HomeMy WebLinkAboutLetter of CompletionLETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
DATE: 03/04/2013
RE: COMPLETION OF
Summit Crossing Utility Relocates
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by Kieschnick General
Contractors and by their subcontractors as indicated by signatures below.
WORK COMPLETE
/-lea�Jr�r� �Xisrinla WArERl,Srv�¢n_�ievlcet�
1YAlL /JEw✓k rEn�ViGEr
T_.�MJ_L >JEw c-�WEA_ �VJcEs
/ I�LOC4T� �ICGT/%JC.AL ��! �t'rFjl f
WARRANTY DATE
\t /I
\l
i�
1/, j
Owner: / IDnIy VE2DL��FVELuvrnF [�/a Contractor: i�S EkgLw^h7&-Xf'g
Phone Number: % a!8— 6775' Phone Number: t,-- lT ! t>
Mailing Address: Address:
a'o9 1)AI1WR5i7. A. E,. Sf� Jlil � � G. Y>��c %yy
Signature: Signature: l�cc4cdC
ACCEPTA+N E & APPROVAL
City Representative
PLAT FILE®
�OFFSITE ESMTS (FILED
TEMP BLANKET ESMT FILED
City ngineer _W_N0OMER ESMTS NEEDED
Revised 1131107