HomeMy WebLinkAboutLetter of Request for Over-Praticipation (from DP Folder 1)ASH lit BROWJ'YE El'YGIJ'YEERIJ'YG, IJ'YC.
October 20, 2003
Spencer Thompson, E. I. T.
Graduate Civil Engineer
Engineers and Consultants
P.O. Box 10838, College Station, Texas 77842
979-846-6914 877-245-4839 Fax: 979-846-8914
Development Services, City of College Station
College Station, TX 77840
Re.: Letter of Request for Over-Participation (OP)
Estates at Spring Creek Development (ESCO) Sanitary Sewer Trunk Line
Dear Mr. Thompson:
My client is requesting Over-Participation support for the construction costs incurred for the
excess sanitary sewer trunk line that the city has requested. The Estates at Spring Creek
Development (-153.35 acres) necessitates a sanitary sewer trunk line with pipe sizes varying
from 8110 through 12"0 with two creek borings. The City of College Station has requested that the
trunk line be over-sized to service the rest of the Spring Creek Watershed Basin (-531 .20 acres)
not already being served. (See Attachment #1) The over-sizing would require that the pipe sizes
increase to 21 "0. Please reference Attachments #2 and #3 for area sewage productions and pipe
capacities. It must be noted that this OP request is for only trunk lines 1 through 5 of the Estates
at Spring Creek Sanitary Sewer Trunk Line. (Please see Attachment #1) Lines 6 through 8 will
be developed at a later date.
Spring Creek Watershed Basin (OP)
Estates at Spring Creek Development, Section1
Sub-Total=
Less Line Item 1.01 from Attach. #4 (8"0 Sewer Line)
Total Over Participation =
$380,806
-$183.266
$197,540
-$ 3,450
$194,090
Attachments to this letter include: 1) ESCO Sanitary Sewer Trunk Line layout, 2) proposed
sewage productions for ESCO, 3) proposed sewage productions for the Spring Creek Watershed
Basin and remaining Crowley Development, 4) Engineer's Cost Estimate for Estates at Spring
Creek Development, 5) Engineer's Cost Estimate for Spring Creek Watershed Basin.
Thank you for all your time and help on this project. Please contact me if you have any questions.
~,,,~. _r~E OF r~;'\\ Cb~t······~\$1··, .. * · ..•. *. . *'' •.. : .................. ~ 2 JOE I. GATIIS I Z··~··············:·· fj :\:•. ( 90964 Q ··$ 'tr,~··:.~f !\ \1-··~~ '\\:'ONA\. E~
F:\Projects\1045 -Munsey Developments\005 -Reatta Meadows Subdivision, Section 1 of 4\letters\COCS -SThompson04 -Letter.wpd /J/) ~ ? JUl-ZI!)-~~
A TI ACHMENT #1
Estates at Spring Creek Development Sanitary Sewer Trunk Line
& Spring Creek Watershed Basin
ATTACHMENT #2
Sanitary Sewer Production for the
Estates at Spring Creek Development
ATTACHMENT #2
COMPUTATION OF SEWAGE PRODUCTION -ESTATES AT SPRING CREEK DEVELOPMENT
ADDED
AREA AREA AVG TOTAL DESIGN DESIGN MIN. PIPE
LENGTH ADDED TOTAL DENSITY FLOW FLOW PEAK FLOW FLOW DIA.
LINE (FT) CAC) (AC) ADDED (GPO) (GPO) FACTOR CGPM) (CFS) REQUIRED
6 686 16.551 16.551 COMM 33,102 33 ,102 4.0 92 0.20 6"
160 SFD,
5 339 39.459 56.01 COMM 66,546 99 ,648 4.0 277 0.62 8"
4 607 10.988 66.998 43 SFD 15,910 115,558 4.0 321 0.71 10"
42 SFD,
3 971 12.7 79.698 PARK 19, 176 134,734 4.0 374 0.83 10"
2 417 14.926 94.624 59 SFD 21 ,830 156,564 4.0 435 0.97 10"
77 SFD,
858 25.859 120.483 COMM 41 ,308 197,872 4.0 550 1.22 12"
MAXIMUM PIPE CAPACITIES
AT MINIMUM VELOCITY & GRADE
MANNING VELOCITY SLOPE AREA
DIAMETER 00 mm 00 m~1 Q Cgpm) DESIGN CRITERIA
6" 0.013 2 0.5 0.196 176 370 GPO per Single Family Dwelling Unit (SFD)
2000 GPO per Commercial acre
8" 0.013 2 0.33 0.349 31 3 1,212 GPO per acre of Park
10" 0.013 2 0.25 0.545 489
12" 0.013 2 0.2 0.785 705
15" 0.013 2 0.15 1.227 1101
18" 0.013 2 0.11 1.767 1586
21 " 0.013 2 0.09 2.404 2158
ATTACHMENT #3
Sanitary Sewer Production for the
Spring Creek Watershed Basin and Remaining Crowley Development
ATTACHMENT #3
COMPUTATION OF SEWAGE PRODUCTION -SPRING CREEK WATERSHED
ADDED MIN. PIPE PIPE
LENGTH AREA AREA AVG TOTAL DESIGN DESIGN DIA. CAPACITIES
(FT) & ADDED TOTAL DENSITY FLOW FLOW PEAK FLOW FLOW REQUIRED @GRADE
LINE GRADE (AC) (AC) ADDED (GPO) (GPO) FACTOR (GPMl (CFS) @GRADE (GPO)
1640@ 1,380
8 0.8% 207.679 207.679 SFD 384,060 384 ,060 4.0 1,067 2.38 10" 1395
1358@ 507 SFD
7 0.6% 105.184 312.863 COMM 194,930 578,990 4.0 1,608 3.58 12" 1966
686@ COMM
6 0.25% 74.643 387.506 SCHOOL 73,102 652,092 4.0 1,811 4.03 21 " 2159
339@ 160 SFD,
5 0.25% 39.459 426.965 COMM 66,546 718,638 4.0 1,996 4.45 21" 2159
607@
4 0.25% 10.988 437.953 43 SFD, 15,910 734,548 4.0 2,040 4.54 21 " 2159
971@ 42 SFD,
3 0.25% 12.7 450.653 PARK 19,176 753,724 4.0 2,094 4.66 21" 2159
417@
2 0.25% 14.926 465.579 59 SFD 21 ,830 775,554 4.0 2,154 4.80 21" 2159
858@ 126 SFD,
1 0.25% 35 .829 501.408 COMM 59,438 834,992 4.0 2,319 5.17 21 " 2159
ATTACHMENT #4
Engineer's Cost Estimate for the
Estates at Spring Creek Development
12110 Sanitary Sewer Trunk Line
ESTATES AT SPRING CREEK DEVELOPMENT
Engineer's Preliminary Opinion of Probable Construction Cost
for 12,. 0 Estates at Spring Creek Sanitary Sewer Trunk Line
ABEi No. 1045005
October 20, 2003
The following construction estimate is based on the engineer's preliminary opinion of
probable construction costs. This estimate constitutes our best judgement at this time.
Please note that the engineer does not have any control over contractor or supplier
workloads and the degree to which inflation may affect project costs between now and the
bid date. During design and construction, additional features may become apparent as
the work progresses, which will result in an increase in cost.
Item Description Estimated Estimated ESTIMATED
No. Quantity Unit Cost TOTAL COSTS
1.00 12" SANITARY SEWER TRUNK LINE
1.01 8"0 ASTM 03034 SOR 26 PVC Sewer 345LF $10.00 $3,450
Line (includes installation, testing, and
cleanup.)
1.02 . 10"0 ASTM 03034 SOR 26 PVC Sewer 1,995 LF $14.00 $27,930
Line (includes installation, testing, and
cleanup.)
· 1.03 12110 ASTM 03034 SOR 26 PVC Sewer 858LF $16.00 $13,728
Line (includes installation, testing, and
cleanup.)
1.04 8' -10' Trenching & Backfill -Non-158 LF $12.00 $1 ,896
Structural (includes backfill and
cleanup)
1.05 10' -12' Trenching & Backfill -Non-304 LF $16.00 $4,864
Structural (includes backfill and
cleanup)
1.06 12' -15' Trenching & Backfill -Non-2,426 LF $20.00 $48,520
Structural (includes backfill and
cleanup)
1.07 16" Bore (Includes mobilization, 3/8" thk. 310 LF $225.00 $69,750
steel casing, spacers, capping, cleanup)
1.08 Trench Safety 3,198 LF $1 .50 $4,797
1.09 4' Standard Manhole (0 -6' Deep) 9EA $1,750.00 $15,750
(includes installation, testing, and
cleanup.)
1.10 Additional Depth for 4' Dia. Standard
Manhole
73VF $100.00 $7,300
Subtotal Item 1.00 -12" Sewer Trunk Line: $166,605
Contingency(10%): $16,661 ------
Preliminary Total Construction Costs: . $183,266 ------
~~'"'''.,.., JI"' ~E OF ri:i:'\\ ~c:,~~······~.s>'''• 1'1.:· * ···.*.'~ , .................... ~ 2 JOEi.GATTiS J I··~··············:·· fj ~·· ( 90964 Q .·$. .. ,O~/ CE NS t..•~~.ii • \,<:-;s ........ .!..~ '\~~IONAl f:.JF' .,,,,,~
I ({)-U> -2e::0 s
ATTACHMENT #5
Engineer's Cost Estimate for the
Spring Creek Watershed Basin
21"0 Sanitary Sewer Trunk Line
ESTATES AT SPRING CREEK DEVELOPMENT
Engineer's Preliminary Opinion of Probable Construction Cost
for 21··0 Estates at Spring Creek Sanitary Sewer Trunk Line
ABEi No. 1045005
October 20, 2003
The following construction estimate is based on the engineer's preliminary opinion of
probable construction costs. This estimate constitutes our best judgement at this time.
Please note that the engineer does not have any control over contractor or supplier
workloads and the degree to which inflation may affect project costs between now and the
bid date. During design and construction, additional features may become apparent as
the work progresses, which will result in an increase in cost.
Item
No.
Description
1.00 21" SANITARY SEWER TRUNK LINE
1.01 21110 ASTM 02241SOR26 PVC Sewer
Line (includes installation, testing, and
cleanup.)
1.02 8' - 1 O' Trenching & Backfill -Non-
structural (includes backfill and
cleanup)
1.03 10' -12' Trenching & Backfill -Non-
structural (includes backfill and
cleanup)
1.04 12' -15' Trenching & Backfill -Non·
Structural (includes backfill and
cleanup)
1.05 30" Bore (Includes mobilization, 3/8" thk.
steel casing, spacers, capping, cleanup)
1.06 Trench Safety
1.07 5' Standard Manhole (0 - 6' Deep)
(includes installation, testing, and
cleanup.)
1. 08 Additional Depth for 4' Dia. Standard
Manhole
Estimated
Quantity
3,198 LF
158 LF
304 LF
2,426 LF
310 LF
3,198 LF
9EA
73VF
Estimated
Unit Cost
$45.00
$12.00
$16.00
$20.00
$380.00
$1 .50
$1 ,900.00
$100.00
ESTIMATED
TOTAL COSTS
$143,910
$1 ,896
$4,864
$48,520
$117,800
$4,797
$17, 100
$7,300
Subtotal Item 1.00 -21" Sewer Trunk Line: $346,187 ------
Contingency(10%): $34,619 ------