HomeMy WebLinkAboutDrainage Report December 2008llB~
111
DRAINAGE REPORT
FO R
THE QUARTERS AT
LUTHER STREET
PREPARED FOR:
TUCKER MACH DEVELOPMENT, L.L.C.
41978 Hempstead Hwy
Waller, Texas 77484
DECEMEBER 3, 2008
MBESI# 1082-0003
SUBMIITED BY:
McCLURE & BROWNE E NGINEERING/SURVEYING. INC.
LOOS Woodcreek Drive, Suite 103 •College Station, Texas 77845
(979) 693-3R3R -fox: (979) 693-2554
THE QUARTER AT LUTHER STREET
Stormwater Management Technical Design Summary Report
MBESI #1082-0003
PART 1 -Executive Summary Report
Section 1 -Contact Infonnation:
Project Designer:
Project Developer:
Submittal Date:
McClure and Browne Engineering and Surveying, Inc.
1008 Woodcreek Drive, Suite 103
College Station, TX 77845
979-693-3838
Tucker Mach Development, L.L.C.
41978 Hempstead Hwy
Waller, TX 77484
(713) 213-4647
December 3, 2008
Section 2 -General Infonnation:
This development is a multi-family residential development to be constructed in College Station. The
development consists of one lot and one block. The total area of the development is approximately 1.583
acres.
Section 3 -Project Location:
The Quarters of Luther Street will be located in College Station approximately 0.46 miles north of F.M.
2818 along Luther Street West. The entire project is located within the city limits of College Station.
The entire site is located within the Whites Creek drainage basin. No portion of the site is shown to be
within the 100-year floodplain; therefore, it is not currently regulated under the National Flood Insurance
Program. (FEMA Firm Map# 48041C0182 C, effective July 2, 1992.)
Based on Figure B-19, Appendix B of the Unified Stormwater Design Guidelines, the site is located in the
Whites Creek drainage basin defined in the table. After evaluating the site, it was determine that
detention will be necessary.
Section 4 -Hydrologic Characteristics:
This project site is mostly pasture grassland with medium brush areas and spots of small trees. The
terrain is relatively flat slope in a south-westerly direction. Storm water drains into an undeveloped track
on the south-west side of the site and eventually drains to Whites Creek.
Stormwater Management Technical Design Summary Report
Tucker Mach Development, L.L.C.
Section 5 -Stormwater Management:
The proposed site is mostly surrounded by developed property in the north, east and south
directions. The surrounding developed areas consist of concrete parking and graded grass areas. These
areas are elevated higher than the project site; therefore, the proposed site grading is designed to capture
site runoff and the existing runoff draining into the site from the surrounding areas. Refer to Exhibit B-1,
pre-development condition drainage map.
Three detention facilities will be provided for this project. Due to the nature of the existing terrain and
storm water drainage conditions, the site is graded such that three shallow detention ponds are proposed.
The site is divided into three drainage areas as shown in post-development condition drainage map,
Exhibit B-2. Detention ponds #1 and #3 will capture most of the site's runoff. The stormwater from
Pond #1 will directly discharge at the Point oflnterest shown on Exhibit B-2. Stormwater from Pond #3
will discharge into a 2'wide concrete flume and conveyed to the Point of Interest. The drainage area for
Pond #2 is the smallest and stormwater is conveyed to the pond via a 2' wide concrete flume. Stormwater
from Pond #2 will be discharged into the gutter on Luther Street.
Outfall structures for Ponds #1 and #3 consist of a concrete structure with a rectangular opening and
weir. The outfall structure for Pond #2 is a trapezoidal shaped concrete channel and will connect to a
rectangular channel that will discharge into the Luther Street gutter.
The design top of berm elevations for Ponds #1, #2 and #3 are 327.20', 328.00' and 328.25', respectively.
Table 1, summarizes that the pre and post-development flows for all design storms at the Point of Interest
#1. Compared to the pre-development flows at the Point of Interest #1 for post-developed flows will
reduce the runoff from the site.
Table 1: Pre-Development and Post-Development Flows at Point of Interest
Storm Pre-Development Post-Development Water Surface
Event (cfs) (cfs) Pond #1 Pond #3
(yr) (ft) (ft)
2 3.30 3.29 326.86 327.95
5 5.62 5.19 327.00 328.05
10 7.32 6.51 327.06 328.10
25 8.76 7.58 327.10 328.14
50 10.79 9.05 327.15 328.19
100 12.53 10.28 327.19 328.22
Stormwater Management Technical Design Summary Report
Tucker Mach Development, L.L.C.
Table 2, summarizes that the pre and post-development flows for all design storms at the Point of Interest
#2. Compared to the pre-development flows at the Point of Interest #2 for post-developed flows will
increase slightly in the gutter along Luther Street. During the more frequents smaller storms (i.e. 25-year
and smaller), the increase inflow will be less than 1 cfs. This small amount is considered insignificant
and will have little to not impact on the street. The 50 and 100-year storm events the runoff into the gutter
is 1.15 and 1.31 cfs, respectively. Based on the street cross section, slope (i.e. 1.13%) and a 12' spread,
the capacity of the gutter is 12.5 cfs. Even during the 50 and 100-year storm events, the runoff entering
the gutter from this development will not adversely impact the capacity of the street.
Table 2: Pre-Development and Post-Development Flows at Luther Street
Storm Pre-Development Post-Development Water Surface
Event (cfs) (cfs) Pond #2
(yr) (ft)
2 0 0.43 327.64
5 0 0.66 327.75
10 0 0.82 327.81
25 0 0.96 327.86
50 0 1.15 327.92
100 0 1.31 327.97
Section 6 -Coordination and Permitting:
No coordination or permitting is required for this development.
Section 7 -Reference:
Exhibit A
Exhibit B-1
Exhibit B-2
Exhibit C
Technical Design Summary Report
Existing Conditions Drainage Map
Post-Developed Conditions Drainage Map
HydroCAD Report
Stormwater Management Technical Design Summary Report
Tucker Mach Development, L.L.C.