10 -5.0 UG7 -5.0 UGB -5.0 SRC 1.4 K-Fact Pt Actual 0.0 6.3 6.3 6.53 6.19 6.21 6.21 6.1 3 5.57 6.89 4.12 Pn na na na na na na na na na na na Flow Actual 1400.0 The maxi mum velocity is 8.36 and it occurs in the pipe between nodes BOR and UG7 Density Comouter Proarams bv Hvdratec Inc Route 111 Windham N.H USA 03087 Page 2 Date Area Press ~~q. rill di l..Jdll;UldLIUI 1::. -ndLt::11-vv lllldl 11::, Ricky N. Terrell, P.E. 2500 Fire Flow Hyd. Ref. Point BOR to UG7 Qa Qt 1400.00 1400.0 Dia. 11c11 Pf/Ft 8.27 140 0.0109 -------·---·-· ------····------· -· 0.0 1400.00 Fitting or Eqv. Ln. 3E 85.404 1G 6.326 1T 55.354 ------- Pipe Ftng's Total 166.000 147.084 313.084 .. -· --------- Pt Pe Pf 0.0 2.166 3.408 5.574 UG2 127.69 8.27 1G 6.326 19.000 6.297 to 140 0.0 6.326 0.0 Pt Pv Pn Page 3 Date ******* Notes Qa = 1400 Vel = 8.36 K Factor= 592.99 UG3 127.69 0.0001 0.0 25.326 0.003 Vel = 0.76 ****** ------·--------------·-···---··--------------------------·---· ---·--·-----·----------------- UG3 0.0 8.27 4F 56.936 1550.000 6.300 to 140 2T 110. 709 186.624 0.0 UG4 127.69 0.0001 3G 18.979 1736.624 0.225 Vel = 0.76 ---·----· UG4 245.83 8.27 2T 110. 709 268.000 6.525 to 140 1G 6.326 117.035 0.0 UG8 373.52 0.0009 0.0 385.035 0.364 Vel = 2.23 0.0 373.52 6.889 K Factor= 142.31 UG2 to UG9 -127.69 -127.69 8.27 140 -0.0001 -·-....... ----·-··--------------· .. UG9 0.0 8.27 140 -0 .0001 to UG10 -127.69 -------· 0.0 -127.69 ---______ ., ____ _ UG4 to UG5 UG5 to UG6 ·---··· UG6 to UG10 UG10 to UG7 UG7 to UG8 UG8 to SRC -245.82 -245.82 0.0 -245.82 0.0 -245.82 8.27 140 -0.0004 18.49 140 0.0 8.27 140 -0.0004 -127.70 8.27 140 -373.52 -0.0009 1400.00 8.27 140 1026.48 0.0061 ·-----····. --· - ----···--·. 373.52 8.27 140 1400.0 0.0100 0.0 1400.00 1 E 28.468 1 F 14.234 1T 55.354 1G 6.326 2F 28.468 1T 55.354 2G 12.652 1F 14.234 1T 55 .354 0.0 0.0 0.0 0.0 2T 110.709 0.0 0.0 1T 55.354 1F 14.234 3G 18.979 2F 28.468 0.0 0.0 0.0 0.0 0.0 698.000 104.382 802.382 371 .000 96.474 467.474 652.000 69.588 721 .588 465.000 0.0 465.000 61.000 110.709 171.709 502.000 88.567 590.567 186.000 28.468 214.468 . --·-·-·---· 0.100 0.0 0.100 6.297 0.0 -0.105 6.192 0.0 -0.060 6.132 6.525 0.0 -0.314 6.211 0.0 -0.004 6.207 0.0 -0.075 6.132 0.0 -0 .558 5.574 0.0 1.315 6.889 -2.772 0.001 4.118 Vel = 0.76 Vel = 0.76 K Factor= -51 .57 Vel = 1.47 Vel = 0.29 Vel = 1.47 Vel = 2.23 Vel = 6.13 Vel = 8.36 K Factor = 689.90 Comouter Proorams bv Hvdratec Inc. Route 111 Windham N.H. USA 03087 General Calculation Program Job -2500 Fire Flow Date -09/11/08 File - G:\119\11934 \F\Water Flow Report \091208 report\BOR2000.wx1Time - 09 :21:24 AREA CALCULATED -HEAD FLOW SUMMARY Actual Req. Delta Actual Req. Delta ID K-factor Flow Flow Flow. Press. Press . Press BOR n/a 2000.00 2000 .00 0.00 0.000 Pt 0.000 0 .000 Total K Factors . 0 Total Fixed Flows . 1 Sum Actual Flow . 2000.00 Sum Required Flow. 2000.00 Sum Delta Flow 0.00 Max Delta Flow 0.00 Max Delta Pressure 0 .000 AREA CALCULATED -COMPLETE SUMMARY Start Finish Diam. Start Normal Pf Elev/Fixed Flow Vel Point Point Pres . Pres. Pres . BOR <-UG7 8.270 0 .000 6 .594 2 . 165 2000.00 11 .95 UG2 <-UG3 8 .270 10 .157 0 . 006 0.000 182.42 1. 09 UG3 <-UG4 8 .270 10 .163 0. 4 36 0.000 182 .42 1. 09 UG4 <-UG8 8 .270 10.599 0 . 704 0 .000 533 .60 3 .19 UG2 -> UG9 8.270 10 .157 -0 .201 0 .000 182.42 -1 .09 UG9 -> UGlO 8.270 9 .956 -0 .117 0.000 182.42 -1 .09 UG4 -> UG5 8 .270 10.599 -0 .608 0.000 351 .18 -2.10 UG5 -> UG6 18 .490 9 .991 -0 .008 0.000 351.18 -0 .42 UG6 -> UGlO 8 .270 9 .983 -0 .145 0 .000 351 .18 -2.10 UGlO -> UG7 8.270 9.838 -1.079 0.000 533.60 -3.19 UG7 <-UG8 8.270 8 .759 2 .544 0 .000 1466 .40 8.76 UG8 <-SRC 8.270 11 . 303 0 .002 -2 .772 2000 .00 11 .95 System Demand Pressure 8.533 J........-FRICTION LO SS Total Flow 2000.000 Fittings L . J Summary Ricky N. Terrell, P.E. Page 2500 Fire Flow Date Fitting Legend Abbrev. Name y, :y. 1Y-1Yi 2 2Y, 3 3Y, 4 5 6 8 10 12 14 16 18 20 24 -------------------·---- E 90' Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 F 45' Elbow 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 G Generic Gate Valve 0 0 0 0 0 2 2 3 4 5 6 7 8 10 11 13 T 90' Flow Thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 II t::i::i::iUI tj I r IUW vUll 111 ldl y -0 I f-\1'1 U/-\r\U Ricky N. Terrell, P.E. 2500 Fire Flow Node Elevation No. BOR 0.0 UG2 -5.0 UG3 -5.0 UG4 -5.0 UG9 -5.0 UG5 -5.0 UG6 -5.0 UG10 -5.0 UG7 -5.0 UG8 -5.0 SRC 1.4 K-Fact ----·- Pt Actual 0.0 10.16 10.16 10.6 9.96 9.99 9.98 9.84 8.76 11.3 8.53 Pn Flow Actual na 2000.0 na na na na na na na na na na The maximum velocity is 11 .95 and it occurs in the pipe between nodes BOR and UG7 Density Comouter Proarams bv Hvdrater: Inc. Route 111 Windham N.H USA 03087 Page 2 Date Area Press Req. rllldl vdl\.,UldllUll::> -ndLt::ll-VVlllldlll::> Ricky N. Terrell , P.E. 2Ei00 Fi re Flow Hyd. Qa Ref. Point Qt BOR 2000.00 to UG7 2000.0 Dia. "Cu Pf/Ft 8.27 140 0.0211 -----·--.. -------·--------·-·-·--- 0.0 2000.00 Fitting or Eqv. Ln . 3E 85.404 1G 6.326 1T 55 .354 ·-··--- Pipe Ftng's Total 166.000 147.084 313.084 -------------------.... -----------------~--· ··-------. -· UG2 182.42 8.27 1G 6.326 19.000 to 140 0.0 6.326 UG3 182.42 0.0002 0.0 25.326 -·---------------------··· UG3 0.0 8.27 4F 56.936 1550.000 to 140 2T 110.709 186.624 UG4 182.42 0.0003 3G 18.979 1736.624 ··----------··. ----··------------- UG4 351 .18 8.27 2T 110.709 268.000 to 140 1G 6.326 117.035 UG8 533.6 0.0018 0.0 385.035 0.0 533.60 -· .. _. .. _ .. ·-··--------·-----------·----·· .. UG2 -182.42 8.27 1E 28.468 698.000 to 140 1F 14.234 104.382 UG9 -182.42 -0.0003 1T 55.354 802.382 1G 6.326 ------------·-···· -------·---- UG9 0.0 8.27 2F 28.468 371 .000 to 140 1T 55.354 96.474 UG10 -182.42 -0.0003 2G 12.652 467.474 0.0 -182.42 ----------·--·-··-·-- UG4 -351 .18 8.27 1F 14.234 652 .000 to 140 1T 55.354 69.588 UG5 -351 .18 -0.0008 0.0 721.588 ·-·---·-···· -· ----------···------- UG5 0.0 18.49 0.0 465.000 to 140 0.0 0.0 UG6 -351 .18 0.0 0.0 465.000 ··-----·----------------·-·-------·-· -------- UG6 0.0 8.27 2T 110.709 61 .000 to 140 0.0 110.709 UG10 -351 .18 -0.0008 0.0 171 .709 ------------------------··-----·-------·-··--··---·--·---------·------ UG10 -182.42 8.27 1T 55 .354 502.000 to 140 1 F 14.234 88.567 UG7 -5 33.6 -0.0018 3G 18.979 590.567 UG7 2000.00 8.27 2F 28.468 186.000 to 140 0.0 28.468 UG8 1466.4 0.0119 0.0 214.468 ----......... -···--·. --··--· -----------····------------- UG8 533.60 8.27 0.0 0.100 to 140 0.0 0.0 SRC 2000.0 0.0200 0.0 0.100 -----------·-· 0.0 2000.00 -.. --. --- Pt Pe Pf 0.0 2.166 6.593 8.759 10.157 0.0 0.006 10.163 0.0 0.436 10.599 0.0 0.704 11 .303 10.157 0.0 -0.201 Pt Pv Pn Page 3 Date ******* Notes ****** Qa = 2000 Vel = 11.95 K Factor= 675.78 Vel = 1.09 Vel = 1.09 Vel = 3.1 9 K Factor= 158. 72 Vel = 1.09 ------·-·---------·---·· -·-. -·----------··---·------ 9.956 0.0 -0.118 Vel = 1.09 9.838 K Factor= -58.16 10.599 0.0 -0.608 Vel = 2.1 0 9.991 0.0 -0.008 Vel = 0.42 9.983 0.0 -0.145 9.838 0.0 -1 .079 8.759 0.0 2.544 11 .303 -2.772 0.002 8.533 Vel = 2.10 Vel = 3.19 Vel = 8.76 Vel= 11 .95 K Factor= 684.67 Comouter Proarams bv Hvdratec Inc Route 111 Windham N.H. USA 03087 ATTACHMENT #3 WATER SUPPLY FLOW TEST For: Wal*Mart Supercenter #1 150 DOMESTIC L/N,E Location: 1815 Brothers Blvd. College Station, TX Static: 104.0 psi Residual: 102.0 psi Date: 01/0 3/08 Pitot: 90.0 ipsi Flow: 1590 gpm Time: 11 :19 a.m. Nozzle: (1) 2-1 /2 inch hydrant outlet Cd: 0.9 Gauge Hydrant Location: South East corner of buildinQ Flow Hydrant Location: South West corner of building Hydrant Elevation: 276.00 Ft. AMSL (FFE) Elevation: 274.60 Ft. AMSL Test Performed By: Charles Willis l Company: Colleqe Station Utilities Backflow Preventer Size I Mfg. I Model: 3" Watts 909 Type: Reduced Pressure Meter Size I Mfg. I Model: 2" Sensus SRH Tvpe: Compound Backflow Preventer I Meter Location: Inside building -·-··-- Base of Riser (BOR) Calculations: TARGET DEMANDS ' Static Residual Residual 1. Taraet Demand Flow (aom) 0 139 139 2. Available Pressure at Target Demand Flow (psi) 104.00 103.98 103.98 3. Elevation Adiustment <FFE el.-Hyd el.) x .4331 (psi) 0.61 0.61 0.61 4. Friction Loss in Pipina to FFE (psi) "See Attached Cales" 0.00 -3.95 -3.95 5. FFE Supply Upstream of Backflow Preventer I Meter (psi 104.61 100.63 100.63 6. Backflow Preventer Loss and Preload (psi) -8.00 -12.00 -12.00 7. Meter Loss and Preload (psi 0.00 -3.00 -3.00 8. FFE Suoolv Downstream of Backflow Preventer I Meter (psi) , ' 96 .61 85.63 85.63 9. Low Tank Level I City Pressure Adjustment (psi) -13.64 -13.64 -13.64 10. Pressure Available at FFE Supply (psi) 82.97 71 .99 71.99 170 160 150 >-- >-- 140 DESIRED DEMAND NOTES: >---130 1FlowTest -/ 139 gpm @45 psi >-- 120 / -/ 110 / / 100 ::::: 90 en #10 Above !!: 80 -_,,..---...... GJ ---~ 70 --"' --"'60 --GJ ... --a.. 50 ---40 ........... ----........... 45psi at 139gpm 1 ~~ ---30 --20 -----10 ------0 100 200 300 400 Flow (GPM) Graph X 1.85 • General Calculation Program Job -2500 Fire Flow Date -09/11/08 Fil e -G:\119\11934\F\Water Flow Report\091208 report\DOM139 .wx1Time - 09 :17:06 AREA CALCULATED -HEAD FLOW SUMMARY Actual Req . Delta Actual Req. Delta ID K-factor Flow Flow Flow. Press . Press . Press DOM n/a 139 . 00 139.00 0 .00 0 .000 Pt 0 .000 0 .000 Total K Factors . 0 Total Fixed Flows . 1 Sum Actual Flow. 139 .00 Sum Required Flow. 139 . 00 Sum Delta Flow 0.00 Max Delta Flow 0.00 Max Delta Pressure 0.000 AREA CALCULATED -COMPLETE SUMMARY Start Finish Diam. Star t Normal Pf Elev/Fixed Flow Vel Point Point Pres . Pres. Pres . DOM <-UG7 2 .907 0.000 4 .541 2 .165 139 .00 6 .72 UG2 <-UG3 8 .270 6 .716 0.000 0 .000 12 . 68 0 .08 UG3 <-UG4 8 .270 6 .716 0 .003 0 .000 12.68 0.08 UG4 <-UG8 8.270 6.719 0 .005 0.000 37 .08 0 .22 UG2 -> UG9 8 .270 6.716 -0 .001 0.000 -12 .68 -0 .08 UG9 -> UGlO 8 .270 6.715 -0.001 0.000 -12.68 -0.08 UG4 -> UG5 8 .270 6.719 -0 .004 0 .000 -24 .41 -0 .15 UG5 -> UG6 18 .490 6.715 -0 .000 0.000 -24.41 -0 .03 UG6 -> UGlO 8.270 6 .715 -0.001 0.000 -24 .41 -0 .15 UGlO -> UG7 8 .270 6 .714 -0 .008 0 .000 -37 .08 -0 .22 UG7 < UG8 8 . 270 6 .706 0 .018 0 .000 101.92 0 .61 UG8 <-SRC 8 .270 6 .724 0 .000 -2 .772 139 . 00 0.83 System Demand Pressure 3.953 r F"f< \C:\ION L.D$5' Total Flo w 139 .00 0 Fittings Used Summary Ricky N. Terrell, P.E. Page 1 2500 Fire Flow Date Fitting Legend Abbrev. Name y, o/. 1Y4 rn 2 2Y, 3 3/'2 4 5 6 8 10 12 14 16 18 20 24 -------------·-----··--··-~--·--------------- E 90' Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 F 45' Elbow 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 G Generic Gate Valve 0 0 0 0 0 2 2 3 4 5 6 7 8 10 11 13 T 90' Flow Thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 i---ressure / riuw 0u111111d1 y -0 1 Kl'llUMr<..u Ricky N. Terrell, P.E. 2500 Fire Flow Node Elevation No. DOM 0.0 UG2 -5.0 UG3 -5.0 UG4 -5.0 UG9 -5.0 UG5 -5.0 UG6 -5.0 UG10 -5.0 UG7 -5.0 UGB -5.0 SRC 1.4 K-Fact Pt Actual 0.0 6.72 6.72 6.72 6.71 6.72 6.71 6.71 6.71 6.72 3.95 Pn na na na na na na na na na na na Flow Actual 139.0 The maximum velocity is 6.72 and it occurs in the pipe between nodes DOM and UG7 Density Comouter Proorams bv Hvdratec Inc. Route 111 Windham N H. USA 03087 Page 2 Date Area Press Req. 11na1 \...,CllCUICILIUfl::) -MdLe11-VVlllldlll~ Ricky N. Terrell, P.E. 2500 Fire Flow Hyd . Ref. Point DOM to UG7 Qa Qt 139.00 139.0 Dia. uc" Pf/Ft 2.907 150 0.0217 Fitting or Eqv. Ln. 3E 24.406 1G 1.162 1T 17.433 Pipe Ftng's Total 166.000 43.001 209.001 -----·------·---·----· -------·------·---------------·--··--·--·· ----···· UG2 to UG3 --------- UG3 to UG4 --··· ----- UG4 to UG8 0.0 139.00 12.68 12.68 0.0 12.68 24.40 37.08 0.0 37.08 8.27 140 0.0 8.27 140 0.0 8.27 140 0.0 . ----·-----·-·------- UG2 -12.68 8.27 to 140 UG9 -12.68 0.0 ·-----·---- UG9 to UG10 0.0 -12.68 8.27 140 0.0 1G 6.326 4F 2T 3G 0.0 0.0 56.936 110.709 18.979 ---·------... -------- 2T 110.709 1G 6.326 0.0 1 E 28.468 1 F 14.234 1T 55.354 1G 6.326 2F 28.468 1T 55.354 2G 12.652 19.000 6.326 25.326 1550.000 186.624 1736.624 --------------------- 268.000 117.035 385.035 698.000 104.382 802.382 371 .000 96.474 467.474 -----------·------· 0.0 -12.68 UG4 -24.41 8.27 to 140 UG5 -24.41 0.0 ------·-· UG5 0.0 18.49 to 140 UG6 -24.41 0.0 -------------------------.. UG6 0.0 8.27 to 140 UG10 -24.41 0.0 UG10 -12.67 8.27 to 140 UG7 -37.08 0.0 -------------------- UG7 139.00 8.27 to 140 UG8 101 .92 0.0001 ··•··-----·· -------···--·-···- UG8 37.08 8.27 to 140 SRC 139 .0 0.0100 -----··-·---- 0.0 139.00 1 F 14.234 1T 55.354 0.0 2T 0.0 0.0 0.0 110.709 0.0 0.0 652.000 69.588 721 .588 ·----···· 465.000 0.0 465.000 61.000 110.709 171 .709 ---------------________ ., ___ 1T 55.354 502.000 1F 14.234 88.567 3G 18.979 590.567 __ .. ___________________ ,. 2F 28.468 186.000 0.0 28.468 0.0 214.468 -·---·--·---·-··--·- 0.0 0.100 0.0 0.0 0.0 0.100 Pt Pe Pf 0.0 2.166 4.540 ···--.. -------- 6.706 6.716 0.0 0.0 6.716 0.0 0.003 6.719 0.0 0.005 6.724 6.716 0.0 -0.001 Pt Pv Pn --·-·-·· -- Pag e 3 Date ******* Notes ****** Qa= 139 Vel = 6.72 ----· --------------·---------·---· ---- K Factor= 53.68 Vel = 0.08 Vel = 0.08 Vel = 0.22 K Factor= 14.30 Vel = 0.08 ·-------·-·--·-·-----·-------__ ,. ........ -.. --... . 6.715 0.0 -0.001 6.714 6.719 0.0 -0.004 ·----------.. -·----·· 6.715 0.0 0.0 6.715 0.0 -0.001 Vel = 0.08 K Factor= -4.89 Vel= 0.15 Vel = 0.03 Vel = 0.15 ·····-----------------·----·--------------.. ------·------·---··· 6.714 0.0 -0.008 Vel = 0.22 ------ 6.706 0.0 0.018 Vel = 0.61 -. -·· --··-· ---· 6.724 -2.772 0.001 Vel = 0.83 3.953 K Factor= 69.91 Comouter Proorams bv Hvdra tec Inc. Route 111 Windham N.H. USA 03087 • ATTACHl'1ENT ~ 4 FIRE (LOW CALCULATIONS General Calculation Program Job -2500 Fire Flow Date -09/11/08 File -G:\119\11934\F\Water Flow Report\091208 report\FF2500.wx1Time - 09:00:38 AREA CALCULATED -HEAD FLOW SUMMARY Actual Req . Delta Actual Req . De l ta ID K-factor Flow Flow Flow. Press. Press . Press FH 2 n/a 1250 .00 1250 .00 0 .00 76 .1 91 Pt 76.191 0 .000 FHl n/a 1250 .00 1250 .00 0.00 73 .832 Pt 73.832 0 .000 Total K Factors . 0 Total Fixed Flows . 2 Sum Actual Flow . 2500 .00 Sum Required Flow . 2500 .00 Sum Delta Flow 0 .00 Max Delta Flow 0 .00 Max Delta Pressure 0.000 AREA CALCULATED -COMPLETE SUMMARY Start Finish Diam. Start Normal Pf Elev/Fixed Flow Vel Point Point Pres . Pres. Pres. FH2 <-UG3 6 .160 76 .191 5 .086 3.032 1250 .00 13 . 46 FHl <-UGl 6 .1 60 73 .832 2 .529 4 .331 1250 .00 13 . 46 UGl <-UG2 8 .270 80 .692 3 .618 0 .000 1250 .00 7 .47 UG2 -> UG3 8 .270 84 .310 -0 .002 0 .000 -91.21 -0 .54 UG3 <-UG4 8 .270 84 .308 13 .325 0 .000 1158 .79 6 .92 UG4 <-UG8 8 .270 97 .633 4.516 0 .000 1457 .48 8 .71 UG2 <-UG9 8 .270 84 .310 8 .069 0 .000 1341.21 8 .01 UG9 <-UGlO 8 .270 92 .379 4.691 0.000 1341 .21 8.01 UG4 -> UG5 8 .270 97 .633 -0.451 0 .000 298 .69 -1 .78 UG5 -> UG6 18 .490 97 .183 -0 .006 0 .000 298 .69 -0.36 UG6 -> UGlO 8 .270 97 . 1 77 -0.107 0 .000 298.69 -1 .78 UGlO <-UG7 8.270 97 .070 3 .726 0 .000 1042.52 6 .23 UG7 <-UG8 8.270 100 .796 1 .353 0.000 1042.52 6 .23 UG8 <-SRC 8.270 102.149 0.003 -2 .772 • 2500.00 14.93 System Demand Pressure 99.380 WARNING Demand Exceeds Available Pressure by Total Flow . . . . . . . . . . . . . . . . . Water Supply Summary @ Point SRC Total Flow From Water Supply Curve Pressure From Water Supply Curve System Pressure Demand At Supply Curve 0.000 2500 .000 2500 .000 99.380 99.380 • Fittings Used Summary Ricky N. Terrell, P.E . Page 2500 Fire Flow Date Fitting Legend Abbrev. Name y, :y. rn 111, 2 2Y, 3 3y, 4 5 6 8 10 12 14 16 18 20 24 ·------------------------ E 90' Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 F 45' Elbow 2 2 3 3 3 4 5 7 9 11 13 17 19 21 24 28 G Generic Gate Valve 0 0 0 0 0 2 2 3 4 5 6 7 8 10 11 13 L Long Turn Elbow 2 2 2 3 4 5 5 6 8 9 13 16 18 24 27 30 34 40 T 90' Flow Thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 t-'ressure / r-1ow 0ummary -0 1 Al\IUAKU Ricky N. Terrell, P.E. 2500 Fire Flow Node Elevation K-Fact No. ----------·-. FH2 2.0 FH1 5.0 UG1 -5.0 UG2 -5.0 UG3 -5.0 UG4 -5.0 UG9 -5.0 UG5 -5.0 UG6 -5.0 UG10 -5.0 UG7 -5.0 UG8 -5.0 SRC 1.4 Pt Actual 76.19 73.83 80.69 84.31 84.31 97.63 92.38 97.18 97.18 97.07 100.8 102.15 99 .38 Pn na na na na na na na na na na na na na Flow Actual 1250.0 1250.0 The maximum velocity is 14.93 and it occurs in the pipe between nodes UG8 and SRC Density Comouter Proorams bv Hvdratec Inc. Route 111 Windham N.H. USA 03087 Page 2 Date Area Press .. f3~Sl·. r-1na1 Ga1cu1at1ons -Hazen-vv1111ams Ricky N. Terrell, P.E. 2500 Fire Flow Hyd. Qa Ref. Point Qt FH2 1250.00 to UG3 1250.0 Dia. "C" Pf/Ft 6.16 140 0.0370 Fitting Pipe or Ftng's Eqv. Ln . Total 1L 12.911 77.000 1G 4.304 60.252 1T 43 .037 137.252 ·--------·-···---------·-···---····---· --------·--·-··---------- 0.0 1250.00 ·------------· -----------------------------------··-·-----·---- FH1 1250.00 6.16 140 to UG1 1250.0 0.0371 UG1 0.0 8.27 to 140 UG2 1250.0 0.0088 UG2 -1341 .21 8.27 ~ 140 UG3 -91.21 -0.0001 UG3 1250.00 to UG4 1158.79 ----·---------- U G4 298.69 to UG8 1457.48 -------·--- 0.0 1457.48 8.27 140 0.0077 8.27 140 0.0117 1L 12.911 1G 4.304 1T 43.037 8.000 60 .252 68.252 ----------·----------.. -- 1L 20.56 383.000 1G 6.326 26 .886 0.0 409.886 -·-·---- 1G 6.326 19.000 0.0 6.326 0.0 25.326 4F 56.936 1550.000 2T 110.709 186.624 3G 18.979 1736.624 ----·-····------- 2T 110.709 268.000 1G 6.326 117.035 0.0 385.035 --------· --·-·-····-----·-- -----------·-----------·----------- UG2 1341 .21 to UG9 1341.21 UG9 0.0 to UG10 1341 .21 0.0 1341 .21 8.27 140 0.0101 8.27 140 0.0101 1 E 28.468 1 F 14.234 1T 55.354 1 G 6.326 2F 28.468 1T 55.354 2G 12.652 ---------------------------------------------·-·-··· UG4 -298.69 to UG5 -298.69 UG5 0.0 to UG6 -298.69 -------·-----·. UG6 0.0 to UG10 -298.69 --·-·-· --·-·----. . UG10 1341.21 to UG7 1042.52 UG7 0.0 to UG8 1042.52 UG8 1457.48 to SRC 2500.0 8.27 140 -0.0006 18.49 140 0.0 ---·-···--·-· 8.27 140 -0.0006 ·---·-···-- 8.27 140 0.0063 8.27 140 0.0063 8.27 140 0.0300 1 F 14.234 1T 55.354 0.0 0.0 0.0 0.0 ------··--··-··---------- 2T 110.709 0.0 0.0 ··········--·- 1T 55.354 1F 14.234 3G 18 .979 2F 28.468 0.0 0.0 0.0 0.0 0.0 698.000 104.382 802.382 370.000 96.474 466.474 652.000 69 .588 721 .588 467.000 0.0 467.000 ------·---·-·----.... 61.000 110.709 171 .709 ·-----------·· 502.000 88.567 590.567 186.000 28.468 214.468 0.100 0.0 0.1 00 Pt Pt Pe Pf 76 .191 3.032 5.085 84.308 Pv Pn Page 3 Date ******* Notes ****** Qa = 1250 Vel = 13.46 K Factor= 136.14 ---··-----~---------------····--··---------·- 73.832 4.331 2.529 80.692 0.0 3.618 84.310 0.0 -0.002 84.308 0.0 13.325 97.633 0.0 Qa = 1250 Vel = 13.46 Vel = 7.47 Vel = 0.54 Vel = 6.92 4.516 Vel= 8.71 --·----------------------.....:.C..C--'------·---·--·--- 102.149 84.310 0.0 8.069 92 .379 0.0 4.691 97.070 97 .633 0.0 -0.450 97.183 0.0 -0.006 ---------- 97 .177 0.0 -0.107 ------·- 97 .070 0.0 3.726 100.796 0.0 1.353 102.149 -2 .772 0.003 K Factor= 144.21 Vel = 8.01 Ve!= 8.01 K Factor= 136.13 Ve!= 1.78 Ve!= 0.36 Ve!= 1.78 Ve!= 6.23 Ve!= 6.23 Vel = 14.93 Comouter Proorams bv Hvdratec Inc. Route 111 Windham N.H. USA 03087 • r-1na1 Ga1cu1auons -vrnnaaru Ricky N. Terrell, P.E. 2500 Fire Flow Hyd. Ref. Point Qa Qt 0.0 2500.00 Dia. "C" Pf/Ft -------------- Fitting or Eqv. Ln. Page 4 Date Pipe Pt Pt Ftng's Pe Pv ******* Notes Total Pf Pn 99.380 K Factor= 250.78 Comouter Proorams bv Hvdratec Inc. Route 111 Windham N.H. USA 03087 ****** WASTEWATER REPORT For College Station Wal-Mart #1150 Expansion 1815 Brothers Blvd College Station, Texas Report -February 16, 2009 z-/7-acr Prepared by: Doucet & Associates, Inc. 7401 B Hwy. 71 W., Suite 160 Austin, Texas 78735 Project No. 001-402 TABLE OF CONTENTS Introduction ..................................................................................... 3 Existing Conditions ............................................................................ .4 Proposed Conditions ........................................................................... 5 Conclusion ....................................................................................... 6 Appendix A -Utility Plan .................................................................. 7 Appendix B -Pipe Calculations for Existing Sanitary Effluent Flows .................. 8 Appendix C -Pipe Calculations for Proposed Sanitary Effluent Flows .................. 9 2 INTRODUCTION The existing College Station Wal-Mart project encompasses 23.24 acres of property, lots 1-4 located at the intersection of Longmire Street and Brothers Blvd in College Station, Texas. This property is currently in the city limits and will be replatted in the future to better accommodate the new development. Wal-Mart is proposing a 63,936SF expansion to the existing Wal-Mart Store #1150 to make it a Supercenter. There currently resides within the development a vacant Albertson's building in which Wal-Mart has purchased. The expansion area will occur in the direction of Albertsons engulfing approximately 6500sf of the Albertsons building. The remainder of the Albertsons building is to be converted to retail and storage. There is also proposed outlots 1 & 2 that are to be developed as well totaling 3.4 acres, which is part of the 23 .24 acre property. EXISTING CONDITIONS The existing Wal-Mart is currently being served by an existing 8" public wastewater line running directly in front of the building. The existing Albertsons is being served at the rear of the building by an existing 8" wastewater line running between the two structures then tying into the aforementioned Wastewater line at the front of the existing Wal-Mart. From this point the existing 8" wastewater line flows to the east and ultimately into a manhole within Brothers Lane and continuing east. The entire development as well as additional development across Longmire Drive to the West drains to this mainline. PROPOSED CONDITIONS The 63 ,936SF Wal-Mart expansion would occur to the West of the existing store and take up a portion of the Albertsons building. Approximately 420' of the existing wastewater lines that run between the buildings will require relocation to accommodate the proposed expansion and will be rerouted and tie back into the existing wastewater network further downstream. The existing wastewater line currently in front of the Wal-Mart serving the development would require relocating out from under the proposed building expansion at the front. The new line will be rerouted further out into the parking field and ultimately back into an existing manhole downstream. The Albertsons building will continue service from the rear with the main line being rerouted within the Brothers Blvd. ROW and tying to an existing downstream manhole then running east. The proposed expansion and the development of outlots 1 &2, will ultimately generate additional effluent volume. Since there are currently no designated tenants for the outlots, assumptions have been made regarding proposed effluent flows for the outlots. (Refer to Appendix A for Utility Plan.) 3 Based on assumptions made for the current flows within the 8" wastewater line from the existing Wal-Mart, Albertsons, and the development across Longmire Drive, the existing and proposed total flows are as follows: E 0 f Fl Dt XIS mg ow aa Average GPO Use Design Unit GPO Units Quantity Total Single Family Per House/Lot 35 0 Lot 19 6,650 Multi Family (Two Bedroom) Per Dwelling 300 Dwelling 20 6,000 Office Per 400 s.f. (qross) 25 s.f. 41 ,700 2,606 General Retail Per 1000 s.f. (gross) 100 s.f. 79,961 7,996 Restaurants Per Seat 40 Seat 152 6,080 Per Bay (Pump Service Stations Island) 1000 Bay 5 5,000 Warehouse/Storaqe Per 1000 s.f. (qross) 25 s.f. 2,500 63 0 0 Wal-Mart SC Loads Per WM 0.032245 128,394 4,140 Total Existing Flows for 8" East of Brothers Blvd. 38 ,535 cf s 0.'06 Total Exist Flows to Brothers Blvd. '25,535 cf s 0.04 The 25 ,535 is an estimated gallons per day served by the existing 8" sanitary sewer line directly to the front of the existing Wal-Mart extending to Brothers Blvd. The estimated 2 hour peak flow through this pipe is 0.16cfs. The pipe is currently running at 25% capacity at an average slope of 0.85%. The 2 hour peak flow rate = 4,256 gph (4x hourly flow rate) = 0.16 cfs The 38,535 is an estimate gallons per day flow for the existing 8" sanitary sewer east of Brothers Blvd. The estimated 2 hour peak flow through this pipe is 0.23cfs. This pipe is currently running at 29% capacity at an average slope of 1.00%. The 2 hour peak flow = 6,423 gph (4x hourly flow rate) = 0.23 cfs (See Appendix B for Existing Sanita1y Flows.) 4 ' . P d Fl D ropose ow ata College Station Wastewater Loads -Proposed Conditions Average GPO Use Design Unit GPO Units Quantity Total Sinqle Family Per House/Lot 350 Lot 19 6,650 Multi Family (Two Bedroom) Per Dwelling 300 Dwellinq 20 6,000 Office Per 400 s .f. ( qross) 25 s.f. 41,700 2,606 General Retail Per 1000 s.f. (qross) 100 s.f. 44,094 4,409 Restaurants Per Seat 40 Seat 212 8,480 Per Bay (Pump Service Stations Island) 1000 Bay 5 . 5,000 Warehouse/Storaqe Per 1000 s.f. (qross) 25 s.f. 38,367 959 0 0 Wal-Mart SC Loads Per WM 0.032245 202,355 6,525 Total Proposed Flows -8" East of Brothers Blvd downstream 18" WW line 40,630 cf s 0.06 Total Proposed Flows to Brothers Lane :27,980 cf s 0.04 The estimated proposed gallons per day served by the reconfigured 8" sanitary sewer line directly to the front of the existing Wal-Mart extending to Brothers Blvd. is 21,614gpd. The estimated 2 hour peak flow through this pipe is 0.17cfs. The pipe will run at 23% capacity at an average slope of 0.92%. The 2 hour peak flow rate = 3,602 gph (4x hourly flow rate) = 0.13 cfs The estimated proposed gallons per day served by the new 8" sanitary sewer line at the back of the store running partially within Brother Blvd. ROW is 6,366gpd. The estimate 2 hour peak flow through this pipe is 0.04cfs. The pipe will run at 15% capacity at an average slope of 0.39% The 2 hour peak flow rate = 1,061 gph ( 4x hourly flow rate) = 0.04 cfs The proposed reconfigured 8" at the front of the building and the proposed 8" at the rear of the proposed Wal-Mart expansion will tie to an existing manhole in Brothers Blvd. and continue running east. The combined 40,630 is an estimated proposed gallons per day flow for the existing 8" sanitary sewer east of Brothers Blvd. The estimated peak flow through this pipe is 0.25cfs. This pipe is currently running at 30% capacity at an average slope of 1.00%. The 2 hour peak flow (4x hourly flow rate) = 6,772 gph = 0.25 cfs 5 CONCLUSION The proposed effluent flows should be accommodated by the proposed sanitary sewer improvements. The existing downstream 8" sanitary sewer pipe, East of Brothers Blvd. will accommodate the proposed flows. (See Appendix C for Proposed Sanitary Flows for reroute of 8" at th e fi'ont of store and new 8 "sanitmy line in Brothers Blvd. and proposed flows for existing 8 " sanitary downstream, East of Brother Blvd..) 6 APPENDIX A 1. Utility Plan. 7 APPENDIXB Pipe Calculations for Existing Sanitary Effluent Flows 8 8'" Sanitary Sewer Pipe Exist Conditions -To Brothers Blvd. Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Normal Depth Diameter ,Results Discharge Flow Area Wetted Perimeter Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type :GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headless Average End Depth Over Rise Manning Formula Discharge Supercritical Composite S1 -> S2 0.01 3 0.00850 ft/ft 0.17 ft 0.67 ft 0.16 ft3/s 0.07 ft2 0.71 ft 0.58 ft 0.18 ft 25.5 % 0.00642 ft/ft 2.26 ft/s 0.08 ft 0.25 ft 1.15 1.20 ft'/s 1.12 ft'/s 0.00017 ft/ft 0.67 ft 820.00 ft 0.18 ft 6.48 ft 63.91 % Normal Depth Over Rise 25.49 % Downstream Velocity 0.45 ft/s Upstream Velocity 2.05 ft/s Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 2/17/2009 2:56:18 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 8" Sanitary Sewer Pipe Exist Conditions -To Brothers Blvd. GVF Output Data Normal Depth 0.17 ft Critical Depth 0.18 ft Channel Slope 0.00850 ft/ft Critical Slope 0.00642 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01 .066.00] 2117/2009 2:56:18 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 8" Sanitary Sewer Existing Conditions · East of Brothers Blvd. ·Project Description Friction Method Solve For Input D?ta Roughness Coefficient Channel Slope Normal Depth Diameter Results Discharge Flow Area Wetted Perimeter Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Average End Depth Over Rise Normal Depth Over Rise Downstream Velocity Upstream Velocity Manning Formula Discharge Supercritical Composite S1 -> S2 0.013 0.01000 ft/ft 0.20 ft 0.67 ft 0.23 ft'/s 0.09 ft' 0.76 ft 0.61 ft 0.22 ft 29.2 % 0.00642 ft/ft 2.65 ft/s 0.11 ft 0.30 ft 1.25 1.30 ft'/s 1.21 ft'/s 0.00035 ft/ft 0.83 ft 400.00 ft 0.22 ft 3.39 ft 78.62 % 29.24 % 0.65 ft/s 2.26 ft/s Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 2/17/2009 2:57 :14 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 8" Sanitary Sewer Existing Conditions -East of Brothers Blvd. GVF Output Data Normal Depth 0.20 ft Critical Depth 0.22 ft Channel Slope 0.01000 ft/ft Critical Slope 0.00642 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01 .066.00] 2/17/2009 2:57:14 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 APPENDIXC Pipe Calculations for Proposed Sanitary Effluent Flows 9 Reconfigured 8"' Sanitary Sewer Proposed Conditions Project Description Friction Method Manning Formula Solve For Discharge Input Data Roughness Coefficient 0.013 Channel Slope 0.00920 ft/ft Normal Depth 0.15 ft Diameter 0.67 ft Results Discharge 0.13 ft'/s Flow Area 0.06 ft2 Wetted Perimeter 0.66 ft Top Width 0.56 ft Critical Depth 0.16 ft Percent Full 22.5 % Critical Slope 0.00644 ft/ft Velocity 2.19 ft/s Velocity Head 0.07 ft Specific Energy 0.22 ft Froude Number 1.19 ,.. Maximum Discharge 1.25 ft' ls Discharge Full 1.16 ft' ls Slope Full 0.00011 ft/ft Flow Type Supercritical GVF Input C?ata Downstream Depth 0.67 ft Length 1010.00 ft Number Of Steps GV,F C?.~tput Data Upstream Depth 0.16 ft Profile Description Composite S1 -> S2 Profile Headloss 8.79 ft Average End Depth Over Rise 62.29 % Normal Depth Over Rise 22.49 % Downstream Velocity 0.37 ft/s Upstream Velocity 1.93 ft/s Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster (08.01.066.00] 2/17/2009 2:58:03 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Reconfigured 8"' Sanitary Sewer Proposed Conditions GVF Output Data Normal Depth 0.15 ft Critical Depth 0.16 ft Channel Slope 0.00920 ft/ft Critical Slope 0.00644 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08 .01.066.00] 2/17/2009 2:58:03 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Proposed 8" Sanitary Sewer -In Brothers Blvd. ROW Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Normal Depth Diameter Results Discharge Flow Area Wetted Perimeter Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type Downstream Depth Length Number Of Steps GVF Output pata Upstream Depth Profile Description Profile Headless Average End Depth Over Rise Normal Depth Over Rise Downstream Velocity Upstream Velocity Manning Formula Discharge SubCritical M1 0.013 0.00390 ft/ft 0.10 ft 0.67 ft 0.04 ft' ls 0.03 ft2 0.53 ft 0.48 ft 0.09 ft 15.0 % 0.00719 ft/ft 1.12 ft/s 0.02 ft 0.12 ft 0.75 0.81 ft3/s 0.76 ft'/s 0.00001 ft/ft 0.34 ft 101 0.00 ft 0.10 ft 3.70 ft 32.98 % 14.99 % 0.20 ft/s 1.12 ft/s Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [OB.01.066.00] 2/17/2009 2:59:24 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Proposed 8" Sanitary Sewer -In Brothers Blvd. ROW GVF Output Data Normal Depth 0.10 ft Critical Depth 0.09 ft Channel Slope 0.00390 tuft Critical Slope 0.00719 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster (08.01.066.00] 2/17/2009 2:59:24 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 • 8" Sanitary Sewer Proposed Conditions -East of Brother Blvd. Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Normal Depth Diameter Results Discharge Flow Area Wetted Perimeter Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type GVF In put Data .... >) Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headless Average End Depth Over Rise Normal Depth Over Rise Downstream Velocity Upstream Velocity Manning Formula Discharge SuperCritical Composite S 1 -> S2 0.013 0.01000 ft/ft 0.21 ft 0.67 ft 0.25 ft'/s 0.09 ft2 0.78 ft 0.62 ft 0.23 ft 30.7 % 0.00644 ft/ft 2.72 ft/s 0.12 ft 0.32 ft 1.25 1.30 ft'/s 1.21 ft•/s 0.00042 ft/ft 0.83 ft 400.00 ft 0.23 ft 3.40 ft 79.46 % 30.73 % 0. 71 ft/s 2.32 ft/s Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 2/17/2009 2:59:59 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1 666 Page 1 of 2 8'" Sanitary Sewer Proposed Conditions -East of Brother Blvd. GVF Output Data Normal Depth 0.21 ft Critica l Depth 0.23 ft Channel Slope 0.01000 ft/ft Critical Slope 0.00644 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01 .066.00] 2/1 7/2009 2:59:59 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2