Loading...
HomeMy WebLinkAboutFolderDEVELOPMENT PERMIT MINIM1JM SUBMIITAL REQumEMENTS n/a $100.00 Development Permit Application Fee. __lL Drainage and erosion control plan, with supporting Drainage Report two (2) copies each. n/a Notice ofintent (N.O.I.) if disturbed area is greater than 5 acres. LEGALDESCRIP110N __ Lo_t_4~,'--=B~l~cx:::~k_4~''---'--=-=--'-'--==~:__--=-=-:___,__,---:7"1,.,.c.+-------­ APPLICANT (Primary Contact for the Project): Name CITY OF OJLLEGE STATION Street Address P .o. Box 9960 City _c_.'--s_. ___________ _ State TX Zip Code 77842 E-Mail Address ------------- Phone Nurnber 764-3570 Fax Number ----------~ ------------------~ PROPER1Y OWNER'S INFORMATION: Name Same as above Street Address -----------------City -------------- State Zip Code E-Mail Address -------------------~ Phone Number Fax Number ----------~ ------------------~ ARCIDTECT OR ENGINEER'S INFORMATION: Name McCLl.JRE ENGINEERING, INC. Street Address 1 008 Woodcreek Drive City c.s. State TX Zip Code _7_7_8_45 __ _ E-Mail Address ------------- Phone Number 693-3838 Fax Number 693-2554 ----------~ ----'-'--'-----"---'-'-------------~ Application is hereby made for the following development specific site/waterway alterations: Construction of the 3MG Park Place Elevated Water Tower in the Wolf Pen Creek drainage basin ACKNOWLEDGMENTS: I, CITY OF OJLLEGE STATION , ~/owner, hereby aclmowledge or affirm that: The infonnation and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application,'I agree to construct the improvements proposed in this application i.ccording to these documents and the requirements of Chapter 13 of the College Station City Code. Property Owner(s) DEVELOPMENT PERMIT DPERMIT.DOC Jn4/99 Contractor l of2 CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A. I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of fl~ing from the 100 year storm. Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended. Engineer Date C. I, Michael R. McClure, P .t.certify that the alterations or development cd~~~~·llolll~m~kt~. diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted si~ tions or development are consistent with requirements of the City of College Station City Code, C~u;,·b ~ }' encroachments o~f flood ways and of floodway fringes. f·~~HAEL°R~M~CLU~g·~ fy7~, ~ &1/z3/ot \~J:.:; .. 3274()·~.::.~1 ~eer Date fa~ .f.'ltSTE~~·· ~ J ,, .s's •••••••• ~0 "" \\.,.~ONAL '(;: --,~~-·~- D. I, do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval: ~~~~~~~~~~~~~~~~~~~~~~~~~~~ In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. DEVELOPMENT PERMIT DPERMIT.DOC 3n4199 2of2 Drainage Report FOR Park Plac e Water Towe r Site VICINITY MAP NTS JULY, 2001 · Prepared By: McClure Engineering, Inc. 1008 Woodcreek Drive, Suite 103 College Station, Texas 77845 (979) 693-3838 Drajnage Report FOR Park Place Water Tower Site VICINITY MAP NTS JULY, 2001 · Prepared By: REVIEWED FOR ~ CCJ~~PLIANCE SEP 5 2001 COLLEGE STATION ENGINEERING McClure Engineering, Inc. 1008 Woodcreek Drive, Suite 103 College Station, Texas 77845 (979) 693-3838 ~ CERTIFICATION I, Kent M. Laza, Registered Professional Engineer No. 65923, State of Texas, certify that this report for the drainage design for the PARK PLACE WATER TOWER SITE project, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof DRAINAGE REPORT PARK PLACE WATER TOWER TABLE OF CONTENTS PARK PLACE WATER TOWER SITE DRAINAGE REPORT INTRODUTION 1 LOCATION 1 DESCRIPTION 1 DRAINAGE DESIGN CRITERIA 2 STORM DRAIN FACILITY DESIGN 2 DETENTION CRITERIA 3 SUMMARY 4 TABLE OF EXHIBITS EXCERPT FROM FLOOD INSURANCE RATE MAP A DRAINAGE AREA MAP -EXISTING CONDITION B-1 DRAINAGE AREA MAP -PROPOSED CONDITION B-2 RATIONAL FORMULA DRAINAGE AREA CALCULATIONS c DRAINAGE REPORT PARK PLACE WATER TOWER PARK PLACE WATER TOWER DRAINAGE REPORT INTRODUCTION: The purpose of this report is to describe potential drainage effects associated with the proposed development of the water tower site on Park Place adjacent to the new HEB Grocery Store. Results from this analysis are intended to demonstrate that the proposed drainage system complies with the City of College Station Drainage Policy and Design Standards (DPDS) by controlling runoff from this site. The project involves construction of a 3 million gallon elevated water storage tank and associated grading and paving. LOCATION: The site is located in College Station near the intersection of Texas Avenue and Park Place. It is bordered to the east and south by the proposed HEB Grocery Store, to the north by Park Place Drive, and to the west by Viking Apartments. DESCRIPTION: The site encompasses 1.04 acres of mostly open pasture with an average slope of about 2%. Stormwater from this site drains into Wolf Pen Creek and eventually to the Navasota River. No portion of the Park Place Water Tower Site is located in the 100-year Flood Hazard vlo/f ~ .ft"l Area of W1::18s0e Creek according to the Flood Insurance Rate Maps prepared by FEMA (Map Number 48041CO144 C, Effective Date July 2, 1992). DRAINAGE REPORT 1 PARK PLACE WATER TOWER DRAINAGE DESIGN CRITERIA: The design parameters for the project have been determined as follows: A Peak Runoff Rates: Rational Method for storm sewer designs, B. Design Storm Frequency: Storm Drain System 10-year (Post-Dev.) C. Runoff Coefficients: Grass covered and undeveloped areas C= 0.40 Developed C= 0.55 & C=0.80 Impervious areas C= 0.90 D. Rainfall Intensities: Information regarding rainfall intensities was obtained from the Hydraulic Manual compiled by TxDOT E. Minimum Time of Concentration: 10 minutes F. Project design must comply with the City of College Station's DPDS STORM DRAIN FACILITY DESIGN: Stormwater runoff from future development of the site will be split as shown in Exhibit B-2. Drainage Area 1 (0.46 acres) will be conveyed to the detention facility located on the HEB site by curb and gutter and storm drain. Drainage Area 2 (0.58 acres) will sheet flow across the site and be released into Park Place to enter the existing storm drain system. Exhibits B-1 and B-2 are the existing drainage area maps that show drainage areas for the existing and proposed conditions respectively. Runoff calculations for each drainage area are DRAINAGE REPORT PARK.PLACE WATER TOWER 2 shown in Exhibit C-1. Table 1 is a summary of the non-detained, pre-and post-development flowrates from the site taken from Exhibit C-1. TABLE 1 Design Event Pre-Development Post-Development Qs= 3.2 cfs 4.4 cfs Q10= 3.6 cfs 5.0 cfs Qis= 4.1 cfs 5.6 cfs Qso= 4.6 cfs 6.4 cfs Q100= 5.2 cfs 7.2 cfs The water tower site plan includes a grated inlet near the base of the tower with an 18" RCP outfall that flows directly to the drainage system on Park Place. While this grate will accept small amounts of runoff in the immediate vicinity of the tower, its primary purpose is to serve as an outfall for the overflow pipe of the elevated tank. Overflow releases from the tank are not included in the drainage system computations shown in Exhibit C-1. All other stormwater from the site will flow overland to HEB or to Park Place Drive. No underground storm drainage facilities are proposed with this project. DETENTION CRITERIA: Detention for the water tower site is provided by the detention facility located on the adjoining HEB site. The entire 1.04 acre site is included in the detention calculations of the HEB DRAINAGE REPORT PARK.PLACE WATER TOWER 3 drainage report that is shown on Sheets 8 and 9.7 of the plans for that project. Calculations from that report indicate that the 25-year, pre-development runoff rate from the combined area is 39.47 cfs. The storage system and outfall have been sized such that the post-development runoff rate is also 39.47 cfs. SUMMARY: Development of the Park Place Water Tower site was anticipated with and included as part of the planning process for the new HEB Grocery Store. The designers of the HEB drainage system accounted for the small increases in stormwater runoff associated with the development of this site and incorporated them into their system. As a result, no additional detention is necessary for the development of the water tower site to meet the requirements of the city's drainage policy. DRAINAGE REPORT 4 PARK PLACE WATER TOWER ,.1 .... ... ;• Flood EXHIBIT A Insurance Rate Map Excerpt Brazos County, Texas and Incorporated Areas Map Numbers: 48041C0144C Effective Date: July 2, 1992 <t 3: w c 0 a: w ....I ....I <t <t a.. <t LL w w 0 i= f-c (.'.) a: ....I 2 <t 2 <t w 2 w (.) :5 ~ <t > w ~ 2 ....I c ....I <t w <t w <t a: (.'.) ~ u; f-cw > f-Wz 0 2 a: w <t 0 >w c f-::::> <t a: a.. f-0 ....I NO. AC. 0.4 0.55 0.9 ft. Ex 1.04 1.04 0.00 0.00 0.42 300.0 1 0.46 0.25 0.00 0.21 0.29 70.0 2 0.58 0.47 0.00 0.11 0.29 30.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations Park Place Water Tower 3: 0 3: 3: ....I LL 0 0 c ....I ....I 2 LL LL >-:5 a: J: a: f-u 0 0 w f-w f-a: ....I f-(.'.) f-....I 0 f-u w ....I f-2 f-....I ....I w > <t ::::> w ::::> <t w cv (/) N IO 0 LL (.'.) ....I (.'.) LL > (.) ::::> £:! 0 ~ 0 ft. ft. ft. ftls min min In/Hr cfs In/Hr cfs 13.0 1.0 1.0 1.5 3.4 10.0 6.33 2.6 7.7 3.2 2.0 80.0 8.0 2.1 1.2 10.0 6.33 1.8 7.7 2.2 1.0 300.0 8.0 2.8 1.9 10.0 6.33 1.8 7.7 2.2 0 0 ...... IO IO N ...... 0 £:! 0 - In/Hr cf s In/Hr cfs 8.6 3.6 9.9 4.1 8.6 2.5 9.9 2.8 8.6 2.5 9.9 2.8 0 ~ In/Hr 11 .1 11.1 11.1 0 0 0 0 IO 0 ...... 0 !: 0 cf s In/Hr cf s 4.6 12.5 5.2 3.2 12.5 3.6 3.2 12.5 3.6 7/19/01 0009-dra.xls Exhibit C-1