Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Planning d Development Seniors 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 ZaAY S ZT;WT61 i�)l NO January 10, 2013 % TO: Rabon Metcalf, RME Consulting Engineers; via: rabon@rmengineer. coml/ FROM: Danielle Singh, Graduate Civil Engineer SUBJECT: Engineering Document Comments for Summit Crossing Block 4 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and approval of the plans: One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Monte Verde Development, Inc.; via: jimeasterly@gmail.com/ Case File No. 12-00500275 r C17T OF COLLEGE STATION Pbnnhg c Dcdopmrnr Sm x. 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 10, 2013 TO: Rabon Metcalf, RME Consulting Engineers; via: rabon@rmengineer.com FROM: Danielle Singh, Graduate Civil Engineer SUBJECT: Engineering Document Comments for Summit Crossing Block 4 Staff reviewed the above -mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for further staff review and appAval of the plans: I One (1) set of revised construction documents. Please note that the Development Permit Balance (Public Infrastructure Review and Inspection Fee), will be calculated and requested once the construction documents and engineer's estimates have been reviewed and approved. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Monte Verde Development, Inc.; via: jimeasterly@gmail.com Case File No. 12-00500275 COMMENTS NO.2 Please provide a vicinity map. 2. Please submit a letter acknowledging City Standards. 3. Please submit an erosion control plan. It appears that Lot 12R has an extra sanitary sewer service. GI9' It appears that Lot 18R does not have a sanitary sewer service. !A�. Please clearly label all the existing services which will remain, so there is no confusion. In order to abandon the water services, the services will need to be removed up to the t pping saddle and the corporation stop turned off at the saddle. ✓ in order to abandon the sanitary sewer services, the services will need to be removed and capped at the main. Please make sure the plans reflect these requirements. 1Services will not be able to cross lot lines. The old services will need to be abandoned and new ones installed (reference labels 1 & 6). Reviewed by: Danielle Singh Date: 1/10113