HomeMy WebLinkAboutDrainage Report (from DP Folder 1)DRAINAGE REPORT
for
SECTIONS 1, 2, & 3 of
ESTATES AT SPRING CREEK DEVELOPMENT
College Station, Texas
PREPARED FOR:
Barron Road Meadows, L.L.P.
P.O. Box 277
Normangee, Texas 77871
PREPARED BY:
ASH & BROWNE ENGINEERING, INC.
P.O. Box 10838
College Station, Texas 77842
October 2003
ABEi No. 1045005
C COPYRIGHT 2003. Ash & Browne, Engineertng, Inc.
TABLE OF CONTENTS
GENERAL LOCATION AND DESCRIPTION
Location ............................................................. 1
Description of Property ................................................. 1
DRAINAGE BASINS AND SUB-BASINS
Drainage Basin Designation ............................................. 1
DRAINAGE DESIGN CRITERIA
Regulations .......................................................... 2
Development Criteria, Reference and Constraints ............................ 2
HYDROLOGICAL CRITERIA
Runoff Calculation Method .............................................. 2
Hydraulic Calculations -Storm Sewer System ................................ 3
SUMMARY ................................................................ 3
CONCLUSION
Compliance with City Standards .......................................... 4
Effectiveness of Drainage Design ......................................... 4
Explanation of 100-Year Storm Event. ...................................... 4
ATTACHMENT #1
ESTATES AT SPRING CREEK DEVELOPMENT
LOCATION MAP
ATTACHMENT #2
FIRM MAP
ATTACHMENT #3
SPRING CREEK WATERSHED BASIN
ATTACHMENT #4
HYDRAULIC CALCULATIONS & SUPPORT DATA
ATTACHMENT #5
HYDRAULIC MODEL & HYDROGRAPHS
ATTACHMENT #6
STORM SEWER SYSTEM LAYOUT, PROFILES, & SUPPORT DATA
REATTA MEADOWS SUBDIVISION, SECTION 1
CERTIFICATION
"I, Joe I. Gattis, certify that this report for the drainage design the Estates at Spring Creek
Development for Sections 1,2 & 3 was prepared by me in accor nee with the provisions of the
City of College Station Drainage Design Manual for t e own thereof.
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
DRAINAGE REPORT
GENERAL LOCATION AND DESCRIPTION
Location
The Estates at Spring Creek Development (ESCO) consists of ±151.06 acres of land situated in
the Robert Stevenson League, Abstract 54, in College Station, Brazos County, Texas. Barron
Road borders the subject property on the northwest boundary. The undeveloped ±49.35 acre
Edward Freehling Tract borders the property on the northeast boundary. The Castlegate
Subdivision, consisting of medium density residential housing, is located to the southeast of the
subject property. Lastly, the ±64.28 acre tract of land owned by the City of College Station
Independent School District lies along the southwest boundary. The ESCO contains the North
Fork of Spring Creek drainage way. The Spring Creek drainage way splits the property, thus
producing Sections 1 and 2 on the northern side and Section 3 on the south side of the creek.
Section 4 is located in the southwestern portion of the Estates of Spring Creek Development.
Sections 1 and 2 are open agriculture pastures used for cattle grazing with intermittent native
trees. Sections 3 and 4, while being used for grazing, consists of a more dense consistency of
trees and ground cover.
Section 1 of Estates at Spring Creek Development shall be called Reatta Meadows Subdivision
and will consist of medium density, single family residential homes. Section 2 of will also be a
single family subdivision consisting oftownhomes with smaller lots. Section 3 shall be a medium
density residential subdivision with larger lots sizes. Please note, Section 3 is bisected by the
Spring Creek Basin ridge. Only the portion of Section 3 within the basin boundary for the
northern fork of the Spring Creek water way is included in this drainage design report. The
remaining portion of Section 3 outside the basin boundary must have its own drainge design.
Section 4 is also outside the limits of this drainage report and is not included in this drainage
report. See Attachment #1 for the Estates at Spring Creek Master Development Plan.
Description of Property
The development (Sections 1, 2, & 3) consists of pasture land, mixed with native grasses and
trees, and is bisected by the northern fork of the Spring Creek Drainage Way forming the northern
Spring Creek Drainage Basin. The North Fork of Spring Creek drainage way is a secondary
branch that feeds the Spring Creek Drainage Basin. The property is located in the unshaded
Flood Zones "X" as shown on FIRM (Flood Insurance Rate Map) map, Map Number:
48041C0205 D, effective date of 02/09/2000. Refer to Attachment #2 for the FIRM Map.
DRAINAGE BASINS AND SUB-BASINS
Drainage Basin Designation
The project site is located in the northern branch of the Spring Creek Drainage Basin (SCDB) as
1
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
described above and by the City of College Station Drainage Design Manual. The SCDB consists
of 5 basins totaling approximately ±532.20 acres of land. Sub-Basins #1, #2, #3 and #5 are
mostly undeveloped with open pasture land and sporadic light density single family residential.
(See Attachment #3)
DRAINAGE DESIGN CRITERIA
Regulations
No deviations were taken from the City's Policy when this report was composed.
Development Criteria, Reference and Constraints
The northern branch of the Spring Creek Drainage Basin (SCDB), consists of 5 sub-basins that
converge to form the northern branch of Spring Creek that has an outfall point on the
southeastern property boundary of the project site. This common outfall point is the Point Of
Reference (POR) and is illustrated in Attachment #6 as Junction #4. To analyze the impact of the
Estates at Spring Creek Development on the existing drainage parameters of the Spring Creek
Drainage Basin, the entire basin was modeled using HEC-HMS. The five sub-basins were
modeled both in pre-developed and developed conditions for storm events 5-yr. through 100-yr.
to determine the peak discharge at the POR to determine ultimate downstream influence.
HYDROLOGICAL CRITERIA
Runoff Calculation Method
Runoff for all areas greater than 50 acres was calculated based on the "SCS Method" in
conjunction with the HEC-HMS (Hydraulic Modeling System) provided by the United States Army
Corp of Engineers. The basin curve numbers were developed by using the City of College
Station Design Manual for percent ground cover and density of development. The curve numbers
used for the hydraulic model varied from 75 to 87. 24 Hour Rainfall Depths for the City of College
Station (Table 111-3, COGS Manual) with a Type II rainfall distribution was used for all rainfall input
data for all storm events.
Runoff for all areas less than 50 acres was calculated based on the "Rational Method". The
runoff coefficients used varied between 0.30 and 0.75 and were determined by the percent
coverage of grassland areas and developed areas, respectively. Intensity was determined using
rainfall data for Brazos County and by the calculated time of concentration (Tc) for each drainage
area.
The method used for determining the Time of Concentration was Technical Release 55 (TR-55)
for overland flow, shallow concentrated flow and gutter flow. If the determined time of
concentration (Tc) determined was less than 10 minutes, a minimum value of 10 minutes was
used for Tc. Refer to Attachment #4 for the runoff calculations.
2
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
Hydraulic Calculations -Storm Sewer System
Per the City of College Station drainage manual, the storm sewer system for this project was
designed to accommodate all intercepted flows, future additions, and evaluated for flow conditions
that result from a 100 year rainfall event. Manning's Equation, Manning's Coefficients, slope,
outlet sizes, etc. were used to determine the capacity of the proposed storm sewer system.
lnteliSOL VE software program "HYDRAFLOW Storm Sewers 2003" was utilized to assist in the
design and modeling of the storm sewer system. Please refer to Attachment #6 for the Storm
Sewer System layout and sewer profiles.
SUMMARY
The development consists of native grasses and intermittent trees with a the northern fork of
Spring Creek Drainage way bisecting the development. The existing flow patterns of the site
sheet flow to the center to the Spring Creek drainage way. There is approximately 4.3 acres of
off-site flow that is accumulated from Barron Road ROW that flows through the northern portion
of the site and discharges into Spring Creek drainage way.
The proposed development will increase the storm water run-off due to the increase in impervious
areas resulting from roof tops, roads, and sidewalks. This increase in storm water run-off will be
captured via the streets, conveyed to the underground storm pipe system via the curb and gutter
system and discharged into the creek without any detention. The peak discharge developed by
the Estates at Spring Creek Development, Sections 1,2 & 3, peaks prior to the Spring Creek
Watershed Basin (SCWB) and any detention of said increased run-off would cause a n~gative
impact to the properties downstream and raise the flood elevation not only locally, but also
downstream. Please refer to the Hydrographs provided in Attachment #5.
The following table illustrates the existing and proposed runoff for the project site and the flow
increase/decrease for this drainage basin:
Table 1.1
Existing/Proposed Runoff
Existing Runoff Proposed Runoff w/o Detention Increase/Decrease
(cfs) (cfs) (cfs)
Storm Frequency (yr) Storm Frequency (yr) Storm Frequency (yr)
-5 10 25 50 100 5 10 25 50 100 5 10 25 50 100
SCWB 478.06 623.02 795.52 919.94 1,070.00 473.26 610.30 n2.64 889.40 1,029.90 (4.80) (12.72) (22.88) (30.54) (40.10)
<@POR
Based on the above information, the development does not require detention. The storm water
run-off produced by the Estates at Spring Creek Development shall be conveyed via a storm
sewer system or allowed to sheet flow to the Spring Creek Drainage Way.
3
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
CONCLUSION
Compliance with City Standards
From the information that is presented in this report, we have shown that the development of this
site will meet the City's policy.
Effectiveness of Drainage Design
The proposed drainage plan demonstrates how the storm water produced from this development
will be conveyed via the street and storm sewer system to Spring Creek drainage way.
Explanation of 100-Year Storm Event.
The complete storm water conveyance system, including streets, curb and gutters, and storm
sewer system have been check based on the 100-year storm event. Based on the results, all
infrastructure mentioned herein is capable of handling the 100-year storm event without adversely
impacting the local development, the waters of the United States or properties down stream.
4
Drainage Report for
Estates at Spring Creek Development, Sections 1, 2, & 3
ATTACHMENT #1
ESTATES AT SPRING CREEK DEVELOPMENT
LOCATION MAP
October 2003
Drainage Report for
Estates at Spring Creek Development, Sections 1, 2, & 3
ATTACHMENT #2
FIRM MAP
October 2003
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
ATTACHMENT #3
SPRING CREEK WATERSHED BASIN
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
ATTACHMENT #4
HYDRAULIC CALCULATIONS & SUPPORT DATA
ESTATES AT SPRING CREEK DEVELOPMENT
SUB-BASIN #1
October 2003
1045005
SCS Curve Number (CN) Allocation Table
By: JIG
DRAINAGE AREA TYPES EXISTING
Area Curve
Number
(acres)
Open Pasture, native grasses, natural grasslands 124.80 75
Low density residential, landscaped areas, large lots 124.80 85
Open Pasture, native grasses, natural grasslands
Low density residential, landscaped areas, large lots
Total: 249.60 80
Time of Concentration Calculations (Tc)
Proposed Flow Path
Description Length Grade Velocity Time
(ft) (%) (fps) (min.)
Overland Flow 300 ------0.5 10.0
Shallow Concentrated Flow/Pasture 509 2.0 1.0 8.5
Shallow Concentrated Flow/Pasture 1713 1.6 0.9 33.6
Shallow Concentrated Flow/Pasture 2508 0.6 0.6 76.0
*Channelized Flow 1030 0.6 3.7 4.6
TOT AL: 132. 7
*Channel cross sections were used to determine channel velocity
Time of Concentration Tc Used
Existin Conditions 10 min. 132. 7 min. 132. 7 min.
PROPOSED
Area Curve
Number
(acres)
124.80 75
124.80 85
249.60 80
By: JIG
ESTATES AT SPRING CREEK DEVELOPMENT
SUB-BASIN #2 (102.40 acres)
October 2003
1045005
SCS Curve Number (CN) Allocation Table
DRAINAGE AREA TYPES EXISTING
Area Curve
Number
(acres)
Open Pasture, native grasses, natural grasslands 76.80 75
Low density residential, landscaped areas, large lots 25.60 85
Open Pasture, native grasses, natural grasslands
Low density residential, landscaped areas, large lots
Total: 102.40 78
Time of Concentration Calculations (Tc)
Proposed Flow Path
Description Length Grade Velocity Time
(ft) (%) (fps) (min.)
Overland Flow 300 ---0.5 10.0
Shallow Concentrated Flow/Pasture 1159 1.2 0.8 24.1
Shallow Concentrated Flow/Pasture 584 0.7 1.2 8.1
Shallow Cone. Flow/Grassed Waterway 1768 1.5 1.8 16.4
TOTAL: 58.6
Time of Concentration Tc Used
Existin Conditions 10 min. 58.6 min. 58.6 min.
PROPOSED
Area Curve
Number
(acres)
76.80 75
25.60 85
102.40 78
ESTATES AT SPRING CREEK DEVELOPMENT
SUB-BASIN #3 (115.20 acres)
By: JIG
October 2003
1045005
SCS Curve Number (CN) Allocation Table
DRAINAGE AREA TYPES EXISTING
Area Curve
Number
(acres)
Open Pasture, native grasses, natural grasslands 115.20 75
Low density residential, landscaped areas, large lots 0.00 0
Open Pasture, native grasses, natural grasslands
Medium density residential , landscaped areas, large lots
Total: 115.20 75
Time of Concentration Calculations (Tc)
Proposed Flow Path
Description Length Grade Velocity Time
(ft) (%) (fps) (min.)
Overland Flow 300 ----0.5 10.0
Shallow Concentrated Flow/Pasture 1123 2.3 1.1 17.0
Shallow Concentrated Flow/Pasture 610 1.3 0.8 12.7
*Channelized Flow (Reach #2) 1843 0.9 3.3 9.3
TOTAL: 49.0
*Channel cross sections were used to determine channel velocity
Time of Concentration Tc Used
Existin Conditions 10 min. 49.0 min. 49.0 min.
PROPOSED
Area Curve
Number
(acres)
86.40 75
28.80 87
115.20 78
ESTATES AT SPRING CREEK DEVELOPMENT
SUB-BASIN #4 (40.96 acres)
October 2003
1045005
SCS Curve Number (CN) Allocation Table
By: JIG
DRAINAGE AREA TYPES EXISTING
Area Curve
Number
(acres)
Open Pasture, native grasses, natural grasslands 40.96 75
Low density residential, landscaped areas, large lots 0.00 0
Open Pasture, native grasses, natural grasslands
Low density residential, landscaped areas, large lots
Total: 40.96 75
Time of Concentration Calculations (Tc)
Proposed Flow Path
Description Length Grade Velocity Time
(ft} (%} (fps} (min.}
Overland Flow 300 ------0.50 10.0
Shallow Concentrated Flow/Pasture 920 2.4 1.10 13.9
Shallow Concentrated Flow/Pasture 1034 1.5 0.85 20.3
TOTAL: 44.2
Time of Concentration Tc Used
Existin Conditions 10 min. 44.2 min. 44.2 min.
PROPOSED
Area Curve
Number
(acres)
2.59 75
38.37 85
40.96 84
ESTATES AT SPRING CREEK DEVELOPMENT
SUB-BASIN #5 (23.04 acres)
October 2003
1045005
SCS Curve Number (CN) Allocation Table
By: JIG
DRAINAGE AREA TYPES EXISTING
Area Curve
Number
(acres)
Open Pasture, native grasses, natural grasslands 23.04 75
Low density residential, landscaped areas, large lots 0.00 0
Greenway, floodplain
Low density residential, landscaped areas, large lots
Total: 23.04 75
Time of Concentration Calculations (Tc)
Proposed Flow Path
Description Length Grade Velocity Time
(ft) (%) (fos) (min.)
Overland Flow 300 ----0.5 10.0
Shallow Concentrated Flow/Pasture 1075 2.4 1.1 16.3
Channelized Flow (Reach #3) 861 0.5 3.6 4.0
TOTAL: 30.3
*Channel cross sections were used to determine channel velocity
Time of Concentration Tc Used
Existin Conditions 10 min. 30.3 min. 30.3 min.
PROPOSED
Area Curve
Number
(acres)
2.66 75
20.38 85
23.04 84
~
r-z w
(..) a:: w a.
z
.W c.. 0 _J
(/")
w
(/") a:: ::>
0
(..) a:: w r-~
·' 50
20
10
5
3
2
.1 5 .
.5
.I
r!llUl\t. ' -VYt.r\LMllU rLVll'I Vt.LU\,,! I !1;..J Ul"l.Jl;.1.1 U1' .n .. vri..
.2 .5 2 3 5 10
I I I l 1,1
;~ I/ I/ ,, ~ , ' I' I
I v , 1-i"I I/ j Of
~r. I I [/ ~ 0:1
$' <' 1 II ,.,,,~ 0 I "-/ '1' -,::-I ,
~ ~'q'" lj v ~
{~$_11 l/ ~' , ..., ..., ..., ~%' 't
t:J . ~ t= : t$°·
;::,< I 't -"'" El-~ ' ..., J.. '=' • 0 ' 0 .... ~ ., ~ ' k' "' '{5_= l i J.. J I ~ 0._):!...,
~. · .. ~-~ ~ ... ~' ,;;1 -v-----"' ..._ .Iv.__ 4.t ~ < ~ ~ 0 !,,, I ,,_, ~ • ~~ " >''7 "'-~' ~ ,, q, "' ..!:!' I II I ~1 ~ -c., J.. I-"' I I ./-« ~ ~"'f tJ/
~ ,;.. ~ 'q'" ~ ~I I ~ 0 " ~/ ~
"8"/
:ft ~11 I iJ ~'5
11 '<.'<fl ::::1 I ~
I -"' ' Q. I
I 11 v· J I y :; '.)
I v v J -) y l! '[J u
~ II ·-J ,_ ,_ --[) IJ ~ ~
I 1. [/ I [J I -.2 .3 .5 2 3 5 10
VELOCITY, V (FT I SEC)
J
I
I
I
I
20
50
30
20
10
5
2
.5
20
Source: Texas Highway Department -Bridge Division Hydraulic Manual, 12/85
·---·
EXHIBIT D-1
24 Hour Rainfall depths for Selected Storm Return Periods1
Store Return Period, "t~
(Years) .
2
5
10
25
50
100
24 Hour Rainfall deoth. "P"
(Inches)
4.5
6.2
7.4
8.8
9.8
11.0
1 From National Weather Service Isohyetal Charts For Selected
J!eturn Periods
Curve Numbers and Percent Impervious Area
For Various Land Cover and Land Use2
Cateaorv Percent Imoervious t
LAND COVER:
Natural Woodlands O
Natural Grasslands O
Landscaped Areas O
Impervious Areas (Pavements,Rooftops,etc) 100
LAND USES:
Low Density Residential
KediU11 Density Residential
High Density Residential
Business/Col!llercial
Industrial
38
52
65
85
72
Curve Htillber
75
75
77
98
84
87
... 91
. 94
92
2 Fro1 "Urban Hydrology For Small Watersheds, Technical Release No. 55" of the
Soil Conservation Service
Drainage Report for
Estates at Spring Creek Development, Sections 1, 2, & 3
ATTACHMENT #5
HYDRAULIC MODEL & HYDROGRAPHS
October 2003
HEC-HMS Project: Reatta Subdivision Basin Model: SC - U ndev
Junction-1
Reach-1
Junction-2
Reach-2
Junction-3
Reach-3
Junction-4
HMS * Summary of Results
Project Reatta Subdivision Run Name Run 2
Start of Run
End of Run
Execution Time
01Jan01 0000 Basin Model SC -Undev Basin
02Jan01 0000 Met. Model 5 Year
240ct03 1444 Control Specs Control 1
Hydro logic Discharge Time of Volu11e Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 212.45 01 Jan 01 1414 78.374 0.390
Subbasin-2 154.01 01 Jan 01 1253 31.374 0.160
Junction-1 282.27 01 Jan 01 1321 109.75 0.550
Reach-1 282.27 01 Jan 01 1326 109.58 0.550
Subbasin-3 181.57 01 Jan 01 1243 32.538 0.180
Junction-2 416.24 01 Jan 01 1258 142.11 0.730
Reach-2 416.24 01 Jan 01 1308 141.67 0.730
Subbasin-4 69.681 01 Jan 01 1238 11.591 0.064
Junction-3 463.54 01 Jan 01 1302 153.26 0 .794
Reach-3 463.54 01 Jan 01 1306 153.07 0.794
Subbasin-5 56.779 01 Jan 01 1219 6.5651 0.036
Junction-4 478.06 01 Jan 01 1305 159.63 0.830
HMS * Summary of Results for Junction-4
Project Reatta Subdivision Run Name Run 2
Start of Run 01Jan01 0000 Basin Model SC -Undev Basin
End of Run 02Jan01 0000 Met. Model 5 Year
Execution Ti•e 240ct03 1444 Control Specs Control
Computed Results
Peak Outflow 478.06 (cfs) Date/Time of Peak Outflow 01 Jan 01 1305
Total Outflow 3.61 (in)
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 2/
5 YEAR UNDEVELOPED HYDROGRAPH
500-.----------------------------.
~
(J)
450
400
350
300
0 250
~
.Q 200
LL
150
100
50
t
l
0 4-~ ...... ~~...;...----;:_---------------------l
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 2 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run NHe Run 3
Start of Run
End of Run
Execution Time
01Jan01 0000
02Jan01 0000
240ct03 1445
Hydro logic Discharge
Element Peak
(cfs)
Subbasin-1 271. 78 01
Subbasin-2 198.61 01
Junction-1 363.78 01
Reach-1 363.78 01
Subbasin-3 237.77 01
Junction-2 541.41 01
Reach-2 541.41 01
Subbasin-4 91.217 01
Junction-3 604.07 01
Reach-3 604.07 01
Subbasin-5 74.212 01
Junction-4 623.02 01
Basin Model
Met. Model
Control Specs
Time of
Peak
Jan 01 1413
Jan 01 1253
Jan 01 1319
Jan 01 1324
Jan 01 1243
Jan 01 1257
Jan 01 1307
Jan 01 1238
Jan 01 1301
Jan 01 1305
Jan 01 1219
Jan 01 1304
SC -Undev Basin
10 Year
Control 1
Volume Drainage
(ac Area
ft) (sq 11i)
100.41 0.390
40.461 0.160
140.87 0.550
140.66 0.550
42.478 0.180
183.14 0.730
182.59 0.730
15.130 0.064
197.72 0.794
197.48 0.794
8.5668 0.036
206.05 0.830
HMS * Summary of Results for Junction-4
Project Reatta Subdivision Run Name Run 3
Start of Run 01Jan01 0000 Basin Model SC -Undev Basin
End of Run 02Jan01 0000 Met. Model 10 Year
Execution TiMe 240ct03 1445 Control Specs Control 1
Computed Results
Peak Outflow 623.02 (cfa) Date/Ti•• of Peak Outflow 01 Jan 01 1304
Total Outflow 4.65 (in)
600
500
400
~ 300
.Q
LL
200
100
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 3/
10 YEAR UNDEVELOPED HYDROGRAPH
0 -1-~---~~.....---m=;.--~-,....~~.,--~---r~~-T-~~
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 3 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na•e Run 4
Start of Run
End of Run
Execution Time
01Jan01 0000 Basin Model SC • Undev Basin
02Jan01 0000 Met. Model 25 Year
240ct03 1445 Control Specs Control 1
Hydro logic Discharge Time of Volu•e Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 341.78 01 Jan 01 1412 126.68 0.390
Subbasin-2 251.34 01 Jan 01 1252 51.338 0.160
Junction-1 460.32 01 Jan 01 1319 178.02 0.550
Reach-1 460.32 01 Jan 01 1324 177.77 0.550
Subbasin-3 304.70 01 Jan 01 1242 54.455 0.180
Junction-2 690.26 01 Jan 01 1256 232.22 0.730
Reach-2 690.26 01 Jan 01 1306 231.56 0.730
Subbasin-4 116.88 01 Jan 01 1237 19.395 0.064
Junction-3 771.27 01 Jan 01 1301 250.96 0.794
Reach-3 771.27 01 Jan 01 1305 250.67 0.794
Subbasin-5 94.944 01 Jan 01 1218 10.978 0.036
Junction-4 795.52 01 Jan 01 1303 261.65 0.830
HMS * Summary of Results for Junction-4
Project Reatta Subdivision Run Name Run 4
Start of Run 01Jan01 0000 Basin Model SC • Undev Basin
End of Run 02Jan01 0000 Met , Model 25 Year
Execution Ti•e 240ct03 1445 Control Specs Control
Computed Results
Peak Outflow 795.52 (cfs) Date/Ti•e of Peak Outflow 01 Jan 01 1303
Total Outflow 5.91 (in)
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 4/
25 YEAR UNDEVELOPED HYDROGRAPH
900
800
700
600
"""' 500 (J)
""--0
"-/
~ 400
.Q
LL
300
200
100
o~~--"~------==---~--~~---~---~~--~---1
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 4 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na•e Run 5
Start of Run
End of Run
Execution Tille
01Jan01 0000
02Jan01 0000
240ct03 1445
Hydrologic Discharge
Element Peak
(cfs)
Subbasin-1 392.02 01
Subbasin-2 289.22 01
Junction-1 529.78 01
Reach-1 529.78 01
Subbasin-3 353.02 01
Junction-2 797.66 01
Reach-2 797.66 01
Subbasin-4 135.40 01
Junction-3 891.99 01
Reach-3 891.99 01
Subbasin-5 109.91 01
Junction-4 919.94 01
Basin Model
Met. Model
Control Specs
Time of
Peak
Jan 01 1411
Jan 01 1252
Jan 01 1318
Jan 01 1323
Jan 01 1242
Jan 01 1256
Jan 01 1306
Jan 01 1237
Jan 01 1300
Jan 01 1304
Jan 01 1218
Jan 01 1303
SC -Undev Basin
50 Year
Control 1
Volume Drainage
(ac Area
ft) (sq 11i)
145.72 0.390
59.234 0.160
204.95 0.550
204.67 0.550
63.189 0.180
267.86 0.730
267.11 0.730
22.505 0.064
289.62 0.794
289.29 0.794
12.736 0.036
302.03 0.830
HMS * Summary of Results for Junction-4
Project Reatta Subdivision Run Na•e Run 5
Start of Run
End of Run
Execution Time
Computed Results
01Jan01 0000
02Jan01 0000
240ct03 1445
Basin Model
Met. Model
Control Specs
SC • Undev Basin
50 Year
Control 1
Peak Outflow 919.94 (cfs) Date/Ti•e of Peak Outflow 01 Jan 01 1303
Total Outflow 6.82 (in)
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 5/
50 YEAR UNDEVELOPED HYDROGRAPH
1000-....-----.....,.-----------------.
900
800
700 .
600
"' ID
II--500 0
"-/
~
Q 400
LL
300
200
100 .
o~~_...~--...-m:::::=---.---.---T-----.---..,....---J
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 5 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na11e Run 6
Start of Run
End of Run
Execution Time
01Jan01 0000 Basin Model SC -Undev Basin
02Jan01 0000 Met. Model 100 Year
240ct03 1446 Control Specs Control 1
Hydro logic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq •i)
Subbasin-1 452.40 01 Jan 01 1410 168.77 0.390
Subbasin-2 334.76 01 Jan 01 1252 68.812 0.160
Junction-1 613.37 01 Jan 01 1318 237.58 0.550
Reach-1 613.37 01 Jan 01 1323 237.26 0.550
Subbasin-3 411.29 01 Jan 01 1242 73.814 0.180
Junction-2 927 .10 01 Jan 01 1255 311.07 0.730
Reach-2 927 .10 01 Jan 01 1305 310.23 0.730
Subbasin-4 157.72 01 Jan 01 1237 26.288 0.064
Junction-3 1037.5 01 Jan 01 1300 336.52 0.794
Reach-3 1037.5 01 Jan 01 1304 336.15 0.794
Subbasin-5 127.95 01 Jan 01 1218 14.875 0.036
Junction-4 1070.0 01 Jan 01 1302 351.02 0.830
HMS * Summary of Results for Junction-4
Project Reatta Subdivision Run Na•e Run 6
Start of Run 01Jan01 0000 Basin Model SC • Undev Basin
End of Run 02Jan01 0000 Met. Model 100 Year
Execution Time 240ct03 1446 Control Specs Control 1
Co•puted Results
Peak Outflow 1070.0 (cfs) Date/Ti•e of Peak Outflow 01 Jan 01 1302
Total Outflow 7.93 (in)
"' <D
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 6/
100 YEAR UNDEVELOPED HYDROGRAPH
1200-------------------------.
1000
800 r
I
0 600
~
.Q
LL
400
200
·04----P--.....-=-----.---..----....----.---...-----1
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21 :00 24:00
I 01Jan2001
-JUNCTION-4 RUN 6 FLOW
HEC-HMS Project: Reatta Subdivision Basin Model: SC -Dev.
Junction-1
Reach-1
Junction-2
Reach-2
Junction-3
Reach-3
Junction-4
HMS * Summary of Results
Project Reatta Subdivision Run Na•e : Run 8
Start of Run
End of Run
Execution Time
01Jan01 0000 Basin Model SC -Dev. Basin
02Jan01 0000 Met. Model 5 Year
240ct03 1446 Control Specs Control 1
Hydrologic Discharge Time of Volume Drainage
Ele•ent Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 212.45 01 Jan 01 1414 78.374 0.390
Subbasin-2 154.01 01 Jan 01 1253 31.374 0.160
Junction-1 282 .27 01 Jan 01 1321 109.75 0.550
Reach-1 282.27 01 Jan 01 1326 109.58 0.550
Subbasin-3 198.27 01 Jan 01 1243 35.425 0.180
Junction-2 430.19 01 Jan 01 1257 145.00 0.730
Reach-2 430.19 01 Jan 01 1307 144.55 0.730
Subbasin-4 150.14 01 Jan 01 1213 14.866 0.064
Junction-3 452 .89 01 Jan 01 1304 159.42 0.794
Reach-3 452.89 01 Jan 01 1308 159.23 0.794
Subbasin-5 64.598 01 Jan 01 1223 8.3342 0.036
Junction-4 473.26 01 Jan 01 1305 167.56 0.830
HMS * Su•mary of Results for Junction-4
Project Reatta Subdivision
Start of Run 01Jan01 0000 Basin Model
End of Run 02Jan01 0000 Met. Model
Run Name Run 8
SC -Dev. Basin
5 Year
Execution Time 240ct03 1446 Control Specs Control 1
Computed Results
Peak Outflow 473.2& (cfs) Date/Time of Peak Outflow 01 Jan 01 1305
Total Outflow 3.79 (in)
"' (J)
400
350
300
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 8/
5 YEAR DEVELOPED HYDROGRAPH
+ -+-
0 250
~ Q 200 -
LL
150
100
50
o ~--~----,...--ie::::::::;:__~--~~....-~--.-~~--~~
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 8 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na11e : Run 9
Start of Run
End of Run
Execution Ti•e
01Jan01 0000 Basin Model SC • Dev. Basin
02Jan01 0000 Met. Model 10 Year
240ct03 1447 Control Specs Control 1
Hydrologic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 271. 78 01 Jan 01 1413 100.41 0.390
Subbasin-2 198.61 01 Jan 01 1253 40.461 0.160
Junction-1 363.78 01 Jan 01 1319 140.87 0.550
Reach-1 363.78 01 Jan 01 1324 140.66 0.550
Subbasin-3 255.60 01 Jan 01 1242 45.678 0.180
Junction-2 556.38 01 Jan 01 1256 186.33 0.730
Reach-2 556.38 01 Jan 01 1306 185.79 0.730
Subbasin-4 187.66 01 Jan 01 1213 18.725 0.064
Junction-3 584.72 01 Jan 01 1303 204.51 0.794
Reach-3 584.72 01 Jan 01 1307 204.27 0.794
Subbasin-5 80.855 01 Jan 01 1223 10.499 0.036
Junction-4 610.30 01 Jan 01 1305 214.77 0.830
HMS * SuMmary of Results for Junction-4
Project Reatta Subdivision
Start of Run 01Jan01 0000 Basin Model
End of Run 02Jan01 0000 Met. Model
Run Name Run 9
SC -Dev. Basin
10 Year
Execution Time 240ct03 1447 Control Specs Control 1
Co11puted Results
Peak Outflow 610.30 (cfs) Date/Time of Peak Outflow 01 Jan 01 1305
Total Outflow 4.85 (in)
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 9/
10 YEAR DEVELOPED HYDROGRAPH
700
600
500
400 L
"' (J)
\i.-0
l...J
~ 300
Q
LL
200
100
o -1-~_... ____ ..._-==~l--~-.-~~....--~__,..~~-.-~--1
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 9 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na•e : Run 10
Start of Run
End of Run
Execution Ti111e
01Jan01 0000 Basin Model SC -Dev. Basin
02Jan01 0000 Met. Model 25 Year
240ct03 1447 Control Specs Control 1
Hydro logic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq 11i)
Subbasin-1 341.78 01 Jan 01 1412 126.68 0.390
Subbasin-2 251.34 01 Jan 01 1252 51.338 0.160
Junction-1 460.32 01 Jan 01 1319 178.02 0.550
Reach-1 460.32 01 Jan 01 1324 177. 77 0.550
Subbasin-3 323.34 01 Jan 01 1242 57.948 0.180
Junction-2 705.94 01 Jan 01 1255 235.72 0.730
Reach-2 705.94 01 Jan 01 1305 235.05 0.730
Subbasin-4 231.47 01 Jan 01 1212 23.292 0.064
Junction-3 740.92 01 Jan 01 1303 258.34 0.794
Reach-3 740.92 01 Jan 01 1307 258.05 0.794
Subbasin-5 99.836 01 Jan 01 1222 13.061 0.036
Junction-4 772.64 01 Jan 01 1304 271.11 0.830
HMS * Sum•ary of Results for Junction-4
Project Reatta Subdivision Run Name Run 10
Start of Run
End of Run
Execution Time
Computed Results
01Jan01 0000 Basin Model
02Jan01 0000 Met. Model
240ct03 1447 Control Specs
SC -Dev. Basin
2S Year
Control
Peak Outflow 772.64 (cfs) Date/Ti•e of Peak Outflow 01 Jan 01 1304
Total Outflow 6.12 (in)
r'\
(l)
700
600
500
0 400
~ ~ 300
200
100
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 10/
25 YEAR DEVELOPED HYDROGRAPH
o -+-~-.----.....-~=--.--~--~~---~--~~--!.-~--'
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21 :00 24:00
I 01Jan2001
-JUNCTION-4 RUN 10 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na•e : Run 11
Start of Run
End of Run
Execution Time
01Jan01 0000
02Jan01 0000
240ct03 1447
Hydro logic Discharge
Element Peak
{cfs)
Subbasin-1 392.02 01
Subbasin-2 289.22 01
Junction-1 529.78 01
Reach-1 529.78 01
Subbasin-3 371.97 01
Junction-2 813.65 01
Reach-2 813.65 01
Subbasin-4 262.68 01
Junction-3 853.28 01
Reach-3 853.28 01
Subbasin-5 113.36 01
Junction-4 889.40 01
Basin Model
Met. Model
Control Specs
Time of
Peak
Jan 01 1411
Jan 01 1252
Jan 01 1318
Jan 01 1323
Jan 01 1242
Jan 01 1255
Jan 01 1305
Jan 01 1212
Jan 01 1302
Jan 01 1306
Jan 01 1222
Jan 01 1304
SC -Dev. Basin
50 Year
Control 1
Volu•e Drainage
{ac Area
ft) {sq mi)
145.72 0.390
59.234 0.160
204.95 0.550
204 .67 0.550
66.856 0.180
271.52 0.730
270.77 0.730
26.582 0.064
297.36 0.794
297.03 0.794
14.907 0.036
311.94 0.830
HMS * Su•mary of Results for Junction-4
Project Reatta Subdivision Run Na•e Run 11
Start of Run 01Jan01 0000 Basin Model SC • Dev. Basin
End of Run 02Jan01 0000 Met. Model 50 Year
Execution Time 240ct03 1447 Control Specs Control 1
Computed Results
Peak Outflow 889.40 (cfs) Date/Time of Peak Outflow 01 Jan 01 1304
Total Outflow 7.05 (in)
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 11 /
50 YEAR DEVELOPED HYDROGRAPH
900----------------------...
800
700
600
""' 500 (J)
11--0
\,,../ ~ 400
.Q
LL
300
200
100
---+
..
I
o +-----r----lll!fl!=~-r----r---"T------.----.-----1
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21 :00 24:00
I 01Jan2001
-JUNCTION-4 RUN 11 FLOW
HMS * Summary of Results
Project Reatta Subdivision Run Na•e : Run 12
Start of Run
End of Run
Execution Time
01Jan01 0000 Basin Model SC -Dev. Basin
02Jan01 0000 Met. Model 100 Year
240ct03 1448 Control Specs Control 1
Hydro logic Discharge Time of Volume Drainage
Element Peak Peak (ac Area
(cfs) ft) (sq mi)
Subbasin-1 452.40 01 Jan 01 1410 168.77 0.390
Subbasin-2 334.76 01 Jan 01 1252 68.812 0.160
Junction-1 613.37 01 Jan 01 1318 237.58 0.550
Reach-1 613.37 01 Jan 01 1323 237.26 0.550
Subbasin-3 430.41 01 Jan 01 1242 77.660 0.180
Junction-2 943.30 01 Jan 01 1255 314.92 0.730
Reach-2 943.30 01 Jan 01 1305 314 .07 0.730
Subbasin-4 300.00 01 Jan 01 1212 30.552 0.064
Junction-3 988.63 01 Jan 01 1302 344.62 0.794
Reach-3 988.63 01 Jan 01 1306 344.25 0.794
Subbasin-5 129.54 01 Jan 01 1222 17.134 0.036
Junction-4 1029.9 01 Jan 01 1304 361.39 0.830
HMS * Summary of Results for Junction-4
Project Reatta Subdivision Run Name Run 12
Start of Run 01Jan01 0000 Basin Model SC -Dev. Basin
End of Run 02Jan01 0000 Met. Model 100 Year
Execution Time 240ct03 1448 Control Specs Control 1
Co•puted Results
Peak Outflow 1029.9 (cfs) Date/Ti•e of Peak Outflow 01 Jan 01 1304
Total Outflow 8.16 (in)
,.....,_
(J)
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 12/
100 YEAR DEVELOPED HYDROGRAPH
1200......------------------------.
1000
800
0 600
400 t
200
o -+-~--f-----~==---.---r---.---~--..:-.-----1
24:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 24:00
I 01Jan2001
-JUNCTION-4 RUN 12 FLOW
"" (J)
500
450
400
350
300
~ 250 0
~ 200
LL
150
100
50
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 2/
5 YEAR DESIGN STORM HYDROGRAPH
UNDEVELOPED vs DEVELOPED
UNDEVELOPED HYDRO-CURVE
o-b=~~~~-r-~--r-~.--~_J
09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
01Jan2001
-JUNCTION-4 RUN 2 FLOW -JUNCTION-4 RUN 8 FLOW
r'\.
(J)
~ 0
'-/
~
.Q
LL
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 3/
10 YEAR DESIGN STORM HYDROGRAPH
UNDEVELOPED vs DEVELOPED
700-.--------------------...,....----.
600
500
400 DEVELOPED HYDRO-CURVE
300
200
UNDEVELOPED HYDRO-CURVE
100
o-t---r---...---r-----.-----.---.-----------1
09:00 10:00 11 :00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
01Jan2001
-JUNCTION-4 RUN 3 FLOW -JUNCTION-4 RUN 9 FLOW
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 4/
25 YEAR DESIGN STORM HYDROGRAPH
UNDEVELOPED vs DEVELOPED
goo-----~------------------
800
700
600
I'"\ 500
(J)
11-0
'-../ 400 ~
.Q
LL 300
200
100
+-----+ -
I
+
+
+
DEVELOPED HYDRO-CURVE
UNDEVELOPED HYDRO-CURVE
+ +-
0---------..---..----------.---.------------1
09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
01Jan2001
-JUNCTION-4 RUN 4 FLOW -JUNCTION-4 RUN 10 FLOW
r'\.
(J)
1000
900
800
700
600
II-500 0
~ _Q 400
LL
300 -
200
100
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 5/
50 YEAR DESIGN STORM HYDROGRAPH
UNDEVELOPED vs DEVELOPED
UNDEVELOPED HYDRO-CURVE
o-;-.---.-.----..~.---..--.---.-.----.-.---....--.---.--.---.-.--~
09:00 10:00 11 :00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
01Jan2001
-JUNCTION-4 RUN 5 FLOW -JUNCTION-4 RUN 11 FLOW
,,......
(J)
Ii-0
'-/
~
_Q
LL
1200
1000
800
600 -
400
200
//JUNCTION-4/FLOW/31 DEC2000/1 MIN/RUN 6/
100 YEAR DESIGN STORM HYDROGRAPH
UNDEVELOPED vs DEVELOPED
1
UNDEVELOPED HYDRO-CURVE
-+
o-+-~-.-~--..~~.....-~-.--~-+-~---.~~.....-~---~-1
09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00
01Jan2001
-JUNCTION-4 RUN 6 FLOW -JUNCTION-4 RUN 12 FLOW
Drainage Report for October 2003
Estates at Spring Creek Development, Sections 1, 2, & 3
ATTACHMENT #6
STORM SEWER SYSTEM LAYOUT, PROFILES, & SUPPORT DATA
REATTA MEADOWS SUBDIVISION, SECTION 1
(4 SHEETS)
STORM SEWER 'A' & 'C'
DESIGN STORM EVENTS
2 Year Storm Event-Storm Sewer 'A' & 'C'
Line Line Invert HGL HGL Curb Capacity Vel
No. ID Up Dn Up Length Full Ave
(ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Al Inlet Box #20 43.00 Cir 1 0.013 283.11 284.73 287.11 287.26 5.00 106.18 4.27
2 A2 Inlet Box #19 41.41 36 Cir 0.010 285.53 286.24 288.53 288.29 1000 113.42 6.95
3 A3 f Inlet Box #18 15.33 30 CJ!:J 0.010 287.61 291.79 290.11 293.10 10.00 94.81 4.51
4 A4 Junct. Box #1 7.05 18 Cir 0.010 292.89 294.61 294.39 295.62 17.56 4.77
5 A5 Inlet Box #17 7.05 18 Cir 0.010 294.71 306.3~ 296.21 307.37 10.00 19.63 4.77
6 Cl Junct. Box #2 16.20 30 Cir 0.010 287.61 290.74 290.11 292.09 54.06 4.66
7 C2 Junct. Box #3 16.20 30 Cir I 0.010 290.84 291.01 293.34 , 293.39 26.22 3.33 >-----
8 C3 Inlet Box #14 16.20 30 Cir 0.010 291.11 294.65 293.61 296.00 10.00 68.53 4.66
9 C4 Inlet Box #16 14.38 30 Cir 0.010 294.75 294.83 297.25 297.27 10.00 25.46 2.94
10 C5 Inlet Box #15 6.36 18 Cir 0.010 295.83 302.14 297.48 303.10 10.00 16.09 4.45
5 Year Storm Event -Storm Sewer 'A' & 'C'
Line Line Inlet Flow Line Line n-value Invert Invert HGL HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe Dn Up Dn Up Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Al Inlet Box #20 53.63 48 Cir 0.013 283.11 284.73 287.11 287.37 5.00 106.18 5.19
2 A2 Inlet Box #19 51.64 36 Cir 0.010 285.53 286.24 288.53 288.53 10.00 113.42 8.11
3 A3 Inlet Box #18 19.06 J. 30 Cir 1 0.010 287.61 291.79 290.39 293.25 10.00 94.81 5.15
4 A4 Junct. Box #1 8.77 18 Cir 0.010 292.89 294.61 294.39 295.74 17.56 5.55
5 A5 Inlet Box #17 8.77 18 Cir 0.010 294.71 306.36 296.21 307.49 10.00 19.63 5.55
6 Cl Junct. Box #2 20.20 30 Cir 0.010 287.61 290.74 290.39 292.24 54.06 5.34
7 C2 Junct. Box #3 20.20 30 Cir 0.010 290.84 291.01 293.34 293.43 26.22 4.14 ___, ~ --<
8 C3 Inlet Box #14 20.20 30 Cir 0.010 29111 294.65 293.66 296.15 10.00 68.53 5.34
9 C4 Inlet Box #16 17.68 30 Cir 0.010 294.75 294.83 297.25 297.281 10.00 25.46 3.61
10 C5 Inlet Box #15 7.92 18 Cir 0.010 295.83 302.14 297.59 303.21 10.00 16.09 5.17
10 Year Storm Event -Storm Sewer 'A' & 'C'
Line Line Inlet Flow Line Line n-value Invert 11 Invert HGL HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe Dn Up Dn Up Length Full Ave
.. ., ....... .. ·--.......... ~
(cfs) (in) (ft) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Al ~t Box#20 60.39 48 Cir 0.013 283.11 284.73 287.11 287.45 5.00 106.18 5.72
2 A2 Inlet Box #19 58.17 36 Cir 0.010 285.53 286.24 288.53 288.67 10.00 113.42 8.86
3 A3 ] 1nlet Box #18 21.40 30 Cir 1 0.010 ' 287.61 291.79 j 290.77 293.34 10.00 94.81 J 5.54
4 A4 Junct. Box #1 9.84 18 Cir 0.010 292.89 294.61 294.39 295.81 .... 17.56 6.04
5 A5 Inlet Box #17 9.84 18 Cir 0.010 294.71 306.36 J 296.21 307.56 10.00 19.63 T 6.04
6 Cl Junct. Box #2 22.76 30 Cir 0.010 287.61 290.74 290.77 292.33 .... 54.06 5.76
7 C2 J Junct. Box #3 22.76 30 Cir 0.010 290.84 291.01 293.34 293.46 .... 26.22 4.65
8 C3 Inlet Box #14 22.76 30 Cir 0.010 291.11 294.65 293.74 296.24 1000 68.53 5.76
9 C4 Inlet Box #16 19.64 30 Cir 0.010 294.75 294.83 297.35 297.40 10.00 25.46 4.00
10 C5 Inlet Box #15 8.91 18 Cir 0.010 295.83 302.14 297.77 303.28 10.00 16.09 5.61
I ---+-I l
I
l
I
-
l i
I l [ I -
---
I
25 Year Storm Event-Storm Sewer 'A' & 'C'
Line Line Inlet Flow Line Line n-value Invert Invert HGL HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe On Up On Up Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Al Inlet Box #20 69.01 48 Cir 0.013 283.11 284.73 287.11 287.58 5.00 106.18 6.34
2 A2 Inlet Box #19 66.46 36 Cir 0.010 285.53 286.24 288.53 288.85 10.00 113.42 9.79
3 A3 Inlet Box #18 24.37 l 30 Cir LQ.010 287.61 291.79 291.27 293.44 10.00 94.81 16.03 -4 A4 Junct. Box #1 11.18 18 Cir 0.010 292.89 294.61 294.39 295.89 17.56 6.64
5 A5 Inlet Box #17 11.18 18 Cir 0.010 294.71 306.36 296.23 307.64 10.00 19.63 6.64
6 Cl Junct. Box #2 26.03 30 Cir 0.010 287.61 290.74 291.27 292.45 54.06 6.30
7 C2 Junct. Box #3 26.03 30 Cir 0.010 290.84 291.01 293.34 293.50 26.22 5.30
8 C3 Inlet Box #14 26.03 30 Cir 0.010 291.11 294.65 293.88 296.36 10.00 68.53 6.30
9 C4 Inlet Box #16 21.99 30 Cir 0.010 294.75 294.83 297.60 297.66 10.00 25.46 4.48
10 C5 Inlet Box #15 10.19 18 Cir 0.010 295.83 302.14 298.13 303.36 10.00 16.09 6.20
50 Year Storm Event-Storm Sewer 'A' & 'C'
11 Line ~--"• I Invert I HGL 11 HGL Line Inlet Flow Line Line n-value Invert Curb I' Capacity Vel
No. ID ID Rate Size Type Pipe On Up On Up Length Full Ave --I! ccts) -(in) (ft) Ii (ft) (ft) (ft) (ft) If (cfs) (ft/s)
1 Al Inlet Box #20 77.87 48 Cir 0.013 I 283.11 284.73 1 287.11 1 287.75 ~00 106.18 I 6.92 1~
2 A2 Inlet Box #19 75.00 36 Cir 0.010 285.53 286.24 288.53 288.96 10.00 113.42 10.87
,~~Inlet Box #18127.31 30 Cir 1 0.010 \ 287.61 291.79 291.85 293.54 1 10.00 I I 94.81 .i_..§.51
4 A4 Junct. Box #1 12.39 18 Cir 0.010 292.89 294.61 294.39 295.94 .... 17.56 7.24
Cir r 0.010 1 294.71 1 306.36 ~296.33 I -5 I A5 j Inlet Box #17 1 12.39 1 18 307.69 10.00 I 19.63 7.24
6 Cl Junct. Box #2 29.47 30 Cir 0.010 287.61 290.74 291.85 292.56 .... 54.06 6.85 _u C2 I Junct. Box #3 29.47 r 30 I Cir I 0.010 I 290.84 291.01 1 293.34 I 293.51 T .... 26.22 6.00 -----
8 C3 Inlet Box #14 29.47 30 Cir 0.010 291.11 294.65 293.99 296.46 1000 68.53 6.86
9 I C4 ] Inlet Box #l§} 24.36 --30 Cir 0.010 294.75 , 294.~ 297.86 1297.93! 10.00 25.46 I 4.96
10 C5 Inlet Box #15 11.52 18 Cir 0.010 295.83 302.14 298.50 303.44 10.00 16.09 6.81 ,..
I ·-----
r ---
---
I
! -·---
'
~ ·-~
---! -
I
\ r---
100 Year Storm Event -Storm Sewer 'A' & 'C'
•. I~ --• l~~rt---II ·-Line Line Inlet Flow Line Line n-value Invert HGL HGL 1 Curb Capacity Vel
No. ID ID Rate Size Type Pipe Dn Up Dn Up I! Length I Full Ave ... ,_ -!i -
(cfs) (in) (ft) (ft) (ft) II (ft) (ft) I (cfs) (ft/s)
1 Al Inlet Box #20 81.16 48 Cir 0.013 283.11 1 284.73 1 287.11 J287.82 5.00 106.18 7.12 ·---2 A2 Inlet Box #19 78.15 36 Cir 0.010 285.53 286.24 288.53 289.00 10.00 113.42 11.28
3 -r . I 1 -94.81 6.69 A3 1 Inlet Box #181 28.39 J-12.. C~OlO 287.61 291.79 J 292.08 293.57 10.00
--~ 4 A4 Junct. Box #1 12.82 18 Cir 0.010 292.89 294.61 294.39 295.96 .... 17.56 7.46
5 ~ Inlet Box #17T12.82 1 18 Cir I 0.010 I 294.71 , 306.36 I 296.37 I 307.71 1 10.00 I -T 19.63 7.46
6 Cl Junct. Box #2 30.75 30 Cir 0.010 287.61 290.74 292.08 292.95 .... 54.06 6.48
7 J C2 [Junct. Box #3! 30.75 , 30 1 Cir r 0.010 f 29o.84 291.01 1 293.34 [293.57 1 .... 26.22 6.26
8 C3 Inlet Box #14 30.75 30 Cir 0.010 29111 294.65 294.09 296.50 10.00 68.53 7.07
-2._] C4 J Inlet Box #16; 25.20 f 30 Cir 1 0.010 I 294.75 294.83 297.95 1 298.03 r 10.oo I 25.46 I 5.13
10 C5 Inlet Box #15 12 02 18 Cir 0.010 295.83 302.14 298.64 303.46 10.00 16.09 7.06 ---t -T r-I
I I '----
f ! l I --~·---
I I
,_
I -
,_ ~ -
STORM SEWER 'B' & 'D. E. F. G'
DESIGN STORM EVENTS
2 Year Stonn Event-Storm Sewer 'B' & 'D, E, F, G'
Line Line Inlet Flow Line Line n-value Invert Invert HGL HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe Dn Up Dn Up Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Bl Inlet Box #21 77.71 60 Cir 0.013 285.11 285.26 290.11 290.15 5.00 146.32 3.97
2 B2 Inlet Box #22 76.67 60 Cir 0.013 285.36 285.50 290.36 290.39 10.00 147.94 3.92
3 B3 Junct. Box #4 69.6?.J 60 Cir 0.013 J 285.74 286.99 290.74 290.741 249.13 I 3.98
4 B4 Inlet Box #13 69.84 60 Cir 0.013 287.79 287.87 292.79 292.80 5.00 159.80 3.56
5 B5 [ Inlet Box #12 62.82 60 Cir 0.013 287.97 288.08 293.10 293.121 15.00 151.95 [ 3.20
6 B6 Inlet Box #9 49.73 54 Cir 0.013 288.67 291.47 293.20 293.49 5.00 196.95 5.15
7 B7 Inlet Box #8 48.92 54 Cir ~.013 292.07 292.15 296.57 296.59 15.00 98.55 3.08
8 B8 Junct. Box #5 38.37 48 Cir 0.013 292.54 293.37 296.66 296.83 78.88 3.19
9 B9 Inlet Box #5 31.36 36 Cir 0.010 295.44 295.80 298.44 298.48 10.00 66.51 4.57
10 BlO Junct. Box #6 21.79 36 Cir 0.010 295.90 296.56 298.99 299.01 69.32 3.30
11 Bll Junct. Box #7 16.43 36 Cir 0.010 296.66 297.17 299.66 299.71 43.60 2.45
12 B12 Junct. Box #8 16.69 30 Cir 0.010 297.65 298.68 300.15 300.05 54.38 4.74
13 B13 Inlet Box #3 16.96 [ 30 Cir 0.010 298.78 299.03 22.! . .2~ 301.37 5.00 26.40 l 3.51
14 B14 Junct. Box #9 6.43 24 Cir 0.010 300.17 302.98 302.17 303.88 44.26 3.38
15 Bl5 Inlet Box #2 6.49 18 Cir 0.010 303.08 303.18 304.58 304.67 5.00 6.76 I 3.67
16 Bl6 Inlet Box #1 5.76 18 Cir 0.010 303.28 303.37 304.90 304.96 5.00 7.02 3.26
17 Dl Inlet Box #23 7.73 24 Cir 0.010 300.67 302.11 302.67 303.09 10.00 29.22 3.74
18 Gl Commercial 1 7.32 24 Cir 0.010 297.55 299.53 299.55 300.49 5.00 33.05 3.63
19 Fl Inlet Box #4 6.55 18 Cir 0.010 297.30 297.66 298.99 299.05 5.00 14.13 3.77
20 El Inlet Box #7 9.60 24 Cir 0.010 296.21 296.41 298.21 298.22 5.00 25.02 3.13
21 E2 Inlet Box #6 8.13 I 18 Cir 0.010 296.91 297.26 298.46 298.46 10.00 14.~ 4.98
22 Hl Junct. Box #10 6.97 24 Cir 0.010 291.17 293.36 293.17 294.29 .... 22.90 3.53
23 I H2 Inlet Box #11 7.04 j 18 Cir J 0.010 293.86 294.76 I 295.36 I 295.~ 5.00 15.46 l 4.77
24 H3 Inlet Box #10 6.98 18 Cir 0.010 294.76 294.90 296.30 296.38 10.00 8.85 3.96
25 D2 Inlet Box #24 0.63 18 Cir 0.010 300.01 300.67 301.66 301.66 1 5.00 20.08 0.43
5 Year Storm Event. Storm Sewer '8' & '0, E, F, G'
Line Line Inlet Flow Line Line n-value Invert Invert HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe On Up On Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Bl Inlet Box #21 101.78 60 Cir 0.013 285.11 285.26 290.11 290.18 5.00 146.32 5.19
2 B2 Inlet Box #22 100.34 60 Cir 0.013 285.36 285.50 290.47 290.50 1000 147.94 5.11
3 B3 Junct. Box #4 90.94 60 Cir 0.013 I 285.74 286.99 290.74 290.74 249.13 5.19
4 B4 Inlet Box #13 91.11 60 Cir 0.013 287.79 287.87 292.79 292.82 5.00 159.80 4.65
5 B5 Inlet Box #12 81.89 60 Cir 0.013 287.97 288.081 293.32 293.35 15.00 151.95 4.17
6 B6 Inlet Box #9 64.39 54 Cir 0.013 288.67 291.47 293.49 293.77 5.00 196.95 5.96
7 B7 ~Box#8 63.28 54 Cir 0.013 292.07 292.15 296.57 296.60 15.00 98.5~ 3.98 ,___
8 B8 Junct. Box #5 49.24 48 Cir 0.013 292.54 293.37 296.72 297.01 78.88 4.01
9 B9 Inlet Box #5 40.19 36 Cir 0.010 T 295.44 295.80 298.44 298.51 1 10.00 66.51 5.83
10 BlO Junct. Box #6 27.84 36 Cir 0.010 295.90 296.56 299.35 299.44 69.32 3.97
11 Bll Junct. Box #7 20.80 36 Cir 0.010 296.66 297.17 299.69 299.78 43.60 3.07
12 B12 Junct. Box #8 21 .06 30 Cir 0.010 297.65 298.68 300.15 300.21 54.38 5.48
13 B131 Inlet Box #3 21.34 30 i..-fir 0.010 298.78 299.03 301.28 301.42 5.00 26.40 4.38
14 814 Junct. Box #9 8.03 24 Cir 0.010 300.17 302.98 302.17 303.98 44.26 3.82
15 B15 Inlet Box #2 8.08 18 Cir 0.010 303.08 303.18 304.58 304.68 5.00 6.76 4.57
16 816 Inlet Box #1 7.15 18 Cir 0.010 303.28 303.37 305.04 305.13 5.00 702 4.05
17 01 Inlet Box #23 9.65 24 Cir 0.010 300.67 302.11 302.67 303.21 10.00 29.22 4.26
18 Gl Commercial 1 9.12 24 Cir 0.010 297.55 299.53 299.69 300.60 5.00 33.05 4.12
19 Fl Inlet Box #4 8.16 18 Cir 0.010 297.30 297.66 299.35 299.47Ll.00 14.13 4.62
20 El Inlet Box #7 11.95 24 Cir 0.010 296.21 296.41 298.21 298.23 5.00 25.02 3.89
21 E2 Inlet Box #6 10.11 18 Cir 0.010 296.91 297.26 298.60 298.76 10.00 14.20 5.72
22 Hl Junct. Box #10 8.72 24 Cir 0.010 291.17 293.36 293.32 294.41 22.90 4.01
23 H2 Inlet Box #11 8.79 18 Cir 0.010 293.86 294.76 1 295.36 295.89 I 5.oo 15.46 5.56
24 H3 Inlet Box #10 8.68 18 Cir 0.010 294.76 294.90 296.54 296.67 10.00 8.85 4.91
25 02 Inlet Box #24 0.78 18 Cir 0.010 300.01 300.67 301.88 301.88 5.00 20.08 0.48
__).,..
10 Year Storm Event-Storm Sewer 'B' & 'D, E, F, G'
Line Line Inlet Flow Line Line n-value Invert Invert HGL HGL Curb Capacity Vet
No. ID ID Rate Size Type Pipe Dn Up Dn Up Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Bl Inlet Box #21 117.61 I 60 I Cir _J. 0.013 285.11 285.26 290.11 290.20 5.00 146.32 6.00
2 B2 Inlet Box #22 115.90 60 Cir 0.013 285.36 285.50 290.59 290.68 1000 147.94 5.90
3 B3 l Junct. Box #4 ' 104.88 j 60 Cir J 0.013 .1_85.74 286.99 290.95 291.02 l .... 249.13 I 5.76
4 B4 Inlet Box #13 105.06 60 Cir 0.013 287.79 287.87 292.79 292.82 5.00 159.80 5.36
5 B5 j Inlet Box #12 1 94.39 60 Cir 0.013_ 287.97 I 288.08 1 293.49 293.53 I 15.oo 151.95 4.81
6 B6 Inlet Box #9 73.94 54 Cir 0.013 288.67 291.47 293.71 293.94 5.00 196.95 6.47
7 B7 Inlet Box #8 72.63 ~ Cir 0.013 292.07 292.15 296.57 ~96.61 l 15.oo 98.55 4.57 ----
8 B8 Junct. Box #5 56.29 48 Cir 0.013 292.54 293.37 296.77 297.16 .... 78.88 4.53
9 B9 Inlet Box #5 45.91 I 36 Cir 0.010 I 295.44 295.801 298.44 J 298.54 I 10.00 66.51 6.64
10 BlO Junct. Box #6 31.75 36 Cir 0.010 295.90 296.56 299.61 299.75 69.32 4.49
11 I Bll , Junct. Box #7 23.62 36 Cir I 0.010 296.66 291 .17 r 30Q.07 300.17 .... .J 43.60 3.34 --12 B12 Junct. Box #8 23.87 30 Cir 0010 297.65 298.68 300.30 300.31 54.38 5.95
13 B13 1 Inlet Box #3 I 24.14 30 Cir 0.010 298.78 299.03 301.28 301.47! 5.00 26.40 4.93
14 B14 Junct. Box #9 9.02 24 Cir 0.010 300.17 302.98 302.17 304.04 44.26 409
0.010 [ 303.08 303.18 r 304.58
,_
15 B15 Inlet Box #2 9.07 18 Cir 304.~ 5.00 6.76 5.13
16 Bl6 Inlet Box #1 803 18 Cir 0.010 303.28 303.37 305.21 305.33 5.00 7 02 4.54
17 I D 1 ~et Box #23 L 10.88 24 Cir 0.010 300.67 302.11 1 302.6!.i 303.2tl_10.oo 29.22 I 4.59
18 Gl Commercial 1 10.26 24 Cir 0.010 297.55 299.53 300.07 300.66 5.00 33.05 4.42
19 I Fl lJnlet Box #4 ~ 18 I Cir 0.010 297.30 297.66 299.61 J 299.77 1 5.00 14.13 5.20
20 El Inlet Box #7 13.42 24 Cir 0010 296.21 296.41 298.21 298.24 5.00 25.02 4.37
21 E2 Inlet Box #6 l 11.35 18 Cir I 0.010 296.91 297.26 298.70 298.9u 10.00 14.20 6.42
22 Hl Junct. Box #10 9.84 24 Cir 0.010 291.17 293.36 293.49 294.47 .... 22.90 4.31
23 ~ Inlet Box #11 9.91 18 Cir 0.010 293.86 294.76 295.36 295.96J 5.00 15.46 6.07
24 H3 Inlet Box #10 9.74 18 Cir 0.010 294.76 294.90 296.69 296.86 10.00 8.85 5.51
25 02 Inlet Box #24 0.88 18 Cir 0.010 300.01 300.67 302.04 302.05 l 5.00 20.08 0.51
l _J t
25 Year Storm Event-Storm Sewer '8' & 'D, E, F, G'
Line Line Inlet Flow Line Line n-value Invert Invert HGL HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe On Up On Up Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Bl Inlet Box #21 I 137.45 60 Cir 0.013 285.11 285.26 290.11 290.24 5.00 ' 146.32 I 7.oo
2 B2 Inlet Box #22 135.40 60 Cir 0.013 285.36 285.50 290.77 290.89 10.00 147.94 6.90
3 l BIT Junct. Box #4 1122.37] 6o _f!.U_ 0.013 285.741 286.99 1 291-26 1291.47 1 249.13 6.41
4 B4 Inlet Box #13 122.55 60 Cir 0.013 287.79 287.87 292.79 292.83 5.00 159.80 6.25
5 B5 Inlet Box #I2 1110.07L22..._, Cir 0.013 I 287.97 288.08 I 293.75 I 293.80 I 15.00 --:-t 151.95 I 5.61
6 B6 Inlet Box #9 85.95 54 Cir 0.013 288.67 291.47 294.05 294.22 5.00 196.95 6.93
~ LJ B7 ~tBox#8 84.40 ;5i} Cir , 0.013 1 292_011292_15 1296.s1I 296.63[i5.oo , 98.55 I 5.31
8 B8 Junct. Box #5 65.17 48 Cir 0.013 292.54 293.37 296.85 297.37 78.88 5.19
9 B9 I Inlet Box #5_l53.13 36 1 Cir I 0.010 I 295_44, 295.80 I 298A4 I 298.60 I 10.00 66.51 7.63
10 BlO Junct. Box #6 36.69 36 Cir 0.010 295.90 296.56 300.00 300.18 69.32 5.19
11 1 Bll I Junct_ Box #7lil8 ~I Cir 0.010 I 296.66 1 297.17 300.601300.80 I .... I 43.60 I 3-85
12 Bl2 Junct. Box #8 27.44 30 Cir 0.010 297.65 298.68 300.97 301.23 54.38 5.59
13 I Bl3 1 Inlet Box #3 I 27.71 I 30 LQ!:._J o.010""'298-78 299.03 301-60 i 301.87 r ~-;o 26.40 5.64
14 814 Junct. Box #9 10.32 24 Cir 0.010 300.17 302.98 302.62 304.12 44.26 4.44
15 I B15J -1Q.31I 18 1
,. ---Inlet Box #2 Cir 1 0.010 J 303.08 1 303.181 304.58 I 304.82 I 5.00 6.76 l 5.87
16 B16 Inlet Box #1 9.17 18 Cir 0.010 303.28 303.37 305.40 305.56 5.00 7.02 5.19
_!Z_l Dl Inlet Box #23 1 12.45 I 24 I Cir 1 omo]3oo.67 302.11J 302filI 303.36 I 10.00 29-22 ~0
18 Gl Commercial 1 11.72 24 Cir 0.010 297.55 299.53 300.60 300.74 5.00 33.05 4.81
19 Fl ~t Box#4 10.51 18 I Cir 1 0.010 ~7.30 l 297.66 j 300.00 1 3002Ql 5.00 14.13 5_95
20 El Inlet Box #7 15.34 24 Cir 0.010 296.21 296.41 298.21 298.25 5.00 25.02 4.98
21 1 E2 } Inlet Box #6 12.96 18 I Cir ] 0.010 1296.9I I 297.26J 298.85[299.1'.ij 10.00 14.20 7.33 ~
22 HI Junct. Box #10 11.26 24 Cir 0.010 291.17 293.36 293.75 294.55 .... 22.90 4.69
23 H2 I Inlet Box #11 I 11.33 J 18 Cir I 0.010 J 293.86 294.76 1295.36 j 296.05 ~ 15.46 I 6.72
24 H3 Inlet Box #10 11 .12 18 Cir 0.010 294.76 294.90 296.89 297.11 1000 8.85 6.30
25 I 02 Inlet Box #24 I 1.01 18 Cir 0.010 300.01 , 300.67 1 302.62 1 302.62 5.00 20.08 I 0.57
--l. t ~
50 Year Storm Event-Storm Sewer 'B' & '0, E, F, G'
Line Line Inlet Flow Line Line n-value Invert Invert HGL HGL Capacity Vel
No. ID ID Rate Size Type Pipe Dn Up Up Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Bl Inlet Box #21 158.40 60 Cir 0.013 285.11 285.26 290.11 290.26 146.32 8.07
2 B2 Inlet Box #22 156.00 60 Cir 0.013 285.36 285.50 290.97 291.12 10.00 147.94 7.95
3 B3 r Junct. Box #4 I 140.83 I GO T~ 0.013 1285.74 1 286.99 I 291.61 [29i.9:fil .... I 249.13 7.17
4 B4 Inlet Box #13 141 .02 60 Cir 0.013 287.79 287.87 292.79 292.85 5.00 159.80 7.18
5 B5 I Inlet Box #12 I 126.62 60 Cir 0.013 j 287.97 j 288.08 l 294.05 I 294.13 I 15.00 151.95 6.45
6 B6 Inlet Box #9 98.61 54 Cir 0.013 288.67 291.47 294.45 294.92 5.00 196.95 6.87
~__QI_ [Inlet Box #8 I 96.80 ~~ 0.013 I 292.07 1 292.15} 296.57 [ 296.65 I 15.00 98.55 6.09
8 B8 Junct. Box #5 74.53 48 Cir 0.013 292.54 293.37 296.93 297.68 78.88 5.93
9 I B9_llnlet Box #5 I 60.73 j 36 Cir 0.010 1295_44 1 295.so ! 298.441298.70 I l ~.oo 66.51 18.64
10 BlO Junct. Box #6 41.89 36 Cir 0.010 295.90 296.56 300.46 300.70 69.32 5.93
11 j Bll : Junct. Box #7 I 30.94 I 36 ~ 0.010 I 296.66 297.17 1 3oi.24J 301.50 r .... 43.60 4.38 __ ...__
12 Bl2 Junct. Box #8 31.19 30 Cir 0.010 297.65 298.68 301 .72 302.06 54.38 6.35
13 Bl3 1 Inlet Box #3 1 31.45 1 30 LQ!.J 0.010 I 298.78 1 299.03 302.53 [ 302.891 5.00 26.40 I 6.41
14 Bl4 Junct. Box #9 11.68 24 Cir 0.010 300.17 302.98 303.85 304.19 44.26 4.80
15 I B15f Inlet Box #2 [11.73 -18 r Cir 0.010 1 303.o8[3"Q:3~ 304.59 J 304.89f 5~~o 6.76 6.64
16 Bl6 Inlet Box #1 10.37 18 Cir 0.010 303.28 303.37 305.65 305.84 5.00 7.02 5.87
17 01 I Inlet Box #23 1 14.10 1 24 I Cir 0.010 I 300.67 I 302.11 J 303.85 I 304."181 10.oo , 29.22 14 .49
18 Gl Commercial 1 13.26 24 Cir 0.010 297.55 299.53 301.24 301.53 5.00 33.05 4.22
19 I Fl I Inlet Box #4 11.90 18 Cir 0.010 1 297.30 , 297.66 1 300.46 J 3oo7iT 5.oo 14.13 I 6.73
20 El Inlet Box #7 17.34 24 Cir 0.010 296.21 296.41 298.22 298.29 5.00 25.02 5.59
21 E2 I Inlet Box #6 14.65 I 18 ~ir I 0.010 296.91 297.261 299.04[299.41 flo.oo 1 14.20 -___,..j 8.29
22 Hl Junct. Box #10 12.77 24 Cir 0.010 291.17 293.36 294 05 294.69 22.90 4.90
23 I H2 [ Inlet Box #11 1 12.83 ~ Q!:.....i 0.010 293.861 294.76 I 295.36 J 296.11 I 5.oo 15.46 7.47
24 H3 Inlet Box #10 12.57 18 Cir 0.010 294.76 294.90 297.11 297.40 10.00 8.85 7.12
25 D2 ~Box#24 1 I 1.14 I 18 I Cir f 0.010 I 300.01 300.67 I 303.85 I 303.85 j 5.00 20.08 0.64
l --i
100 Year Storm Event-Storm Sewer 'B' & 'D, E, F, G'
Line Line Inlet Flow Line Line n-value Invert Invert HGL Curb Capacity Vel
No. ID ID Rate Size Type Pipe On Up On Length Full Ave
(cfs) (in) (ft) (ft) (ft) (ft) (cfs) (ft/s)
1 Bl Inlet Box #21 166.10 60 Cir 0.013 285.11 285.26, 290.11 290.26 5.00 146.32 8.46
2 B2 Inlet Box #22 163.56 60 Cir 0.013 285.36 285.50 291.04 291.21 10.00 147.94 8.33
3 B3 Junct. Box #4 147.62 60 Cir 0.013 285.74 286.99 291.75 292.19 249.13 7.52
4 B4 Inlet Box #13 147.81 60 Cir 0.013 287.79 287.87 29307 293.14 5.00 159.80 7.53
5 B5 Inlet Box #12 132.70 60 Cir 0.013 287.97 288.08 294.46 294.54 15.00 151.95 6.76
6 B6 Inlet Box #9 103.26 54 Cir 0.013 288.67 291.47 294.90 295.56 5.00 196.95 6.65
7 B7 Inlet Box #8 101.36 54 Cir 0.013 292.07 292.15 I 296.57 296.65 15.00 9~ 6.37
8 B8 Junct. Box #5 77.97 48 Cir 0.013 292.54 293.37 296.97 297.78 78.88 6.21
9 l B9 J Inlet Box #5 63.53 36 Cir 1 0.010 295.44 295.80 I 298.44 r 298.74 r 10.00 66.51 9.01
10 BlO Junct. Box #6 43.81 36 Cir 0.010 295.90 296.56 300.64 300.91 69.32 6.20
11 Bll Junct. Box #7 32.32 36 Cir 0.010 296.66 297.17 301.50 301.78 43.60 4.57
12 Bl2 Junct. Box #8 32.58 30 Cir 0.010 297.65 298.68 302.03 302.40 54.38 6.64
13 Bl3 I Inlet Box #3 32.84 30 Cir 0.010 298.78 299.03 ' 302.91 303.30f 5.00 26.40 6.69
14 Bl4 Junct. Box #9 12.20 24 Cir 0.010 300.17 302.98 304.34 304.44 44.26 4.43
15 Bl5 Inlet Box #2 12.25 18 Cir 0.010 303.08 303.18 304.73 305.05 5.00 6.76 6.93
16 Bl6 Inlet Box #1 10.82 18 Cir 0.010 303.28 303.37 305.88 306.09 5.00 7.02 6.13
17 01 Inlet Box #23 14.71 24 Cir 0.010 300.67 302.11 304.34 304.71 ._10.00 29.22 4.68
18 Gl Commercial 1 13.84 24 Cir 0.010 297.55 299.53 301.50 301 .85 5.00 33.05 4.41
19 Fl Inlet Box #4 12.42 18 Cir 0.010 I 297.30 297.66 300.64 300.92l2:._00 14.13 7.03
20 El Inlet Box #7 18.11 24 Cir 0.010 296.21 296.41 298.38 298.48 5.00 25.02 5.77
21 E2 Inlet Box #6 15.29 18 Cir 0.010 296.91 297.26 299.26 299.66 10.00 14.20 8.66
22 Hl Junct. Box #10 13.32 24 Cir 0.010 291.17 293.36 294.46 295.12 22.90 4.40
23 H2 Inlet Box #11 1 13.39 18 Cir 0.010 293.86 294.76 295.39 296.13 J...2 00 15.46 7.75
24 H3 Inlet Box #10 13.13 18 Cir 0.010 294.76 294.90 297.20 297.51 10.00 8.85 7.43
25 02 Inlet Box #24 1.19 18 Cir 0.010 300.01 300.67 304.34 304.34 5.00 20.08 0.67