HomeMy WebLinkAboutDrainage ReportDRAINAGE REPORT
FOR
HOLLEMAN DRIVE
COLLEGE STATION, BRAZOS COUNTY, TEXAS
SEPTEMBER, 2009
MBESI# 1075-0004
SUBMIITED BY:
HBMl:H ~cCLURE & BROWNE E NGINEERING/SUR VE YING, INC. II ~ 1008 Woodcreek Dr., Suite 103 ·College Station, Tx. 77845 · (979) 693-3838 Engineer Reg. No. F-458
1314 10th Street, Suite 210 ·Huntsville, Tx. 77320 · (936) 294-9749 Survey Reg. No. 101033--00
CERTIFICATION
Drainage Report for
Holleman Drive Extension
MBESI # 1075-0004
I, Jeffery L. Robertson, Registered Professional Engineer No. 94745, State of Texas, certify that this
addendum report for the drainage design of the Holleman Drive Extension was prepared by me in
accordance with the provisions of the City of College Station Drainage Design Guidelines for the owners
thereof.
SUMMARY
This report is to analyze the storm drain system required for the extension of Holleman Drive.
GENERAL INFORMATION
Area encompassed by:
Anticipated land use:
Anticipated number of lots:
Notes on surrounding development:
5.8 acres
Utilities/Urban
NIA
The Holleman Road eJ1..1:ension is surrounded by property owned by the
City of College Station.
DESCRIPTION OF DRAINAGE SYSTEMS
Primary System: The site is open with scattered trees and vegetation. From Station 11 +00 to Station 20+ 25
the runoff sheet flows into a tributary of Whites Creek. From Station 20+25 to the end of
the project the runoff sheet flows into the existing street ditch of Jones Butler Road and
flows to a tributary of Bee Creek.
Secondary System: Runoff will be captured in Inlets and Area Inlets to convey the storm water runoff to the
existing tributaries. The use of Area Inlets will be used to minimize the amount of runoff
entering Holleman Drive. The purpose of the Area Inlets is to decrease the number of
inlets required to minimize the flow in the gutter and to allow for a connection inlet for
future development and road construction.
Applicable Exhibits: Exhibit A Technical Design Summary
Drainage Report
Holleman Drive E>..iension
Exhibit B Drainage Area Map (Proposed Conditions)
SECONDARY STORM DRAIN DESIGN
Design Storm: 10-yr, 100-yr
Design Methodology
Hydrology:
Software Model:
Time of Concentration:
Rational Formula, SCS Method
Excel Spreadsheet, HEC-HMS
10 min.
Runoff Coefficients:
Hydraulics:
Software Model:
Manning's N:
0 .40 -Undeveloped area
0.80 -Commercial
0.90 -Paved areas
Manning's Equation
HEC-RAS River Modeling System
0.014 (concrete pipe or HDPE pipe)
Applicable Exhibits: C-1 Rational Formula Drainage Area Calculations
C-2 Inlet Computations
C-3 Pipe Size Calculations
C-4 Hydraulic Grade Line Calculations (10 yr.)
C-5 Hydraulic Grade Line Calculations (100 yr.)
C-6 Culvert Analysis -18" RCP Driveway Culvert
C-7 Culvert Analysis -(2) 30" RCP @ Saddle Lane
D-1 HEC-HMS Results for Culvert #3
D-2 Drainage Area Parameters
E-1 HEC-RAS Results for Culvert #3
DETENTION REQUIREMENTS
General Note: Detention is not required.
EROSION AND SEDIMENTATION CONTROLS
Control Measures: Silt fence
Hydromulch seeding
SWPPP:
Drainage Report
Holleman Drive E'-'tension
Inlet protection
Construction entrance/exit
The contractor shall be responsible for establishing and maintaining the SWPPP in
accordance with TCEQ requirements.
Drainage Report
Holleman Drive E>..1ension
EXHIBIT A
TECHNICAL DESIGN SUMMARY
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
The Cities of Bryan and College Station both requ ire storm drainage design to follow these
Unified Stormwater Des ign Guidelines. Paragraph C2 of Section Ill (Administration) req uires
submittal of a drainage report in support of the drainage plan (stormwater management plan )
proposed in connection with land development projects, both site projects and subdivisions.
That report may be subm itted as a traditional prose report, complete with applicable maps,
graphs, tables and drawings, or it may take the form of a "Technical Design Summary". The
format and content for such a summary report shall be in substantial conformance with the
description in this Appendix to those Guidelines. In either format the report must answe r the
questions (affirmative or negative) and provide, at minimum, the information prescribed in the
"Technical Design Summary" in this Appendix.
The Stormwater Management Technical Design Summary Report shall include several parts
as listed below. The information called for in each part must be provided as applicable. In
addition to the requirements for the Executive Summary, this Appendix includes several
pages detailing the requirements for a Techn ical Design Summary Report as forms to be
completed. These are provided so that they may be copied and completed or scanned and
digitized. In addition, electronic versions of the report forms may be obtained from the City.
Requirements for the means (medium) of submittal are the same as for a conventional report
as detailed in Section Ill of these Guidelines.
Note: Part 1 -Executive Summary must accompany any drainage report
required to be provided in connection with any land development project,
regardless of the format chosen for said report.
Note: Parts 2 through 6 are to be provided via the forms provided in this
Appendix. Brief statements should be included in the forms as requested,
but additional information should be attached as necessary.
Part 1 -Executive Summary Report
Part 2 -Project Administration
Part 3 -Project Characteristics
Part 4 -Drainage Concept and Design Parameters
Part 5 -Plans and Specifications
Part 6 -Conclusions and Attestation
STORMWATER MANAGEMENT TECHNICAL DESIGN SUMMARY REPORT
Part 1 -Executive Summary
This is to be a brief prose report that must address each of the seven areas listed below.
Ideally it will include one or more paragraphs about each item.
1. Name, address, and contact information of the engineer submitting the report, and
of the land owner and developer (or applicant if not the owner or developer). The
date of submittal should also be included.
2. Identification of the size and general nature of the proposed project, including any
proposed project phases. This paragraph should also include reference to
STORMWATER DESIGN GUI DELINES
Effective February 2007
Page 1of26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 2 -Project Administration I Start (Page 2 .1)
Engineering and Design Professionals Information
Engineering Firm Name and Address: Jurisdiction
McC lure & Browne Engineering/Surveying, Inc. City: Bryan
1008 Woodcreek Dr., Ste. 103 x College Station
College Station, Tx 77845 Date of Submittal: Augu st, 2009
Lead Engineer's Name and Contact lnfo.(phone , e-mail, fax): I Other:
Jeffery Robertson , PE , PH : 693-3838, FX : 693-2 554, jeffr@mcclurebrowne.com
Supporting Engineering I Consulting Firm(s): Other contacts:
Developer I Owner I Applicant Information
Developer I Applicant Name and Address: Phone and e-mail:
City of College Station PH : 764-3570
P.O. Box 996 0, College Station , Tx 77842 msmith@cstx.gov
Property Owner(s) if not Developer I Applicant (&address): Phone and e-mail:
Project Identification
Development Name: Hol leman Drive Extension
Is subject property a site project, a single-phase subdivision, or part of a multi-phase subdivision?
If multi-phase, subject property is phase of
Legal description of subject property (phase) or Project Area:
(see Section 11 , Paragraph B-3a)
If subject property (phase) is second or later phase of a project, describe general status of all
earlier phases. For most recent earlier phase Include submittal and review dates.
General Location of Project Area, or subject property (phase):
Generally from the intersection of Holleman an d FM 2818 to a connection point
just south of the Dowling Road pump station on Jones-Butler Road
In City Limits?
Bryan: acres.
College Station: acres.
STORMWATER DESIGN GUIDELINES
Effective February 2007
Extraterritorial Jurisdiction (acreage):
Bryan: College Station:
Acreage Outside ET J:
Page 3 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised Februarv 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 2 -Project Administration I Continued (page 2.3)
Coordination For Project or Subject Property (or Phase)
Note: For any Coordination of stormwater matters indicated below, attach documentation
describing and substantiating any agreements, understandings, contracts, or approvals.
Coordination Dept. Contact: Date: Subject:
With Other
Departments of
Jurisdiction
City (Bryan or
College Station)
Coordination With Summarize need(s) & actions taken (include contacts & dates):
Non-jurisdiction
City Needed?
Yes __ No~
Coordination with Summarize need(s) & actions taken (include contacts & dates):
Brazos County
Needed?
Yes --No~
Coordination with Summarize need(s) & actions taken (include contacts & dates):
TxDOT Needed?
Yes No x ----
Coordination with Summarize need(s) & actions taken (include contacts & dates):
T AMUS Needed?
Yes No x ----
Permits For Project or Subject Property (or Phase)
As to stormwater management, are permits required for the proposed work from any of the entities
listed below? If so, summarize status of efforts toward that objective in spaces below.
Entity Permitted or
Approved?
US Army Crops of Nationwide Engineers Permit
No Yes X --
US Environmental
Protection Agency
No x Yes ---
Texas Commission on
Environmental Quality
No~ Yes --
Brazos River
Authority
No~ Yes -
STORMWATER DESIGN GUIDELINES
Effective February 2007
Status of Actions (include dates)
Permit has been submitted (June 2009) and
is pending approval
Page 5 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 3 -ProQerty: Characteristics I Continued (Page 3.2)
Hydrologic Attributes of Subject Property (or Phase)
Has an earlier hydrologic analysis been done for larger area including subject property?
Yes Reference the study (&date) here, and attach copy if not already in City files.
--
Is the stormwater management plan for the property in substantial conformance with the
earlier study? Yes No If not, explain how it differs.
No If subject property is not part of multi-phase project, describe stormwater management
x plan for the property in Part 4. -If property is part of multi-phase project, provide overview of stormwater management plan
for Project Area here. In Part 4 describe how plan for subject property will comply
therewith.
Do existing topographic features on subject property store or detain runoff? __ No _x_ Yes
Describe them (include approximate size, volume, outfall, model, etc).
Existing stock tank located near the proposed 6'x5' culvert. The overflow structure
for this facility does not effectively detain the water once the pond is full.
Any known drainage or flooding problems in areas near subject property? _ X _ No --Yes
Identify:
Based on location of study property in a watershed, is Type 1 Detention (flood control) needed?
(see Table B-1 in Appendix B)
__ Detention is required. --Need must be evaluated. ~ Detention not required.
What decision has been reached? By whom?
If the need for
Type 1 Detention How was determination made?
must be evaluated:
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 7 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised Februarv 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 3 -Pro12ert:i Characteristics I Continued (Page 3.4)
Hydrologic Attributes of Subject Property (or Phase) (continued)
Conveyance Pathways (continued)
Do drainage If yes, for what part of length? % Created by? __ plat, or
easements
exist for any
__ instrument. If instrument(s), describe their provisions.
part of
pathway(s)?
No --
Yes --
Where runoff must cross lower properties, describe characteristics of abutting lower
property(ies). (Existing watercourses? Easement or Consent aquired?)
Pathway
Areas
Describe any built or improved drainage facilities existing near the property (culverts,
bridges, lined channels, buried conduit, swales, detention ponds, etc).
Nearby
Drainage Do any of these have hydrologic or hydraulic influence on proposed stormwater Facilities design? --No --Yes If yes, explain:
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 9 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Conce12t and Design Parameters j Continued (Page 4.2)
Stormwater Management Concept (continued)
Within Project Area Of Multi-Phase Project
Identify gaining Basins or Watersheds and acres shifting:
Will project result
in shifting runoff
between Basins or
between What design and mitigation is used to compensate for increased runoff
Watersheds? from gaining basin or watershed? x No --
Yes --
How will runoff from Project 1. __ With facility(ies) involving other development projects.
Area be mitigated to pre-2. __ Establishing features to serve overall Project Area. development conditions?
Select any or all of 1, 2, 3. __ On phase (or site) project basis within Project Area.
and/or 3, and explain below. Roadways do not require detention.
1. Shared facility (type & location of facil ity; design drainage area served; relationship to size of
Project Area): (Attached Exhibit# )
2. For Overall Project Area (type & location of facilities): (Attached Exhibit # )
3. By phase (or site) project: Describe planned mitigation measures for phases (or sites) in
subsequent questions of this Part.
Are aquatic echosystems proposed? __ No --Yes In which phase(s) or
project(s)?
C"-·
-0 Q) (/) c Q) c >-Are other Best Management Practices for reducing stormwater pollutants proposed? Cll
0::: No Yes Summarize type of BMP and extent of use:
(/) ----c
.g>
(/)
Q) 0 0 z -ro If design of any runoff-handling facilities deviate from provisions of B-CS Technical Jxl Specifications, check type facility(ies) and explain in later questions.
Q) --Detention elements --Conduit elements --Channel features ..... <{ Swales Ditches __ Inlets __ Valley gutters __ Outfalls ----
--Culvert features __ Bridges Other
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 11 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.4)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Gutter line slopes: Least 0.60% Usual .1.0% Greatest -1.5%
Are inlets recessed on arterial and collector streets? x Yes No If "no", -- --identify where and why.
Will inlets capture 10-year design stormflow to prevent flooding of intersections (arterial
with arterial or collector)? x Yes No If no, explain where and why not. --
C:-· "C Q.)
(/) Will inlet size and placement prevent exceeding allowable water spread for 10-year :J .... design storm throughout site (or phase)? x Yes No If no, explain. 2 ----:5 Cl
"C -c "C x ro a.> Sag curves: Are inlets placed at low points? Yes No Are inlets and .0 ~ ----.... ·-conduit sized to prevent 100-year stormflow from ponding at greater than 24 inches? :J .... 0 c x Yes No Explain "no" answers. 0 .c 0 ----~ ._... :::
(/)
Q)
Q.) .... Vi
Q.) Will 100-yr stormflow be contained in combination of ROW and buried conduit on .... ~ whole length of all streets? x Yes No If no, describe where and why. --
Do designs for curb, gutter, and inlets comply with B-CS Technical Specifications? x Yes --No If not, describe difterence(s) and attach justification.
Are any 12-inch laterals used? __ No x Yes Identify length(s) and where --
used. Underground drainage system for landscaped median.
C:-· "C Pipe runs between system I Typical 80 ' Longest 338' Q.)
(/) (/) access points (feet): :J Q.)
E >-x ixJ Are junction boxes used at each bend? --Yes --No If not, explain where
and why.
(/)
c ·-0 ez "C
I
E .... 0 Are downstream soffits at or below upstream softits? Least amount that hydraulic Vi
.!!!. Yes x No __ If not, explain where and why: grade line is below gutter line
(system-wide):
1.37' (10-year)
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 13 of 26 APPENDIX. D: TECH . DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.6)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Are roadside ditches used? No _ X _Yes If so, provide the following : C/)
Ql Is 25-year flow contained with 6 inches of freeboard throughout ? _ X _Yes No .c --.B Are top of banks separated from road shoulders 2 feet or more? _ x Yes No 0 ---
Ql Are all ditch sections trapezoidal and at least 1.5 feet deep? --Yes -x -No
'O For any "no" answers provide location(s) and explain : '(ii
'O Existing ditches along Sadd le Lane and Jones-Butler are "V-Shaped". co 0 n:: The proposed design is to ti e-in to these ditches.
If conduit is beneath a swale, provide the following information (each instance).
Instance 1 Describe general location , approximate length:
C/)
Ql Is 100-year design flow contained in conduit/swale combination? Yes >-No -- --
lw If "no" explain:
c Space for 100-year storm flow? ROW Easement Width 0 co z u; Swale Surface type, minimum Conduit Type and size, minimum and maximum xj ~ and maximum slopes: slopes, design storm:
0
C'-· ~
'O .5!!. 'O Inlets Describe how conduit is loaded (from streets/storm drains, inlets by type): Ql co c >, c co c
.c co
(.) .....
0 c '+-
Ql c Access Describe how maintenance access is provided (to swale, into conduit): c. 0 0 :;;
'+-co 0 E ::::l .....
.!!2 .2 c .~ Ql Instance 2 Describe general location , approximate length:
'O E Ql co C/) C/) ::::l
C/) Ql Is 100-year design flow contained in conduit/swale combination? Yes No c 'O
.Q ·;; ----
0 If "no" explain: ro ..... c c.
Li a; Space for 100-year storm flow? E Ql ROW Easement Width
0 .c
(.) C/) Swale Surface type, minimum Conduit Type and size, minimum and maximum ..... Ql
::::l ~ and maximum slopes: slopes, design storm: 'O c co
0 c.
(.) Ql Inlets Describe how conduit is loaded (from streets/storm drains, inlets by type): ~ C/)
c co .s. ~ C/)
Ql Access Describe how maintenance access is provided (to swale, into conduit): ~
STORMWATER DESIGN GU IDELINES
Effective February 2007
Page 15 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised Februarv 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Conce~t and Design Parameters l Continued (Page 4.8)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Existing channels {small creeks ): Are these used? --No --Yes
If "yes" provide the information below.
Will small creeks and their floodplains remain undisturbed? __ Yes No How
many disturbance instances? Identify each planned location:
For each location, describe length and general type of proposed improvement
(including floodplain changes):
For each location, describe section shape & area, flow line slope (min. & max.),
surfaces, and 100-year design flow.
~ "O Cl)
::i c ~ Watercourses {and tributaries): Aside from fringe changes, are Regulatory 0 Watercourses proposed to be altered? __ No Yes Explain below. 0 --
(J) c Submit full report describing proposed changes to Regul atory Watercourses. Address
Cl) existing and proposed section size and shape, surfaces, alignment, flow line changes, E
Cl) length affected, and capacity, and provide full documentation of analysis procedures > 0 and data. Is full report submitted? Yes No If "no" explain: .... --a. E
Qi c c ro All Proposed Ch annel Work: For all proposed channel work, provide information ..c () requested in next three boxes.
If design is to replicate natural channel, identify location and length here, and describe
design in Special Design section of this Part of Report.
Will 100-year flow be contained with one foot of freeboard? --Yes --No If
not, identify location and explain:
Are ROW I easements sized to contain channel and required maintenance space?
--Yes --No If not, identify location(s) and explain:
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 17 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Conce12t and Design Parameters I Continued (Page 4.10)
Stormwater Management Concept (continued)
Within Or Serving Subject Property {Phase, or Site) (continued)
Do structures comply with B-CS Specifications? Yes or no, and explain if "no":
Cf)
Facility 1;
Q)
~ =~ ~ Q) Facility 2: LL :i c c~ 0 c :;::::; 0 c u
Q) -Q) For additional facilities provide all same information on a separate sheet. 0
Are parking areas to be used for detention? __ No --Yes What is
maximum depth due to required design storm?
Roadside Ditches: Will culverts serve access driveways at roadside ditches?
--No -x -Yes If "yes", provide information in next two boxes.
Will 25-yr. flow pass without flowing over driveway in all cases? x Yes No ----
Without causing flowing or standing water on public roadway? x Yes No ----
Designs & materials comply with B-CS Technical Specifications? _x_ Yes --No
Explain any "no" answers:
C"-· Cf)
OJ c
Cf) Are culverts parallel to public roadway alignment? _X_ Yes No Explain: Cf) 0 --..... Cf) u Q) 2 >-
jxl Creeks at Private Drives: Do private driveways, drives, or streets cross drainage
ro wavs that serve Above-Project areas or are in public easements/ ROW?
"Cl 0 x No Yes If "yes" provide information below. Q) z ----Cf)
I :i How many instances? Describe location and provide information below. Cf)
"t Q) Location 1: ~ :i u
Q) Location 2: ..... <
Location 3:
For each location enter value for: 1 2 3
Design year passing without toping travelway?
Water depth on travelway at 25-year flow?
Water depth on travelway at 100-year flow?
For more instances describe location and same information on separate sheet.
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 19 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Concept and Design Parameters I Continued (Page 4.12)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
All Proposed Culverts: For all proposed culvert facilities (except driveway/roadside
ditch intersects) provide information requested in next eight boxes.
Do culverts and travelways intersect at 90 degrees? X_Y_e_s _______ N_o_l_f-no_t_, ----1
identify location(s) and intersect angle(s), and justify the design(s):
Does drainage way alipnment change within or near limits of culvert and surfaced
approaches thereto? L No __ Yes If "yes" identify location(s), describe
change(s), and justification :
Are flumes or conduit to discharge into culvert barrel(s)? __ No L Yes If yes,
identify location(s) and provide justification:
Proposed drainage system along Holleman drive to discharge into the
side of the 6'x5' box culvert.
ArP. flumes or conduit to discharge into or near surfaced approaches to culvert ends? ~No __ Yes If "yes" identify location(s), describe outfall design treatment(s):
Is scour/erosion protection provided to ensure lnng term stability of culvert structural
components, and surfacing at culvert ends? ~Yes __ No If "no" Identify
locations and provide justification(s ):
Will 100-yr flow and spread of backwater be fully contained in street ROW, and/or
drainage easements/ ROW? __ Yes __ No if not, why not?
Do appreciable hydraulic effects of any culvert extend downstr0 "1m or upstream to
neighboring land(s) not encompassed in subject property? ~No __ Yes If
"yes" describe location(s) and mitigation measures:
ArP. all culvert designs and materials in compliance with B-CS Tech. Specifications?
_K_ Yes __ No If not, explain in Special Design Section of this Part.
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 21of26 APPENDIX. D: TECH . DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage Conce~t and Design Parameters I Continued (Page 4.14)
Stormwater Management Concept (continued)
Within Or Serving Subject Property (Phase, or Site) (continued)
Special Designs -Deviation From B-CS Technical Specifications
If any design(s) or material(s) of traditional runoff-handling facilities deviate from provisions of
B-CS Technical Specifications, check type facility(ies) and explain by specific detail element.
Detention elements __ Drain system elements Channel features ----
Culvert features Swales Ditches Inlets Outfalls ----------
__ Valley gutters __ Bridges (explain in bridge report)
In table below briefly identify specific element, justification for deviation(s ).
Specific Detail Element Justification for Deviation (attach additional sheets if needed)
1)
2)
3)
4)
5)
Have elements been coordinated with the City Engineer or her/his designee? For each item
above provide "yes" or "no", action date, and staff name:
1)
2)
3)
4)
5)
Design Parameters
Hydrology
Is a map(s) showing all Design Drainage Areas provided? x Yes No ----
Briefly summarize the range of applications made of the Rational Formula:
Determination of flow rates for inlets and pipes along the roadway.
What is the size and location of largest Design Drainage Area to which the Rational Formula
has been applied? 5.07 acres
STORMWATER DESIGN GUIDELINES
Effective February 2007
Location (or identifier): Drainage Area 35
Page 23 of 26 APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
SECTION IX
APPENDIX D -TECHNICAL DESIGN SUMMARY
Part 4 -Drainage ConceQt and Design Parameters j Continued (Page 4.17)
Design Parameters (continued)
Computer Software
What computer software has been used in the analysis and assessment of stormwater
management needs and/or the development of facility designs proposed for subject property
project? List them below, being sure to identify the software name and version, the date of the
version, any applicable patches and the publisher
HEC-HMS 3.3
HEC-RAS 4.0
Microsoft Excel Spreadsheet
Part 5 -Plans and SQecifications
Requirements for submittal of construction drawings and specifications do not differ due to use of a
Technical Design Summary Report. See Section Ill, Paragraph C3.
Part 6 -Conclusions and Attestation
Conclusions
Add any concluding information here:
Attestation
Provide attestation to the accuracy and completeness of the foregoing 6 Parts of this Technical
Desiqn Summary Drainaqe Report by siqninq and sealinq below.
"This report (plan) for the drainage design of the development named in Part B was prepared
by me (or under my supervision) in accordance with provisions of the Bryan/College Station
Unified Drainage Design Guidelines for the owners of the property. Alf licenses and permits
required by any and all state and federal regulatory agencies for the pr<?._R.,Q.w8.,r;J.(ainage
improvements have b;en issued or fall under applicable general permit~~~~.?.'.. .. '..~:'.~~'t•r
~ J f (Amx Seal) -" "' .·· ·· * ·· ... • '11 ,.. * .-·. * I ~ ~ . · ... ··I. ~ /' L . -)w ~ ~ 1 fPJ 1.:"." ... : ........ ······0sE:R1·s·oN ~ ~ 'Qi ~! I ~ JEFFERY L. R ............ , ..... ~ LicenSE!< P essional E gineer ~ ..... , ........... ii4745 if£ 5 '1 ~~, .. ~ ... I~··. Q . .-.;::f,..
State of Texas PE No. q ~] ~ S 'r, o~~··.~~~~~~~.·~~o/ 1ti\§StoN P..'-~---
STORMWATER DESIGN GUIDELINES
Effective February 2007
Page 26 of 26
-~--=---~-
APPENDIX. D: TECH. DESIGN SUMMARY
As Revised February 2008
Drainage Report
Holleman Drive E>..'tension
EXHIBITC
STORM DRAIN SYSTEM DESIGN
< ~ w 0 0 0::: w ...J < < a. LL
w w 0 iii I-0
C> 0::: ...J -~ z < z
< < w w u < ::c ...J > "' ::'!: ...J ...J I-z < W<l; E w < 0::: C> ~ I-ow E > I-Wz 0 z 0::: 0 < 0 >w 0 I-::::> < u a. I-0 ...J
NO. AC. 0.4 0.8 0.9 ft.
1.0 2.50 0.00 1.90 0.60 2.06 166.4
2.0 0.24 0.00 0.00 0.24 0.22 10.0
3.0 0.53 0.00 0.42 0. 11 0.44 243.0 -4.0 0.79 0.00 0.65 0.14 0.65 305.0
6.0 0.97 0.00 0.45 0.52 0.83 232.0
10.0 0.84 0.22 0.00 0.62 0.65 92.0
20.0 5.15 5.15 0.00 0.00 2.06 100.0
21 .0 0.50 0.00 0.00 0.50 0.45 17.0
32.0 0.00 0.00 0.00 0.00 0.00 1.0
33.0 0.52 0.00 0.00 0.52 0.47 10.0
34.0 0.22 0.00 0.00 0.22 0.20 10.0
35.0 5.07 5.07 0.00 0.00 2.03 10.0
36.0 1. 14 0.00 1.14 0.00 0.91 17.0
Cui 1 0.65 0.45 0.00 0.20 0.36 21.0
Cui 2 15.35 14.11 0.00 1.24 6.76 20.0
EXHIBIT C-1
Rational Formula Drainage Area Calculations
HOLLEMAN DRIVE EXTENSION
~ 0 ~ ~ ...J LL 0 0 0 ...J ...J z LL LL !'.: < 0::: ::c 0::: " ...J w I-w u I-" 0::: ...J ~ C> I-...J 0 I-u w ...J ::::> z I-...J ...J w >< ::::> < w iii (/) N .,,
0 LL C> ~ Cl LL > u ::::> N a .,, a
ft. ft. ft. tus min min In/Hr cfs In/Hr cfs
1.7 247.0 2.5 1.2 6.0 10.0 6.33 13.0 7.7 15.8
0.1 260.0 1.6 1.5 3.1 10.0 6.33 1.4 7.7 1.7
2.4 65.0 0.4 0.8 6.4 10.0 6.33 2.8 7.7 3.3
3.1 79.0 0.5 0.8 8.0 10.0 6.33 4.1 7.7 5.0
2.3 490.0 7.4 1.4 8.8 10.0 6.33 5.2 7.7 6.4
0.9 450.0 6.0 1.7 5.5 10.0 6.33 4.1 7.7 5.0
2.0 540.0 6.0 1.8 6.0 10.0 6.33 13.0 7.7 15.8
0.3 460.0 5.0 2.0 4.0 10.0 6.33 2.8 7.7 3.5
1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0
0.1 20.0 0.2 1.2 0.4 10.0 6.33 3.0 7.7 3.6
0.1 20.0 0.2 1.2 0.4 10.0 6.33 1.3 7.7 1.5
0.1 20.0 0.2 1.2 0.4 10.0 6.33 12.8 7.7 15.6
0.2 232.0 2.0 1.7 2.5 10.0 6.33 5.8 7.7 7.0
0.2 634.0 10.0 2.3 4.7 10.0 6.33 2.3 7.7 2.8
1.0 1340.0 12.0 1.9 12. 1 12. 1 5.78 39.1 7.1 47.7
0 .,,
0 a .,, N 0 ..... N a .,,
In/Hr cfs In/Hr cfs In/Hr
8.6 17.8 9.9 20.3 11 .1
8.6 1.9 9.9 2.1 11 .1
8.6 3.8 9.9 4.3 11 .1
8.6 5.6 9.9 6.4 11 .1
8.6 7.1 9.9 8.2 11 .1
8.6 5.6 9.9 6.4 11 .1
8.6 17.8 9.9 20.3 11 . 1
8.6 3.9 9.9 4.4 11 . 1
8.6 0.0 9.9 0.0 11 .·1 -8.6 4.0 9.9 4.6 11 . 1
8.6 1.7 9.9 2.0 11 .1
8.6 17.5 9.9 20.0 11. 1
8.6 7.9 9.9 9.0 11 . 1
8.6 3.1 9.9 3.6 11 . 1
7.9 53.7 9.1 61.4 10.3
0 0 0 0 .,, 0 a a .....
cfs In/Hr cfs
23.0 12.5 25.8
2.4 12.5 2.7 -·4.8 -12.5 5.4
7.2 12.5 8.1
9.2 12.5 10.4 ----7.2 12.5 8.1 ... --.. , 23.0 12.5 25.8 s.o 12.5 5.6 -0~0 12.5 0.0 ----5.2 12.5 5.9
2.2 12.5 2.5 c----22.6 12.5 25.4
10.2 12.5 11 .4 -4.0 12.5 4.5 - -69.5 11 .6 78.2
--
---
----
--
-. --
9/9/2009
10750004-DRA.xls
Exhibit C-1
EXHIBIT C-2 INLET COMPUTATIONS HOLLEMAN DRIVE EXTENSION 0 ---~ ~ J.. ~ ~ ~ • J.. ..c . "O "O r~i ~ ~ ~ = ..C J.. = i;:;. ~ -i;:;. ~ ~ ~ • ~ !::: > ..... -00 ..... ~ "O > ~ c'5 ·= :g '-'O ""'" 0 --o -~ 0 ~ ::s ..._ < ~ ~ ~ ~ .... "O '? ~ J.. "O ~ J.. C" ~ z z 0 ~CJ ~CJ c 0 ~ ~ ~ 0 0 ~ -cl ·> c "O ~ ~ 8 ..... < ti:= = = J.. -.... z C" 0 J.. ~ ~ ~ ;Z ~ J.. .... .... e'% "; ~ ::s ~. -"; ~ ~ J.. e'% "O ~ e'% e'% ~ ~ ~ u -~ C" 0-~ ..... ~ ~ u = ...... ~ ~ ~i.. J.. 0 ~ i3 0 • O"-< J.. J.. ~ < O ~ ~ O ~ oo ~ f;:i ..,. ~ DESCRIPTION u ~ ~ O ,~ ~-_ < < Curb Inlet Grate Inlet ·-· cfs cfs ft ft 'fi~fSsq-·ft· sq-ft 2 10.0 1.9 0.0 1.9 56 0.1% 2 1.9 Recessed Inlet on Grade 0.62 3.02 5 0 -----------3 4.0 3.8 0.0 3.8 56 0.2% 3 3.8 Recessed Inlet on Grade 0.62 6.08 10 0 -4---6.o 5.6 0.0 5.6 56 0.5% 4 5.6 RecessedlnletonGrade 0.62 9.03 10 0-----------~-·--6 na 7.1 0.0 7.1 56 0.8% 6 7.1 Recessed Low Point Inlet 2.33 3.06 5 0 ---+--10 na 5.6 0.0 5.6 56 0.5% I 0 5.6 Recessed Low Point Inlet 2.33 2.39 5 0 21 na 3.9 0.0 3.9 56 0.2% 21 3.9 Recessed Low Point Inlet 2.33 1.66 5 0 ------·-·-----------31 na 0.0 0.0 0.0 56 0.0% 31 0.0 Recessed Inlet on Grade 0.62 0.00 5 0 ----33 na 4.0 0.0 4.0 56 0.3% 33 4.0 Recessed Low Point Inlet 2.33 1.73 5 0 --t----------------34 na 1.7 0.0 1.7 56 0.0% 34 1.7 Recessed Low Point Inlet 2.33 0.73 5 0 - -----------36 na 7.9 0.0 7.9 56 1.0% 36 7.9 Recessed Low Point Inlet 2.33 3.37 5 0 -----------·-----1-------1--·-----------------------9/9/2009 10750004-DRA.xls Exhibit C-2
I
! i ! I I i E c5 < E-1-u 0 z w -...:l ...:l r/) E-z < -~ w -E-...:l "' ~ 0 0 i;; Ill E-E-E-Q
# # Ac. min yr
1 2 2.1 10.0 10
2 4 2.3 10.1 10
3 4 0.4 10.0 10
4 5 3.4 10.8 10
5 6 3.4 11.8 10
6 Out 4.2 12.5 10
20 21 2.1 10.0 10
21 33 2.5 12.8 10
30 32 1.6 10.0 10
32 33 1.6 10.2 10
33 36 4.5 12.9 10
34 36 0.2 10.0 10
36 HW41 5.6 13.2 10
•includes 33% Flow Increase for pipe sizes <27" dia.
I -~ I "' Ill
EXHIBIT C-3
PIPE SIZE CALCULATIONS
HOLLEMAN DRIVE EXTENSION
I I
I
I ~ ·X
·X I i 1 Q I ·-Ill Ill "' I Q. I §' I 10 I -= "' Ill Ill Q., Vi I -I "O Q. 1-"' I ~ i:i: Ill I § = ·-. "'-J: .... Q., -= ::: . :, ::: 0 ::: ·..::: w c:I i;; N c 0 -= 0 0 0 .i: ~ 1i: < 1i: z 1i: -[;i;., r/)
J w >
cfs cfs # cfs % " I fps
17.8 17.8 1 17.8 0.22 30 3.6
19.6 19.6 1 19.6 0.26 30 4.0
3.8 4.9 1 4.9 0.25 18 2.8
28.0 28.0 1 28.0 0.54 30 5.7
27.0 27.0 1 27.0 0.50 30 5.5
32.8 32.8 1 32.8 0.74 30 6.7
17.8 17.8 1 17.8 0.00 118 0.2
19.4 25.3 1 25.3 6.67 18 14.3
13.4 13.4 1 13.4 0.12 30 2.7
13.3 17.3 1 17.3 0.68 24 5.5
35.1 35.1 1 35.1 0.84 30 7.1
1.7 2.2 1 2.2 0.05 18 1.3
43.2 43.2 1 43.2 1.28 30 8.8
I
•• See Plan & Profile for pipe slope used (Pipe slope >or= Friction slope)
I
Ill E :r: l= E-~ ~ z ....
c:I w 1-...:l E-
' min
16 0.07
67 0.28
139 0.84
339 0.99
231 0.70
30 0.07
40 2.85
22 0.03
26 0.16
67 0.20
136 0.32
57 0.76
72 0.14
:
l
I
I I
I
I i I ,
I I -= !:i:,E-~ I E-:i:
@ lo S2
i;; 1-w
E-I ~ :r:
min ' '
10.07
10.35
10.84
11.83
12.53
12.60
12.85
12.87
10.17
10.37
13.19
10.76
13.33
91912009
107 50004-DRA.xls
Exhibit C-3
Inlets FL FL Beain Pioe
From To U"""r Lower WSElev 010 Dia
5 6 317.99 315.12 318.00 26.97 30
4 5 320.45 318.09 319.66 28.02 30
3 4 324.56 323.6 322.33 3.76 18
2 4 320.89 320.56 322.33 19.59 30
1 2 321.07 320.99 322.53 17.79 30
36 HW36 317.65 317.22 319.00 43.16 30
34 36 318.13 317.84 320.65 1.71 18
33 36 318.54 317.75 320.65 35.07 30
32 33 321.03 320.38 321.83 13.34 24
30 32 321.45 320.95 322.53 13.43 30
EXHIBIT C-4
HYDRAULIC GRADE LINE - 1 OYr. Storm
HOLLEMAN DRIVE EXTENSION
Nonnal Normal
DeDlh Sta.ttnn DeDlh Velocltv Velocltv
LenQtn Sf ,,.,.,5 Lower WSElev Uooer Hf In Out
230.59 0.501% 1.245% 316.56 318.00 319.43 1.16 7.30 9.16
338.76 0.541% 0.697% 319.84 319.84 322.20 1.83 6.02 7.30
139.19 0.251% 0.690% 324.31 324.31 325.27 0.35 0.00 4.50
67 0.264% 0.507% 322.11 322.33 322.45 0.18 5.84 6.02
16 0.218% 0.500% 322.43 322.53 322.51 0.03 0.00 5.84
72 1.283% 0.597% 319.72 319.72 320.15 0.92 6.74 6.84
57 0.052% 0.509% 318.33 320.65 318.62 0.03 0.00 3.24
136.11 0.847% 0.580% 320.25 320.65 321.04 1.15 7.00 6.74
67 0.682% 0.970% 321.53 321.83 322.18 0.46 8.95 7.00
26 0.124% 1.923% 321.83 322.53 322.33 0.03 0.00 8.95
Endina Too Della
Hi WSElev Inlet Check
0.24 319.66 322.61 OK
0.13 322.33 327.1 OK
0.16 325.43 328.06 OK
0.02 322.53 327.1 OK
0.27 322.83 325.57 OK
0.01 320.65 321.86 OK
0.08 320.76 321.86 OK
0.03 321.83 323.9 OK
0.24 322.53 324.56 OK
0.62 323.19 324.95 OK
Della
2.9450
4.7671
2.6306
4.5740
2.7439
1.2062
1.0952
2.0665
2.0275
1.7630
Q Main
Full Inlet In
42.6 4
31.9 2
8.1 0
27.2 1
27.0 0
29.5 33
7.0 0
29.1 32
20.7 30
53.0 0
9/9/2009
10750004-DRA.Xls
Exhibl C-4
1-. FL FL "-"n Pine
From To '~ Lower ws Elev 0 100 Dia L~
5 8 317.99 315.12 320.00 39.24 30 230.59
4 5 320.45 318.09 322.81 40.70 30 338.78
3 4 324.56 323.6 326.59 5.45 18 139.19
2 4 320.89 320.55 326.59 28.43 30 67
1 2 321.07 320.99 326.97 25.80 30 16
38 HW38 317.65 317.22 320.00 62.92 30 n
34 38 318.13 317.84 321.86 2.48 18 57
33 38 318.54 317.75 321.86 51.09 30 138.11
32 33 321.03 320.38 323.90 19.38 24 67
31 32 322.41 321.95 324.56 0.00 18 22.45
30 32 321.45 320.95 324.56 19.48 30 26
EXHIBIT C-5
HYDRAULIC GRADE LINE -100Yr. Storm
HOLLEMAN DRIVE EXTENSION
----=-.,....~ ---=-v..,,,,.,, """"""" ., .... ~ Tao ., .......
Sf ~s L°""' WSElev ~ HI In o..c Hi WSHeild !riot ws Elev
1.06% 1.24% 318.93 320.00 319.80 2.44 7.38 9.82 0.33 322.77 322.81 322.81
1.14% 0.70% 320.59 322.81 322.95 3.86 6.30 7.38 0.11 326.59 327.1 326.59
0.53% 0.69% 324.50 326.59 325.48 0.74 0.00 4.92 0.19 327.51 328.06 327.51
0.56% 0.51% 322.81 326.59 322.95 0.37 6.25 6.30 0.01 326.97 327.1 326.97
0.48% 0.50% 322.87 326.97 322.95 0.07 0.00 6.25 0.30 327.34 325.57 325.57
2.73% 0.60% 319.72 320.00 320.15 1.96 8.74 6.84 0.01 321.97 321.86 321.86
0.11% 0.51% 318.44 321.88 318.73 0.06 0.00 3.59 0.10 322.02 321.86 321.86
1.80% 0.58% 320.25 321.86 321.04 2.45 7.48 6.74 0.08 324.39 323.9 323.90
1.44% 0.97% 321 .83 323.90 322.48 0.96 9.89 7.48 0.33 325.19 324.56 324.56
0.00% 2.05% 321 .95 324.56 322.41 0.00 0.00 0.00 0.00 324.56 325.41 324.56
0.26% 1.92% 321 .95 324.56 322.45 0.07 0.00 9.89 0.78 325.39 324.95 324.95
Dela Q Slreet
Cl1eck Dela s..face Width
~~ -0.16 0.00 56
OK 0.51 0.00 56
OK 0.55 0.00 56
~--0.13 0.00 56
~~~ -1.77 0.00 56
,,.....,.,.,. -0.11 25.85 56
~~--0.18 0.00 56
~---0.49 8.18 56
~~--0.83 0.00 56
OK 0.85 0.00 56
~~--0.44 0.00 56
-ROW
~ ~· 1.40% 130.59
0.63% 87.60
0.83% 87.80
0.83% 87.60
0.83% 87.80
---
1.50% 135.17
1.50% 135.17
1.50% 135.17
1.50% 135.17
1.50% 135.17
1.50% 135.17
Moin
Inlet In
4
2
0
1
0
-
33
0
32
30
0
0
9/9'2009
10750004-0RA.lds
ElctibilC-5
Culvert #1
Culvert Description
18" RCP
Driveway Culvert
@
Sta. 30+00
C I D . C . u vert es1qn ntena
Circular
Pipe No.
Dia. (ft.) Pipes
1.50 1
c ulvert A I . CI na1vs1s a culations
Total Flow per Critical
Design Flow Pipe Depth(ft.)
Storm (els) (els) de
5 2.80 2.80 0.65
10 3.10 3.10 0.65
25 3.60 3.60 0.80
50 4.00 4.00 0.80
100 4.50 4.50 0.85
El hi = Hwi + Eli
ho= TW or (de+ D)/2 (Whichever is Greater)
n
0.014
Normal
Depth
(ft.)
0.66
0.70
0.76
0.81
0.87
Invert
Elev. (Eli)
(ft.)
315.45
EXHIBIT C-6
CULVERT ANALYSIS
HOLLEMAN DRIVE EXTENSION
Outlet Culvert Top
Elev. (ELo) Length Slope of
(ft.) (ft.) (fVft) Road ke
315.30 29.00 0.0052 317.43 0.50
I
I
HEADWATER CALCULATIONS
Outfall Channel Desiqn Criteria
Lt. Side Rt. Side
Slope Slope Slope
(fVft) (?:1) (?:1)
0.0100 4.00 4.00
INLET CONTROL OUTLET CONTROL
HWi/D HWi ELhi
0.79 1.18 316.63
0.80 1.20 316.65
0.82 1.23 316.68
0.84 1.26 316.71
0.86 1.30 316.75
H = (1 +ke+((29.(n'2)'L)IR'1.33))'((v•2)12g)
Elho = Elo + H +ho
TW de
0.53 0.65
0.55 0.65
0.58 0.80
0.60 0.80
0.63 0.85
(de+ D)/2 ho H EL ho
1.08 1.08 0.08 316.46
1.08 1.08 0.10 316.48
1.15 1.15 0.14 316.59
1.15 1.15 0.17 316.62
1.18 1.18 0.21 316.69
Bottom
Width n
(ft.)
0.00 0.024
Control Type
HW of
Elev. Control
316.63 Inlet
316.65 Inlet
316.68 Inlet
316.71 Inlet
316.75 Inlet
Outlet
Velocity Free board
(fps)
3.76
3.86
4.00
4.11
4.22
(ft.)
0.80
0.78
0.75
0.72
0.68
9/9/2009
10750004-cul.xls
Exhibit C-6
Culvert #2
C I rt D I C l . u ve es1qn n ena
Culvert Description Circular
Pipe No.
30" RCP I Dia. (ft.) Pipes n
@ Saddle Lane 2.50 2 0.014
Culvert Analvsis Calculations
Total Flow per Critical Normal
Design Flow Pipe Depth(ft.) Depth
Storm (cfsl (cfsl de (ft.)
5 47.70 23.85 1.68 1.73
10 53.70 26.85 1.78 1.91
25 61 .40 30.70 1.90 2.50
50 69.50 34.75 2.03 2.50
100 78.50 39.25 2.13 2.50
Elhi = Hwi + EU
ho= TW or (de+ 0)12 (Whichever is Greater)
EXHIBITC-7
CULVERT ANALYSIS
HOLLEMAN DRIVE EXTENSION
ELh;~:-1;----~ H
~ Top of Road ~ELho
__/-- - - - - - - -TW
Invert Outlet Culvert
Elev. (Eli) Elev. (Elo) Length
(ft.) (ft.) (ft.)
312.42 312.08 59.50
INLET CONTROL
HWi/D HWi EL hi
1.01 2.53 314.95
1.09 2.72 315.14
1.19 2.99 315.41
1.32 3.31 315.73
1.48 3.71 316.13
H = [1 +ke+((29.(n•2).L)/R•1.33)]"((v•2)12g)
Elho = Elo + H +ho
Eli Proposed Culvert ~ - - ---, ~ Elo
0 f Ch ut all
Top
Slope of Slope
(fVft) Road ke I (fVft)
0.0057 316.50 0.50 I 0.0100
HEADWATER CALCULATIONS
OUTLET CONTROL
TW de (de+ Dl/2 ho
1.53 1.68 2.09 2.09
1.60 1.78 2.14 2.14
1.68 1.90 2.20 2.20
1.76 2.03 2.27 2.27
1.84 2.13 2.32 2.32
anne Desiqn c ritena
Lt. Side Rt. Side Bottom
Slope Slope Width
(?:1) (?:1) (ft)
4.00 4.00 0.00
Control
HW
H EL ho Elev.
0.78 314.95 314.95
0.99 315.21 315.21
1.30 315.58 315.58
1.66 316.01 316.01
2.12 316.51 316.51
n
0.024
Type
of
Control
Inlet
Outlet
Outlet
Outlet
Outlet
Outlet
Velocity Freeboard
(fps) (ft.)
6.56 1.55
7.18 1.29
7.67 0.92
8.14 0.49
8.81 -0.01
9/9/2009
10750004-cul2.xls
Exhibit C-7
Drainage Report
Holleman Drive E>.'tension
EXHIBITD-1
HEC-HMS RESULTS
Project: Holleman Simulation Run : 2-P
Start of Run : 27Mar2007, 12:00 Basin Model: Proposed
End of Run : 28Mar2007, 12:01 Meteorologic Model: 2
Compute Time: 09Sep2009, 15:40 :21 Control Specifications: Control 1
Volume Units: IN
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN)
Culvert 3 0.0548 58.25 28Mar2007, 00:29 2.86
Project: Holleman Simulation Run : 5-P
Start of Run: 27Mar2007, 12:00 Basin Model: Proposed
End of Run : 28Mar2007, 12:01 Meteorologic Model: 5
Compute Time: 09Sep2009, 15:40:27 Control Specifications: Control 1
Volume Units: IN
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN )
Culvert 3 0.0548 89.22 28Mar2007, 00:29 4.43
Project: Holleman Simulation Run: 10-P
Start of Run : 27Mar2007, 12:00
End of Run: 28Mar2007, 12:01
Compute Time: 09Sep2009, 15:40:16
Volume Units: IN
Basin Model : Proposed
Meteorologic Model: 10
Control Specifications: Control 1
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN)
Culvert 3 0.0548 111 .15 28Mar2007, 00 :29 5.57
Project: Holleman Simulation Run : 25-P
Start of Run : 27Mar2007, 12:00
End of Run : 28Mar2007, 12:01
Compute Time: 09Sep2009, 15:40:18
Volume Units: IN
Basin Model: Proposed
Meteorologic Model: 25
Control Specifications: Control 1
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN)
Cu lvert 3 0.0548 129.39 28Mar2007, 00:29 6.52
Project: Holleman Simulation Run : 50-P
Start of Run : 27Mar2007, 12:00
End of Run : 28Mar2007 , 12:01
Compute Time: 09Sep2009, 15:40:25
Volume Units: IN
Basin Model: Proposed
Meteorologic Model: 50
Control Specifications: Control 1
Hydro logic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN)
Culvert 3 0.0548 154.88 28Mar2007, 00:28 7.87
Project: Holleman Simulation Run : 100-P
Start of Run: 27Mar2007, 12 :00
End of Run : 28Mar2007, 12 :01
Compute Time: 09Sep2009 , 15:40:13
Volume Units: IN
Basin Model: Proposed
Meteorologic Model: 100
Control Specifications: Control 1
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN)
Culvert 3 0.0548 176.65 28Mar2007, 00:28 9.04
Project: Holleman Simulation Run : 500-P
Start of Run : 27Mar2007, 12 :00
End of Run : 28Mar2007, 12:01
Compute Time: 09Sep2009, 15:40:23
Volume Units: IN
Basin Model: Proposed
Meteorologic Model: 500
Control Specifications: Control 1
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (Ml2) (CFS) (IN)
Culvert 3 0.0548 230.71 28Mar2007, 00 :28 11 .97
Drainage Report
Holleman Drive fa .. 'tension
EXHIBITD-2
DRAINAGE AREA PARAMETERS
General
0 ~ 41 ~ r.n
0 0
....:l 0 ~~ ~ > J.Ll J.Ll ~< 09 < J.Ll < ~ ~~ ~ 00 ~~ 3~
# ACRES ACRES ACRES
Plan 1 Culvert 3 34.26 0.84 0.00
Exhibit D-2
Drainage Area Parameters
~~ 41 41 41 ,_ ~~~ r.n u ~ ~I J.Ll J.Ll 08 r.n 0 00 8 0 < $ 00 ~ ~ z 00 ~ gs ~ s:: ~ 0 0 i::q u
ACRES ACRES ACRES ACRES ACRES
< ~
MILES
0.00 0.00 0.00 0.00 35.10 0.0548
J.Ll ~ p.. ~ 0 ~ ....:l 00
LENGTH DROP FT/FT
1970 24 0.012
Existing Cond.
PLAN I
"' ;:j
~ 0 -~
a <1.> 0 0.. E < ,_. ....:l
# % HOURS
84.3 2 0.43
Exhibit D-2
Drainage Area Parameters
10750004-lag.xls
Drainage Report
Holleman Drive E:i..iension
HEC-RAS Version 4.0.0 March 2008
U.S. Army Corps of Engineers
Hydrologic Engineering Center
609 Second Street
Davis, California
x x xxxxxx xx xx xx xx xx x x x x x x x x x x x x x x x x x xxxxxxx xx xx x xxx xx xx xxxxxx x x x x x x x x x x xxxxxx xx xx
PROJECT DATA
Project Title: Holleman Culvert
Project File HollemanCulvert.prj
x
Run Date and Time : 9/10/2009 8:34 :36 AM
Project in English units
PLAN DATA
Plan Title: Plan 01
x x x x x x x x x x x x
xx xx x x xxxx x x xxxxx
Plan File : f:\1075 -Mitchell & Morgan\0004 -Holleman Drive Extension\Docs\Drainage
Report\HollemanCulvert.pOl
Geometry Title: Geom 01
Geometry File : f :\1075 -Mitchell & Morgan\0004 -Holleman Drive Extension\Docs\Drainage
Report\HollemanCulvert.gOl
Flow Title Flow 01
Flow File
Report\HollemanCulvert.fOl
f :\1075 -Mitchell & Morgan\0004 -Holleman Drive Extension\Docs\Drainage
Plan Summary Information:
Number of: Cross Sections =
Culverts
Bridges
Computational Information
5
1
0
Multiple Openings
Inline Structures
Lateral Structures
Water surf ace calculation tolerance
Critical depth calculation tolerance -
Maximum number of iterations
0.01
0.01
20
0.3
0.001
Maximum difference tolerance
Flow tolerance factor
Computation Options
Critical depth computed only where necessary
Conveyance Calculation Method: At breaks in n values only
Friction Slope Method: Average Conveyance
Computational Flow Regime: Mixed Flow
FLOW DATA
Flow Title: Flow 01
0
0
0
Flow File : f :\1075 -Mitchell & Morgan\0004 -Holleman Drive Extension\Docs\Drainage
Report\HollemanCulvert.fOl
Flow Data I cfs)
River Reach RS PF 1 PF 2
PF 5 PF 6 PF 7
Whites Holleman 1542 58 89
155 177 231
Boundary Conditions
River Reach Profile Upstream
PF 3
111
Downstream
PF 4
129
Culvert Report
Holleman Drive
Whites Holleman PF 1 Normal s 0.01 Normal
Whites Holleman PF 2 Normal s = 0.01 Normal
Whites Holleman PF 3 Normal s 0.01 Normal
Whi tes Hol leman PF 4 Normal s -0.01 Normal
Whites Holleman PF 5 Normal s 0.01 Normal
Whi tes Holleman PF 6 Normal s -0.01 Normal
Whites Holleman PF 7 Normal s 0.01 Normal
GEOMETRY DATA
Geometry Title: Geom 01
Geometry Fil e : f:\1075 -Mit chell & Morgan\0004 -Holleman Drive Extensi on\Docs\Drai nage
Report\HollemanCulvert.gOl
CROSS SECTION
RIVER: Whites
REACH : Holleman
INPUT
Description:
RS: 1542
Station Elevation Data num=
Sta Elev Sta Elev
0 323 40 322
93 321 141 322
Manning's n Values num=
Sta n Val Sta n Val
0 .06 45 .045
Bank Sta: Left Right Lengths:
45 93
CROSS SECTION OUTPUT Profil e #PF 1
E.G. Elev (ft) 320.61
Vel Head (ft) 0.20 w.s. Elev (ft) 320.41
Crit W.S. (ft) 320.41
E.G. Slope (ft/ft ) 0.040929
Q Total (cfs) 58.00
Top Width (ft) 41. 55
Vel Total (f t/s) 3.57
Max Chl Dpth (ft ) 0.41
Conv. Total (cfs ) 28 6. 7
Length Wtd. (ft) 253.00
Min Ch El (ft) 320.00
Alpha 1. 00
Fr ctn Loss (ft) 0.34
C & E Loss (ft) 0.05
CROSS SECTION OUTPUT Profile #PF 2
E.G. Elev (ft ) 320.80
Vel Head (ft) 0.26 w.s. Elev (ft ) 320.55
Crit W.S. (ft ) 320.55
E.G. Slope (ft/ft ) 0.037187
Q Total (cfs) 89.00
Top Width (ft ) 43.03
Vel Total (ft/s ) 4 .06
Max Chl Dpth (ft ) 0 .55
Conv. Total (cfs) 461. 5
Length Wtd. (ft ) 253.00
Min Ch El (ft ) 320 .00
Alpha 1.00
Fr ctn Loss (ft ) 0 .23
C & E Loss (ft ) 0 .07
CROSS SECTION OUTPUT Pr ofile #PF 3
E.G. Elev (ft ) 320 .92
Vel Head (ft ) 0 .29 w.s. Elev (ft) 320 .63
8
Sta Elev Sta
45 321 48
181 323
3
Sta n Val
93 .06
Left Channel Right
253 253 253
Element
Wt . n-Val.
Reach Len. (ft)
Flow Area (sq ft )
Area (sq ft)
Flow (cfs)
Top Width (ft)
Avg. Vel. (ft/s )
Hydr . Depth (ft )
Conv. (cfs)
Wetted Per. (ft )
Shear (lb/sq ft )
Stream Power (lb/ft
Cum Volume (acre-ft)
Cum SA (acres)
Element
Wt. n-Val.
Reach Len. (ft)
Flow Area (sq ft )
Area (sq ft)
Flow (cfs)
Top Wi dth (ft)
Avg . Vel. (ft/s )
Hydr . Depth (ft )
Conv. (cfs)
Wetted Per . (ft )
Shear ilb/sq ft )
Stream Power (lb/ft
Cum Volume (acre-ft )
Cum SA (acres)
Element
Wt. n-Val .
Reach Len . (ft)
s)
s )
El ev Sta
320 85
Coe ff Contr.
.1
Left OB
253.00
0.00
0.02
Left OB
253.00
0.02
0.04
Left OB
~53 .00
Elev
320
Expan .
.3
Channel
0.045
253.00
16.26
16 .26
58.00
41. 55
3.57
0.39
286. 7
41.65
1.00
3.56
0.33
0.37
Channel
0.045
253.00
21. 94
21. 94
89. 00
43 .03
4.06
0.51
4 61. 5
43.15
1.18
4.79
0 . 4 9
0 .39
Channel
0 .045
253 .00
Right OB
253.00
0.01
0.03
Right OB
253.00
0.02
0.05
Right OB
253.00
s 0.01
s = 0.01
s = 0.01
s = 0.01
s = 0.01
s 0.01
s = 0.01
Culvert Report
Holleman Drive
Crit W.S. (ft ) 320.63 Flow Area (sq ft) 25.63
E.G. Slope (ft/ ft) 0.035475 P...rea lsq ft ) 25.63
Q Total lcfs) lil. 00 Flow (cfs) 111. 00
Top Width (ft ) 43. 96 Top Width (ft ) 43.96
Vel Total (ft /s l 4.33 Avg . Vel. (ft /s l 4.33
Max Chl Dpth (ft) 0.63 Hydr. Depth (ft) 0.58
Conv. Total (cfs) 589.3 Conv. (cfs ) 589 .3
Length Wtd. (ft) 253.00 Wetted Per. (ft ) 44 .11
Min Ch El (ft ) 320.00 Shear (lb/sq ft) l. 29
Alpha l. 00 Stream Power (lb/ft s ) 5.57
Fr ctn Loss (ft) 0 .19 Cum Volume (acre-ft) 0.03 0.59 0 .04
C & E Loss (ft) 0 .08 Cum SA (acres) 0.06 0. 40 0.07
CROSS SECTION OUTPUT Profile #PF 4
E.G. Elev (ft) 321. 02 Element Left OB Channel Right OB
Vel Head (ft) 0 .32 Wt . n-Val . 0.045 w.s . Elev (ft) 320.69 Reach Len. (ft) 253 .00 253.00 253.00 Cr it W .S. (ft) 320.69 Flow Area (sq ft) 28.36
E.G. Slope (ft/ft) 0.034926 Area (sq ft) 28.36
Q Total (cfs) 129.00 Flow (cfs) 129.00
Top Width (ft ) 44.64 Top Width (ft) 4 4 . 64
Vel Total ( ft/s) 4.55 Avg. Vel. (ft/s) 4.55
Max Chl Dpth (ft) 0.69 Hydr. Depth (ft) 0.64
Conv . Total (cfsl 690.3 Conv. (cfs ) 690.3
Length Wtd. (ft) 253.00 Wetted Per. (ft) 44 .80
Min Ch El (ft ) 320.00 Shear (lb/sq ft) l. 38
Alpha l. 00 Stream Power (lb/ft s) 6.28
Fr ctn Loss (ft ) Cum Volume (acre-ft) 0.05 0.67 0.05
C & E Loss (ft) Cum SA (acres I 0.08 0. 40 0.09
CROSS SECTION OUTPUT Profile #PF 5
E.G. Elev (ft) 321.14 Element Left OB Channel Right OB Vel Head (ft ) 0.36 Wt. n-Val. 0.045 w.s. Elev (ft) 320.78 Reach Len. (ft) 253.00 253.00 253.00
Crit W.S. (ft) 320.78 Flow Area (sq ft) 32.28
E.G. Slope (ft/ft) 0.033674 Area (sq ft) 32.28
Q Total (cfs) 155.00 Flow (cfs) 155.00
Top Width (ft) 45.60 Top Width (ft) 45.60
Vel Total (ft/s l 4.80 Avg. Vel. (ft/sl 4.80
Max Chl Dpth (ft ) 0.78 Hydr. Depth (ft ) 0.71
Conv. Total (cfs) 844.7 Conv. (cfs) 844.7
Length Wtd. (ft) 253.00 Wetted Per. (ft) 45.77
Min Ch El (ft ) 320.00 Shear (lb/sq ft) 1. 48
Alpha 1. 00 Stream Power (lb/ft s ) 7.12
Fr ctn Loss (ft) Cum Volume (acre-ft) 0.07 0.79 0.08
C & E Loss (ft) Cum SA (acres) 0.10 o. 40 0.11
CROSS SECTION OUTPUT Profile #PF 6
E.G. Elev (ft) 321. 24 Element Left OB Channel Right OB
Vel Head (ft) 0.39 Wt. n-Val. 0.045 w.s. Elev (ft) 320.85 Reach Len. (ft) 253 .00 253.00 253.00
Crit W.S . (ft) 320.85 Flow Area (sq ft) 35 .51
E.G. Slope (ft/ft) 0.032698 Area (sq ft) 35 .51
Q Total (cfs) 177.00 Flow (cfs) 177 .00
Top Width (ft) 4 6. 37 Top Width (ft ) 4 6. 37
Vel Total (ft/s) 4. 98 Avg . Vel. (ft/s) 4 .98
Max Chl Dpth (ft) 0 .85 Hydr. Depth (ft) 0 .77
Conv. Total (cfs) 978. 8 Conv. (cfs) 978 .8
Length Wtd. (ft) 253.00 Wetted Per . (ft) 46.56
Min Ch El (ft) 320.00 Shear (lb/sq ft) 1. 56
Alpha 1.00 Stream Power (lb/ft s) 7.76
Frctn Loss (ft ) 0.12 Cum Volume (acre-ft) 0.09 0.89 0.10
C & E Loss (ft) 0 .11 Cum SA (acres ) 0.11 0 .41 0.13
CROSS SECTION OUTPUT Profile #PF 7
E.G. Elev (ft) 321.46 Element Left OB Channel Right OB
Vel Head (ft ) 0 . 45 Wt. n-Val. 0 .045 0.000 w.s. Elev (ft ) 321. 00 Reach Len. (ft ) 253.00 253.00 253.00
Crit W.S. (ft ) 321. 00 Flow Area (sq ft ) 42 .71 0.00
Culve rt Report
Holleman Drive
E.G. Slope (ft/ft ) 0.031556 Area (Sq ft ) 0.00 42.71 0.00
Q Total lcfsl 231. 00 Flow (cfs) 231. 00 0.00
Top Width (ft ) 48.23 Top Width (ft ) 0.02 48.00 0.21
Vel Total I ft /s ) 5.41 Avg. Vel. (ft /s ) 5.41 0.07
Max Chl Dpth (ft) 1. 00 Hydr. Depth (ft ) 0.89 0.00
Conv. Total (cfs) 1300.4 Conv . (cfs) 1300.4 0.0
Length Wtd. (ft) 253.00 Wetted Per. (ft ) 48.22 0.21
Min Ch El (ft ) 320.00 Shear (lb/sq ft ) 1. 74
Alpha 1. 00 Stream Power (lb/ft s ) 9.44
Fr ctn Loss (ft) Cum Volume (acre-ft ) 0.15 1.12 0.17
C & E Loss (ft) Cum SA (acres I 0.14 0. 41 0.17
CROSS SECTION
RIVER : Whites
REACH : Holleman RS: 1289
INPUT
Description:
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 321 34 314 40 312.75 60 312.75 64 314
97 320
Manning's n Values num-3
Sta n Val Sta n Val Sta n Val
0 .06 34 .045 64 .06
Bank Sta: Left Right Lengths: Left Channel Right Coe ff Contr. Expan.
34 64 220 220 220 .1 .3
CROSS SECTION OUTPUT Profile #PF 1
E.G. Elev (ft) 314 . 8 6 Element Left OB Channel Right OB
Vel Head (ft) 0.02 Wt . n-Val . 0.060 0.045 0 .060
w.s . Elev (ft ) 314 .84 Reach Len. (ft) 220.00 220 .00 220.00
Crit W.S. (ft) 313.36 Flow Area (sq ft ) 1. 72 56 . 4 7 1. 94
E.G. Slope (ft/ft ) 0.000408 Area (sq ft) 1. 72 56. 4 7 1. 94
Q Total (cfs) 58.00 Flow (cfs) 0.47 56.99 0.54
Top Width (ft) 38.71 Top Width (ft) 4.08 30.00 4.62
Vel Total (ft/s ) 0.96 Avg. Vel. (ft/s ) 0.28 1. 01 0.28
Max Chl Dpth (ft) 2.09 Hydr . Depth (ft) 0. 42 1. 88 0. 42
Conv . Total (cfs) 2872. 5 Conv . (cfs) 23.5 2822 .3 26.7
Length Wtd. (ft ) 220.00 Wetted Per. (ft) 4.17 30.32 4. 70
Min Ch El (ft) 312.75 Shear (lb/sq ft ) 0.01 0.05 0.01
Alpha 1. 08 Stream Power (lb/ft s) 0.00 0.05 0.00
Fr ctn Loss (ft) Cum Volume (acre-ft) 0.12
C & E Loss (ft) Cum SA (acres) 0.01 0.17 0.01
CROSS SECTION OUTPUT Profile #PF 2
E.G. Elev (ft) 315.68 Element Left OB Channel Right OB
Vel Head (ft) 0.02 Wt. n-Val. 0.060 0.045 0.060
w.s. Elev (ft) 315.67 Reach Len. (ft) 220.00 220.00 220.00
Crit W.S. (ft) 313.55 Flow Area (sq ft) 6 .73 81.20 7 .62
E.G. Slope (ft/ft ) 0.000264 Area (sq ft) 6.73 81.20 7 .62
Q Total (cfs) 89.00 Flow (cfs) 2.36 83 .95 2 .68
Top Width (ft) 47.24 Top Width (ft) 8.09 30.00 9 .16
Vel Total (ft/s) 0.93 Avg. Vel. (ft/s) 0.35 1. 03 0.35
Max Chl Dpth (ft ) 2.91 Hydr. Depth (ft) 0.83 2.71 0 .83
Conv. Total (cfs ) 5481. 6 Conv. (cfs) 145.5 5170.8 165.3
Length Wtd. (ft ) 220.00 Wetted Per . (ft) 8 .26 30.32 9.31
Min Ch El (ft) 312.75 Shear (lb/sq ft) 0.01 0.04 0 .01
Alpha 1.17 Stream Power (lb/ft s ) 0.00 0.05 0.00
Fr ctn Loss (ft) Cum Volume (acre-ft) 0 .19
C & E Loss (ft) Cum SA (acres) 0.02 0.18 0.02
CROSS SECTION OUTPUT Profile #PF 3
E.G. Elev (ft) 316.21 Element Left OB Channel Right OB
Vel Head (ft) 0.02 Wt. n-Val. 0.060 0.045 0.060
w.s. Elev (ft) 316.19 Reach Len. (ft) 220.00 220.00 220.00
Cr it w.s. (ft) 313.67 Flow Area (sq ft) 11. 67 97.01 13.21
E.G. Slope (ft/ft ) 0.000213 Area (sq ft) 11. 67 97.01 13.21
Culvert Report
Holleman Drive
Q Total (cfs ) 111. 00 Flow lcfs) 4.42 101. 55 5.02
Top Width (ft ) 52.70 Top Width (ft ) 10. 65 30.00 12 .06
Vel Total lft/s) 0 .91 Avg. Vel. (ft/s) 0 .38 1. 05 0.38
Max Chl Dpth (ft ) 3.44 Hydr. Depth (ft ) 1.10 3.23 1.10
Conv. Total (cfs) 7602 .1 Conv. (cfs) 302.9 6955 .l 34 4. 1
Length Wtd. (ft ) 220 .00 Wetted Per . (ft ) 10.87 30.32 12.25
Min Ch El (f t) 312.75 Shear I lb/sq ft l 0.01 0.04 0. 01
Alpha 1. 22 Stream Power (lb/ft S ) 0.01 0.04 0.01
Fr ctn Loss (ft ) Cum Volume (acre-ft) 0.23
C & E Loss I ft ) Cum SA (acres ) 0.03 0.18 0. 04
CROSS SECTION OUTPUT Profile #PF 4
E.G. Elev (ft) 316.61 Element Left OB Channel Right OB
Vel Head (ft) 0.02 Wt . n-Val . 0 .060 0 .045 0 .060 w.s. Elev (ft ) 316.60 Reach Len. (ft) 220 .00 220.00 220.00
Cr it W .S. (ft) 313. 76 Flow Area (sq ft) 16. 38 109.17 18.55
E.G . Slope (ft/ft ) 0.000185 Area (sq ft) 16.38 109 .17 18.55
Q Total (cfsl 129 .00 Flow (cfs) 6.48 115 .16 7.36
Top Width (ft) 56.90 Top Width (ft ) 12.62 30.00 14. 29
Vel Total (ft/s l 0 .90 Avg. Vel. (ft/s) 0.40 1. 05 0. 40
Max Chl Dpth (ft ) 3.85 Hydr. Depth (ft ) 1.30 3. 64 1. 30
Conv. Total (cfs ) 9486.3 Conv. (cfs) 476.4 8468.9 541. l
Length Wtd. (ft ) 220.00 Wetted Per. (ft) 12.88 30.32 14 .52
Min Ch El (ft) 312.75 Shear (lb/sq ft) 0.01 0.04 0.01 Alpha 1. 26 Stream Power (lb/ft s) 0.01 0.04 0.01 Fr ctn Loss (ft) Cum Volume (acre-ft) 0.27
C & E Loss (ft ) Cum SA (acres ) 0.04 0.18 0.05
CROSS SECTION OUTPUT Profile #PF 5
E.G. Elev (ft ) 317 .17 Element Left OB Channel Right OB Vel Head (ft) 0.02 Wt. n-Val. 0 .060 0.045 0.060 w.s. Elev (ft) 317 .15 Reach Len. (ft) 220 .00 220.00 220 .00
Cr it W.S . (ft) 313.88 Flow Area (sq ft) 24.12 125. 7 9 27 .31
E.G. Slope (ft /ft) 0 .000156 Area (sq ft) 24 .12 125.79 27 .31
Q Total (cfs) 155.00 Flow (cfs) 9.95 133.75 11 . 30
Top Widt h (ft) 62. 64 Top Width (ft) 15 .31 30.00 17.33
Vel Total (ft/s ) 0.87 Avg . Vel. (ft/s) 0 . 41 1. 06 0 . 41
Max Chl Dpth (ft) 4.40 Hydr . Depth (ft ) 1. 58 4.19 1. 58
Conv. Total (cfs) 12428.6 Conv . (cfs) 797.7 10724.9 906 .0
Length Wtd. (ft ) 220.00 We tted Per. (ft) 15.63 30.32 17 . 62
Min Ch El (ft) 312.75 Shear (lb/ sq ft ) 0 .01 0. 04 0.02
Alpha 1.31 Stream Power (lb/ft s) 0.01 0.04 0.01
Fr ctn Loss (ft) Cum Volume (acre-ft) 0.33
C & E Loss (ft) Cum SA (acres) 0 .05 0.19 0.06
CROSS SECTION OUTPUT Profile #PF 6
E.G. Elev (ft) 317.61 Element Left OB Channel Right OB
Vel Head (ft) 0.02 Wt. n-Val. 0 .060 0.045 0 .060 w.s. Elev (ft) 317 .60 Reach Len. (ft) 220.00 220.00 220.00
Crit W.S. (ft) 313.98 Flow Area (sq ft ) 31. 41 139.14 35.57
E.G. Slope (ft/ft) 0 .000137 Area (sq ft ) 31. 41 139.14 35.57
Q Total (cfs) 177. 00 Flow lcfs) 13 . 29 148.62 15 .09
Top Width (ft ) 67 .25 Top Width (ft) 17.47 30.00 19.78
Vel Total (ft/s) 0.86 Avg . Vel. lft/s ) 0. 42 1.07 0. 42
Max Chl Dpth (ft) 4. 85 Hydr. Depth (ft ) 1. 80 4.64 1. 80
Conv. Total (cfs) 15110. 8 Conv. (cfs) 1134. 5 12687.9 1288.5
Length Wtd . (ft) 220.00 Wetted Per. (ft ) 17.83 30.32 20 .10
Min Ch El (ft) 312.75 Shear (lb/sq ft ) 0.02 0.04 0.02
Alpha 1. 34 Stream Power (lb/ft s ) 0.01 0.04 0.01
Fr ctn Loss (ft) Cum Volume (acr e-ft) 0.38
C & E Loss (ft) Cum SA (acres) 0 .06 0.19 o. 07
CROSS SECTION OUTPUT Profile #PF 7
E.G. Elev (ft) 318.63 Element Left OB Channel Right OB
Vel Head (ft ) 0.01 Wt. n-Val . 0 .060 0.045 0.060 w.s. Elev (ft) 318.62 Reach Len. (ft) 220.00 220.00 220.00
Crit W.S. (ft) 314 .19 Flow Area (sq ft ) 51. 77 169.76 58 .62
E.G. Slope (ft/ft ) 0 .000106 Area (sq ft) 51 .77 169.76 58 .62
Q Total lcfs) 231.00 Flow (cfsl 22.78 182.34 25.88
Top Width (ft) 77.82 Top Width (ft) 22 . 43 30.00 25 .39
Culvert Report
Holleman Drive
Vel Total lft/s ) 0 .82 Avg . Vel. ift/s l 0.44 1.07 0.44
Max Chl Dpth (ft ) 5.87 Hydr. Depth (ft ) 2.31 5.66 2.31
Conv. Total lcfs) 22392.1 Conv. lcfs) 2208 .6 17 675.0 2508.5
Length Wtd. (ft ) 220.00 Wetted Per. (ft ) 22.90 30 .32 25.81
Min Ch El (f t) 312.75 Shear ilb/sq ft ) 0.02 0.04 0.02
Alpha 1. 40 Stream Power (lb/ft s ) 0.01 0.04 0.01
Fr ctn Loss (ft) Cum Volume (acre-ft) 0.51
C & E Loss (ft) Cum SA (acres I 0.08 0.19 0 .10
Note: Hydraulic jump has occurred between this cross section and the previous upstream section.
CULVERT
RIVER: Whites
REACH : Holleman
INPUT
Description:
RS: 1194
Distance from Upstream XS = 40
Deck/Roadway Width 64
Weir Coefficient 2.6
Upstream Deck/Roadway Coordinates
num= 2
Sta Hi Cord Lo Cord
0 319. 8
Sta Hi Cord Lo Cord
97 319.8
Upstream Bridge Cross Section Data
Station Elevation Data num= 6
Sta Elev Sta Elev Sta Elev
0 321 34 314 40 312.75
97 320
Manning 's n Values num= 3
Sta n Val Sta n Val Sta n Val
0 .06 34 .045 64 .06
Bank Sta: Left Right Coe ff Con tr. Expan.
34 64 .1 .3
Downstream Deck/Roadway Coordinates
num= 2
Sta Hi Cord Lo Cord
0 319.8
Downstream Bridge Cross
Station Elevation Data
Sta Elev Sta
0 318 17
52 310 63
Manning 1 s n Values
Sta n Val Sta
0 .06 41
Bank Sta: Left Right
41 63
Sta Hi Cord Lo Cord
131 319.8
Section Data
num= 9
Elev Sta Elev
315 32 313
312 76 313
num-3
n Val Sta n Val
.045 63 .06
Coe ff Contr. Expan.
.1 . 3
Sta Elev
60 312.75
Sta Elev
41 312
131 317
Sta
64
Sta
49
Upstream Embankment side slope
Downstream Embankment side slope
Maximum allowable submergence for weir
Elevation at which weir flow begins
Energy head used in spillway design
Spillway height used in design
horiz. to 1.0 vertical
4 horiz. to 1 .0 vertical
flow -.98
Weir crest shape Broad Crested
Number of Culverts -1
Culvert Name Shape Rise Span
Culvert #1 Box 5 6
FHWA Chart # 10-90 degree headwall; Chamfered or beveled inlet
FHWA Scale # 1 -Inlet edges chamfered 3/4 i nch
Solution Criteria = Outlet control
Elev
314
Elev
310
Culvert Upstrm Dist Length Top n Bottom n Depth Blocked
65 149 .014 .014 0
Entrance Loss Coef
.5
Upstream Elevation= 312.36
Centerline Station = 49
Downstream Elevation -310.11
Centerline Station = 50 .5
Exit Loss Coef
1
Culvert Report
Holleman Drive
CULVERT OUTPUT Profile #PF Culv Group: Culvert #1
Q Culv Group lcfs) 58 .00 Culv Full Len (ft)
Barrels l Culv Vel us lft/sl 6.78
Q Barrel lcfsl 58.00 Culv Vel OS (f t/s) 10.39 E.G. us. (ft ) 314. 86 Culv Inv El Up (ft) 312 .36 w.s. us. (ft) 314.84 Culv Inv El On (ft) 310 .11 E.G. OS (ft) 311. 85 Culv Frctn Ls (ft ) 1. 78 w.s. OS (ft ) 311. 71 Culv Exit Loss (ft ) 0.86 Delta EG (ft ) 3.00 Culv Entr Loss (ft ) 0.36 Delta WS (ft ) 3 .13 Q Weir (cfs)
E.G. IC (ft ) 314. 70 Weir Sta Lft (ft )
E.G. oc (ft ) 314.86 Weir Sta Rgt (ft)
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 313.79 Weir Max Depth (ft )
Culv ws Outlet (ft) 311. 04 Weir Avg Depth (ft )
Culv Nml Depth (ft ) 0 .93 Weir Flow Area (sq ft)
Culv Crt Depth (ft) 1. 43 Min El Weir Flow (ft) 31 9.81
CULVERT OUTPUT Profile #PF 2 Culv Group: Culvert #1
Q Culv Group (cfsl 89.00 Culv Full Len (ft )
# Barrels l Culv Vel us lft/s l 7.82
Q Barrel (cfs l 89.00 Culv Vel OS (ft/s ) 11. 66 E.G . us. (ft ) 315.68 Culv Inv El Up (ft ) 312.36 w.s. us. (ft ) 315.67 Culv Inv El On (ft ) 310 .11
E.G. OS (ft) 312.20 Culv Frctn Ls (ft ) 1. 71 w.s. OS (ft) 312 .00 Culv Exit Loss (ft ) 1. 30
Delta EG (ft ) 3. 48 Culv Entr Loss (ft ) 0.47
Delta WS (ft ) 3.66 Q Weir (cfs)
E.G. IC (ft) 315.47 Weir Sta Lf t (ft )
E.G. oc (ft) 315.68 Weir Sta Rgt (ft )
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 314 .26 Weir Max Depth (ft)
Culv WS Outlet (ft ) 311. 38 We ir Avg Depth (ft)
Culv Nml Depth (ft ) 1.24 Weir Flow Area (sq ft)
Culv Crt Depth (ft ) 1. 90 Min El Weir Flow (ft ) 319.81
CULVERT OUTPUT Profile #PF 3 Culv Group: Culvert #1
Q Culv Group (cfs) 111. 00 Culv Full Len (ft )
# Barrels 1 Culv Vel us (ft/s) 8.41
Q Barrel (cfs) 111. 00 Culv Vel OS (ft/s) 12 .41
E.G. us . (ft ) 316.21 Culv Inv El Up (ft) 312 .36 w.s. us . (ft ) 316. 19 Culv Inv El Dn (ft) 310.11
E.G. DS (ft) 312.39 Culv Frctn Ls (ft) 1. 67 w.s. DS (ft) 312.15 Culv Exit Loss (ft ) 1. 60
Delta EG (ft ) 3.82 Culv Entr Loss (ft) 0.55
Delta WS (ft ) 4.04 Q Weir (cfs )
E.G. IC (ft) 315.96 Weir Sta Lft (ft)
E.G. oc (ft) 316.21 Weir Sta Rgt (ft)
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 314.56 Weir Max Depth (ft ) Culv WS Outlet (ft) 311. 60 Weir Avg Depth (ft )
Culv Nml Depth (ft ) 1. 45 Weir Flow Area (sq ft)
Culv Crt Depth (ft) 2.20 Min El Weir Flow (ft ) 319.81
CULVERT OUTPUT Profile #PF Culv Group: Culvert #1
Q Culv Group (cfs) 129.00 Culv Full Len (ft )
# Barrels 1 Culv Vel US (ft/s) 8.85
Q Barrel (cfs) 12 9. 00 Culv Vel OS (ft/s) 12 .92
E.G. us. (ft) 316.61 Culv Inv El Up (ft) 312.36 w.s . us. (ft ) 316.60 Culv Inv El Dn (ft) 310 .11
E.G. OS (ft) 312.53 Culv Frctn Ls (ft) 1. 64 w.s. OS (ft) 312.25 Culv Exit Loss (ft ) 1. 84
Delta EG (ft ) 4.09 Culv Entr Loss (ft ) 0.61
Delta WS (ft ) 4.34 Q Weir (cfs )
E.G. IC (ft) 316.34 Weir Sta Lft (ft)
E.G . oc (ft) 316. 61 Weir Sta Rgt (ft)
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 31 4.79 Weir Max Depth (ft)
Culv WS Outlet (ft) 311. 77 Weir Avg Depth (ft)
Culv Nml Depth (ft) 1. 60 Weir Flow Area (sq ft)
Culv Crt Depth (ft) 2. 43 Min El Weir Flow (ft) 319.81
Culvert Report
Holleman Drive
CULVERT OUTPUT Profil e #PF 5 Culv Group : Culvert #1
Q Culv Group (Cfs ) 155.00 Culv Full Len (ft )
# Barrels l Culv Vel us (ft/s) 9.40
Q Barrel (cfs) 155.00 Culv Vel OS (ft/s ) 13 .56
E.G. us. (ft) 317.17 Culv Inv El Up (ft ) 312.36 w.s . us. (ft) 317 .15 Culv Inv El On (ft ) 310.11
E.G. OS (ft ) 312.71 Culv Frctn Ls (ft) 1. 61 w.s. DS (ft ) 312.39 Culv Exit Loss (ft ) 2.16
Delta EG (ft ) 4.46 Culv Entr Loss (ft) 0.69
Delta WS (ft) 4.76 Q Weir (cfs )
E.G. IC (ft) 316.86 Weir Sta Lft (ft )
E.G . oc (ft ) 317 .17 Weir Sta Rgt (ft )
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 315 .11 Weir Max Depth (ft)
Culv WS Outlet (ft) 312.02 Weir Avg Depth (ft)
Culv Nml Depth (ft) 1. 82 Weir Flow Area (sq ft )
Culv Crt Depth (ft) 2.75 Min El Weir Flow (ft) 319 .81
CULVERT OUTPUT Profile #PF 6 Culv Group: Culvert #1
Q Culv Group (cfs ) 177.00 Culv Full Len (ft)
# Barrels 1 Culv Vel us (ft/s) 9.83
Q Barrel (cfs ) 177.00 Culv Vel OS (ft/s) 14. 02
E.G. us. (ft ) 317.61 Culv Inv El Up (ft) 312 .36 w.s. us. (ft ) 317.60 Culv Inv El Dn (ft ) 310 .11
E.G. OS (ft) 312.85 Culv Frctn Ls (ft) 1. 60 w.s. OS (ft ) 312.48 Culv Exit Loss (ft ) 2.42
Delta EG (ft ) 4.76 Culv Entr Loss (ft) 0.75
Delta WS (ft ) 5.11 Q Weir (cfs)
E.G. IC (ft ) 317.28 Weir Sta Lft (ft)
E.G. oc (ft ) 317 .61 Weir Sta Rgt (ft)
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 315.36 Weir Max Depth (ft )
Culv WS Outlet (ft ) 312.21 Weir Avg Depth (ft )
Culv Nml Depth (ft) 2.00 Weir Flow Area (sq ft)
Culv Crt Depth (ft ) 3.00 Min El Weir Flow (ft) 319.81
CULVERT OUTPUT Profile #PF 7 Culv Group: Culvert #1
Q Culv Group (cfs) 231 .00 Culv Full Len (ft )
# Barrels 1 Culv Vel us (ft/s ) 10.74
Q Barrel (cfs) 231. 00 Culv Vel OS (ft/s ) 14. 96
E.G . us. (ft ) 318 .63 Culv Inv El Up (f t) 312.36 w.s. us. (ft ) 318.62 Culv Inv El Dn (ft) 310 .11
E.G. OS (ft ) 313.16 Culv Frctn Ls (ft) 1. 58 w.s. OS (ft ) 312.69 Culv Exit Loss (ft ) 3.00
Delta EG (ft ) 5. 47 Culv Entr Loss (ft ) 0.90
Delta ws (ft ) 5.93 Q Weir (cfs)
E.G . IC (ft ) 318.23 Weir Sta Lft (ft)
E.G. oc (ft) 318.63 Weir Sta Rgt (ft)
Culvert Control Outlet Weir Submerg
Culv WS Inlet (ft) 315.94 Weir Max Depth (ft )
Culv ws Outlet (ft ) 312.68 Weir Avg Depth (ft )
Culv Nml Depth (ft ) 2. 42 Weir Flow Area (sq ft )
Culv Crt Depth (ft ) 3.58 Min El Weir Flow (ft) 319.81
CROSS SECTION
RIVER: Whites
REACH: Holleman RS : 1068
INPUT
Description:
Station El evati on Data num~ 9
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 318 17 315 32 313 41 312 49 310
52 310 63 312 76 313 131 317
Manning's n Values num-3
Sta n Val Sta n Val Sta n Val
0 .06 41 .045 63 .06
Culve rt Report
Holleman Drive
Bank Sta: Left Right Lengths: Left Channel Right Coe ff Contr. Expan .
41 63 23 23 23 .1 . 3
CROSS SECTION OUTPUT Profile #PF 1
E.G. Elev (ft ) 311. 85 Element Left OB Channel Right OB
Vel Head (ft ) 0.15 Wt . n-Val. 0 .045 w.s. Elev (ft ) 311. 71 Reach Len. (ft ) 23 .00 23.00 23.00
Crit W.S . (ft ) Flow Area (sq ft ) 18. 94
E.G. Slope (ft /ft) 0.008990 Area (sq ft) 18. 94
Q Total (cfs) 58.00 Flow (cfs) 58 .00
Top Width (ft ) 19.20 Top Width (ft ) 19.20
Vel Total ( ft/s) 3.06 Avg. Vel. (ft/s ) 3 .06
Max Chl Dpth (ft) 1. 71 Hydr. Depth (ft ) 0.99
Conv. Total (cfs) 611. 7 Conv. (cfs) 611. 7
Length Wtd . (ft) 23.00 Wetted Per. (ft ) 19.57
Min Ch El (ft ) 310.00 Shear (lb/sq ft ) 0.54
Alpha 1. 00 Stream Power (lb/ft s ) 1. 66
Fr ctn Loss (ft) 0.13 Cum Volume (acre-ft) 0.04
C & E Loss (ft) 0.03 Cum SA (acres) 0.04
CROSS SECTION OUTPUT Profile #PF 2
E.G. Elev (ft ) 312 .20 Element Left OB Channel Right OB
Vel Head (ft ) 0.20 Wt. n-Val. 0.045
w.s. Elev (ft ) 312.00 Reach Len. (ft) 23.00 23.00 23.00
Crit W.S. (ft ) Flow Area (sq ft ) 25.04
E.G. Slope (ft/ft) 0 .009998 Area (sq ft) 0 .00 25.04 0.00
Q Total (cfs) 89 .00 Flow (cfs) 89 .00
Top Width (ft) 22 .04 Top Width (ft) 0 .02 22 .00 0.03
Vel Total (ft/s) 3 .55 Avg . Vel. (ft/s) 3 .55
Max Chl Dpth (ft ) 2.00 Hydr. Depth (ft ) 1.14
Conv . Total (cfs) 890.1 Conv. (cfs) 890.1
Lengt h Wtd . (ft ) 23.00 Wetted Per. (ft) 22 . 43
Min Ch El (ft) 310.00 Shear (lb/sq ft ) 0.70
Alpha 1. 00 St ream Power (lb/ft s ) 2.48
Fr ctn Loss (ft) 0.14 Cum Volume (acre-ft) 0.00 0.05 0 .00
C & E Loss (ft) 0 .04 Cum SA (acres) 0.00 0.05 0 .00
CROSS SECTION OUTPUT Profile #PF 3
E.G. Elev (ft) 312 .39 Element Left OB Channel Right OB
Vel Head (ft) 0 .24 Wt. n-Val. 0 .060 0.045 0.060
w.s. Elev (ft ) 312 .15 Reach Len. (ft ) 23 .00 23.00 23.00
Crit W.S. (ft) Flow Area (sq ft) 0.10 28.33 0.15
E.G. Slope (ft/ft) 0.010289 Area (sq ft ) 0.10 28.33 0.15
Q Tot al (cfs) 111.00 Flow (cfs) 0.05 110. 89 0.07
Top Width (ft ) 25.33 Top Width (ft) 1.36 22.00 1. 97
Vel Total (ft/s ) 3.88 Avg. Vel . (ft/s ) 0. 45 3.91 0. 45
Max Chl Dpth (ft) 2.15 Hydr. Depth (ft) 0.08 1. 29 0.08
Conv. Total (cfs) 1094.3 Conv . (cfs) 0.5 1093.2 0.7
Length Wtd. (ft) 23.00 Wetted Per. (ft) 1.37 22. 43 1. 97
Min Ch El (ft) 310.00 Shear (lb/sq ft) 0.05 0.81 0.05
Alpha 1. 01 Stream Power (lb/ft s ) 0.02 3.18 0 .02
Fr ctn Loss (ft) 0.14 Cum Volume (acre-ft l 0.00 0.06 0 .00
C & E Loss (ft) 0. 04 Cum SA (acres) 0.00 0.05 0 .00
CROSS SECTION OUTPUT Profile #PF 4
E.G. Elev (ft) 312.53 Element Le f t OB Channel Right OB
Vel Head (ft ) 0.27 Wt . n-Val. 0.060 0 .045 0.060 w.s. Elev (ft ) 312.25 Reach Len. (ft) 23 .00 23 .00 23.00
Crit W.S. (ft) Flow Area (sq ft ) 0 .29 30.61 0. 42
E.G. Slope (ft/ft ) 0.010684 Area (sq ft) 0.29 30.61 0. 42
Q Total lcfs) 129.00 Flow (cfs) 0.19 128.54 0.27
Top Width (ft) 27 .61 Top Width (ft) 2.29 22.00 3.31
Vel Total (ft/s ) 4 .12 Avg. Vel. (ft/s ) 0 .65 4. 20 0.65
Max Chl Dpth (ft ) 2.25 Hydr. Depth (ft) 0 .13 1. 39 0 .13
Conv . Total (cfs ) 1248.0 Conv. (cfs) 1. 8 1243 .6 2.6
Length Wtd. (ft ) 23 .00 Wetted Per . (ft ) 2.31 22.43 3.32
Min Ch El (ft) 310.00 Shear (lb/ sq ft ) 0.08 0 .91 0.08
Alpha 1. 04 Stream Power (lb/ft s ) 0.05 3 .82 0.05
Fr ctn Loss (ft ) 0 .14 Cum Volume (acre-ft) 0.00 0 .07 0.00
C & E Loss (ft ) 0.05 Cum SA (acres ) 0.00 0.05 0.00
Culvert Report
Holleman Drive
CROSS SECTION OUTPUT
E.G. Elev (ft )
Vel Head (ft) w.s. Elev (ft)
Crit W.S. (ft)
E.G. Slope (ft/ft )
Q Total (cfs)
Top Width (ft)
Vel Total ( ft/s)
Max Chl Dpth (ft )
Conv. Total (cfs )
Length Wtd . (ft)
Min Ch El (ft)
Alpha
Fr ctn Loss (ft)
C & E Loss (ft)
CROSS SECTION OUTPUT
E.G. Elev (ft)
Vel Head (ft) w.s. Elev (ft)
Crit W.S. (ft)
E.G. Slope (ft/ft )
Q Total (cfs)
Top Width (ft)
Vel Total (ft/s)
Max Chl Dpth (ft )
Conv. Total (cfs)
Length Wtd. (ft)
Min Ch El (ft)
Alpha
Fr ctn Loss (ft)
C & E Loss (ft)
CROSS SECTION OUTPUT
E.G. Elev (ft)
Vel Head (ft) w.s. Elev (ft)
Crit W.S. (ft)
E.G. Slope (ft/ft )
Q Total (cfs)
Top Width (ft)
Vel Total (ft/s)
Max Chl Dpth (ft )
Conv. Total (cfs)
Length Wtd . (ft)
Min Ch El (ft)
Alpha
Frctn Loss (ft)
C & E Loss (ft)
CROSS SECTION
RIVER: Whites
REACH: Holleman
INPUT
Description:
Profile #PF 5
312.71
0.32
312.39
0. 011220
155.00
30.56
4.40
2.39
1463.3
23.00
310 .00
1. 07
0.14
0 .06
Profile #PF 6
312 .85
0.37
312 . 4 8
0.011838
177.00
32.63
4.63
2. 48
1626.8
23.00
310.00
1.10
0.15
0.07
Profile #PF 7
313.16
0.47
312.69
0.013067
231. 00
37.18
5.09
2.69
2020.8
23.00
310.00
1.16
0.16
0.09
RS: 1045
Station Elevation Data num~
Sta Elev Sta Elev
0 316 5 315
57 310 64 310
118 314 128 315
Manning 's n Values nurn=
Sta n Val Sta n Val
0 .06 53 .045
Bank Sta: Left Right Lengths:
Element
Wt. n-Val.
Reach Len. (ft )
Flow Area (sq ft)
Area (sq ft )
Flow (cfs)
Top Width (ft)
Avg. Vel. (ft/s)
Hydr. Depth (ft)
Conv . (cfs)
Wetted Per. (ft)
Shear (lb/sq ft)
Stream Power (lb/ft s )
Cum Volume (acre-ft)
Cum SA (acres)
Element
Wt. n-Val.
Reach Len. (ft)
Flow Area (sq ft)
Area (sq ft)
Flow (cfs)
Top Width (ft)
Avg . Vel. (ft/s)
Hydr. Depth (ft)
Conv. (cfs)
Wetted Per. (ft)
Shear (lb/sq ft)
Stream Power (lb/ft s)
Cum Volume (acre-ft)
Cum SA (acres)
Element
Wt . n-Val.
Reach Len. (ft)
Flow Area (sq ft)
Area (sq ft)
Flow (cfs)
Top Width (ft)
Avg . Vel. (ft/s)
Hydr. Depth (ft)
Conv. (cfs)
Wetted Per. (ft)
Shear (lb/sq ft)
Stream Power (lb/ft s)
Cum Volume (acre-ft)
Cum SA (acres)
12
Sta Elev Sta
21 314 46
75 311 90
3
Sta n Val
90 .06
Left Channel Right
Left OB
0.060
23.00
0.68
0.68
0.60
3.50
0 .88
0 .19
5.6
3.52
0 .14
0.12
0.00
0.00
Left OB
0.060
23.00
1. 05
1.05
1. 09
4.35
1. 04
0.24
10.1
4.38
0.18
0 .18
0.00
0.00
Left OB
0.060
23.00
2.14
2.14
2. 97
6.21
1. 39
0 .35
26.0
6.25
0 .28
0.39
0.00
0.01
Elev Sta
313 53
312 104
Coeff Contr .
Channel
0.045
23.00
33.56
33.56
153.54
22.00
4.58
1. 53
1449.5
22. 43
1. 05
4.80
0.08
0.05
Channel
0.045
23.00
35.63
35.63
174.32
22.00
4.89
1. 62
1602.2
22. 43
1.17
5.74
0 .08
0.05
Channel
0 .045
23.00
40 .18
40.18
223 .73
22.00
5.57
1. 83
1957.2
22. 43
1. 46
8. 14
0.09
0.05
Elev
312
313
Expan.
Right OB
0.060
23.00
0.98
0.98
0.86
5.06
0.88
0.19
8.2
5. 07
0 .14
0.12
0 .00
0.01
Right OB
0.060
23.00
1.52
1. 52
1.58
6.28
1. 04
0.24
14.6
6.30
0.18
0.19
0.00
0.01
Right OB
0.060
23.00
3.09
3.09
4.30
8. 97
1. 39
0.35
37.6
9.00
0.28
0.39
0.00
0.01
Culve rt Report
Holle man Drive
53 90 45 45 45 . 1 .3
CROSS SECTION OUTPUT Profile #PF 1
E.G. Elev (ft ) 311.70 Element Left OB Channel Right OB
Vel Head (ft ) 0.06 Wt. n-Val . 0.045 w.s. Elev (ft) 311. 64 Reach Len. (ft) 45.00 45.00 45 .00
Crit W.S . (ft ) Flow Area (sq ft ) 29.76
E.G. Slope (ft /ft) 0.003728 Area (sq ft ) 29.76
Q Total (cfsl 58.00 Flow (cfs l 58.00
Top Width (ft ) 30.87 Top Width (ft) 30.87
Vel Total (ft/s l 1. 95 Avg. Vel. (ft/sl 1. 95
Max Chl Dpth (ft) 1. 64 Hydr. Depth (ft) 0.96
Conv. Total (cfs) 949.9 Conv. (cfs ) 94 9 . 9
Length Wtd. (ft) 45.00 Wetted Per. (ft) 31. 32
Min Ch El (ft ) 310.00 Shear (lb/sq ft) 0.22
Alpha 1. 00 Stream Power (lb/ft s l 0. 43
Fr ctn Loss (ft ) 0.26 Cum Volume (acre-ft I 0.03
C & E Loss (ft) 0.01 Cum SA (acres I 0 .03
CROSS SECTION OUTPUT Profile #PF 2
E.G. Elev (ft ) 312 .02 Element Left OB Channel Right OB
Vel Head (ft ) 0.08 Wt . n-Val. 0.045 w.s. Elev (ft ) 311 .95 Reach Len. (ft) 45 .00 45 .00 45.00
Crit W.S. (ft ) Flow Area (sq ft) 40 .07
E.G. Slope I ft/ft I 0 .004015 Area (sq ft) 40 .07
Q Total (cfs l 89 . 00 Flow lcfsl 89.00
Top Width (ft) 36.10 Top Width (ft) 36.10
Vel Total (ft/s) 2.22 Avg . Vel. (ft/sl 2.22
Max Chl Dpth (ft) 1. 95 Hydr . Depth (ft) 1.11
Conv. Total (cfsl 1404 .5 Conv. (cfs) 1404 .5
Length Wtd . (ft) 45 .00 Wetted Per. (ft ) 36. 64
Min Ch El (ft) 310.00 Shear (lb/sq ft ) 0.27
Alpha 1.00 Stream Power (lb/ft s l 0.61
Fr ctn Loss (ft) 0 .27 Cum Volume (acre-ft I 0.04
C & E Loss (ft) 0 .01 Cum SA (acres) 0.03
CROSS SECTION OUTPUT Profile #PF 3
E.G. Elev (ft ) 312.21 Element Left OB Channel Right OB
Vel Head (ft) 0.09 Wt. n-Val. 0 .060 0.045 0 .060
w.s. Elev (ft ) 312 .12 Reach Len. (ft) 45 .00 45.00 45.00
Crit W.S. (ft) Flow Area (sq ft ) 0.05 46.29 0.09
E.G. Slope (ft/ft) 0.003988 Area (sq ft) 0.05 46.29 0.09
Q Total (cfs) 111. 00 Flow (cfs) 0.01 110. 97 0.02
Top Width (ft ) 39. 43 Top Width (ft) 0.81 37.00 1. 62
Vel Total (ft /s ) 2.39 Avg. Vel. (ft/sl 0.23 2 . 40 0.23
Max Chl Dpth (ft ) 2.12 Hydr. Depth (ft) 0.06 1. 25 0.06
Conv. Total lcfsl 1757 .6 Conv. (cfs) 0.2 1757.1 0.3
Length Wtd. (ft ) 45.00 Wetted Per. (ft) 0.82 37 .55 1. 63
Min Ch El (ft ) 310.00 Shear (lb/sq ft) 0.01 0.31 0.01
Alpha 1. 01 Stream Power (lb/ft s ) 0.00 0.74 0.00
Fr ctn Loss (ft) 0.27 Cum Volume (acre-ft) 0.00 0.04 0.00
C & E Loss (ft) 0 .01 Cum SA (acres I 0.00 0 .04 0.00
CROSS SECTION OUTPUT Profile #PF 4
E.G. Elev (ft ) 312.33 Element Left OB Channel Right OB
Vel Head (ft) 0.10 Wt. n-Val. 0.060 0 .045 0. 060 w.s. Elev (ft ) 312.23 Reach Len. (ft) 45 .00 45.00 45.00
Crit W.S. (ft) Flow Area (sq ft) 0.19 50.69 0.39
E.G. Slope (ft/ft) 0.003969 Area (sq ft ) 0.19 50.69 0 .39
Q Total (cfsl 129.00 Flow lcfsl 0.07 128.78 0 .14
Top Width (ft) 41. 93 Top Width (ft) 1. 64 37.00 3 .29
Vel Total (ft/s l 2.52 Avg. Vel . I ft/ s l 0.37 2. 54 0.37
Max Chl Dpth (ft ) 2.23 Hydr. Depth (ft) 0.12 1. 37 0.12
Conv. Total lcfsl 2047 .6 Conv. (cfs) 1.1 2044 .l 2.3
Length Wtd. (ft ) 45.00 Wetted Per. (ft ) 1. 66 37 .55 3 .29
Min Ch El (ft ) 310.00 Shear (lb/sq ft ) 0.03 0.33 0.03
Alpha 1. 02 Stream Power I lb/ ft s ) 0.01 0.85 0 .01
Fr ctn Loss (ft) 0.27 Cum Volume (acre-ft I 0.00 0.05 0.00
C & E Loss (ft) 0.01 Cum SA (acres) 0.00 0.04 0 .00
Culvert Report
Holleman Drive
CROSS SECTION OUTPUT Profile #PF 5
E.G. Elev (ft) 312.50 Element Left OB Channel Right OB
Vel Head (ft) 0.12 Wt. n-Val. 0. 060 0.045 0.060 w.s. Elev (ft) 312.39 Reach Len. (ft) 45.00 45.00 45.00
Crit W.S. (ft) Flow Area (Sq ft) 0.53 56. 41 1.06
E.G. Slope (ft/ft ) 0 .003982 Area (sq ft ) 0.53 56.41 1.06
Total lcfs) 155.00 Flow lcfs) 0.28 154.17 0.56
Top Width (ft) 45.18 Top Width (ft) 2.73 37.00 5.45
Vel Total (ft/s) 2 .67 Avg. Vel. lft /s) 0.52 2.73 0.52
Max Chl Dpth (ft ) 2.39 Hydr. Depth (ft) 0.19 1. 52 0 .19
Conv. Total (cfs) 2456.4 Conv. (cfs) 4. 4 2443.2 8.8
Length Wtd. (ft) 45.00 Wetted Per. (ft) 2. 7 5 37.55 5. 47
Min Ch El (ft) 310.00 Shear (lb/sq ft) 0.05 0.37 0.05
Alpha 1. 04 Stream Power (lb/ft s) 0.02 1.02 0 .03
Fr ctn Loss (ft ) 0.27 Cum Volume (acre-ft) 0.00 0.05 0.00
C & E Loss (ft) 0.01 Cum SA (acres) 0.00 0.04 0.00
CROSS SECTION OUTPUT Profile #PF 6
E.G. Elev (ft) 312 .63 Element Left OB Channel Right OB
Vel Head (ft) 0.13 Wt. n-Val. 0. 060 0.045 0.060 w.s. Elev (ft) 312.50 Reach Len . (ft) 45.00 45.00 45 .00
Crit W.S. (ft) Flow Area (sq ft) 0.87 60.48 1. 75
E.G. Slope (ft/ft) 0.004084 Area (sq ft) 0.87 60.48 1. 75
Q Total (cfs) 177 .00 Flow (cfs) 0.54 175 .36 1. 09
Top Width (ft) 47. 4 9 Top Width (ft) 3.50 37 .00 6.99
Vel Total (ft/s) 2.81 Avg. Vel. (ft/s) 0.62 2.90 0.63
Max Chl Dpth (ft) 2 .50 Hydr. Depth (ft) 0.25 1. 63 0.25
Conv. Total lcfs) 2769.6 Conv . (cfs) 8.5 2744 .o 17.1
Length Wtd. (ft ) 45 .00 Wetted Per. (ft) 3.53 37.55 7.01
Min Ch El (ft) 310.00 Shear (lb/sq ft) 0.06 0 .41 0.06
Alpha 1. 06 Stream Power (lb/ft s ) 0.04 1.19 0.04
Fr ctn Loss (ft) 0.27 Cum Volume (acre-ft ) 0.00 0.06 0.00
C & E Loss (ft ) 0.01 Cum SA (acres) 0.00 0.04 0.00
CROSS SECTION OUTPUT Profile #PF 7
E.G. Elev (ft) 312.90 Element Left OB Channel Right OB
Vel Head (ft) 0.16 Wt. n-Val. 0.060 0 .045 0.060 w.s. Elev (ft) 312.74 Reach Len. (ft) 45.00 45.00 45 .00
Cr it W. S. (ft) Flow Area (sq ft ) 1. 94 69.52 3.87
E.G. Slope (ft/ft) 0.004271 Area (sq ft) 1. 94 69.52 3.87
Q Total (cfs) 231. 00 Flow (cfs) 1. 61 226.16 3.23
Top Width (ft) 52. 62 Top Width (ft) 5.21 37 .00 10.41
Vel Total (ft/s) 3.07 Avg. Vel. (ft/s ) 0.83 3.25 0.84
Max Chl Dpth (ft) 2 .74 Hydr. Depth (ft) 0 .37 1. 88 0.37
Conv. Total (cfs) 3534.8 Conv. (cfs) 24.6 3460.7 49 .5
Length Wtd. (ft) 45.00 Wetted Per. (ft) 5.26 37.55 10.44
Min Ch El (ft) 310.00 Shear (lb/sq ft) 0.10 0. 4 9 0.10
Alpha 1.10 Stream Power (lb/ft s) 0.08 1. 61 0.08
Fr ctn Loss (ft) 0.28 Cum Volume (acre-ft) 0.00 0.06 0.00
C & E Loss (ft) 0.01 Cum SA (acres) 0 .00 0.04 0.01
CROSS SECTION
RIVER : Whites
REACH: Holleman RS : 1000
INPUT
Description:
Station Elevation Data num= 12
Sta Elev Sta Elev Sta Elev Sta Elev Sta Elev
0 316 5 315 21 314 46 313 53 312
57 310 64 310 75 311 90 312 104 313
118 314 128 315
Manning 's n Values num-3
Sta n Val Sta n Val Sta n Val
0 .06 53 .045 90 .06
Bank Sta: Left Right Coe ff Contr. Expan.
53 90 . 1 .3
Culvert Report
Holleman Drive
CROSS SECTION OUTPUT Profile #PF 1
E.G. Elev (ft ) 311. 43 Element Left OB Channel Right OB
Vel Head (ft ) 0.13 Wt. n-Val. 0.045 w.s . Elev (ft ) 311.31 Reach Len. I ft I
Crit W.S. (ft) 310.95 Flow Area (sq ft ) 20.41
E.G . Slope (ft/ft) 0 .010003 Area (sq ft) 20.41
Q Total lcfsl 58.00 Flow lcfs) 58.00
Top Width (ft) 25.20 Top Width (ft ) 25 .20
Vel Total lft/s ) 2.84 Avg . Vel. (ft/sl 2.84
Max Chl Dpth (ft ) 1. 31 Hydr. Depth (ft) 0.81
Conv. Total (cfs ) 579.9 Conv. (cfsl 579 .9
Length Wtd. (ft ) Wetted Per . (ft) 25.56
Min Ch El I ft) 310.00 Shear (lb/sq ft) 0 .50
Alpha 1. 00 Stream Power (lb/ft S) 1. 42
Fr ctn Loss (ft ) Cum Volume (acre-ft )
C & E Loss (ft ) Cum SA (acres)
CROSS SECTION OUTPUT Profile #PF 2
E.G . Elev (ft ) 311.75 Element Left OB Channel Right OB
Vel Head (ft) 0 .15 Wt. n-Val . 0 .045 w.s. Elev (ft ) 311. 59 Reach Len. (ft)
Crit W.S. (ft ) 311.20 Flow Area (sq ft ) 28.31
E.G. Slope (ft/ft) 0.010008 Area (sq ft) 28 .31
Q Total (cfs ) 89.00 Flow (cfs ) 89.00
Top Width (ft ) 30.06 Top Width (ft ) 30.06
Vel Total (ft/s l 3.14 Avg . Vel . (ft/s) 3.14
Max Chl Dpth (ft ) 1. 59 Hydr. Depth (ft) 0. 94
Conv. Total (cfs) 889.6 Conv. (cfs) 889.6
Length Wtd. (ft ) Wetted Per. (ft) 30.50
Min Ch El (ft ) 310.00 Shear (lb/sq ft) 0.58
Alpha 1. 00 Stream Power (lb/ft s l 1. 82
Fr ctn Loss (ft ) Cum Volume (acre-ft)
C & E Loss (ft ) Cum SA (acres)
CROSS SECTION OUTPUT Profile #PF 3
E.G. Elev (ft) 311. 93 Element Left OB Channel Right OB
Vel Head (ft ) 0 .17 Wt. n-Val . 0.045 w.s. Elev (ft ) 311. 76 Reach Len. (ft)
Crit W.S. (ft ) 311. 34 Flow Area (sq ft) 33.51
E.G. Slope (ft/ft) 0.010003 Area (sq ft ) 33.51
Q Total (cfs ) 111. 00 Flow (cfs) 111. 00
Top Width (ft ) 32.87 Top Width (ft) 32.87
Vel Total (ft/s ) 3.31 Avg. Vel. lft/s) 3.31
Max Chl Dpth (ft ) 1. 76 Hydr. Depth (ft) 1. 02
Conv. Total lcfsl 1109. 8 Conv. lcfsl 1109 .8
Length Wtd . (ft ) Wetted Per. (ft) 33.35
Min Ch El (ft ) 310.00 Shear (lb/sq ft) 0.63
Alpha 1. 00 Stream Power (lb/ft s l 2.08
Fr ctn Loss (ft) Cum Volume (acre-ft )
C & E Loss (ft ) Cum SA (acres)
CROSS SECTION OUTPUT Profile #PF 4
E.G. Elev (ft ) 312 .06 Element Left OB Channel Right OB
Vel Head (ft) 0.18 Wt . n-Val. 0 .045 w.s. Elev (ft ) 311. 88 Reach Len. (ft)
Crit W.S. (ft ) 311.45 Flow Area (sq ft) 37.56
E.G. Slope (ft/ft) 0.010004 Area (sq ft) 37.56
Q Total lcfs) 12 9. 00 Flow (cfs) 129.00
Top Width (ft ) 34.90 Top Width (ft) 34.90
Vel Total lft /s l 3. 43 Avg . Vel. (ft/sl 3.43
Max Chl Dpth (ft ) 1. 88 Hydr. Depth (ft) 1. 08
Conv. Total lcfsl 1289.7 Conv. (cfs) 1289.7
Length Wtd. (ft) Wetted Per. (ft) 35. 42
Min Ch El (ft) 310.00 Shear (lb/sq ft) 0.66
Alpha 1.00 Stream Power (lb/ft s) 2 .27
Fr ctn Loss (ft) Cum Volume I acre-ft I
C & E Loss (ft) Cum SA (acres I
CROSS SECTION OUTPUT Profile #PF 5
E.G. Elev (ft ) 312.23 Element Left OB Channel Right OB
Vel Head (ft) 0 .20 Wt. n-Val. 0 .000 0.045 0 .000
Culvert Report
Holleman Drive
w.s. Elev I ft) 312.03
Cr it w.s. (ft) 311. 58
E.G. Slope I ft:/ ft l 0.010003
Q Total (cfs) 155.00
Top Width (ft) 37 .53
Vel Total 1ft/s) 3.61
Max Chl Dpth (ft) 2.03
Conv . Total (Cfs) 1549.7
Length Wtd. (ft)
Min Ch El (ft) 310 .00
Alpha 1.00
Fr ctn Loss (ft)
C & E Loss (ft)
CROSS SECTION OUTPUT Profile #PF 6
E.G. Elev (ft) 312.35
Vel Head (ft) 0.22 w.s. Elev (ft) 312.12
Crit W.S. (ft) 311. 68
E.G. Slope (ft/ft) 0.010000
Q Total (cfsl 177.00
Top Width (ft) 39.54
Vel Total lft/s) 3 .80
Max Chl Dpth (ft) 2.12
Conv. Total (cfs) 1770.0
Length Wtd. (ft)
Min Ch El (ft) 310.00
Alpha 1. 01
Fr ctn Loss (ft)
C & E Loss (ft)
CROSS SECTION OUTPUT Profile #PF 7
E.G. Elev (ft) 312 .61
Vel Head (ft) 0.28 w.s. Elev (ft) 312.34
Crit W.S. (ft) 311. 91
E.G. Slope (f t/ft) 0.010008
Q Total (cfs ) 231.00
Top Width (ft) 44.04
Vel Total (ft/s ) 4.16
Max Chl Dpth (ft) 2.34
Conv. Total lcfs ) 2309.1
Length Wtd. (ft)
Min Ch El (ft) 310.00
Alpha 1. 03
Fr ctn Loss (ft)
C & E Loss (ft)
SUMMARY OF MANNING'S N VALUES
River :Whites
Reach River Sta.
Holleman 1542
Holleman 1289
Holleman 1194
Holleman 1068
Holleman 1045
Holleman 1000
SUMMARY OF REACH LENGTHS
River: Whites
Reach River Sta.
Holleman 1542
Holleman 1289
Holleman 1194
Holleman 1068
Reach Len. lft )
Flow Area (Sq ft ) 0 .00
Area (sq ft ) 0.00
Flow (cfs) 0.00
Top Width (ft ) 0 .18
Avg. Vel . (ft/sl 0.13
Hydr. Depth (ft I 0.01
Conv. (cfsl 0.0
Wetted Per. (ft) 0 .18
Shear (lb/sq ft)
St ream Power (lb/ft s )
Cum Volume (acre-ft )
Cum SA (acres I
Element Left 08
Wt. n-Val. 0.060
Reach Len. (ft)
Flow Area (sq ft) 0.05
Area (sq ft) 0.05
Flow (cfs) 0.02
Top Width (ft) 0.85
Avg. Vel. (ft/sl 0.38
Hydr. Depth (ft) 0.06
Conv. lcfs) 0.2
Wetted Per. (ft ) 0.86
Shear (lb/sq ft) 0.04
Stream Power (lb/ft s) 0.01
Cum Volume (acre-ft)
Cum SA (acres)
Element Left OB
Wt. n-Val. 0 .060
Reach Len. (ft )
Flow Area (sq ft) 0.39
Area (sq ft) 0.39
Flow lcfs) 0. 29
Top Width (ft ) 2.35
Avg. Vel. lft/s) 0.75
Hydr. Depth (ft) 0.17
Conv. (cfs) 2.9
Wetted Per. (ft) 2.37
Shear (lb/ sq ft) 0.10
Stream Power (lb/ft s) 0.08
Cum Volume (acre-ft )
Cum SA (acres)
nl n2 n3
.06 .045 .06
.06 .045 .06
Culvert
.06 .045 .06
.06 .045 .06
.06 .045 .06
Left Channel Right
253 253 253
220 220 220
Culvert
23 23 23
42.93
42.93
155.00
37.00
3.61
1.16
154 9. 7
37 .55
0.71
2.58
Channel
0.045
4 6. 48
46.48
17 6. 94
37 .00
3.81
1. 26
1769.4
37.55
0.77
2. 94
Channel
0.045
54.40
54.40
230 .11
37.00
4 .23
1. 47
2300.2
37.55
0.91
3.83
0.00
0.00
0.00
0.35
0.13
0.01
0.0
0.35
Right 08
0 .060
0.10
0.10
0. 04
1. 70
0.38
0.06
0.4
1. 70
0.04
0.01
Right 08
0.060
0.79
0.79
0.59
4.69
0.75
0.17
5.9
4. 71
0.10
0.08
Culvert Report
Holleman Drive
Holleman
Holleman
1045
1000
45
SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS
River: Whites
Reach River Sta. Contr. Expan.
Holleman 1542 .1 .3
Holleman 1289 .1 .3
Holleman 1194 Culvert
Holleman 1068 . 1 .3
Holleman 1045 .1 .3
Holleman 1000 .1 .3
45 45
Culvert Report
Holleman Drive
HEC-RAS Plan:
I Reech I River Sle Profile Q Total
I !cf&) I 1Hoieman :1542 !?F 1 58.oo: 320.61 ;
E.G. Slope I Velctl!ll Flowl>tea
lftlft) lftlsl i (sq ftl
0.040929: 3.5i: 16.26:
Top Width Froude #Chi
320.00:
W.S. Elev Crif w.s.
(!ti I (ft\
320.41 1 320.41:
E.G Elev Mm Ch El
(ft) I (fl) 11t1 I ,
41.55 1.01:
Holleman 1 15~:? PF: 89.0~1 320.001 320.5SI 320.551 320.801 0.037187~ 4.QSI 21.941 43.03' 1.00j
I Holleman 11542 ,pf 3 ,,, 001 320.001 320.631 320 53, 320 921 0 035475; 4.33, 25.631 43.961 , 001
Holeman 11542 PF 4 129.001 32G.001 320.70 020.701 0.034811 1 4.541 26.39 44.651 1.00
Hor.ernan 154: PF 5 155.001 320.00 :>20.78 320.78 0.033553 4.60, Z2.321 45.61 I 1.00
' 1PF6 1n 001 320 ool 3?0 851 -. -. --. 0 03?6981 -35 51 I 46 371 1 00 I
Holieman 11542 1PF 7 I 231.001 320.001 321.011 321.011 32146; 0.0311381 5.391 4288 48 421 1.00
I i I : I I I Hollemon 1289 PF 1 58.00I 312.751 314.841 313 351 314 86~ 0.0004081 1.01 I 6012 38.71 0.13
Hollemon 11289 1PF 2 I 89.00 312.751 315.671 313.551 315681 0.000264 1.031 9556 47.24 0.11 1
Holleman 1239 ;PF3 111.00 312.75 316.19 313.67 316.21 0.000213 1.05 121.89j 52.701 0.10
Ho~eman 11289 lpf 4 129.00! 312.751 316.601 313.76 316.61 o.0001eGI 1.05 144.111 56.901 0.101
Holleman 1289 1PF5 155.00 312.75 317.15 313.881 317.17 0.000156 1.06 177.22 62.64! 0.09'
Honeman 1289 'PF6 177.00j 312.75 317.60 313.98 317.61 0.000137 1.07 206.12 67.25 0.09
Ho~e:nen 1289 Pf; 231.00 312,;5 318.62 314.18 318.53 0.000106 1.07 280.15 n.82 0.08
Holleman 1194 i Culvert i I
I
Holte men 1068 PF 1 58.00 310.00 311.85 311.20 311.96 0.005157 2.56 21.811 20.58 0.46
Holleman 1068 IPF2 89.00 310.00 312.14 I 312.30 0.006746 3.16 28.39 25.17 0.49
Holleman 1068 Pf 3 111.00 310.00 312.31 312.49 0.006957 3.47 32.81 28.77 0.51
Honeman 1068 Pf 4 129.00 310.00 312.43 312.64 0.007107 3.70 36.44 31.42 0.52
Holleman 1068 iPF5 155.00 310.00 312.68 312.01 312.82 0.007380 4.01 41.45 34.76 0.54
Holleman 1068 PF6 177.00 310.00 312.68 312.12 312.96 0.007784 4.29 45.15 37.02 0.56
Holleman 1068 PF7 231.00 310.00 312.91 312.41 313.25 0.008509 4.85 54.23 42.07 0.60
Holeman 1000 PF 1 58.00 31000 311.31 310.95 311.43 0.010003 2.84 20.41 25.20 0.56
Holletnen 1000 PF2 89.00 310.00 311.59 311 .20 311 .75 0.010008 3.14 28.31 30.06 0.57
Holeman 1000 PF3 111.00 310.00 311.76 31 1.34 31 1.93 0.010003 3.31 33.51 32.87 0.58
Holleman 1000 !PF 4 129.ool 310.00 311.88 31 1.45 312.06 0.010004 3.43 37.56 34.90 0.58
Holleman 1000 PF5 155.00 310.00 312.03 311 .58 312.23 0.010003 3.61 42.93 37.53 0.59
HoUeman 1000 PF6 177.00 310.00 312.12 311.69 312.35 0.010000 3.81 46.63 39.54 0.60
Holerrni_n 1000 PF7 231.00 310.00 312.34 311.91 312.61 0.010008 4.23 55.59 44.04 0.61