HomeMy WebLinkAboutMaster Drainage PlanJ:~ Consulting
. . . SOUTH HAMPTON . · ,,
1 : :PHASES ONE thru· SEVEN
. I ·~ I
MUNICIPAL , DEVELOPMENT GROUP
2551 TEXAS. AVENUE. SOUTH, STE . A
COLLEGE STATION, TEXAS 77840
Ph: (409)693-5359 Fx: (409) 693-4243 . .
Engineers ·.Environmental· Surveyors· Planners
MASTER DRAINAGE PLAN
FOR
SOUTH HAMPTON
PHASES ONE thru SEVEN
52.14 ACRE DEVELOPMENT
COLLEGE STATION, BRAZOS COUNTY, TEXAS
JANUARY, 1998
REVISED: FEBRUARY, 1998
REVISED: JUNE, 1998
MUNICIPAL DEVELOPMENT GROUP
I ~,, I ~y~ 2551 TEXAS AVENUE. SOUTH, STE. A ~ S ~ ~!I COLLEGE STATION , TEXAS 77840
Ph: (409)693-5359 Fx: (409) 693-4243
Consulting Engineers · Environmental· Surveyors· Planners
TABLE OF CONTENTS
DRAINAGE REPORT
PROJECT SUMMARY ................................................................................................ 3
DRAINAGE AREA DESCRIPTIONS .......................................................................... 3
DESIGN CONSTRAITS ............................................................................................... 4
DRAINAGE CALCULATIONS ................................................................................... 5
RESULTS ..................................................................................................................... 6
CONCLUSIONS ......................................................................................................... 10
ATTACHMENTS
SECTION #1 -DRAINAGE & PHASE STRUCTURE MAPS
SECTION #2 -DRAINAGE AREAS EVALUATION
SECTION #3 -CURB & GUTTER FLOW CALCUATIONS
SECTION #4 -CHANNEL FLOW CALCULATIONS
SECTION #5 -CUL VERT FLOW CALCULATIONS
SECTION #6 -STORM INLETS FLOW CALCULATIONS
SECTION #7 -EXISTING TxDOT CALCULATIONS
SECTION #8 -STANDARD DETAILS
Drainage Report - 2
PROJECT SUMMARY
This report outlines the master drainage plan for the South Hampton, Phase One thru
Seven, 52 .14 acre development. The subject development site is situated on the west side
of State Highway No. 6 approximately 1.5 miles south of the State Highway No. 6 and
Greens Prairie Road intersection.
The site is currently vacant with heavy timber and native grasses and weeds. The natural
drainage of the site is generally to the northeast of the development site to a ditch in
TxDOT right-of-way. Thence, 1,400 linear feet to an existing TxDOT box culvert that is
a part of the confluence of Alum Creek. This site is in the secondary drainage system of
the Alum Creek primary system.
The drainage calculations are presented in six basic sections:
I. Drainage Areas Maps -General drainage area maps.
II. Drainage Areas Evaluation -Calculations for the amount of runoff for each
drainage area with post-development conditions of the development site.
III. Curb & Gutter Flow Calculations -Calculations for the depth, velocity and other
conditions in the residential streets.
IV. Channel Flow Calculations -Calculations for the depth, velocity and other
conditions in the proposed drainage channels.
V. Culvert Flow Calculations -Calculations for the size requirements, velocity and
other conditions in the proposed drainage structures.
VI. Storm Inlet Flow Calculations -Calculations for the size requirements and other
conditions in the proposed drainage inlets.
VII. Existing TxDOT Calculations -Calculations to verify that the existing TxDOT
structures can pass the post-development discharge.
VIII. Standard details -Standard details for proposed drainage structures.
Drainage Report -3
DRAINAGE AREA DESCRIPTIONS
There will be several minor drainage areas considered for the evaluation of this site.
Each drainage area shall be evaluated for the selected rainfall events. From the
calculated runoff volumes, adequate ditch channels, curb sections and drainage structures
will be sized.
DESIGN CONSTRAINTS
I. Street Curb & Gutter Flow Constraints -The proposed residential streets will be
designed in accordance with the Stormwater Management Plan for the City of
College Station. Velocities shall be maintained from a maximum of 10 feet per
second to a minimum velocity at 0.4%. The runoff for residential streets shall be
contained within the curb for the 10-year rainfall event and within the public
right-of-way for the 100-year rainfall event. The runoff for collector streets shall
be contained within the curb for the 10-year rainfall event with a 12 foot clear
traffic lane and, within the public right-of-way for the 100-year rainfall event. All
proposed residential streets will have a 28' back-to-back curb & gutter section
within a 50' right-of-way. All proposed collector streets will have a 39' back-to-
back curb & gutter section with sidewalks within a 60' right-of-way.
II. Channel Flow Constraints -The proposed open channels will be designed m
accordance with the Stormwater Management Plan for the City of College
Station. Channel capacities shall contain the 25-year rainfall event. Pending on
the maximum velocity in the channel, the surface of the proposed channel shall be
as shown on Table VII-2, page 60 of the Drainage Policy and Design Standards.
These velocities will be the maximum allowed during the 25-year rainfall event.
A minimum velocity of 2.5 ft/sec shall be maintained in all the open channels.
Channels shall be designed to have a freeboard of 0.2 times the depth of the
channel or a minimum of 0.5 feet in depth during the 100-year rainfall event. The
100-year rainfall event shall be contained within the drainage easement.
Minimum drainage easement widths will be 20 ' for all side and back drainage
Drainage Report - 4
channels. The main drainage channel between Phase One and Phase Five shall
have a easement width of the design storm top width, plus 5' and 15 '. All
drainage easements prohibit the following : The construction of fences through or
along the easement; placing of structures within the easement; the alteration of
shape; configuration of surface treatment of the open channel. All improved
drainage channels shall be constructed with a concrete pilot channel, sized to
carry 1/3 of the 5-year rainfall event.
ID. Culvert Flow Constraints -The proposed culverts will be designed in accordance
with the Stormwater Management Plan for the City of College Station. Culverts
that are on residential streets and in the secondary drainage system shall have a
capacity that will pass the 10-year rainfall event. All other culverts that are on
collector streets or larger shall have a capacity that will pass the 25-year rainfall
event. The maximum depth that the upstream end of the culvert can be
surcharged is one-foot below the proposed top-of-curb elevation. Culverts will
have a tailwater elevation equal to the water surface elevation of the channel
immediately downstream of the culvert. The tailwater will correspond with the
channel's elevation for the IO-year, 25-year or 100-year rainfall event. Maximum
discharge velocities will be as stated on page 65 of the Drainage Policy and
Design Standards. Also, each proposed culvert will be analyzed to ensure
adequate means of passing the I 00-year rainfall event without exceed the policies
for discharge carryover for a residential street. Carryover velocities shall be at a
maximum of 6.0 ft/sec and not have a depth of more than 2 feet.
IV. Storm Inlet Flow Constraints
The proposed storm drain inlets will be designed in accordance with the
Stormwater Management Plan for the City of College Station. Inlets will be sized
to have a capacity for the I 0-year rainfall event with a minimum opening width of
5'. Inlets at culvert structures shall be oversized to accommodate 125% of the
design storm for the roadway. Inlets at low points in the proposed street will be
sized to restrict ponding at the inlet to a maximum of 18" up to the I 00-year
rainfall event.
Drainage Report -5
I
I
DRAINAGE CALCULATIONS
The drainage area calculations are summarized accordingly using the Rational Method:
(Q=CIA) where "Q" is the runoff in cubic feet/second, "C" is the runoff coefficient, ''r' is
the storm intensity in inches/hour for each selected frequency, and "A" is the drainage
area in acres. A minimum 10-minute time of concentration for all calculations will be
assumed. The selected frequencies will be 2, 5, 10, 25, 50, 100-year rainfall events.
The curb inlet flow calculations are summarized accordingly using the Modified
Mannings Formula: (Q=3.0Ly312) where "Q" is the runoff in cubic feet/second, "L" is the
length of the curb opening in feet and "y" is the head on the curb opening during weir
flow in feet.
Channel and curb & gutter flow calculations were computed using Mannings Formula,
aided by the program FlowMaster v5.07. Culvert flow calculations were computed using
Manning's Formula aided by the program Texas Hydraulics System Design vl.O by
TxDOT.
RESULTS
In Section # 1, "Drainage & Phase Structure Maps", is the mappmg of the pnmary
drainage system up stream of State Highway No. 6. This portion of the primary drainage
basin consist of 1,395 acres. The Nantucket Lake serves as a detention facility for this
drainage area. No on-site detention will be necessary since the South Hampton site runoff
discharges into the primary system downstream of Nantucket Lake. With this scenario,
the South Hampton site peak runoff will have already passed before the drainage basin's
peak discharge, at the point of discharge.
From the drainage calculations, the following results were determined:
Drainage Report -6
CURB & GUTIER FLOW RESULTS MINIMUM 8/8 (10 YEAR) CHANNEL STREET ID DRAINAGE SLOPE WIDTH DISCHARGE VELOCITY CURB DEPTH NO. AREA (%) (ft) (cfs) (ft/sec) (ft) 1 B 1.00 28 8.685 3.25 0.31 2 E 1.00 28 10.970 4.10 0.45 3* E 0.50 39 10.970 2.92 0.44 4 F 1.00 28 13.634 4.33 0.48 5• F 0.80 39 13.634 3.67 0.44 6 H 1.60 39 26.814 4.75 0.38 7 M 1.40 39 22.982 4.34 0.37 8 M 1.60 39 22.982 4.56 0.36 9 p 1.75 39 37.553 5.34 0.43 10 T 1.00 28 6.096 3.54 0.36 11 T 1.60 39 6.096 3.89 0.29 12 u 2.00 28 13.399 5.59 0.42 13 y 2.00 28 16.856 5.92 0.46 14 u 3.00 28 13.399 6.50 0.39 15 y 3.00 28 16.856 6.89 0.43 16 u 0.60 39 13.399 3.28 0.46 17 y 0.60 39 16.856 3.48 0.51 18 z 1.00 28 4.670 3.31 0.32 19 x 1.00 28 8.025 3.79 0.40 20 w 1.00 28 19.198 4.71 0.55 21 x 1.00 39 8.025 3.50 0.35 22 w 1.00 39 36.652 5.11 0.61 23 z 1.00 39 4.670 3.05 0.28 I Drainage Report -7
CURB & GUTTER FLOW RESULTS
MINIMUM B/B (100 YEAR)
CHANNEL STREET
ID DRAINAGE SLOPE WIDTH DISCHARG CURB DEPTH .O.W. WIDT
NO. AREA % ft cfs ft ft
1 B 1.00 11.707 0.35 50
2 E 1.00 14.788 0.50 50
14.788 0.50 60
5 F 0.80
6 H 1.60
7 M 1.40
8 M 1.60
9 p 1.75
10 T 1.00
11 T 1.60
12 u 2.00
All the proposed residential streets were designed for the 10-year and 100-year rainfall
event. As shown above, the streets have the capacity to carry the 10-year rainfall event
within the curb & gutter section of the street. Also, most of the proposed street's curb &
gutter cross-sections will carry the 100-year rainfall event and all within the 50' right-of-
way. Items denoted by"*" are designed to accommodate a 12' traffic lane during the 10-
year rainfall event. The shaded portions of the above table displays the streets where the
100-year rainfall event is not carried within the curb & gutter but within the provided
right-of-way. Drainage areas with two parts reflect that the street has a grade change.
These areas are clarified on the Drainage Pattern Map.
Drainage Report - 8
I
I
I
ID DRAINAGE
NO. AREA
1 c
2 D
3 G
4* I
7 L
8 L
10 Q
11 s
12 v
13 x
ID DRAINAGE
NO. AREA
1 c
2 D
3 G
4 I
7 L
8 L .
10 Q
11 s
12 v
13 x
ID DRAINAGE
NO. AREA
4*
1
2
3
8
10
11
12
13
c
D
G
I
CHANNEL FLOW RESULTS
MINIMUM (25 YEAR)
CHANNEL
SLOPE DISCHARG VELOCITY IDE SLOPE
% cfs ft/sec ft/ft
0.75 26.425 3.33 4 to 1
1.00 17.749 3.36 4 to 1
1.10 49.197 4.49 4 to 1
1.50 96.248 5.96 4 to 1
1.00 84.243 3.38 25 to 1
1.00 84.243 3.47 26 to 1
1.75 8.486 3.44 4 to 1
1.84 22.932 4.50 4 to 1
1.30 37.452 4.46 4 to 1
1.00 9.128 2.61 4 to 1
CHANNEL FLOW RESULTS
MINIMUM (100 YEAR)
CHANNEL
SLOPE DISCHARGE TOTAL DEPTH EASEMENT
% cf s ft ft
0.75 32.996 2.03 20
1.00 20.950 1.72 20
1.10 58.092 1.76 20
1.50 113.636 2.14 20
1.00 99.836 1.20 80
1.00 99.836 1.10 90
1.75 10.017 1.34 20
1.84 27.104 1.20 20
1.30 44.421 1.54 20
1.00 10.774 1.49 20
CHANNEL FLOW RESULTS
MINIMUM
CHANNEL
SLOPE
%
0.75
1.00
1.10
1.50
PILOT CHANNEL
1/3 (5 yr)
DISCHARGE REQUIRED PROVIDED
cfs ft ft
5.07
4.06
5.83
5
4
6
Drainage Report - 9
I
I
The proposed open-channel drainage ditches will be triangular in shape with 4: 1 side
slopes. For each drainage area, the corresponding total depth for the channel is shown
above. In this total depth, a 0.5' freeboard is included. Velocities are maintained below
4.5 ft/sec, which will require all proposed channel to a have a minimum of seeded grass
surfaces. Items denoted by "*" exceed a 4.5 ft/sec velocity and shall be sodded channel
surfaces. The shaded portion of the above table displays the flows and conditions in the
existing drainage creek.
For TxDOT purposes, the road ditches between the west frontage road and right-of-way
line was analyzed at key points. Each key point was analyzed with existing cross-
sections and roughness conditions conditions during the 10-year rainfall event. Below is
a summary of the results:
TxDOT CHANNEL FLOW RESULTS {10-YEAR)
APPROX
CHANNEL DEPTH
ID DRAINAGE SLOPE DISCHARGE VELOCITY TOP WIDTH ACTUAL ALLOW
NO. AREA (%) (cfs) tusec) ft) (ft) (ft)
14 (EXIST) N 1.33 123.000 4.96 37.90 1.19 1.5
14 N 1.33 ~ r.ttt 1.5
15 0 1.33 12.738 0.78 2.75
0'6 .c.i50 1 .. 0~
CULVERT FLOW RESULTS (JO-YEAR)
APPROX HEADWATER
CULVERT NO. TAILWATER DISCHARGE DISTANCE
ID DRAINAGE SLOPE BARRELS DIAMETER DISCHARGE DEPTH VELOCITY FROM TIC
NO. AREA (% (Each) (in) (cfs) (ft) (tusec) (ft)
D 0.51 30 26.510 1.27 2.20 1.72
7 R 1.00 18 10.236 0.94 5.79
8 T 0.50 27 26.131 1.33 2.12 1.3
9 v 0.70 2 30 83.120 2.64 2.62 1.32
10 x 1.00 1 18 12.740 0.78 7.21 NIA
Drainage Report - I 0
I
I
CULVERT FLOW RESULTS (100-YEAR)
ID DRAINAGE FLOW
NO. AREA cfs)
D 0.000
CARRY-OVER
VELOCITY
(ft/sec)
0.00
DEPTH
(ft)
0.00
The proposed culverts have been analyzed during the 10-year and 100-year rainfall event.
Since these are residential streets and not within the primary drainage system, the 10-year
design is acceptable. Since the proposed culverts will be discharged into a channel that is
man-made with seeded cover, the maximum allowable discharge velocity will be 6 ft/sec.
Culverts were also sized so that the upstream headwater elevation would always be more
than one foot from the proposed street top-of-curb during the 10-year rainfall event. The
shaded portion of the above table displays the culverts that will replace existing TxDOT
culverts.
The discharge velocity was c~lculated for each culvert at the end of the proposed
headwall. For culvert headwalls that are within the TxDOT right-of-way, a 6: 1 straight
wingwall slope was used. For culvert headwalls that are on residential streets, a 6: 1
wingwall slope was used at a 30° flare.
STORM INLET FLOW RESULTS
(10 YEAR) (100 YEAR)
CURB PONDING PONDING
ID DRAINAGE LENGTH FLOW DEPTH FLOW DEPTH
NO. AREA (ft) (cfs) (ft) (cfs) (ft)
1 8 8 8.685 0.51 11.707 0.62
2 E 8 13.713 0.69 18.485 0.84
3 H 10 16.759 0.68 22.591 0.83
5 T 6 7.620 0.56 10.273 0.69
6 u 10 32.597 1.23 54.925 1.50
7 x 8 13.832 0.69 36.652 1.33
Drainage Report -11
I
I
I
I
I
The proposed storm inlets have been analyzed during the 10-year and 100-year rainfall
event. All curb inlets will have a gutter recessed entrance of 3" in depth. Curb inlets
were sized so that all inlets would be in weir flow during the design storm with minimum
ponding created upstream in the curb section. No curb inlets were surcharged to have
over 18" of ponding during the 100-year rainfall event.
CONCLUSIONS
Below is a break-down of the drainage structures that will be constructed for each Phase
of the South Hampton Subdivision. Each identification number for curb & gutter,
channels, culverts and curb inlets correspond with the number indicated in the "Results"
portion of the drainage report.
SOUTH HAMPTON PHASE DEVELOPMENT
CURB&GUTIER
PHASE STREET OPEN-CHANNEL CULVERT CURB INLET
NO. IDNO. IDNO. IDNO. IDNO.
I 11, 12, 13, 14, 15, 16, 17 7, 8, 11, 12, 13 9 6,7
II 19,20, 21 ,22 10
Ill 10, 11, 18, 23 10 8 5
IV 9 6
v 7, 8 5
VI 3, 5, 6 3, 4 1, 2, 3 2, 3
VII 1, 2, 4 1, 2 1
The existing TxDOT drainage structures were analyzed for the increased residential
development runoff and resolved still adequate. See Section VII for these calculations.
Drainage Report -12
I
I
I
I
I
SECTION#!
DRAINAGE & PHASE STRUCTURE MAPS , ._ . -I -" .. . . . -..
l;
"
I
SECTION#2
DRAINAGE AREA EVALUATION
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area A
Drainage Area (AA) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (DA) =
Velocity of Runoff 0J A) =
Coefficient of Runoff (CA) =
**NOTE: Minimum Tc allowed = 1 O min.
1.40 acres
860 ft
1.00 rt"fsec
0.50
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
TqA) = 14.3 min.
Rainfall Intensity (1:0 = 5.317 i%r
::11a::m:::::::::::I::wm;:::;::i:::::i:i::[::::;mm:::i:::::::::11s111:::srf:::::::::::;:r;
Rainfall Intensity (15) = 6.521 in/hr
::Di1a::i:::1:::::::1:;:1::;:::mm:i1::::::::irn::::i::::;::::::::=:=:'I::11l!i m ili1;:::::::::::
Rainfall Intensity (110) = 7.354 in/hr
::r11::1::m:=::m;;;:;:;::m:::m:.:::::::::;1m::::::::=::::::::::::::I::'I::=1f:1a:::srt:i::::::::::
Rainfall Intensity (125) = 8.415 in/hr
::1111::1::::::::-:::·:::::::::::::;::[:::m::,:[::::::;:[::::::::::1:::::::::::::::::::::§;,111:::m :::;;;[::
Rainfall Intensity (150) = 9.530 i%r
::a.11:::::::::::::::::::=1::1::::::::::1m:1::::1.::::::::::::::::::::::::::::::=::::::::1::1~1~1;:::1t!1::::m
Rainfall Intensity (1 100) 9.943 in/hr
::1i1::a:::::::::::::I:::::::i[;;;;:::i;[::::l:::::1:::::::::::::::::::::::i=:::·rt~111Im:::::::::[::-
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area B
Drainage Area (As) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (Ds) =
Velocity of Runoff <Vs) =
Coefficient of Runoff (Cs) =
**NOTE: Minimum Tc allowed = 10 min.
1.05 acres
280 ft
ft 4.00 fsec
0.95
2 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
TqsJ = 1.2 min.
Rainfall Intensity (12) = 6.327 i%r
:11.:a::::::::·:::·:::,::1:::::::::_::::::::::::::::::1::::::::::::::::::::::::::::::::::==@:1::::::=:::::1~111:::1r!:::1::::::::
Rainfall Intensity (Is) = 7.693 in/hr
:·~::a:::::-:::::1::::::::::::::::::-:::::::::::::::::::::::1:::::::::::::::::=:::::::::::::::::,:::::::=::::::::::!~zg::::m::::::.r·
Rainfall Intensity (110) = 8.635 in/hr
· ~~'¥'.· _.,, · ':i:itI:::::::::=1.::1:::::::::::::::::::::::1::::::f::l~§l::::ir~::::::::t::
Rainfall Intensity (12s) = 9.861 in/hr
:,11::5 :::]'·:==::::1:::·:,:_:::::::::::::::::::::::::::1.::::1,,::::::::::.:=::::::::::::::::::::1;111:::SI']':::=:::::
Rainfall Intensity (Isa) = 11.148 i%r
::11[a::::::,:::=:::::-:;:::::::::::::::::::1.:::::::1:::i,i:::::,:::i:::::i:::::::1:1:~i11:::1r!:,:i:::::,::
Rainfall Intensity (1100) 11 .639 in/hr
11n1=:a::::::::::t:::.:::,:,:::::::::::1::::::::::::::::::=:::·:·:.:·:·:·::._:::::·:-::::::::r::11,~797::::m:::::::=:::
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area C
Drainage Area (Ac) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (De) =
Velocity of Runoff 0Jc) =
Coefficient of Runoff (Cc) =
**NOTE: Minimum Tc allowed = 1 O min.
2.69 acres
760 ft
It 1.00 fsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
Tccq = 12.7 min.
Rainfall Intensity (l:i) = 5.660 in/hr
=:§i::e,,:,:III:I:::I:::1::::::i1::::::]]m:::::::::::::::::::::::::,:::=::1::z~11:::it~]:::.]:
Rainfall Intensity (15) = 6.921 in/hr
:l1::a::1:i::::::::::::::::::::::::::::,:::::::::::::::::::::::::::::::::=::1::::::::::::::::::=:::::,::::::i *!11::,m :::-::,:::::::::
Rainfall Intensity (110) = 7.791 in/hr
::1i1::a:::::=:_=,::::=:m:::::::::1i::::1:::::1:::::::::::::::1:::::::::::::1:::::1=:118§ii:::1r~:::::::::::::::
Rainfall Intensity (125) = 8.909 in/hr
::11::a:::::::::::::::::=:,:::;::::::::::::::::1::::::m:::::::::::::=::::::::::::=:::::=:::=:,:·:::;1g~11::::m·:-=::=;:::::::
Rainfall Intensity (150) = 10.084 in/hr
::a::a::::::::::::::,:::::::::::::::::::=:.:::::::::::i1::::::,::::::1&I1::1::r:1i~11:::1r~:I:I:::
Rainfall Intensity (1100) 10.523 in/hr
::1;1::a]::·::::::::::.:::::::1::::::::::I:::::::::::::r:::::::::::=:::::,:=::::=::::-:=:1M111:::·m ·:i1:=:
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area D
Drainage Area (A0) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (D0) =
Velocity of Runoff (V0) =
Coefficient of Runoff (C0) =
**NOTE: Minimum Tc allowed = 10 min.
3.57 acres
540 ft
ft 1.00 fsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0. 754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882--025 Drainage Evaluation.xis
RESULT
Tqo) = 9.0 min.
Rainfall Intensity (12) = 6.327 in/hr
::1i.::1,:::[:=:.:,::::.:·:,':t:::=[lI::::_[_:.:r·:::::::::::::::,,::m::: ... :,11·~111:::ir!::::::::=::,:::
Rainfall Intensity (15) = 7.693 in/hr
::ru.:::t:::,:,:::_::::.::.:::r::::::,:::::::::::::::::::=::::::::::::::::1::::::::1::::::1::::,:1:1~1i1::::m::::::::::.:_:,:
Rainfall Intensity (125) = 9.861 in/hr
:1~-ffl:,: ,, .:::::::::::::::::::::,:r:::::r:::i:::::::,:,:::::::::::::':::.:·:-:-:=:=:irt~Iil:::m::':::·:::=::::
Rainfall Intensity (150) = 11.148 in/hr
,R 'e'::.=:=·::[ .:::[::::,:::::::::::::::::::,:::.::::::::::=::1::::::::::'::=::_::11'.~i§l:::!t!,:::::,:,::::::
Rainfall Intensity (1100) 11 .639 in/hr
:,sj1':a:,:::=:··=:':,:=:::::::::::.'·:::::::,:.[::.:::1:·:'=:::-:::::::::r:,:.:·::[.:,,,~1.~~1:::m::_:::::::::=:·:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area E
Drainage Area (Ai=) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff (VJ =
Coefficient of Runoff (CJ =
**NOTE: Minimum Tc allowed = 10 min.
1.40 acres
470 ft
ft 4.00 fsec
0.90
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
TqE) = 2.0 min.
Rainfall Intensity (l:i) = 6.327 in/hr
::11.1a::=::::::1]:::::i:::l::::::::::::::]::::::li:::::::::::::::::::;m:m:1:1::1f,11::::£t~i::::::1;
Rainfall Intensity (15) = 7.693 in/hr
::11.::m:::::::::::::::.:::::::i:::::::::11:::::rn:::::::::m:11:1:rn:::::::::::::1:::~1~1t1:::m,:i:::::::;:
Rainfall Intensity (110) = 8.635 in/hr
:·:···:·:-:·:·:·:·:·;·;·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·:·.·:·:·:·:·:-:·:·:·:·:·:·:·:-:·:·:-:·;·:·:·:-:·:·:·:·:·;·:·:·:·:·:·:·: ··•·•···································•·•·····•···················· :J~~;:;~== .. ::-::-· ... · ·.·:\~'= .. = :::':D;rn;:.\;:::::::;:==:.-,::::=~,::'i:t!P~!itJF:t4!Wfai
Rainfall Intensity (125) = 9.861 in/hr
::11::1:=1:,:::::1:.::::,::1:::::r::1::::::::::::m:::::::::::::::::::1r::::::::::::1i~1a:::m:::::=::1::;
Rainfall Intensity (150) = 11.148 in/hr
1a::a::::::::;:::::::1:::::;:ir:;111:::1I:i:::::11:1::::I:::::;:11J,111:::£t~::::::]:::1
Rainfall Intensity (1100) 11 .639 in/hr
::1~1::1:::::::[::;::::::::::::::::::1:1::::::;::1::::::::[::::::1::::::I::::::;::11T:u::::m:::::.::::::::i
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area F
Drainage Area (AF) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (DF) =
Velocity of Runoff 0f F) =
Coefficient of Runoff (CF) =
**NOTE: Minimum Tc allowed= 10 min.
2.61 acres
700 ft
ft 2.00 fsec
0.60
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
T C(F) = 5.8 min.
Rainfall Intensity (Ii) = 6.327 in/hr
::1l::e,1::::::::::::::;::l:]:::m:::;,:;::::i:::::1:::::::::::::::1:::::::1:1::1::::::::;::::1f,m:::1r~::l:::l'
Rainfall Intensity (15) = 7.693 i%r
::g;.;e:::::::::::::::l::::i:::i::::::::::m:::::::::::::::::::m:::::::::::ii:IIllMitJ:::l§::::,:::::ll
Rainfall Intensity (110) = 8.635 in/hr
::r-1i:aI::,:=:::,::::::i;:::::::::'::::::::::::::::::::::::::::::::::,:i::i::::::::::::::::::::11~1a'::1r~::::,:::::l
Rainfall Intensity (125) = 9.861 in/hr
::11::a::::::::::::::::::;:::::::::::=::::::::::1::::::::::::::::::::::::::::::,:::::::m:m::i11~11:::m,:::::::::::::i
Rainfall Intensity (150) = 11 .1 48 in/hr
::11::e:::::::t:::l[:I::::::::::::::;::::::::::::::::::::::::::::::::::::::::::::::::::::::::,:11fli:::i!~]:]:::;
Rainfall Intensity (1 100) 11.639 i%r
:,su#::a:::::::::;:=:i1::::::::i::::::::i::::::::::=:,:::':'::::::::i::::::i:::::::::::11~11t=::=m=:,:,:::::,]
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area G
Drainage Area (Ac;) =
TIME OF CONCENTRATION CT,.)
GIVEN
Maximum Travel Distance (DG) =
Velocity of Runoff 0JG) =
Coefficient of Runoff (CG) =
-NOTE: Minimum Tc allowed = 1 O min.
4.44 acres
850 ft
It 1.00 /sec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluatioruds
96
8
RESULT
TC(G) = 14.2 min.
Rainfall Intensity (Ii} = 5.349 in/hr
::mirmm::1m;::m;rnm::::::mmm:1ili:::::E::::::::m11:~11:::1r!I1:=:;:
Rainfall Intensity (15) = 6.559 in/hr
:;11::a1:1I;:::::I:::::::::::::::Im::::::rn:rn;::::::::;:;;::::::m::::;:::11n:::m.t::I::::::
Rainfall Intensity (110) = 7.395 i%r
::mi.i~5:::::i:::::::::m[;:;:i:::::::::::::1=:;:::::::::::::::1:::::::::II:::1:1¥:111:::1r!lI=]
Rainfall Intensity (125) = 8.461 i%r
]ll:a::::::::::::::::::::1I1::I1:::::IlIJ[Ilt:::::i::::::i:11,~111:::m::i:::i
Rainfall Intensity (150) = 9.582 in/hr
:;a::a::;::::::::::::::::1:1;::;::1:1m:::::tm::::i::::::::::::11:::;:::;&1:~11.A:::1r!:1::::::1::
Rainfall Intensity (1100) 9.998 in/hr
::1j1::a::::::rni1::::::;:wm:::::::::::1::::::::::::::11:::::::::::::::::::::11~m:::mm::::::::::
I
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area H
Drainage Area (AH) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (DH) =
Velocity of Runoff (VH) =
Coefficient of Runoff (CH) =
**NOTE: Minimum Tc allowed = 10 min.
3.42 acres
750 ft
ft 4.00 fsec
0.90
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
TcCHi= 3.1 min.
Rainfall Intensity (12) = 6.327 in/hr
::111a::1m:m::::::m::;:::::::;;:::::::;::I:tm:::]::[:::::I::::::::::::::11&:s.1::1~::[:::[:
Rainfall Intensity (1 5) = 7.693 i%r
::m:::1:m:mtm::m::::mrn::::::::m::::::::=::::::::::i::::::::::::::::::::!!~1•:::m::1:::::::::::::
Rainfall Intensity (110) = 8.635 i%r
11ii::a::::;:::::::mii:~~1:1::I::;::::::,::::::::::::::::::::::::::::::::::::::::::rn11J,1111::1r~:III
Rainfall Intensity (125) = 9.861 in/hr
::11::mt:1;;:m::;::::i::::::::::m:::::::u::::1~1:1:1:::::t:m::::::::19.lff.l::::l!I:::::=:m1
Rainfall Intensity (150) = 11.148 in/hr
;a ::a 1::::::1:::::::::r1;::I::11:1::I1::::::;::::rn::::m:::::::::::::;::::::::::::::;::11J,111:::1.,:::::[:::11
Rainfall Intensity (1 100) 11 .639 in/hr
::111:::::::::::::1::::::rn1:1::::;::::;::::::::::;::::::::::::i:::::::::::::::i::::::::11a1I m ::::::::::::::::;
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area I
Drainage Area (A1) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (D1) =
Velocity of Runoff (V1) =
Coefficient of Runoff (C1) =
**NOTE: Minimum Tc allowed = 1 O min.
3.64 acres
750 ft
It 1.00 !sec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
Tq1i= 12.5 min.
Rainfall Intensity (I~ = 5.697 in/hr
:;11::1:::I1::::::::::::::::;::::::::m:::::1:%::11::;:1:li~~::::::::mill:1::::::ilii:::!elm1:1%im1;
Rainfall Intensity (15) = 6.964 in/hr
1:PJ::::~:rwr:1;m:1::::1m::m:::::@::::::1~;:1;:::::::::::;illill:111~11im::1:1:i
Rainfall Intensity (110) = 7 .839 i%r
mm1::::::::rn:;:m:::::m::::i::::mm:::::::::::m:::m::::::mii:11~m:::14=rn:rn
Rainfall Intensity (125) = 8.963 in/hr
111:::::::::;::;:::::::::;;:::::::::::::;;;;m:::;:::::m;;;::::mr;;:::mI:111u:::m ::::::;:::::ili
Rainfall Intensity (150) = 10.143 i%r
ini11m::;::::;:::::;:;i:ili::::m:r;r;:11rn:;::::::::::1rn::::E:Ioc1~111:::14:;:,::::rn:
Rainfall Intensity (1100) 10.585 in/hr
lsj1.;1:::rn::I11:1:::1::r;,:;:1m::::::I:::::m:i::::m::::::::=::::::11~1!!:::m::~::1:::::::
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area J
Drainage Area (AJ) = 25.56 acres
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (DJ) =
Velocity of Runoff (VJ)=
Coefficient of Runoff (CJ) =
**NOTE: Minimum Tc allowed = 1 O min.
1700 ft
ft 1.00 fsec
0.35
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d} =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
TqJ) = 28.3 min.
Rainfall Intensity (12) = 3.592 i%r
::11::a::::::::::]::::::::I:tl:::::]::::1:::::::::::::::::::::;:;::;:::::::::-;]:::il.kll§:::if!]t]:r
Rainfall Intensity (15) = 4.480 i%r
::~::1::::::::::::m::::::::::::::::;:::::::i::::::::ffifil::rnw;1::::::;,::@::::::i::191111:m::,:::::::=L
Rainfall Intensity (110) = 5.106 in/hr
::1J1;:1::·::::::,:;::;:::;:::::::::::::::;::;::::::::::::;::::::::::m::;,::::::::;:,::;:::::':,:11~111·:':st!:::::::::'::::::
Rainfall Intensity (125) = 5.867 in/hr
111·:1:']::::=::::::::::::::::::::::::::;::::::::1:::::::::::m:::::l::::,:1:::::::::·::::::!i~m:-:'m,:::::::::::·::
Rainfall Intensity (150} = 6.674 in/hr
::a :::.:::=::::::::::::::::r:::::::::1::f:[:::::::::::::::::::1rn:::::;:::::@::::11¥:111::,:st!lI]:
Rainfall Intensity (1100) 6.970 in/hr
::1~1::1==:,:::::.::::::::::::::::::::::::::]::=:::::::::::::::::::::::::·:::::1:r::::i::,::§1~11i::::m::::::::::::::
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area K
Drainage Area (AK) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff 0/J =
Coefficient of Runoff (CK) =
**NOTE: Minimum Tc allowed = 10 min.
2.21 acres
600 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
T C(K) = 10.0 min.
Rainfall Intensity (I~ = 6.327 in/hr
;1;::5:::=:::i:::i:mm:;:::m:;:::::::Im::::::t_:·:f:I[f::m::::~~111:::1t!:I[f
Rainfall Intensity (Is) = 7 .693 i%r
::-.::1::::::::::::::::::::::::::m:::H~:I:1@::::::::1:::::::::::;:::::::::::::::::::::::::;[1~111:::m;:::::::;::::,
Rainfall Intensity 010) = 8.635 i%r
Ilia:a:=;:::::rn::m:::l1:rn::;:::1:::::::1:::::::::::l=::::::::;::::::::;:::::::l::::m:1f,111:::1!,:::[;:::::
Rainfall Intensity 02s) = 9.861 i%r
::11::1:':'::::::::1::::::mmm:::::;rn:::::=::::::::m:=::::::::::::::::::::::::::::11~m:::m:i::::::::::·
Rainfall Intensity (ls0) = 11 .148 in/hr
::a::5:::::::::::::i:::::::II@:=::II:t:::::::::tillil:Illil~m:::£t!i.i.i.::::::::::
Rainfall Intensity 0100) 11 .639 in/hr
::1~1::1::::::::::::::::;:::::::::;::::;::;:;:;:::::::;m::::::::t::;:;:::::::]:::;::::"1~111:::m:::::[f:
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area L
Drainage Area (AJ =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (DJ =
Velocity of Runoff (VJ =
Coefficient of Runoff (CJ =
-NOTE: Minimum Tc allowed = 1 O min.
6.30 acres
1200 ft
2.00 ft/sec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) =
Coefficient (d) =
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
Tc(L) = 10.0 min.
Rainfall Intensity (Ii) = 6.327 i%r
;m::a•::::r1;::::@:::;;:;:m::::::::::irn::i:::::::;::::=::::::::::::::I:::;:::::&1~11:::ir!::::::::::::::
Rainfall Intensity (15) = 7.693 in/hr
::!l•:arn::::::::::::::::::::irn:::::::::::;::::::::::::::::1:::::::1:;::::::•:::•:::::::1:1m11:::m :,:, •.::::
Rainfall Intensity (110) = 8.635 in/hr
ilii::a::;:::•:•::=•;::::••=;:=:::::::::::•::::::::=:::::i•:::::@;::::::::::;::;:••I•ltil~l1,~•,•it!!·i'!•!:J'::::•
Rainfall Intensity (125) = 9.861 in/hr
::11::a::•:::i;::::;:::1::::::::::mm:::::::mi:::=::Ii:::::::.:;:::::::::1:::::;::11:~1q,1,::m:.:i:i:
Rainfall Intensity (150) = 11.148 in/hr
::a ::a::::[[,[:f;:::mi::::::::::::;;:::::m:::rn:•:::::::•=:::::i::::111=m ::.:ir!i::::1i
Rainfall Intensity (1100) 11.639 in/hr
::sjifiiali]•]::::::::::::::'::::;::::::::H::•ItlI::::::::::::I::::::,:•::::11~~!:::,m.::::,:,:•::t
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area M
Drainage Area (AM) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (OM) =
Velocity of Runoff NM) =
Coefficient of Runoff (CM) =
**NOTE: Minimum Tc allowed = 1 O min.
2.93 acres
1100 ft
It 4.00 fsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
Tq M) = 4.6 min.
Rainfall Intensity (Ii} = 6.327 in/hr
::li::a:mi:;:::::::::::::::::::::::I:I:::::::::::[:::I:::::II::::::I:::::::::ii fii!l'li!!::i::::::::::::
Rainfall Intensity (15) = 7.693 in/hr
::!fi!a::::::::::::::t:::rn:i::::I::::m:::,1==:,:11::::,m:::::::::::::::::,:i1;1111:::m :::::;:::::::::
Rainfall Intensity (110) = 8.635 in/hr
::~~::§·.··:::::u:::::::M:::::::::fa::;::::;::i::::::::::::::=:::::::::::::::::::::::~!¥:!!!::::§tf:ii:::::
Rainfall Intensity (125) = 9.861 i%r
::11::a::::::::::::::::::::::::::::::::::::::::;::::::::::::::::::::1:::::::::::::::::::::::::::::::::::::~i~m:::m:::::::::::::::
Rainfall Intensity (150) = 11 .1 48 in/hr
::g::5:::::::::::::::11::::m:::::i::rn::::::i:i::::::::::::::::I:]t:1;11~:::1?:::::'::::i::
Rainfall Intensity (1100) 11 .639 i%r
::sj1J.ia:,::[:::::::::::1::::::::;;:::::::::m::::::;::=:;:::::=::i::::::::::1:::::111111:::m :::::1::::::
I
SECTION #2 -DRAINAGE AREAS EV ALDA TION
GENERAL INFORMATION
Description: Drainage basin for Area N
Drainage Area (AN) =
TIME OF CONCENTRATION (TJ
GIVEN
Maximum Travel Distance (ON) =
Velocity of Runoff (VN) =
Coefficient of Runoff (CN) =
**NOTE: Minimum Tc allowed = 10 min.
1.79 acres
1100 ft
ft 2.50 fsec
0.50
2 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
T C(N) = 7.3 min.
Rainfall Intensity (12) = 6.327 in/hr
::1i::a]· . _::i:.-::::::::.:::,::::::::::i:::,::::::::::::::::::i::::ir-tis~~ii::PI$t::::.:::
Rainfall Intensity (15) = 7.693 in/hr
::1~::&1::]]:::11::::::::::::::::::::::::::::::::::;::::;:::: :::::::::::::::::::::::: :,r,:::if:li~lim:::].]
Rainfall Intensity (1 10) = 8.635 in/hr
::i~ a:.i-,:::::::::c :u :: :,:._::::::::::::t:·: ::::::::::::::_::.·.: z~~~i :P:r.~:::::::::
Rainfall Intensity (1 25) = 9.861 in/hr
]i!M§t:.:: ::=::==::::::=: ::::::::.;.:::::: :: ::: . .:::::::::::1 i!l,!~~:-1#:]·:· .·,:
Rainfall Intensity (150) = · 11 .148 in/hr
:11::a:_::·:::::·:::::r=:::rJ:t1r:::::::::.::::·:r:::::::::::::::::.:::!!~P:~·:_P.f$rn:m
Rainfall Intensity (1100) 11.639 in/hr
::gj~J:&:::·: :rm : : .r:: ':: :r1 : t i:Q'.~sd.J.:::il.L .:::
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description : Drainage basin for Area 0
Drainage Area (A0 ) =
TIME OF CONCENTRATION CTc)
GIVEN
Maximum Travel Distance (D0 ) =
Velocity of Runoff 0/o) =
Coefficient of Runoff (C0 ) =
**NOTE: Minimum Tc allowed = 10 min.
1.09 acres
375 ft
ft 2.50 fsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
Tqoi = 2.5 min.
Rainfall Intensity (Ii) = 6.327 in/hr
::1;.::a:,:,::::I:=::':::::::t::::::m:::::r:I·:=::1::::,:;::.:::::·:=:::::::::::=::1::=:=1~11:,:m::::[f::
Rainfall Intensity (15) = 7.693 in/hr
:'g~::ffi::::t:::::f:::::::::::::f:::::::::::::l[f::::::::::::::::t:::::::::,:::,::='::=::::a*ll::::ilt:::t::::
Rainfall Intensity (110) = 8.635 in/hr
::li~::a:::,::::.:·::·:::.:i::::::::::::::::·:' ·t::::::=::,tt:: ·::' =r::.:=:1~f:~::Ef.~tr::,
Rainfall Intensity (125) = 9.861 in/hr
1#.~,:ffi·=·:' :: : : =::::::::: !?!t: /: ::=::::::=:: J::: :': l~tU!,:mi: J
Rainfall Intensity (150) = 11 .1 48 i%r ::•::a:··: : : , :=:.:::::.:I:::·:::::::::::::.:::.:.'.:::.:.::,:.::\;::: 1~1:11:::·m::::,::·:::
Rainfall Intensity (1100) 11 .639 i%r
i'§ji ::ffio:::·: ·:·::::::::,:::=:::':'':· ::·:::;::::-::::::::::::::::::::::::::::::::::::1:6]!~::::~·:::::,:.f':
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area P
Drainage Area (Ap) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (Op) =
Velocity of Runoff 0f p) =
Coefficient of Runoff (Cp) =
**NOTE: Minimum Tc allowed = 10 min.
5.75 acres
1050 ft
2.00 ft/sec
0.75
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b} =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) = 98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
Tc<Pi= 8.8 min.
Rainfall Intensity (l:i) = 6.327 in/hr
::1i::a:;i,::.:::::::::m;:::im:rn:m:=r:1m:1;::::;::;::::::::::m:::1111,1:::1•::::1:,::;
Rainfall Intensity (15) = 7.693 in/hr
:i1~wi::::::::::::::::::::::::::::::;:::::::rn;::1:::::::::::::1::1:Iri::m:::::::::1:r:11s1:1:mJ::;::::::::
Rainfall Intensity (110) = 8.635 i%r
::E.11a:r;:[:::::::::::::m::::::1::::mm1:::;;::i:m:;::;:ill::1::;::::::;;;1,1,],111:::1r!Il:::1::
Rainfall Intensity (125) = 9.861 in/hr
::11::e:::,:::::::,::::::::rn::;m:::::::::::::::::::::;:m:::::~:;11111I1::nJ.11J:::m::::::::::::·:::,
Rainfall Intensity (150) = 11 .148 in/hr
::11::a::::::i@:::::r11r111::1m::rn:::1i:i:rn:r1=::I:1::11~11;:::1r•1:::::1
Rainfall Intensity {1100) 11 .639 in/hr
::1 i 1 ::5::::::::::::i:::::::::::]m:::m:i1rn:::::::1::::::::::::::::::::::::::::111111:::,m:::::111
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area Q
Drainage Area (Ac;J =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (Dc;J =
Velocity of Runoff 0/c:J =
Coefficient of Runoff (Cc;J =
**NOTE: Minimum Tc allowed = 10 min.
1.73 acres
620 ft
1.00 ~"/sec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
Tqa) = 10.3 min.
Rainfall Intensity (Ii) = 6.234 in/hr
;11:5:::::1::::::[1:::::::::::::::1:1::::::::::::1:::1.m::::::::.:_:::::::::=:::::::=:::1},111:::1r.$:::::::::::::::·
Rainfall Intensity (15) = 7.586 in/hr
::K1::1:::::::::::::::::::=::::::::1:m::::1:rn:::::::1:::::::::::1::i:::::;Im::::1~111::::m:;,:,::1::
Rainfall Intensity (110) = 8.518 in/hr
::Qi1::5:::::1::1:::::::::;::1:::::1::::::::::::::.::::::::::::::::1:::::::::::::::::::::=::::·tt},lili!Pf!::::::·::::::::
Rainfall Intensity (1 25) = 9.730 i%r
::11::1f;::::::;::::::::::::::::::::::::]:::::::i:[::::::1:::::::::::::::::::::::::::::::::::1:11 1!::::m ::::::::::::::i
Rainfall Intensity (1 50) = 11 .000 i%r
::a.::5::::::::::=::::::::::::::::::::::::::::::::::::::::1::::::[::1:::::1::::::::[:::::,[:ilflfi:::it!=i::::[:.::
Rainfall Intensity (1 100) 11 .484 in/hr
::sj1::1rn::::::::::::i1::::i1::::1:::::::::1::::l::::::::::::::::::11:1:1~111::::m:::::::[:::
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area R
Drainage Area (AR) =
TIME OF CONCENTRATION (Tel
GIVEN
Maximum Travel Distance (DR) =
Velocity of Runoff (VR) =
Coefficient of Runoff (CR) =
**NOTE: Minimum Tc allowed = 10 min.
2.73 acres
840 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
TqR) = 14.0 min.
Rainfall Intensity (1:0 = 5.382 in/hr
::~;:e::::::::::::::::::::::::::::::::::::::::::l::::::::i::::::::::1;::::::i::::::,::m:::1:;1;.111:::11t::::::::::::::::
Rainfall Intensity (15) = 6.597 in/hr
::1:.]!:::r::[::::i::::m::::.::::m:::::::::::::::::::::::::i::::m:rn::im:::::::1+.11imtm:::::·
Rainfall Intensity (110) = 7 .437 in/hr
::~1::eI::1::::::::::::::i:tI[::::i:::::i::'t:::i::::1::i::::::a:181~:::11t:::. ·:.;::::
Rainfall Intensity (125) = 8.508 i%r
::11::a::::::::::::::::::::::::::::::;::::::i:::::::::::::::::;:i:::::;:::::1i::::::;::::::11,~11:1:::::m.:·:.::::::::
Rainfall Intensity (150) = 9.635 in/hr
::a1a:1I::;::::::::::::::::::;:::r:::::::::rnn::::::::::::m::m:::i~;::11~111::::11t:::=::i:::::
Rainfall Intensity (1100) 10.053 in/hr
:;1.j1::a:::::::::::::;::;:::::::::::::::i:::::i,::;::11.:::::'tt:::::.:i::::::a11f.11::::m i',:::::::::
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area S
Drainage Area (AR) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (Ds) =
Velocity of Runoff (V 5) =
Coefficient of Runoff (Cs) =
-NOTE: Minimum Tc allowed= 10 min.
5.52 acres
900 ft
. ft 1.00 !sec
0.50
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
Tqsi= 15.0 min.
Rainfall Intensity (l:i) = 5.192 i%r
;11::e:m:::::;::::::;r;::mm::::::::::::mrn1:=:::::H:::;::::::::m;::::::;11i,111::::1'~:::::=:::::::;=
Rainfall Intensity (15) = 6.376 in/hr
::ro.1:::imrn:1m;:::II::;::::::Irn::::::::::;;1::1:m:1:::;::::::::::11l111::1:mI::::::::m
Rainfall Intensity (110) = 7 .194 i%r
[fliiem::;:;;:::::~mI::;;::1::m::m:l@::::::::1:::u:::::=::11~111:11t!:I::m::
Rainfall Intensity (125) = 8.234 in/hr
:~11:::::::rnmm::::mrn:mtII:::::m::1::::::::::::I:I:1~m:::m;m::::::::i
Rainfall Intensity (150) = 9.328 in/hr
::11:~1,;m:::;:rn:I:::::;:::::;;m:::::m;;:::::::;:::rn:::::I:::::::::::JJ!*itl:~1~;::;;m::i
Rainfall Intensity (1100) 9.732 in/hr
::1i11:5:::::;::::;:::::;:]::::rn::::::;:;::t::::m;:::m:::::;::::::::::::::::,1~ia::m::::::]J
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area T
Drainage Area (AT) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (~) =
Velocity of Runoff (VT) =
Coefficient of Runoff (~) =
-NOTE: Minimum Tc allowed = 1 O min.
0.78 acres
400 ft
ft 4.00 fsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
T C(T) = 1.7 min.
Rainfall Intensity (l:i) = 6.327 in/hr
::r1::e:mrn:::::I1I1::~~;;::Irnr;:=:i1:::::I:I:III:f :tl1=tlli]fti::::::::::::,::
Rainfall Intensity (15) = 7.693 in/hr
::~::e:::::::::::1:::::::::I::::1::::::::::::1:::[;::11:::::::::::m::::;:::;:;,::::::::1111::::m::::::::::1;
Rainfall Intensity (110) = 8.635 i%r
!(~i::a::::::::::::::::m:::mrn1rnrn:::1:I::::::1::::::::::::;::::;::::;:H:::::1~@~:::st!l'I::rn·::
Rainfall Intensity (125) = 9.861 in/hr
::111:::::::i:1:::::i::::1::::1:i:::I::1;::::1:::::rnm:::::::;::::::u~~11]m::m:r::
Rainfall Intensity (150) = 11 .148 in/hr
;a::e;:::::::::::1:::::1:::::::;:::::1ri::::::i:::rn1:m::::::::::::::rn::::::::::::::1~111::::s!!l::::::1:r==
Rainfall Intensity (1100) 11.639 in/hr
::s.11::::1r:::::::::::::::;:1::::::irn:~:::::::::::::m:::m::i:::1:1·::::1~iJ1::::m:::;::::]l
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area U
Drainage Area (Au) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (Du) =
Velocity of Runoff (Vu) =
Coefficient of Runoff (Cu) =
**NOTE: Minimum Tc allowed = 1 O min.
1.71 acres
900 ft
4.00 ft/sec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) =
Coefficient (d) =
76
8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882--025 Drainage Evaluation.xis
0.73
96
8
RESULT
Tccui = 3.8 min.
Rainfall Intensity (Ii} = 6.327 in/hr
::~:,5;:::;::::;::::::=:1::,:::::::::::::::::::l::::::::::::::::::l:::::::::::::::::::::1;::::::::::1~§J.ltit!i[!l::::
Rainfall Intensity (15) = 7.693 i%r
::~::a:::::::::::::::::::.::::;:::::::::::::::::ll:;;:::::::::::]:::::::::m:::::::::;rn:::11]!i!:::m1::::=:=::;:1
Rainfall Intensity (110) = 8.635 in/hr
::~i1:5:::::::::::::::::::::::::::::::11::::::::::::::::::::::i::::::::::::::::::::::::::::::::::::::i1:1~m11t!:::::i:::::
Rainfall Intensity (125) = 9.861 i%r
::1~::~rn:::,:=:;::::i.::::m::::::::::::::i::@::,:.::::::::::::t:::::::::::::::::::\1:1f.1m:::m.t.::::]
Rainfall Intensity (150) = 11.148 in/hr
::a.1:::::::::::::::::::m:::::::::::::::::::;::1::::::::::::t::::::::::m:m:m::::1zf:m :::1t!1:1::;:
Rainfall Intensity (1100) 11.639 in/hr
:=sj1:::{:::::::::]::::::1::::::::::::::1I:::::::1::i::1:::i::::m::::::::::11~11g::,m::::::::::::::::
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area V
Drainage Area (Av) =
TIME OF CONCENTRATION CTc>
GIVEN
Maximum Travel Distance (Dv) =
Velocity of Runoff (Vv) =
Coefficient of Runoff (Cv) =
-NOTE: Minimum Tc allowed = 1 O min.
1.52 acres
250 ft
ft 1.00 lsec
0.50
2 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
2882-025 Drainage Evaluation.xis
RESULT
TcM= 4.2 min.
Rainfall Intensity (Ii) = 6.327 in/hr
::1i.::a::::::,:.:,::·::;:::=:::::::::::::::::::::::::::::::::::::::::::::::::::[:::::::::::::::::::::::::::::::::::11=m ·::P:rt,'::::::::::::::
Rainfall Intensity (15) = 7.693 in/hr
;11::a:1::::1:::::::::::::::::::::::i::::::::::::::1::::::::::::::::::::::::::;1::::::ii::::::1~11J:::m:;::::;::::::1
Rainfall Intensity (110) = 8.635 i%r
::~ij::a:::::::::1::::::,::::;:=:::::::.:::::::::::::.::,:::::=:-:::::::::::::::::::::::::::::::::::::::::::=:::1~11z·=1r!i::,:::::::::_:::
Rainfall Intensity (125) = 9.861 in/hr
::11::a:::::=:::,::::::::::::1::::::::,::::m::::::::::::::::::::::::i::;:::::::::::::::1:::ili::::::::~B1:=::m::::::::::::::::
Rainfall Intensity (150) = 11.148 in/hr
::a::a:::::r:::::::1:::::[:[::::::::::::1::::::::::::::::::::;:=:::1:::::I::::::1::::::::=:::1~11:::sr~:::::::::=:::::
Rainfall Intensity (1100) 11 .639 in/hr
::sj~::a:::::::i:::1:::1::1:::[::::::::::::::::'::::::::::::::::::::::::::::::::::;::::::::::1~111:::m::::::':::::::::
I
I
I
I
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area W
Drainage Area (Aw)= 2.94 acres
TIME OF CONCEJ':'TRATION CL)
GIVEN
Maximum Travel Distance (Ow) =
Velocity of Runoff (Vw) =
Coefficient of Runoff (Cw) =
**NOTE: Minimum Tc allowed = 10 min.
880 ft
2.00 ft/sec
0.75
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.806
Coefficient (b) =
Coefficient (d) =
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient (d) =
98
8.5
100 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
Tc(W) = 7.3 min.
Rainfall Intensity (l:i} = 6.327 in;hr
::m;5:::mrn:::1:::::::::::::f:rn::::~:I1m:::::1[:m::::::::I::::::11],1i1:::1r![:::::i:
Rainfall Intensity (15) = 7.693 in;hr
;11::a:I[::']:]::@ili::':I::;::::::::::::::::::m::::::::::::::1:::::::::::111:z~111:::m:::::::::r:i
Rainfall Intensity (110) = 8.635 in;hr
::~1;5:::;::::::::::::::::I::::::::m;;;::i:;:::::::':::::::11:::::::::rn:::,;::::11~1!:111r•::::::.::::::::
Rainfall Intensity (125) = 9.861 in;hr
::a1a::::::1:::::::::::::::::::::mm::::::::::::i::::::::I:i:::::::m:::::::::f:1:~111:m::::::::,:::::::·
Rainfall Intensity (150) = 11 .148 in;hr
::a ::e:::::::t:::::::1::::1::::::::1::::::m:1::;:::::::::::1:::::::i::]:::::::111=z11:::1r!::::i::::::
Rainfall Intensity (1100) 11.639 in;hr
::1l1::5:;:::::::::::;::::::::::1::::::::m:i:::::::::::::::::i::::::::::::,:;:::::::::::a§~111::::m::.:::::::1:
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area X
Drainage Area (Ax) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (Ox) =
Velocity of Runoff (Vx) =
Coefficient of Runoff (Cx) =
-NOTE: Minimum Tc allowed = 1 O min.
1.02 acres
800 ft
ft 4.00 /sec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) = 89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) =
Coefficient {d) =
98
8.5
100 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
T C(X) = 3.3 min.
Rainfall Intensity (10 = 6.327 in/hr
::11::a:::::::::::::::::::::::::::::=:;:::~:::::::I::::::I::=:::::::::::::;;:::::::::::I:::::;:::=::;:::::§f,ifiJit~ill:II:::
Rainfall Intensity (15) = 7.693 i%r
::t1&i:1:::::::::::::::::m::::iI:::::::::::::m::::::::::::::::::i::i::i::::::::@:::::::~~1:11:::m::;:::=::::::i
Rainfall Intensity (110) = 8.635 i%r
::~1::a11=r::;::::::::::::::::::::::::::::=:::::::::::::=:=:::::::::::=::1~::::=1=i:::::::::::~~!11;::1r~:::::::I:::=
Rainfall Intensity (125) = 9.861 in/hr
;11::1::::::::::i:::::::mm:::::::::::::::::::::::i:::::;:::::::::::1:::::;::::::::::::::::::::::::!~1:1::::m:1:::.=_:=:
Rainfall Intensity (150) = 11.148 i%r
::m::aJ]::I:::::::I:::::I:t::I:::l:II:lII:::::::::::::::;::I1:1~111:::1r~:::::;:::::::::
Rainfall Intensity (1100) 11.639 i%r
::1;1::rrn:::::::::::::::::t:::::rn::::::::::::::::::;;;::::::::::::;::1::::m::1:::::11~11:1:::m1::::::::m
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area Y
Drainage Area (Ay) =
TIME OF CONCENTRATION CTcl
GIVEN
Maximum Travel Distance (Dy) =
Velocity of Runoff 0Jy) =
Coefficient of Runoff (Cy) =
-NOTE: Minimum Tc allowed = 1 O min.
2.54 acres
1050 ft
ft 2.00 fsec
0.75
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.754
Coefficient (b) =
Coefficient (d) =
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY, RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
0.73
96
8
RESULT
TcM= 8.8 min.
Rainfall Intensity (Ii) = 6.327 i%r
1r1::5:::::::::::::::1::::::::::=::::::::::::::::::;m1]:::::,:·:,f::=:.:=:::::::::::=:::::::l:1~~1:~~:::P:r!::::,:.::-.::
Rainfall Intensity (15) = 7.693 in/hr
::~::a::::::i:::::::t::::i:::::::::::::::::::::::::::::::i:::::::::::::::I::::::::::::::::i!mirl:li:::~=f :::::
Rainfall Intensity (110) = 8.635 in/hr
::sw'~fa::=::t:=:itfa:(:tt' ::::::=:::::::::::::::::::::::::f:.:::~~~§.1=:¢f!;::::::::::
Rainfall Intensity (125) = 9.861 in/hr
:=•::e:::::::::11::::::::=:::::::.::::::::::::::::::r::::::::::,:::.:::::::::::::::::::::::::]:j·1~m::::m:::::::::r::
Rainfall Intensity (150) = 11 .148 in/hr
::a:.a::;:::::::::::::::::.:[:,:::::::::.:::::::::::::::::,:::::::::::=:=::::::1=:::::::::,::::1&1:~11~:=:f:r¥:,::::==[
Rainfall Intensity (1100) 11.639 in/hr
=aji,:m:::::':.:·::=::==:::::::v:·::=-:-:-:::==.::=:=::::=:r=,,=:=-:.,::,:.1::1f :=11~1?:,::m::::::::::·:
I
I
SECTION #2 -DRAINAGE AREAS EVALUATION
GENERAL INFORMATION
Description: Drainage basin for Area Z
Drainage Area (A-z) =
TIME OF CONCENTRATION CTJ
GIVEN
Maximum Travel Distance (D-z) =
Velocity of Runoff (V-z) =
Coefficient of Runoff (C-z) =
-NOTE: Minimum Tc allowed = 1 O min.
0.60 acres
400 ft
ft 4.00 fsec
0.90
2 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.806
65
8
5 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.785
76
8.5
10 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.763
80
8.5
25 YEAR FREQUENCY. RATE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.754
89
8.5
50 YEAR FREQUENCY. RA TE OF DISCHARGE (Q)
Coefficient (e) =
Coefficient (b) =
Coefficient (d) =
0.745
98
8.5
100 YEAR FREQUENCY, RA TE OF DISCHARGE (Q)
Coefficient (e) = 0.73
Coefficient (b) =
Coefficient (d) =
2882-025 Drainage Evaluation.xis
96
8
RESULT
Tcczi= 1.7 min.
Rainfall Intensity (Ii) = , 6.327 in/hr
::m ::e:I:::;::::::=:=:::::::::::::::::::::::::::;::::,:=:::::::::::::::,:::::::::::::::::::::::::::::::::::::::,:::1,},m :=:1t!::::·:::·:=·::
Rainfall Intensity (1 5) = 7.693 in/hr
::-.:\5:::;:::::::::::::::::1::::]f::::::::::,:]:::11:::11f]I::I:::::,:::l1~111::::m::,:,:::::::,:::
Rainfall Intensity (110) = 8.635 in/hr
::1~ta·::::j:_:,::::::*::::1:::=l:::::::::::l:::;=:::l:::,:::::::::::m:::::::_:]::11=ii1:::1t!::=:-:::
Rainfall Intensity (125) = 9.861 i%r
:=11·:1:::::::::::::,::t]trn:::;:1::::::::·::=::::::::::::::::=:,:::::::::::::=:]:::::::::.1~111:::m;:::·:m::
Rainfall Intensity (150) = 11.148 in/hr
::B.::5::::::::::::::::::::::::::::1r:i:::::::::1::]:::::::1:::::::::]:::]::::::1::::1},1,a:,:1t!::::·:::,:::,::
Rainfall Intensity (1 100) 11.639 in/hr
::1;1::1:.;:::=:::::::::]I:::::::::::::=:::::::::::::::,]:::],:::::-:::::::::::::::::::::::,::::::1~11::=m=i:::::::::
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION#3
CURB & GUTTER FLOW CALCULATIONS
--
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #1 (AREA 8)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.0000 %
294.81 ft
8.685 cfs
296.
£ 295.8
'-"295.6
I I I I I I I I I I
c 295.4
.Q 295.2 ro 295.o ~ 294.8
---,---------r--------,---------r--------,---------r--------,---------r--------,---------,
---------~--------~---------~--------~---------~--------~---------~--------~---------! I I I I I I I I I -----r--------,---------r--------,---------r--------,---------r--------,---------
--------~-------~--------~---------L--•-----~---------L--------~---------L--------~--1 I I I --------;---------, -------.--------,-------- --- - -1 ------ - - -,
-------~---------L --------~ ---------' I I I w 294.6 --------.---------.-' --r --- - - - --., - - - - - - - --1
294.4'--~~~~L-~~~~..L.-~~~~_._~~~~-'-~~~~--'-~~~~_._~~~~......_~~~~-'-~~~~-'-~~~~~
0.0 5 .0 10.0
Notes:
Collects Runoff from Drainage Basisn: B
Discharges into Drainage Basin: C
Discharges into Structure Type: Open Channel
15.0 20.0 25.0
Station (ft)
Municipal Development Group
30.0 35.0
02/19/98
08:37:09 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
40.0 45.0 50.0
FlowMaster v5.07
Page 1 of 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #1 (AREA 8)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
lnpu~ Data
Channel Slope 1.0000 %
Elevation range: 294.50 ft to 296.00 ft.
Station (ft} Elevation (ft)
0.00 296.00
11 .00
11 .50
11 .50
25.00
38.50
38.50
39.00
50.00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
295.00
295.00
294.50
295.00
294.50
295.00
295.00
295.25
8.685 cfs
0.013
294.81
2.67
17.63
16.99
0.31
294.86
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004563 ft/ft
Velocity 3.25 ft/s
Velocity Head 0.16 ft
Specific Energy 294.98 ft
Froude Number 1.44
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
50.00
02/19/98
08:37:33AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 ra.fm2
1.D. #1 (AREA 8)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.0000 %
294.85 ft
11 .707 cfs
-
296. £ 295.8
.__, 295.6
I I I I I I I I I I
c 295.4
.Q 295.2
-ro 295.o
---,---------.--------,---------,--------,---------,--------,---------,--------,---------,
---------L.--------.1---------L.--------.1---------L.--------.1------~--L.--------.1---------1 I I I I I I I I I -----,--------,---------,---------,---------.--------,---------.--------,-----------------.1-------l..--------.1---------L.--------.l---------l..--------.l---------L.--------.l--I I I I I I I I --------,---------. ------,---------.-------------.--------,-------------, ---------,
Q)> 294.8 -- ------.1---------L. -I I ------,-y----I -------~----------"'""#-,--------L. --------.1 --------_, I I I w 294.6 --------,---------.----------;--------,---------;----------· --------, ---------,
294.4'--~~~~'--~~~~......_~~~~-'-~~~~-'-~~~~_._~~~~~~~~~-'-~~~~-'-~~~~-'-~~~~-'
0.0 5 .0 10.0
Notes:
Collects Runoff from Drainage Basisn: B
Discharges into Drainage Basin: C
Discharges into Structure Type: Open Channel
15.0 20.0 25.0
Station (ft)
Municipal Development Group
30.0 35.0
02/19/98
08:37:57 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
40.0 45.0 50.0
FlowMaster v5.07
Page 1of1
I
I
I
I
I
I
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #1 (AREA 8)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 294.50 ft to 296.00 ft.
Station (ft) Elevation (ft)
0.00 296.00
11.00 295.00
11.50 295.00
11 .50 294.50
25.00 295.00
38 .50 294.50
38 .50 295.00
39 .00 295.00
50 .00 295.25
Discharge 11.707 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 294.85
Flow Area 3.34
Wetted Perimeter 19.72
Top Width 19.00
Height 0.35
Critical Depth 294.91
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004385 Wft
Velocity 3.50 Ws
Velocity Head 0.19 ft
Specific Energy 295.04 ft
Froude Number 1.47
Flow is supercritical.
. Flow is divided.
Municipal Development Group
End Station
50.00
02119/98
08:38:17 AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #2 (AREA E) (10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
10.970 cfs
0.45 ft
2.68 ffl
12.48 ft
12.02 ft
0.53 ft
0.004033 ft/ft
4.10 ft/s
0.26 ft
0.71 ft
1.53
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin: G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Sconset Cove
Municipal Development Group 06/09/98
1°2:50:44 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 re. fm2
l.D. #2 (AREA E) (100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 . %
0.000000 H: V
27 .000000 H : V
14.788 cfs
0.50 ft
3.35 ft2
13.96 ft
13.45 ft
0.60 ft
0.003875 ft/ft
4.41 ft/s
0.30 ft
0.80 ft
1.56
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin: G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Sconset Cove
Municipal Development Group 06/09/98
02:51 :25 PM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 re. fm2
l.D. #3 (AREA E)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.5000 %
0.000000 H: V
38.000000 H: V
10.970 cfs
0.44 ft
3.76 ft2
17.36 ft
16.91 ft
0.46 ft
0.004161 ft/ft
2.92 ft/s
0.13 ft
0.58 ft
1.09
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin: G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Wayfarer Lane
Note: 12' Clear Lane Provided -Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane .
07/01/98
1
08:26:49 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #3 (AREA E)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.5000 %
0.000000 H: V
38.000000 H : V
14.788 cfs
0.50 ft
4.71 ft2
19.42 ft
18.91 ft
0.52 ft
0.003999 ft/ft
3.14 ft/s
0.15 ft
0.65 ft
1.11
Collects Runoff from Drainage Basin: E
Discharges into Drainage Basin: G
Discharges into Structure Type: Culvert
Runoff on Southwest Side of Wayfaer Lane.
Municipal Development Group 07/01/98
08:27:20AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #4 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
13.634 cfs
0.48 ft
3.15 ft2
13.54 ft
13.05 ft
0.58 ft
0.003918 Wft
4.33 Ws
0.29 ft
0.77 ft
1.55
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on Northeast Side of Sconset Cove.
Municipal Development Group 06109198
03:00:35 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #4 (AREA F}(100 YR}
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
18.379 cfs
0.54 ft
3.94 ft2
15.14 ft
14.59 ft
0.65 ft
0.003765 ft/ft
4.66 ft/s
0.34 ft
0.88 ft
1.58
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on Northeast Side of Sconset Cove.
Note: There will be a minimum 3" cut from the TIC to to daylight. Therefore, overflow of the 100-yr flood will be
maintained with in the R.O.W and shall be shown on the construction documents for South Hampton, Phase Seven.
06109198
03:01:39 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #5 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
0.000000 H: V
38.000000 H: V
13.634 cfs
0.44 ft
3.71 ft2
17.25 ft
16.80 ft
0.50 ft
0.004043 ft/ft
3.67 ft/s
0.21 ft
0.65 ft
1.38
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Note: 12" Clear Lane Provided -Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane.
06/09/98
03:10:14 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #5 (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
0.000000 H: V
38.000000 H : V
18.379 cfs
0.49 ft
4.64 ft2
19.29 ft
18.79 ft
0.57 ft
0.003885 ft/ft
3.96 ft/s
0.24 ft
0.74 ft
1.40
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Note: Assumed majority of runoff to be carried on Southeast Side of Wayfarer Lane.
Municipal Development Group 06109198
03:12:25 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is sueercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 ra.fm2
l.D. #5 {AREA F){100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.013
0.8000 %
0.000000 H: V
38.000000 H : V
18.379 cfs
0.49 ft
4.64 ft2
19.29 ft
18.79 ft
0.57 ft
0.003885 ft/ft
3.96 ft/s
0.24 ft
0.74 ft
1.40
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
02119/98
09:51 :12 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS.07
Page 1 of 1
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #Q (AREA H)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
0.013
1.6000 %
295.63 ft
26.814 cfs
Water Surface Elevation
Discharge
£ 295.9
'-"295.8
c 295.7 g 295.6
t1l 295.5
I
- - - - - --1---- - - --1-"-----P--~'-..P..----...... --_____ -1-______ -1-r
I I
-- - - - --1-- --- - --1-
--
(!)> 295.4 - - - - - --1-- --- - --1----~-------~-------~-------i-------L----1 I w 295.3 - -- ----1------ --1--
1 I I I I -,-------,-------,-------;-------r-------r-------r-
---
295.2'--~~~'--~~~"'-~~~_._~~~-'-~~~-'-~~~-'-~~~-'-~~~-'-~~~-'-~~~-'-~~~-'-~~~-'
0.0 5 .0 10.0
Notes:
Collects Runoff from Drainage Basin: H
Discharges into Drainage Basin: I
15.0
Discharges into Structure Type: Open Channel
20.0 25.0 30.0
Station (ft)
Municipal Development Group
35.0 40.0
06/11 /98
11:23:43 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
45.0 50.0 55.0 60.0
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Channel Slope
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. tlf) (AREA H)(10 YR)
Irregular Channel
Manning's Formula
Water Elevation
1.6000%
Elevation range: 295.25 ft to 296.00 ft.
Station (ft) Elevation (ft) Start Station
0.00
10.50
0.00 296.00
10.50 295.75
11.00 295.75
11.00 295.25
30.00 295.75
49.00 295.25
49.50 295.75
60.00 296.00
Discharge 26 .. 814 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 295.63 ft
Flow Area 5.65 ft2
Wetted Perimeter 30.05 ft
Top Width 29.50 ft
Height 0.38 ft
Critical Depth 295.75 ft
Critical Slope 0.004017 ft/ft
Velocity 4.75 ft/s
Velocity Head 0.35 ft
Specific Energy 295.98 ft
Froude Number 1.91
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
10.50
60.00
06/11198
11 :24:06AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. '#6 (AREA H)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
295.68 ft
36.145 cfs
- -
' ' I I I I I I I I I I
--
e 295.9
'-' 295.8 -------~-------,-------,-------,-------1-------y-------r-------r-------r-------
-1 ------~-------~-------~-------.. -------+-------·-------~-------~
-
c:: 295. 7 l-------:------~~--.......... --~,.,,,_~-~-11 '!'-~ ...... ili:~ .................. 4,.i~-..... -.--.. ---.,4!.~-..... -.--.--.. ----1 r - - - - - --:-- - - - - - -: .Q 295.6 - ------I--- -- - --1-_______ _. ______ _
i 295.5 -------~------~------~-------4-------+-----~ 295.4 - - - ----:-- - - - - --:-- --~ - --- - - -~ - - - - - - -~ - - - - - - -7 -------; ----
LiJ 295.3 -------i--------1---,-------,-------,--------y-------r-------r-------r-
295 .2'--~~~'--~~~-'-~~~-'-~~~-'-~~~-'-~~~_._~~~-'-~~~-'-~~~-'-~~~-'-~~~-'-~~~---'
0 .0 5.0 10.0
Notes:
Collects Runoff from Drainage Basin: H
Discharges into Drainage Basin: I
15.0
Discharges into Structure Type: Open Channel
20.0 25.0 30.0
Station (ft)
Municipal Development Group
35.0 40.0
06/11/98
11 :24:42 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
45.0 50.0 55.0 60.0
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Channel Slope
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. '116 (AREA H)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
1.6000 %
Elevation range: 295.25 ft to 296.00 ft.
Station (ft) Elevation (ft) Start Station
0.00
10.50
0.00 296.00
10.50 295.75
11 .00 295.75
11 .00 295.25
30.00 295.75
49.00 295.25
49.50 295.75
60.00 296.00
Discharae 36.145 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 295.68 ft
Flow Area 7.07 ft2
Wetted Perimeter 33.61 ft
Top Width 32.99 ft
Height 0.43 ft
Critical Depth 295.81 ft
Critical Slope 0.004619 tuft
Velocity 5.11 tus
Velocity Head 0.41 ft
Specific Energy 296.08 ft
Froude Number 1.95
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
10.50
60.00
06/11/98
11:24:59 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #7 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.4000 %
275.62 ft
22.982 cfs
I I I I
---
2275.9 -------~-------~-------~-------~-------4 -------+-------+-------~-------~-------~-------~275 .8 ~-------~-------~-------~-------~-------~-------~-------~-------~-------c 275.7 -------:--------,--,-------:--------
.Q 275.6 ------_, __ - ---__ ,_I-!-~~~~~~~~~~~~~'.:":: -~-------~-------: ro 275.5 -------:--------:--r-------r-------1
~ 275.4 -------:--------:----~-------~-------~-------~-------~-----~-------~-------: m 275.3 -------r------,---,-------,-------,-------,-------r-------r-------r---r-------r-------,
275 .2'--~~~-'-~~~ .......... ~~~---'-~~~--''--~~~-'-~~~-'-~~~--'-~~~_,_~~~~'--~~~-'-~~~-'-~~~-'
0.0 5 .0 10.0 15.0
Notes:
Collects Runoff from Drainage Basin: M
Discharges into Drainage Basin: TxDOT R.O.W.
Discharge into Structure Type: Open Channel
20.0 25.0 30.0
Station (ft)
Municipal Development Group
35.0 40.0
06/11/98
11 :26:32 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
45.0 50.0 55.0 60.0
FlowMaster v5.07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #7 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.4000 %
Elevation range: 275.25 ft to 276.00 ft.
Station (ft) Elevation (ft)
0.00 276.00
10.50 275.75
11 .00
11.00
30.00
49.00
49.00
49.50
60.00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
275.75
275.25
275.75
275.25
275.75
275.75
275.80
22.982 cfs
0.013
275.62
5.30
29.13
28.37
0.37
275.72
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004136 ft/ft
Velocity 4.34 ft/s
Velocity Head 0.29 ft
Specific Energy 275.92 ft
Froude Number 1.77
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
60.00
06/11/98
11 :26:54AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
06/11/98
Project Description
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #7 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.4000 %
275.67 ft
30.980 cfs
e 275.9
'-' 275.8
c 275.7
.Q 275.6
~ 275.5
I I I I I I I I I I I -------~-------,-------,-------,-------,-------y-------r-------r-------r-------r-------
-1-------J-------J-------J-------~-------•-------•-------~-------L-------I I I I I I I -------~------~------------------------------------r-------r-------1
-- -----1--------1--------~--------L. - - - --- -~ -- - - ---1
1 I 1 I I I I I
-- -----i---- - - --i------,-------,-------,------ r ------- r -------1
;;"; 275.4 -- -----1------ --1-
"' I I ill 275.3 -- -----1---- - - --i--
___ J _______ J-------~-------•-------•----I I I I I -;-------,-------1-------1-------1-------T-------r--L-------L-------1 I I I --r-------r-------1
275 .2'--~~~.L-~~~-'--~~~....._~~~-'-~~~-'-~~~-'-~~~--'-~~~-'-~~~-'-~~~-'-~~~--'-~~~~
0.0 5 .0 10.0 15.0
Notes:
Collects Runoff from Drainage Basin: M
Discharges into Drainage Basin: TxDOT R.O.W .
Discharge into Structure Type: Open Channel
20.0 25.0 30.0
Station (ft)
Municipal Development Group
35.0 40.0 45.0 50.0 55.0 60.0
11 :27:42 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #7 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.4000 %
Elevation range: 275.25 ft to 276.00 ft.
Station (ft) Elevation (ft)
0.00 276.00
10.50
11 .00
11 .00
30.00
49.00
49.00
49.50
60.00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
275.75
275.75
275.25
275.75
275.25
275.75
275.75
275.80
30.980 cfs
0.013
275.67
6.62
32.58
31.73
0.42
275.79
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004135 ft/ft
Velocity 4.68 ft/s
Velocity Head 0.34 ft
Specific Energy 276.01 ft
Froude Number 1.80
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
60.00
06/11/98
11:28:00 AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
--
Project Description
-SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #8 (AREA M)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.013
1.6000 %
265.61 ft
22.982 cfs
. . . . . .
£265.9 ------~-------------~------------~-------------~------------~-------------! ---------: .__, 265.8 -I - - - - - - - - - - - --1-- - - - - - - - - - - --1-- - - - - - - - - -- -" - - - - --- - - - - -_,_ -- - - - - -.. - - -- - - - - - ----1 C:: 265. 7 I I y ____________ +-__________ --:
.Q 265.6 I ...,.,,_ ___ ~----~-="'=------1----_-::_~----~~----1-I-------------.l-- --------- --I
i 265.5 ------------,------------~------------~-------------+-------------: ~ 265.4 - --- - - - - --- -~ ----~ - - - --- - -- - - -~ ------- ------T ----:-------------~ -------------: m 265.3 ------------,---------r------------,-------------r---------~-------------y-------------,
265.2'--~~~~~--''--~~~~~--''--~~~~~--'~~~~~~---"~~~~~~---"~~~~~~--'-~~~~~~_,
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin: M
Discharges into Drainage Basin: TxDOT R.O.W.
Discharge into Structure Type: Culvert
20.0 30.0
Station
40.0
(ft)
Municipal Development Group
50.0
06/11 /98
11 :29:23 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 70.0
FlowMaster v5.07
Page 1 of1
06/11/98
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #8 {AREA M){10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevation range: 265.25 ft to 266.00 ft.
Station {ft) Elevation {ft)
0.00 266.00
10.50 265.75
11 .00 265.75
11 .00 265.25
30.00 265.75
49.00 265.25
49.00 265.75
49.50 265.75
70.00 266.00
Discharge 22.982 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 265.61
Flow Area 5.04
Wetted Perimeter 28.41
Top Width 27.67
Height 0.36
Critical Depth 265.72
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004136 ft/ft
Velocity 4.56 ft/s
Velocity Head 0.32 ft
Specific Energy 265.94 ft
Froude Number 1.89
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
70.00
11 :29:41 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #8 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.6000 %
265.66 ft
30.980 cfs
Water Surface Elevation
Discharge
I t o I t o
I I I I I I I E' 265.9 .._, 265.8 ------,-------------r------------,-------------r------------~-----------------------,
c 265.7
.Q 265.6 10 265.5
~ 265.4 w 265.3
-I - - --- - -- -- - - -I-- - - --- - - --- -...j - - - - - - --- --- -l. ---- -- --- - - -_,_ --- - - - -J. -- - - - --- - - --_, I I I 1-----~~-------------~-.. -... ------------,-------------r - - - - - - -- -- - --,
~-------------.1.-------------1 I I I -,--- ------- -- -T -- - - - - - - - - - --,
---L------- -----.J--------- ----l. ----'-------------.I.-------------1 I I I I I I --------r------------,-------------r---------~-------------r-------------,
265.2'--~~~~~~'--~~~~~~'--~~~~~---'--~~~~~--'~~~~~~--'~~~~~~---'-~~~~~~~
0 .0 10.0
Notes:
Collects Runoff from Drainage Basin: M
Discharges into Drainage Basin : TxDOT R.O.W.
Discharge into Structure Type: Culvert
20.0 30.0 40.0 50.0
Station (ft)
Municipal Development Group 06/11/98
11 :30:30AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 70.0
FlowMaster v5.07
Page 1 of1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 re. fm2
l.D. #8 (AREA M)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.6000 %
Elevation range: 265.25 ft to 266.00 ft.
Station (ft) Elevation (ft)
0.00 266.00
10.50 265.75
11 .00 265.75
11 .00 265.25
30.00 265.75
49.00 265.25
49.00 265.75
49.50 265.75
70.00 266.00
Discharge 30.980 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 265.66
Flow Area 6.30
Wetted Perimeter 31 .77
Top Width 30.95
Height 0.41
Critical Depth 265.78
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.004021 ft/ft
Velocity 4.92 ft/s
Velocity Head 0.38 ft
Specific Energy 266.03 ft
Froude Number 1.92
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
70.00
06/11/98
11 :30:46 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(10 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.7500 %
261.68 ft
37.553 cfs
Water Surface Elevation
Discharge
I f I I I
I I I I I I I E' 261 .9
........ 261 .8
c 261.7
.Q 261.6 iii 261 .5 ~ 261.4 w 261 .3
------,-------------r------------,-------------r------------~-----------------------,
~-------------L------------~-------------L------------~--------~-------------! I I I I -,-~-------------y-------------,
~-------------~-------------' I I I ,-------------y-------------,
---L------------~-------------L---~-------------~-------------! I I I I I I --------r------------,-------------r---------,-------------y-------------,
261 .2L-~~~~~~.....__~~~~~~-'-~~~~~~__.~~~~~~~'--~~~~~~_,_~~~~~~_,_~~~~~~-'
0.0 10.0
Notes:
Collects Runoff from Drainage Basin: P
Discharges into Drainage Basin: Nantucket Dr.
Discharge into Structure Type: Culvert
20.0 30.0 40.0 50.0
Station (ft)
Municipal Development Group 06/10/98
08:44:44AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 70.0
FlowMaster v5.07
Page 1 of 1
I
I
I
I
06/10/98
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.7500 %
Elevation range: 261.25 ft to 262.00 ft.
Station (ft) Elevation (ft)
0.00 262.00
10.50 261 .75
11 .00
11 .00
30 .00
49.00
49.00
49.50
70 .00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
261 .75
261 .25
261.75
261 .25
261 .75
261 .75
262.00
37.553 cfs
0.013
261.68
7.04
33.58
32.71
0.43
261 .83
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.003941 ft/ft
Velocity 5.34 ft/s
Velocity Head 0.44 ft
Specific Energy 262.12 ft
Froude Number 2.03
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
70.00
I 08:45:06 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1of1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #3 -CURB & GUTTER FLOW
Cross Section for Irregular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(100 YR)
Irregular Channel
M~nning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.013
1.7500%
261.73 ft
50.621 cfs
Water Surface Elevation
Discharge
I I I 0 I I
I I I I I I I e 261 .s
........ 261 .8
c: 261 .7
.Q 261 .6 10 261 .5 ~ 261 .4 iii 261 .3
- - - - - -1 - - - - - - - - --- - -I--- -- - - - -- - - --, -- -- -- --- - - - -T - - - --- --- - - --,-- - - - - - - - - - - ---- - -- - - -,
-I - - - - - - --- - - - - - - - - - - - - - -.J-- - - - - - - - ----- - - - - - - - - - -_,_ -- - - - - -.I. - - - - - - - - - - - --1 I I ~-------------y-------------, ~-------------.1.-------------1 I I I ~-------------,-------------,
- --L. - - - - - - - - - - - -... _ - --- - - - - - - - -I.. - - -_,_ - - - - - - - - - - - -.I. - - - - - - - - --- -_, I I I I I I - - - - - - - - r - - - - - - - - - - - -1-- - - - - - - - - - - -r - - - - - - - - --,-- - - - - - - - - - - -T - - - - - - - - - - - --,
261 .2'--~~~~~--''--~~~~~--''--~~~~~--'~~~~~~__,,~~~~~~--"~~~~~~__._~~~~~~-'
0.0 10.0
Notes:
Collects Runoff from Drainage Basin: P
Discharges into Drainage Basin: Nantucket Dr.
Discharge into Structure Type: Culvert
20.0 30.0 40.0 50:0
Station (ft)
Municipal Development Group 06/10/98
08:45:49AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 70.0
FlowMaster v5.07
Page 1 of1
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #9 (AREA P)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.7500 %
Elevation range: 261 .25 ft to 262.00 ft.
Station (ft) Elevation (ft)
0.00 262.00
10.50 261.75
11.00 261.75
11 .00 261 .25
30.00 261 .75
49.00 261.25
49.00 261 .75
49.50 261.75
70.00 262.00
Discharge 50.621 cfs
Results
Wtd. Mannings Coefficient 0.013
Water Surface Elevation 261 .73
Flow Area 8.81
Wetted Perimeter 37.56
Top Width 36.58
Height 0.48
Critical Depth 261 .90
ft
ft2
ft
ft
ft
ft
Start Station
0.00
Critical Slope 0.003810 ft/ft
Velocity 5.75 ft/s
Velocity Head 0.51 ft
Specific Energy 262.24 ft
Froude Number 2.07
Flow is supercritical.
Flow is divided.
Municipal Development Group
End Station
70.00
06/10/98
08:46:10 AM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.013
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #10 (AREA T)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
6.096 cfs
0.36 ft
1.72 ft2
10.01 ft
9.65 ft
0.42 ft
0.004362 ft/ft
3.54 ft/s
0.19 ft
0.55 ft
1.48
Collects Runoff from Drainage Basin: T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on East Side of Beacon.
Municipal Development Group 06/10/98
09:02:45AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #10 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27.000000 H: V
8.218 cfs
0.40 ft
2.16 ft2
11 .20 ft
10.79 ft
0.47 ft
0.004191 ft/ft
3.81 ft/s
0.23 ft
0.63 ft
1.50
Collects Runoff from Drainage Basin: T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on East Side of Beacon.
Municipal Development Group 06/10198
09:03:28AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
06/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 re. fm2
l.D. #11 (AREA T)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.6000 %
0.000000 H : V
38.000000 H : V
6.096 cfs
0.29 ft
1.57 ft2
11 .20 ft
10.91 ft
0.36 ft
0.004500 ft/ft
3.89 ft/s
0.24 ft
0.52 ft
1.81
Collects Runoff from Drainage Basin: T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on South Side of Cranberry Court.
Municipal Development Group
1
09:13:19AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 7SS-°1666
FlowMaster v5.07
Page 1 of 1
06/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 re. fm2
l.D. #11 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.6000 %
0.000000 H : V
38.000000 H : V
8.218 cfs
0.32 ft
1.96 ft2
12.53 ft
12.20 ft
0.41 ft
0.004324 ft/ft
4.20 ft/s
0.27 ft
0.59 ft
1.85
Collects Runoff from Drainage Basin: T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Runoff on South Side of Cranberry Court.
Municipal Development Group
, 09:13:01 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowM.aster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slop~
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #12 {AREA U){10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
13.399 cfs
0.42 ft
2.40 ft2
11.81 ft
11.38 ft
0.57 ft
0.003927 ft/ft
5.59 ft/s
0.48 ft
0.91 ft
2.14
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Municipal Development Group 06/10/98
09:57:04AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #12 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
18.062 cfs
0.47 ft
3.00 w
13.21 ft
12.73 ft
0.64 ft
0.003774 ft/ft
6.02 ft/s
0.56 ft
1.03 ft
2.19
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Municipal Development Group 06/10/98
1
09:57:57 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
06/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #13 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
16.856 cfs
0.46 ft
2.85 ft2
12.87 ft
12.40 ft
0.63 ft
0.003809 ft/ft
5.92 ft/s
0.54 ft
1.00 ft
2.18
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Municipal Development Group
1
10:02:08 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203} 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #13 {AREA Y){100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
2.0000 %
0.000000 H : V
27 .000000 H : V
22.357 cfs
0.51 ft
3.52 ft2
14.31 ft
13.79 ft
0.70 ft
0.003668 ft/ft
6.35 ft/s
0.63 ft
1.14 ft
2.21
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Note: There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O.W . and shall be shown on the construction documents for South Hampton, Phase One.
06/10/98
1
10:05:22 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #14 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27.000000 H: V
13.399 cfs
0.39 ft
2.06 ft2
10.95 ft
10.55 ft
0.57 ft
0.003927 ft/ft
6.50 ft/s
0.66 ft
1.05 ft
2.59
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Municipal Development Group 06/10/98
10:08:35AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2 ·
l.D. #14 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
18.062 cfs
0.44 ft
2.58 ft2
12.24 ft
11.80 ft
0.64 ft
0.003773 ft/ft
7.01 ft/s
0.76 ft
1.20 ft
2.64
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
06/10/98
10:09:19 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
06/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 re . fm2
1.D. #15 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27 .000000 H : V
16.856 cfs
0.43 ft
2.45 ft2
11.93 ft
11.50 ft
0.63 ft
0.003809 ft/ft
6.89 ft/s
0.74 ft
1.16 ft
2.63
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Municipal Development Group
1
1 0:09:55 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #15 {AREA Y){100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
3.0000 %
0.000000 H : V
27.000000 H: V
22.357 cfs
0.47 ft
3.03 ft2
13.26 ft
12.78 ft
0.70 ft
0.003668 ft/ft
7.39 ft/s
0.85 ft
1.32 ft
2.68
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Municipal Development Group 06/10/98
10:10:33 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1of1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #16 (AREA U)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38.000000 H: V
13.399 cfs
0.46 ft
4.08 ft2
18.08 ft
17.61 ft
0.50 ft
0.004052 Wft
3.28 Ws
0.17 ft
0.63 ft
1.20
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Municipal Development Group 06/10/98
10:12:56 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #16 (AREA U)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38.000000 H : V
18.062 cfs
0.52 ft
5.11 ft2
20.23 ft
19.70 ft
0.56 ft
0.003894 Wft
3.54 Ws
0.19 ft
0.71 ft
1.22
Collects Runoff from Drainage Basin: U
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on West Side of Windrift Cove.
Note: There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O.W. and shall be shown on the construction documents for South Hampton, Phase One.
10/98
15:07 AM Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #17 (AREA Y)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H : V
38 .000000 H: V
16.856 cfs
0.51 ft
4.85 ft2
19.71 ft
19.20 ft
0.55 ft
0.003930 ft/ft
3.48 ft/s
0.19 ft
0.69 ft
1.22
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
06/10/98
10:16:31 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #17 {AREA Y){100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.6000 %
0.000000 H: V
38.000000 H: V
22.357 cfs
0.56 ft
5.99 ft2
21 .91 ft
21.34 ft
0.61 ft
0.003785 ft/ft
3.73 ft/s
0.22 ft
0.78 ft
1.24
Collects Runoff from Drainage Basin: Y
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Culvert
Runoff on East Side of Windrift Cove.
Note: There will be a minimum 3" cut from the TIC to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O.W . and shall be shown on the construction documents for South Hampton, Phase One.
06/10/98
1 10:18:13 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #18 {AREA Z){10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
4.670 cfs
0.32 ft
1.41 ft2
9.06 ft
8.73 ft
0.38 ft
0.004519 ft/ft
3.31 ft/s
0.17 ft
0.49 ft
1.45
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on West Side of Beacon.
Municipal Development Group 06/10/98
10:20:51 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is sueercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #18 (AREA Z)(100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
6.295 cfs
0.36 ft
1.77 ft2
10.13 ft
9.76 ft
0.42 ft
0.004343 ft/ft
3.57 ft/s
0.20 ft
0.56 ft
1.48
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on West Side of Beacon.
Municipal Development Group l/10/98
l:21 :34AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
R~sults
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #19 (AREA X)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
8.025 cfs
0.40 ft
2.12 ft2
11.10 ft
10.69 ft
0.47 ft
0.004205 ft/ft
3.79 ft/s
0.22 ft
0.62 ft
1.50
Collects Runoff from Drainage Basin: X+Spill Over l.D. #20
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01/98
08:37:23AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #19 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
27 .000000 H : V
11.037 cfs
0.45 ft
2.69 ft2
12.51 ft
12.05 ft
0.53 ft
0.004030 ft/ft
4.10 ft/s
0.26 ft
0.71 ft
1.53
Collects Runoff from Drainage Basin: X+Spill Over
l.D.#20
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01/98
08:38:24AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #20 (AREA W)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
19.198 cfs
0.55 ft
4.07 ft2
15.39 ft
14.83 ft
0.66 ft
0.003743 ft/ft
4.71 ft/s
0.35 ft
0.89 ft
1.59
Collects Runoff from Drainage Basin: W
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Assumed that additional flow on Southeast Side will spill over and be carried on the Northwest Side of Ebbtide Cove.
Runoff on Southeast Side of Ebbtide Cove.
I
I
06/10/98
r 0:40:40AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #20 (AREA W)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
27 .000000 H : V
25.878 cfs
0.61 ft
5.10 ft2
17.22 ft
16.59 ft
0.74 ft
0.003597 ft/ft
5.08 ft/s
0.40 ft
1.02 ft
1.61
Collects Runoff from Drainage Sasin: W
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on Southeast Side of Ebbtide Cove.
I Note: There will be a minimum 3" cut from TIC to daylight. Therefore, overflow of the 100-yr flood will be maintained
within the R.O.W. and shall be shown on the construction documents for South Hampton, Phase Two.
I
I
I
06/10/98 I 10:40:54AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #21 (AREAX}(10 YR}
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38.000000 H: V
8.025 cfs
0.35 ft
2.29 ft2
13.56 ft
13.21 ft
0.41 ft
0.004338 ft/ft
3.50 ft/s
0.19 ft
0.54 ft
1.48
Collects Runoff from Drainage Basin: X+Spill Over
l.D.#20
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01/98
08:39:39 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #21 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38.000000 H: V
11.307 cfs
0.40 ft
2.97 ft2
15.42 ft
15.02 ft
0.47 ft
0.004144 ft/ft
3.81 ft/s
0.23 ft
0.62 ft
1.51
Collects Runoff from Drainage Basin: X +Spill Over
l.D.#20
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Runoff on Northwest Side of Ebbtide Cove.
Municipal Development Group 07/01/98
08:40:24AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
1.D. #22 (AREA W)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H: V
38.000000 H: V
36.652 cfs
0.61 ft
7.17 ft2
23.96 ft
23.34 ft
0.75 ft
0.003543 ft/ft
5.11 ft/s
0.41 ft
1.02 ft
1.63
Collects Runoff from Drainage Basin: W+X
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
Runoff on Southeast Side of Ebbtide Cove.
Note: There will be a minimum 3" cut from the T/C to daylight. Therefore, overflow of the 100-yr flood will be
maintained within the R.O.W. and shall be shown on the construction documents for South Hampton, Phase Seven.
l/10198
l:45:53AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #23 (AREA Z)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38.000000 H: V
4.670 cfs
0.28 ft
1.53 ft2
11.07 ft
10.78 ft
0.33 ft
0.004662 ft/ft
3.05 ft/s
0.14 ft
0.43 ft
1.43
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on South Side of Cranberry Court.
Note: Assumed majority of runoff to be carried on South Side of Cranberry Court.
06/10/98
10:49:21 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS.07
Page 1 of 1
I
I
06/10198
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #3 -CURB & GUTTER FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r1 rc.fm2
l.D. #23 (AREA Z)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
0.000000 H : V
38.000000 H: V
6.295 cfs
0.32 ft
1.91 ft2
12.38 ft
12.06 ft
0.37 ft
0.004481 ft/ft
3.29 ft/s
0.17 ft
0.49 ft
1.46
Collects Runoff from Drainage Basin: Z
Discharges into Drainage Basin: W
Discharges into Structure Type: Curb & Gutter
Runoff on South Side of Cranberry Court.
Note: Assumed majority of runoff to be earned on South Side of Cranberry Court.
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 {203) 755-1666 110:50:07 AM
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
I
I
I
I
SECTION#4
CHANNEL FLOW CALCULATIONS
I
I
I
02/19198
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D. #1 (AREA C)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.7500 %
4.000000 H : V
4.000000 H : V
26.425 cfs
1.41 ft
7.94 ft2
11 .62 ft
11 .27 ft
1.22 ft
0.016097 ft/ft
3.33 ft/s
0.17 ft
1.58 ft
0.70
Collects Runoff from Drainage Basin: A+B+C
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Municipal Development Group I 01 :08:43 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
02/19/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra. fm2
l.D. #1 (AREA C)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.7500 %
4.000000 H : V
4.000000 H: V
32.996 cfs
1.53 ft
9.38 ft2
12.63 ft
12.25 ft
1.33 ft
0.015628 ft/ft
3.52 ft/s
0.19 ft
1.72 ft
0.71
Collects Runoff from Drainage Basin: A+B+C
Discharges into Drainage Basin: TxDOT R.O~W.
Discharges into Structure Type: Open Channel
Municipal Development Group
01 :14:57 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-11566
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #1 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.7500 %
4.000000 H : V
4.000000 H: V
7.242 cfs
0.63 ft
1.61 ft2
5.23 ft
5.07 ft
0.73 ft
0.003592 ft/ft
4.51 ft/s
0.32 ft
0.95 ft
1.41
Collects Runoff from Drainage Basin: A+B+C
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Open Channel
Municipal Development Group 06/09/98
03:23:12 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D. #2 (AREA D)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H: V
17.749 cfs
1.15 ft
5.29 ft2
9.48 ft
9.20 ft
1.04 ft
0.01697 4 ft/ft
3.36 ft/s
0.18 ft
1.32 ft
0.78
Collects Runoff from Drainage Basin: D
Discharges into Drainage Basin: G
Discharge into Structure Type: Culvert
Municipal Development Group 02119/98
01 :17:45 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D. "#2. (AREA D)(100 YR)
Triangular Channel
Manning's Formula
Channel De~th
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
20.949 cfs
1.22 ft
5.99 ft2
10.09 ft
9.79 ft
1.11 ft
0.016603 tuft
3.50 tus
0.19 ft
1.41 ft
0.79
Collects Runoff from Drainage Basin: D
Discharges into Drainage Basin: G
Discharge into Structure Type: Culvert
02/19/98
01 :18:20 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. #2 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
4.000000 H : V
4.000000 H : V
4.615 cfs
0.51 ft
1.03 fP
4.18 ft
4.06 ft
0.61 ft
0.003814 ft/ft
4.49 ft/s
0.31 ft
0.82 ft
1.57
Collects Runoff from Drainage Basin: D
Discharges into Drainage Basin: G
Discharge into Structure Type: Culvert
06109198
03:25:34 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS.07
Page 1 of 1
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharae
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #3 (AREA G)(25 YR)
Triangular Channel
Manning's Formula
Channel Del?th
0.030
1.1000 %
4.000000 H : V
4.000000 H : V
49.197 cfs
1.66 ft
10.96 ft2
13.65 ft
13.24 ft
1.57 ft
0.014817 ft/ft
4.49 ft/s
0.31 ft
1.97 ft
0.87
Collects Runoff from Drainage Basin: D+E+G
Discharge into Drainage Basin: H
Discharge into Structure Type: Culvert
Municipal Development Group 06/11/98
11 :45:14AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. #3 (AREA G)(100 YR)
Triangular Channel
Manning's Formula
Channel Deeth
0.030
1.1000 %
4.000000 H : V
4.000000 H : V
58.092 cfs
1.76 ft
12.42 ffl
14.53 ft
14.10 ft
1.67 ft
0.014492 ft/ft
4.68 ft/s
0.34 ft
2.10 ft
0.88
Collects Runoff from Drainage Basin: D+E+G
Discharge into Drainage Basin: H
Discharge into Structure Type: Culvert
Municipal Development Group 06/11198
11 :45:35 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #3 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.1000 %
4.000000 H: V
4.000000 H: V
12.726 cfs
0.73 ft
2.12 ft2
6.01 ft
5.83 ft
0.91 ft
0.003332 ft/ft
5.99 ft/s
0.56 ft
1.29 ft
1.75
Collects Runoff from Drainage Basin: D+E+G
Discharge into Drainage Basin: H
Discharge into Structure Type: Culvert
06/11198
11 :46:53AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 96708 (203) 755-1666
FlowMaster vS.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. #4(AREA1)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H: V
96.248 cfs
2.01 ft
16.14 ft2
16.57 ft
16.07 ft
2.05 ft
0.013549 ft/ft
5.96 ft/s
0.55 ft
2.56 ft
1.05
Collect Runoff from Drainage Basin: D+E+G+H+I
Discharge into Drainage Basin: TxDOT R.O.W.
Discharge into Structure Type: Existing Structure
Municipal Development Group 06/11/98
11 :50:21 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. #4(AREA1)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
113.636 cfs
2.14 ft
18.28 ft2
17.63 ft
17.10 ft
2.19 ft
0.013252 ft/ft
6.22 ft/s
0.60 ft
2.74 ft
1.06
Collect Runoff from Drainage Basin: D+E+G+H+I
Discharge into Drainage Basin: TxDOT R.O.W .
Discharge into Structure Type: Existing Structure
Municipal Development Group 06/11/98
11:52:11 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r2rc. fm2
l.D. #4 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.5000 %
4.000000 H : V
4.000000 H: V
24.980 cfs
0.89 ft
3.13 ft2
7.30 ft
7.08 ft
1.19 ft
0.003046 ft/ft
7.97 ft/s
0.99 ft
1.87 ft
2.11
Collect Runoff from Drainage Basin: D+E+G+H+I
Discharge into Drainage Basin: TxDOT R.O.W.
Discharge into Structure Type: Existing Structure
Municipal Development Group 06/11/98
11:54:06 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. '1#3 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.050
1.0000 %
272.17 ft
52.935 cfs
278. --------------------------r--------------------------•------------~-------------•-------------•
£277.0 ----------~-------------~------------~-------------~------------~-------------+-------------'
"'"'276.0 -----------~-------------~---------------------------
c 275.0 ------~-------------~----------~-------------~------------~-------------+-------------: ~227743 .. oo ----~-------------~-----------~-------------T------------~-------------7-------------:
w --,-------------r----------,-------------r------------~-------------y-------------, ~ 272. o ---------~ -------------T -- -- - --- --- --:------ -------7 -------------: W 271 .0 .---..... ;..;;.,-.,-.---.----- --- - - - -,------- - - - ---r - - --- - - -- ----,--- - - - - - - - - - -T - -- ------- ---,
270.0'--~~~~~~'--~~~~~---''--~~~~~---''--~~~~~--'~~~~~~--1.~~~~~~_,_~~~~~~-'
-10.0 0.0
Notes:
Collects Runoff from Drainage Basin: J
Discharges into Drainge Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
10.0 20.0
Station
30.0
{ft}
Municipal Development Group
40.0
06/11/98
12:18:42 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
50.0 60.0
FlowMaster v5.07
Page 1of1
I
I
I
I
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south ha mpton\2882r2rc. fm2
l.D. '#IS (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 270.50 ft to 278.00 ft.
Station (ft) Elevation (ft)
-10.00 278.00
0.00
5.00
10.00
20.00
60.00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
271.00
270.50
271 .00
276.00
276.25
52.935 cfs
0.050
272.17
16.49
14.69
14.00
1.67
271.69
ft
ft2
ft
ft
ft
ft
Critical Slope 0.040603 ft/ft
Velocity 3.21 ft/s
Velocity Head 0.16 ft
Specific Energy 272.33 ft
Froude Number 0.52
Flow is subcritical.
Start Station
-10.00
End Station
60.00
06/11/98
1 12:19:03 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.050
FlowMaster v5.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #6 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.050
1.0000 %
272.31 ft
62.885 cfs
278. ------------~-------------r------------~-------------P------------~-------------·-------------,
£277.0 -----------~-------------~------------~-------------~------------~-------------+-------------'
'-'276.0 -----------~-------------~--------------------------------c 275.0 I I ------1-------------,---------I I I I I -1-------------r------------~-------------y-------------, ~ ~~~:8 -- - -.J - - - - - - - --- - - -L - - - - - - - - - --.J--- - - - - - - - - - -~ - - - - - - - - - - - --1-- - - - - - - - - - - -.L - - - - - - -- -- - --1 I I I I I I I
~272.0 ---------~-------------~------------~-------------~-------------:
ijj 271 .0 .-----------. - - - - - - - --- - -1-- - - - - - - - - - - -r - - - - - - - - - - - --,-- - - - - - - - - - - -T---- - - - - - - - --,
--., - - - - ------- r ----- - - - - -., - ---- -- - - --- - r - - - --- - --- ---,---- - - --- - - - -T - - - --- ---- - - -,
270.0'--~~~~~~....._~~~~~~-'-~~~~~~-'-~~~~~~--''--~~~~~~..._~~~~~~-'-~~~~~~-'
-10.0 0 .0
Notes:
Collects Runoff from Drainage Basin: J
Discharges into Drainge Basin: TxDOT R.O.W .
Discharges into Structure Type: Culvert
10.0 20.0
Station
30.0
(ft)
Municipal Development Group
40.0
06/11/98
12:19:52 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
50.0 60.0
FlowMaster v5.07
Page 1of1
I
I
I
I
I
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. "#6 {AREA L){100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 270.50 ft to 278.00 ft.
Station {ft) Elevation {ft)
-10.00 278.00
0.00 271.00
5.00 270.50
10.00 271.00
20.00 276.00
60.00 276.25
Discharge 62.885 cfs
Results
Wtd. Mannings Coefficient 0.050
Water Surface Elevation 272.31 ft
Flow Area 18.57 ft2
Wetted Perimeter 15.27 ft
Top Width 14.50 ft
Height 1.81 ft
Critical Depth 271 .80 ft
Critical Slope 0.039522 tuft
Velocity 3.39 tus
Velocity Head 0.18 ft
Specific Energy 272.49 ft
Froude Number 0.53
Flow is subcritical.
Start Station
-10.00
End Station
60.00
06/11/98
112:20:07 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.050
FlowMaster v5.07
Page 1 of 1
----
Project Description
- --SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #7 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
265.13 ft
84.243 cfs
-- -
268,0 ----------------------~-----------------------~-----------9 -----------P-----------~ £ 267.5 -----------:--- - --------:-------- - - --:------ -- ----l-----------+-----------f--------,------------:
-267 .0 - - - - --- - - --1-- - - - - - - - - -_,_. - - - - - - - - - --1-- - - - - - - ----I - --- - - - - - - -+ - - - - - - - - - - - - - - - - - --1-- -- - - - - - - -_,
c 266.5 - - - - - - - - - --:-- - - - - - - - - --:-- - - - - - - - - - -:- - - - - ------1-----------.!. - - - - - --f------------:------------:
~226665 .. 05 ---!-----------~-----------~-----------~--------~-----------~-----------~-----------:
w -------~-----------,--------------------r-----------r-----------r-----------, ~ 265.0 -----------~-------
ill 264.5 -----------,------------,----~-----------+-----------L-----------~-----------1 I I I I I
-----~-----------r-----------r-----------r-----------, 264.0L--~~~~--'L--~~~~---1~~~~...:=-.i.i£::...~~~~-1-~~~~~-'--~~~~~....1-~~~~~L-~~~~--'
-60.0 -40.0 -20.0
Notes:
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
0 .0 20.0
Station {ft)
Municipal Development Group
40.0
06/11198
12:21 :38 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
60.0 80.0 100.0
FlowMaster v5.07
Page 1of1
I
I
I
I
I
I
I
I
I
I
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #7 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 264.00 ft to 268.00 ft.
Station (ft) Elevation (ft)
-48.00 266.00
0.00
30.00
84 .00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
264.00
266.00
268.00
84.243 cfs
0.030
265.13
24.91
44.14
44 .08
1.13
265.03
ft
ft2
ft
ft
ft
ft
Critical Slope 0.016390 ft/ft
Velocity 3.38 ft/s
Velocity Head 0.18 ft
Specific Energy 265.31 ft
Froude Number 0.79
Flow is subcritical.
Start Station
-48.00
End Station
84.00
06/11/98
12:21:59 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
---
Project Description
-
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #7 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.030
1.0000 %
265.20 ft
99.836 cfs
268.0 --- - - - - ----~ - - - - --- -- --·-- --- - - -- - -~ - - -- -- - --- -~ --- - --- --- -• - ---- - ---- -~ -- ------ -- -
£267.5 -----------~----------~-----------~-----------1-----------+-----------l----~267.0 -----------L.----------~-----------...1-----------~-----------~-------c 266.5 - - - - - - - ----:---- - - - - - - --:------ - --- --:-- - - - - - ----1-----------.!. - - - - - --l------------f------------:
~ 226665 .. 05 ---L--- - - - - - - - --1-- - --- ------'-- - - - - - - - - -~ - --- - - - -~ -- - - - - - - - - -~ - - - - - - - - - - -~ - - - - - - -- -- -:
·~ ---------r-----------r-----------r-----------, ~ 265.0 -----------~-----------~-~~-+-~~~~~...,f--~~~~~-'~;-----------~-----------~-----------~-----------:
ill264.5 -----------r----------~--------,-----------r-----------r-----------r-----------, 264.0L-~~~~--'~~~~~--1~~~~-=--llP!::....~~~~--'-~~~~~...J._~~~~~-'-~~~~~.L-~~~~--'
-60.0 -40.0 -20.0
Notes:
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
0 .0 20.0
Station (ft)
40.0 60.0 80.0 100.0
06/11/98
12:22:54 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1of1
I
I
I
I
I
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #7 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 264.00 ft to 268.00 ft.
Station {ft) Elevation (ft)
-48.00 266.00
0.00
30.00
84.00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
264.00
266.00
268.00
99.836 cfs
0.030
265.20
28.29
47.04
46.97
1.20
265.10
ft
ffZ
ft
ft
ft
ft
Start Station
-48.00
Critical Slope 0.016024 ft/ft
Velocity 3.53 ft/s
Velocity Head 0.19 ft
Specific Energy 265.40 ft
Froude Number 0.80
Flow is subcritical.
Municipal Development Group
End Station
84.00
06/11/98
12:23:24 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #7 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
4.000000 H: V
4.000000 H : V
21.615 cfs
0.90 ft
3.27 ft2
7.46 ft
7.24 ft
1.13 ft
0.003105 ft/ft
6.60 ft/s
0.68 ft
1.58 ft
1.73
Collects Runoff from Drainage Basin: J+L
Discharges into Drainage Basin: TxDOT R.O.W.
Discharge into Structure: Existing Structure
06/11/98
1
12:24:42 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
--SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
c:\projects\000\2882-south ham pton\2882r2rc. fm2
l.D. #8 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.030
1.0000 %
260.78 ft
84.243 cfs
Water Surface Elevation
Discharge
262.0 --------
§:261.5
c 261 .0 ---------;----------~----------0 ' I I _________ J __________ L _________ J __________ -
I I I I ~ 260.5
> I I
_____ J _______ ~--l----------~---
1 I I
I
---------~----------r---------4----------r---------4---
1 I I I
~ 260.0 w ;..;;;.;;.::.,.:,:,;.;.;..:;..--..-.--;-----------~ ----------:
259.5'--~~~~-'-~~~~---''--~~~~-'-~~~~---L~~~~~.l..-~~~~......L...~~~~---''--~~~~-'-~~~~_J
-60.0 -50.0 -40.0
Notes:
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert
-30.0 -20.0
Station
-10.0
(ft)
Municipal Development Group
0 .0
06/11/98
12:29:17 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
10.0 20.0 30.0
FlowMaster v5.07
Page 1of1
I
I
I
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #8 (AREA L)(25 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range : 259.75 ft to 262.00 ft.
Station (ft) Elevation (ft)
-51 .00 262.00
-6.00
0.00
10.00
30.00
Discharge
Results
Wtd. Mannings Coefficient
Water Surface Elevation
Flow Area
Wetted Perimeter
Top Width
Height
Critical Depth
260.00
259.75
260.00
262.00
84.243 cfs
0.030
260.78
24.26
41 .33
41.27
1.03
260.68
ft
ft2
ft
ft
ft
ft
Critical Slope 0.016195 ft/ft
Velocity 3.47 ft/s
Velocity Head 0.19 ft
Specific Energy 260.96 ft
Froude Number 0.80
Flow is subcritical.
Start Station
-51 .00
End Station
30.00
06/11 /98
112:29:47 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
--
Project Description
-SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #8 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
262.0 --------
g261 .5
0.030
1.0000 %
260.85 ft
99 .836 cfs
I
I I I I I I --------~----------r---------~----------,----------~---------,----
1 I I c 261 . 0 - -'t - - - - - - - - --1-- - - --- - - -0 I I I ~-.. ..... ~~;-.~~~~~-r-~~_..;~V~....;~~~~~--i~~~~..,.~I I
~260.5 ---------~----------~---------~----------------~----------+----------~-------+----------: > _g/ 260.0 w 259 .5'--~~~~-'-~~~~~-'-~~~~~'--~~~~-'-~~~~~..._~~~~--'~~~~~-'-~~~~~'--~~~~--'
-60.0 -50.0 -40.0
Notes:
Collects Runoff from Drainage Basin: J+L
Discharges into Drainge Basin: TxDOT R.O.W .
Discharges into Structure Type: Culvert
-30.0 -20.0
Station
-10.0
(ft)
Municipal Development Group
0 .0
06/11/98
12:31:54 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
10.0 20.0 30.0
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #8 (AREA L)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.0000 %
Elevation range: 259. 75 ft to 262.00 ft.
Station (ft) Elevation (ft)
-51 .00 262.00
-6.00 260.00
0.00 259.75
10 .00 260.00
30.00 262.00
Discharge 99.836 cfs
Results
Wtd. Mannings Coefficient 0.030
Water Surface Elevation 260.85
Flow Area 27.50
Wetted Perimeter 43.81
Top Width 43.74
Height 1.10
Critical Depth 260.75
ft
ft2
ft
ft
ft
ft
Start Station
-51.00
Critical Slope 0.015810 ftlft
Velocity 3.63 ftls
Velocity Head 0.20 ft
Specific Energy 261.06 ft
Froude Number 0.81
Flow is subcritical.
Municipal Development Group
End Station
30.00
06/11/98
12:32:11 PM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #8 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.0000 %
4.000000 H : V
4.000000 H : V
21.615 cfs
0.90 ft
3.27 ft2
7.46 ft
7.24 ft
1.13 ft
0.003105 ft/ft
6.60 ft/s
0.68 ft
1.58 ft
1.73
Collects Runoff from Drainage Basin: J+L
Discharges into Drainage Basin: TxDOT R.O.W.
Discharge into Structure: Existing Structure
Municipal Development Group 06/11/98
1
12:32:54 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D. #10 (AREA 0)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.7500 %
4.000000 H : V
4.000000 H : V
8.486 cfs
0.79 ft
2.47 ft2
6.47 ft
6.28 ft
0.78 ft
0.018730 tuft
3.44 fUs
0.18 ft
0.97 ft
0.97
Collects Runoff from Drainage Basin: Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type: Open Channel
Municipal Development Group 02/19/98
06:45:33 PM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r2ra. fm2
l.D. #10 (AREA Q)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.7500 %
4.000000 H: V
4.000000 H : V
10.017 cfs
0.84 ft
2.79 ft2
6.89 ft
6.68 ft
0.83 ft
0.018320 Wft
3.59 Ws
0.20 ft
1.04 ft
0.98
Collects Runoff from Drainage Basin: Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type: Open Channel
02/19/98
106:46:12 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc. fm2
l.D. #10 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.7500 %
4.000000 H : V
4.000000 H : V
2.205 cfs
0.35 ft
0.48 ft2
2.85 ft
2.77 ft
0.45 ft
0.004209 ft/ft
4.60 ft/s
0.33 ft
0.68 ft
1.95
Collects Runoff from Drainage Basin: Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type: Open Channel
06/09/98
03:49:28 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #11 (AREA S)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.8400 %
4.000000 H : V
4.000000 H : V
22.932 cfs
1.13 ft
5.10 ft2
9.31 ft
9.03 ft
1.15 ft
0.016404 ft/ft
4.50 ft/s
0.31 ft
1.44 ft
1.06
Collects Runoff from Drainage Basin: S
Discharges into Drainage Basin: V
Discharge into Structure Type: Culvert
Municipal Development Group 07/01/98
08:49:40AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #11 (AREA S)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.8400 %
4.000000 H : V
4.000000 H : V
27.104 cfs
1.20 ft
5.78 ft2
9.91 ft
9.62 ft
1.23 ft
0.016043 ft/ft
4.69 ft/s
0.34 ft
1.54 ft
1.07
Collects Runoff from Drainage Basin: S
Discharges into Drainage Basin: V
Discharge into Structure Type: Culvert
07/01/98
08:50:03AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS.07
Page 1 of 1
I
I
I
I
I
I
I
I
I
I
07/01198
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #11 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.8400 %
4.000000 H : V
4.000000 H : V
5.919 cfs
0.50 ft
0.99 ft2
4.09 ft
3.97 ft
0.67 ft
0.003690 ft/ft
6.00 ft/s
0.56 ft
1.06 ft
2.12
Collects Runoff from Drainage Basin: S
Discharges into Drainage Basin: V
Discharge into Structure Type: Culvert
Municipal Development Group I 08:50:23 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #12 (AREA V)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
37.452 cfs
1.45 ft
8.39 ft2
11.94 ft
11.59 ft
1.40 ft
0.015366 tuft
4.46 fUs
0.31 ft
1.76 ft
0.92
Collects Runoff from Drainage Basin: S+ T +V
Dischargelj into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Municipal Development Group 06/10198
11:38:19 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #12 (AREA V)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
44.421 cfs
1.54 ft
9.54 ft2
12.73 ft
12.35 ft
1.50 ft
0.015021 ft/ft
4.66 ftls
0.34 ft
1.88 ft
0.93
Collects Runoff from Drainage Basin: S+ T +V
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Municipal Development Group 06/10/98
11:39:16 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r2rc. fm2
l.D. #12 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
1.3000 %
4.000000 H : V
4.000000 H: V
9.694 cfs
0.64 ft
1.63 ft2
5.26 ft
5.10 ft
0.82 ft
0.003455 ft/ft
5.96 ft/s
0.55 ft
1.19 ft
1.86
Collects Runoff from Drainage Basin: S+ T +V
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Open Channel
06/10/98
11 :40:30 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r2ra.fm2
l.D. #13 (AREA X)(25 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.8000 %
4.000000 H: V
4.000000 H: V
9.128 cfs
0.93 ft
3.49 ft2
7.70 ft
7.47 ft
0.80 ft
0.018549 ft/ft
2.61 ft/s
0.11 ft
1.04 ft
0.67
Collects Runoff from Drainage Basin: X
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Municipal Development Group 02119/98
06:54:52 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster vS.07
Page 1 of 1
I
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r2ra. fm2
l.D. #13 (AREA X)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.8000 %
4.000000 H: V
4.000000 H : V
10.774 cfs
0.99 ft
3.95 ft2
8.20 ft
7.95 ft
0.85 ft
0.018142 Wft
2.72 Ws
0.12 ft
1.11 ft
0.68
Collects Runoff from Drainage Basin: X
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Open Channel
02119/98
06:55:25 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #4 -CHANNEL FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ~ampton\2882r2rc.fm2
l.D. #13 PILOT CHANNEL
Triangular Channel
Manning's Formula
Channel Depth
0.013
0.8000 %
4.000000 H : V
4.000000 H: V
2.374 cfs
0.41 ft
0.68 ft2
3.40 ft
3.30 ft
0.47 ft
0.004168 ft/ft
3.50 ft/s
0.19 ft
0.60 ft
1.36
Collects Runoff from Drainage Basin: X
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open Channel
Municipal Development Group 06109198
03:51 :53 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
i:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #14 (AREA N)(10 YR)(EXISTING)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.3300 %
Elevation range : 258.80 ft to 260.30 ft .
Station (ft) Elevation (ft)
-10.00 260.25
0.00 260.00
15.00 259.00
20.00 258.80
25.00 259.00
42.00 260.30
Discharge 123.000 cfs
Results
Wtd. Mannings Coefficient 0.026
Water Surface Elevation 259.99
Flow Area 24.80
Wetted Peri meter 37.98
Top Width 37.90
Height 1.19
Critical Depth 260.04
ft
ft2
ft
ft
ft
ft
Start Station
-10.00
Critical Slope 0.011334 ft/ft
Velocity 4.96 ft/s
Velocity Head 0.38 ft
Specific Energy 260.38 ft
Froude Number 1.08
Flow is supercritical.
Municipal Development Group
End Station
42.00
05/1 8100
10:30:08AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Roughness
0.026
FlowMaster vS.07
Page 1 of 1
Project Description
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
Project File
Worksheet
Flow Element
Method
i:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #14 (AREA N)(10 YR)(EXISTING)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Section Data
Wtd. Mannings Coefficient
Channel Slope
Water Surface Elevation
Discharge
0.026
1.3300 %
259.99 ft
123.000 cfs
260.4 -------~----------------,----------------,--------- - ------i" --------,--------I --------
260.0
2259.8 .._,
c
0 259.6 :.::;
Cll > ~ 259.4 w
259.2
259.0
-------,--------
-------~-------~
I 7
I --------~-------...]
I I • -------..J -------3
I ' : '° _______ _J _____ _
I I I I --------,----------------1----------------,----------------,
- - -r-- - - - - - - , - - - - - - - -r - - - - - - --1-- - - - - - - , - - - - - - - -r - - - - - - - -
I I I I ~
I I D
-- - - -., - - - - - - - -~ - -- -- ---1--- - -- - -; - - - - - - - -~ - - - ----1-- - -- ---'1 --_j
I I I I I I I '::J:
V)
-t - - - - --- -t----- - - --1-- --- - - --t - - - - - - - -- - - - - - --1-- - - - - - --t - - -
I I I
I
I
- - - - - - - - L - - - --- -..J - - - --- - - --- - - - --1- - - - - - - -I I I
I I U. 0
-- - -I
I
- - - -I
I
I
I
-- --I
I
- ---I
258 .8'--~~~-'-~~~--''--~~~-'-~~~-'-~~~~-'--~~~.3olo0~~~~......._~~~-'-~~~--''--~~~-'-~"--~-'
05/18/00
10:30:14 AM
-10.0 -5.0 0 .0 5 .0 10.0 15.0
Station
20.0
(ft)
Municipal Development Group
25.0
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
30.0 35.0 40.0 45.0
FlowMaster v5.07
Page 1of1
I
I
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
i:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #14 (AREA N)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.3300 %
Elevation range: 258.80 ft to 260.30 ft.
Station (ft) Elevation (ft)
-10.00 260.25
0.00 260.00
15.00 259.00
20.00 258.80
25.00 259.00
42.00 260.30
Discharge 86 .650 cfs
Results
Wtd. Mannings Coefficient 0.026
Water Surface Elevation 259.83
Flow Area 19.11
Wetted Perimeter 33.49
Top Width 33.42
Height 1.03
Critical Depth 259.86
ft
ft2
ft
ft
ft
ft
Start Station
-10.00
Critical Slope 0.011809 tuft
Velocity 4.53 fUs
Velocity Head 0.32 ft
Specific Energy 260.15 ft
Froude Number 1.06
Flow is supercritical.
Notes:
Collects Runoff from Drainage Basin: J+K +L +M+N
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: TxDOT #2
Municipal Development Group
End Station
42.00
07/12100
09:19:24 AM Haestad Methods. Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.026
FlowMaster v5.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
i:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #14 (AREA N)(10 YR)
Irregular Channel
Manning's Formula
Water Elevation
Wtd. Mannings Coefficient
Channel Slope
0.026
1.3300 %
259.83 ft
86.650 cfs
Water Surface Elevation
Discharge
260.4 -----r-----r-----r-----r -----T-----T-----T-----T-----,-----,-----,
c
260.2 ------------------- ----- ---------- ----- -----
260.0 -----1-----------~-----1------+-----+-----·-----·-----~---
259.8
I
I
'I
"='I -----,-----
I
I
I
__ J
I
I 0 259.6 ~ -----1----------1------+-----+-----·-----·---4-----4--- --4
co > Q) w
17/12/00
r9:19:28AM
259.4
259.2
259.0
I
I -----~----\\!
'Z -J
I • -----~---3 q
t:C.
I -----r -----
I
I I
I I~
I : :o -----,-----,-J.
I ::t. : '° I
I I : ~ __ i _____ J _____ J __
I I I I I I -----r-----r----------r----------T------,-----,--
1
I --,
--..J
I --,
258.8~~~~~~~~~~~~~~~~-'--~~--~~-'-~~__.~~~.._~~-'---"-~-'
-10.0 -5.0 0 .0 5 .0 10.0 15.0 20.0
Station (ft)
Municipal Development Group
25.0 30.0
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
35.0 40.0 45.0
FlowMaster v5.07
Page 1 of 1
I
I
I
05117100
SECTION #4 -CHANNEL FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
i:\projects\000\2882-south hampton\2882r2rc.fm2
1.D. #15 (AREA 0)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.3300 %
Elevation range: 255.00 ft to 258.25 ft.
Station (ft) Elevation (ft)
0.00 258.25
3.00 258.00
6.00 256.00
12.00 255.00
20.00 256.00
42.00 257.75
Discharge 12.738 Cts
Results
Wtd. Mannings Coefficient 0.030
Water Surface Elevation 255.78 ft
Flow Area 4.22 ft2
Wetted Perimeter 10.98 ft
Top Width 10.87 ft
Height 0.78 ft
Critical Depth 255.73 ft
Critical Slope 0.018614 ftjft
Velocity 3.02 ftfs
Velocity Head 0.14 ft
Specific Energy 255.92 ft
Froude Number 0.85
Flow is subcritical.
Notes:
Collects Runoff from Drainage Basin: O+X
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Culvert l.D. #10
Start Station
0.00
Municipal Development Group
End Station
42.00
11 :27:32 AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster vS.07
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Section Data
SECTION #4 -CHANNEL FLOW
Cross Section for Irregular Channel
i:\projects\000\2882-south hampton\2882r2rc.fm2
l.D. #15 (AREA 0)(10 YR)
Irregular Channel
Manning's Formula
Water Elevation
---
Wtd. Mannings Coefficient
Channel Slope
0.030
1.3300 %
Water Surface Elevation
Discharge
255.78 ft
12.738 cfs
~ .....
!::.,
c 0 :;;
258.5
257.5
257.0
---------1----------r---------~----------r----------~---------1----------r---------1----------
I I I I I I I
---4----------~---------~----------~----------1----------~----------~---------4---------
--, - --- - - -- - -r - - - --- ----1--- ---- - - -,.. - --- ------1-- --- -----~ - - - - - -- ---r---- -- -
I I I I I
I I
I I I I I I I I l----------r---------~----------r--------------------1--------r---------1---
1 I 1 I
I I I •
~ 256.5
(!)
-- - - - - --- L --- - --- --_1 _ - - - - - - -- -L - - -- - - -- -_ 1_ -I I I
I I I <;::I ------~----------~---------~--~
:i iii . S I 256.0 0 - - - - -- --, -
• I
cJ)
I I I I I I I I
-- - - - - -r-- - - - -----4 - - -- -- -- -- - --- - -----1-- - - --- - - -"t -- -- ---- --r-- - - -- - - - -""1 --"t.\: - - - ---I
I I I I I I Q
I I I I I I
255.5 : : : : : w : ---- - --; ----------:----------: ----------:----------; --~ ------:
I I ~ I
255.0'--~~~~~'--~~~~--'~~=---~~-L~~~~~-'-~~~~~-'-~~~~~-'-~~~~~-'-~~~~~'--~_._~~~
0.0 5 .0 10.0 15.0 20.0
Station
25.0
(ft)
30.0 35.0 40.0 45.0
-
05/1 7/00
11 :27:44 AM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
SECTION#5
CULVERT FLOW CALCULATIONS
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r3rc. fm2
l.D. #1 (AREA D)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H : V
4.000000 H : V
26.511 cfs
1.27 ft
6.48 ft2
10.49 ft
10.18 ft
1.22 ft
0.016090 ft/ft
4.09 ft/s
0.26 ft
1.53 ft
0.90
Collects Runoff from Drainage Basin: D+E
Discharges into Drainage Basin: G
Discharges into Structure Type: Open-Channel
Municipal Development Group 16/09/98
13:56:52 PM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Notes:
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
Collects Runoff from Drainage Basin: D+E
Discharges into Drainage Basin: G
Discharges into Structure Type: Open-Channel
06/09198
03:57:41 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION#5 -CULVERT FLOW
LD. #1
Shape: I Circular
Material: l Concrete
Sp.an:§1.00 ft
Rise: 2.50 ft
Barrels: 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
26.51
35.74
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
292.03 290.27
292.67 290.42
Length(L): I 63 .ool ft
Slope(S): I 0.0051l
n: 0.0120
Ke: 0.20
Entrance Type: 1:1.5 Beveled Edge I
BW* v
out
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(ft) (ft) (cfs) (ft) (ft)
1.44 7.21 0.00 2.64 2.72
1.93 7.28 0.00 3.32 3.36
6/ 9/98
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #2 (AREA F)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H: V
4.000000 H : V
13.634 cfs
0.99 ft
3.93 ft2
8.18 ft
7.93 ft
0.94 ft
0.017582 ft/ft
3.47 ft/s
0.19 ft
1.18 ft
0.87
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Open-Channel
06109198
04:05:27 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc. fm2
1.0. #2. (AREA F)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.3000 %
4.000000 H: V
4.000000 H: V
18.379 cfs
1.11 ft
4.92 ff2
9.15 ft
8.87 ft
1.06 ft
0.016896 tuft
3.74 tus
0.22 ft
1.33 ft
0.88
Collects Runoff from Drainage Basin: F
Discharges into Drainage Basin: TxDOT R.O.W .
Discharges into Structure Type: Open-Channel
Municipal Development Group 5/09198
4:05:41 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #2
Shape: I Circular
Material: I Concrete
S~an:§1.oo ft
Rise: 1.75 ft
Barrels: 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
13.63
18.38
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
288.74 287.03
289.77 287.15
Length(L): I 63 .ool ft
Slope(S): I 0.00401
n: 0.0120
Ke: 0.50
Entrance Type: Headwall I ~~~~~~~~~-
BW*
(ft)
1.46
2.37
v
out
(ft)
5.67
7.64
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(cfs) (ft) (ft)
0.00 2.44 2.44
0.00 3.47 3.11
619/98
I
I
I
I
I
I
I
I
I
I
I
I
I
I
06/11/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r3rc. fm2
l.D. #3 (AREA H)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
68.165 cfs
1.77 ft
12.46 ft2
14.56 ft
14.12 ft
1.78 ft
0.014187 ft/ft
5.47 ft/s
0.46 ft
2.23 ft
1.03
Collects Runoff from Drainage Basin: D+E+G+H
Discharges into Drainage Basin: I
Discharges into Structure Type: Open-Channel
Municipal Development Group I 01 :16:17 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is supercritical.
Notes:
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #3 (AREA H)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
94.237 cfs
1.99 ft
15.89 ft2
16.43 ft
15.94 ft
2.03 ft
0.013587 ft/ft
5.93 ft/s
0.55 ft
2.54 ft
1.05
Collects Runoff from Drainage Basin: D+E+G+H
Discharges into Drainage Basin: I
Discharges into Structure Type: Open-Channel
06111/98
01 :17:48 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #3
Shape: !circular
Material: I concrete
Sp.an:§1.00 ft
Rise: 3. 00 ft
Barrels: 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
43.05
58.09
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
{ft) (ft)
283.85 281.92
284.67 282.14
Length(L): I 63 .ool ft
Slope(S): I 0.00511
n: 0.0120
Ke: 0.20
Entrance Type: 1:1.5 Beveled Edge I
BW* v
out
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(ft) (ft) (cfs) (ft) (ft)
1.61 8.16 0.00 3.23 3.29
2.20 8.22 0.00 4.09 4.11
6/11/98
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc. fm2
l.D. #5 (AREA M)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H : V
32.581 cfs
1.34 ft
7.16 ft2
11.04 ft
10.71 ft
1.33 ft
0.015654 ft/ft
4.55 ft/s
0.32 ft
1.66 ft
0.98
Collects Runoff from Drainage Basin: K +M
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: TxDOT R.O.W.
Municipal Development Group 5111/98
2:17:42 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\proj ects\000\2882-south hampton\2882r3rc. fm2
l.D. #5 (AREA M}(100 YR}
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.5000 %
4.000000 H : V
4.000000 H: V
43.919 cfs
1.50 ft
8.96 ft2
12.34 ft
11.97 ft
1.50 ft
0.015043 ft/ft
4.90 ft/s
0.37 ft
1.87 ft
1.00
Collects Runoff from Drainage Basin: K+M
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: TxDOT R.O.W .
06/11/98
02:18:38 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I I.D. #5
Shape: !circular
Material: I concrete
Sp.an:§1.00 ft
Rise: 1.50 ft
Barrels: 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
9.60
12.94
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
266.73 265.55
267.68 265.71
Length(L): I 63.ool ft
Slope(S): I 0.00491
n: 0.0120
Ke: 0.50
Entrance Type: Headwall I ,____~~~~~~~~-
BW*
(ft)
0.88
1.66
v
out
(ft)
5.43
7.32
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(cfs) (ft) (ft)
0.00 2.17 2.16
0.00 3.12 2.75
6/l l/98
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc. fm2
l.D. #6 (AREA P)(10 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.5000 %
4.000000 H: V
4.000000 H: V
44.982 . cfs
1.86 ft
13.78 ft2
15.30 ft
14.85 ft
1.51 ft
0.014995 ft/ft
3.27 ft/s
0.17 ft
2.02 ft
0.60
Collects Runoff from Drainage Basin: P+Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type: Open Channel
06/10/98
01 :34:38 PM
Municipal Development Group
Haestad Methods. Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. tl6 (AREA P)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
0.5000 %
4.000000 H : V
4.000000 H : V
60.638 cfs
2.08 ft
17.23 ft2
17.12 ft
16.61 ft
1.70 ft
0.014410 ft/ft
3.52 ft/s
0.19 ft
2.27 ft
0.61
Collects Runoff from Drainage Basin: P+Q
Discharges into Drainage Basin: Nantuck Dr.
Discharges into Structure Type: Open Channel .
06/10/98
01:35:30 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #6
Shape: I Circular
Material: I Concrete
Sp.an:§1.oo ft
Rise: 2.50 ft
Barrels: 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
44.98
60.64
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
260.98 258.26
261.75 258.48
Length(L): I 69.ool ft
Slope(S): I 0.00511
n: 0.0120 ·
Ke: 0.20
Entrance Type: 1:1.5 Beveled Edge I
BW* v
out
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(ft) (ft) ( cfs) (ft) (ft)
2.37 9.16 0.00 4.1 6 4.07
2.92 10.65 8.38 4.93 4.61
6110/98
06/09/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5 -CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #7 (AREA R)(10 YR)
Triangul!'lr Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
10.236 cfs
0.94 ft
3.50 ft2
7.71 ft
7.48 ft
0.84 ft
0.018267 ft/ft
2.92 ft/s
0.13 ft
1.07 ft
0.75
Collects Runoff from Drainage Basin: R
Discharges into Drainage Basin: Nantuck Dr.
Dishcarges into Structure Type: Open-Channel
Municipal Development Group
1
04:18:13 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south ha mpton\2882r3rc. fm2
l.D. #7 (AREA R)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H : V
13.837 cfs
1.05 ft
4.39 ft2
8.64 ft
8.38 ft
0.94 ft
0.017547 Wft
3.15 Ws
0.15 ft
1.20 ft
0.77
Collects Runoff from Drainage Basin: R
Discharges into Drainage Basin: Nantuck Dr.
Dishcarges into Structure Type: Open-Channel
06/09198
04:18:47 PM
Municipal Development Group
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
I
I
I
I
I
I
I
I
I
I
I
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I.D. #7
Shape: !circular
Material: !Aluminum
Sp.an:§1.00 ft
Rise: 1.50 ft
Barrels: 1
Discharge Description Q
IOYR
lOOYR
total
(cfs)
10.24
13.84
*Backwater (BW = HW -TW -S-L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
255.86 253.88
256.20 253.99
Length(L): I 62.ool ft
Slope(S): I 0.01001
n: 0.0149
Ke: 0.50
Entrance Type: Headwall I
.___~~~~~~~~--
BW*
(ft)
1.36
1.59
v
out
(ft)
5.79
6.51
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(cfs) (ft) (ft)
0.00 2.30 2.24
2.32 2.64 2.49
619/98
I
I
I
I
I
I
I
06/10/98
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
Project Description
Project File c:\projects\000\2882-south hampton\2882r3rc.fm2
Worksheet l.D. #8 (AREA T)(10 YR)
Flow Element Triangular Channel
Method Manning's Formula
Solve For Channel Deeth
Input Data
Mannings Coefficient 0.030
Channel Slope 1.0000 %
Left Side Slope 4.000000 H : V
Right Side Slope 4.000000 H : V
Discharge 26.131 cfs
Results
Depth 1.33 ft
Flow Area 7.07 ft2
Wetted Perimeter 10.96 ft
Top Width 10.63 ft
Critical Depth 1.22 ft
Critical Slope 0.016121 ft/ft
Velocity 3.70 ft/s
Velocity Head 0.21 ft
Specific Energy 1.54 ft
Froude Number 0.80
Flow is subcritical.
Notes:
Collects Runoff from Drainage Basin: S+ T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Municipal Development Group I 01 :43:18 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
06/10/98
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Notes:
SECTION #5-CULVERT FLOW
Worksheet for Triangular Channel
c:\projects\000\2882-south hampton\2882r3rc. fm2
l.D. #8 (AREA T)(100 YR)
Triangular Channel
Manning's Formula
Channel Depth
0.030
1.0000 %
4.000000 H : V
4.000000 H: V
35.322 cfs
1.49 ft
8.86 ft2
12.27 ft
11 .91 ft
1.37 ft
0.015486 ft/ft
3.99 ft/s
0.25 ft
1.74 ft
0.81
Collects Runoff from Drainage Basin: S+ T
Discharges into Drainage Basin: V
Discharges into Structure Type: Open Channel
Municipal Development Group I 01 :44:00 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v5.07
Page 1 of 1
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CUL VERT FLOW
I LD. #8
I
I
I
Shape: I circular
Material: I Concrete
S~an:~.00 ft
Rise: 2.25 ft
Barrels: 1
Discharge Description
lOYR
lOOYR
Q
total
(cfs)
26.13
35.32
*Backwater (BW = HW -TW -S·L)
C:\PROJECTS\000\2882-S-l \2882T3RC.CL V
HW TW
elevation elevation
(ft) (ft)
264.22 262.26
265.08 262.42
Length{L): I 63 .ool ft
Slope(S): I 0.00501
n: 0.0120
Ke: 0.20
Entrance Type: 1:1.5 Beveled Edge I
BW* v
out
Q Inlet Ctl Outlet Ctl
over road HW depth HW depth
(ft) (ft) (cfs) (ft) (ft)
1.65 6.57 0.00 2.86 2.91
2.35 8.74 0.55 3.77 3.68
6/10/98
I 1.0. #9 (AREA V)(10 YR)
I
I
I
I
P-3
BAY STRE T
-2
WINDRIFT COVE
I Project Title: South Hampton Subdivison
c:\projects\()()()\2882-south hampton\2882t1ra.stm MUNICIPAL DEVELOPMENT GROUP
I 06/10/98 04:34:01 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
----
258.00
lllttrn-1~~~~~+::--~~~~~--i~~~~~-aul.U.f-""-1.ll~l.L.LL--~~-+-~~~~~~-Alll.l.....-R-lw.l..ir;6..lli1W.1.l.L.ill257.00
ft 256.00
Project Title: South Hampton SubdMson
c:\projects\000\2882-south hampton\2882t1 ra.stm
06/10/98 04:17:31 PM
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
255.00
254.00
253.00
Elevation ft
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
I Node Report
I Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 16.586 1.63 258.00
1-2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 35.173 3.74 258.00
1-1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 31 .361 10.23 258.00
J-1 NIA N/A NIA NIA 0.02 0.02 0.00 0.000 66.534 6.78 258.00
J-2 NIA NIA NIA NIA 0.30 0.30 0.00 0.000 83.120 8.47 258.00
J-3 NIA NIA NIA NIA 0.55 0.55 0.00 0.000 83.120 8.47 258.00
Outlet NIA NIA NIA NIA 0.57 0.57 0.00 0.000 NIA 8.47 257.75
Project Title: South Hampton Subdivison
c:\projects\000\2882-south hampton\2882t1ra.stm MUNICIPAL DEVELOPMENT GROUP
06/10198 04:12:23 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim
Elevation
(ft)
258.02
257.41
258.00
258.00
258.00
258.00
257.75
Sump
Elevation
(ft)
252.00
253.00
255.75
25253
251.74
250.85
250.65
Project Engineer: RM
StonnCAD v1 .0
Page 1 of 1
Pipe Report
-~ Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness Capacity Upstream
Node Node (cfs) (ft} Slope Velocity Size (cfs) Invert
(%) (ft/s) Elevation
(ft)
I P-7 1-3 J-2 16.586 6.00 4.3333 1.57 48inch 0.013 299.001 252.00
P-6 1-2 J-1 35.173 4.00 11.7500 3.44 481nch 0.013 492.358 253.00
P-1 1-1 J-1 31 .361 14.00 1.7857 10.38 241nch 0.013 30.229 255.75
I P-2 J-1 J-2 66.534 112.00 0.7054 6.78 30 Inch 0.013 68.893 252.53
P-3 J-2 J-3 83.120 126.00 0.7063 8.47 30 Inch 0.013 68.942 251.74
P-4 J-3 Outlet 83.120 14.00 0.7143 8.47 301nch 0.013 69.328 250.85
Project Title: South Hampton Subdivison
c:lprojects\00012882-south hampton\288211 ra.stm MUNICIPAL DEVELOPMENT GROUP
06/10198 04:12:58 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Downstream Upstream
Invert HGL
Elevation (ft)
(ft)
251.74 255.02
252.53 255.81
255.50 257.63
251 .74 255.76
250.85 254.85
250.75 253.39
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
l.D. #9 (AREA V)(100 YR)
P-3
BAY STRE T
I
-2
WINDRIFT COVE
I
I Project Trtle: South Hampton Subdivison
c:\projects\000\2882-south hampton\2882t1ra.stm MUNICIPAL DEVELOPMENT GROUP
06/10/98 04:33:48 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Project Engineer: RM
StonnCAD v1 .0
Page 1 of 1
-
258.00
ll!tinn:i!~~~~~:--~~~~---t-~~~~~~~~~~=----t~~~~~--1~~~~~~257.00 ft
Project Title: South Hampton Subdlvison
c:\projects\000\2882-south hampton\2882t1 ra.stm
06/10/98 04:21 :47 PM .
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
256.00
255.00
254.00
253.00
Elevation ft
Project Engineer: RM
StormCAD v1 .0
Page 1 of 1
Node Report
~ Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) .(min) (cfs)
I 1-3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 20.357 1.62 258.00
1-2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 50.325 4.00 258.00
1-1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 44.421 14.14 258.00
I J-1 N/A N/A N/A N/A 0.02 0.02 0.00 0.000 94.746 9.65 258.00
J-2 N/A N/A N/A N/A 0.21 0.21 0.00 0.000 115.103 11 .72 258.00
J-3 N/A N/A N/A N/A 0.39 0.39 0.00 0.000 115.103 11 .72 258.00
Outlet NIA N/A N/A N/A 0.41 0.41 0.00 0.000 N/A 11 .72 257.75 -I
I
I
I
I
I Project Title: South Hampton Subdivison
c:\projects'll00\2882-south hampton\2882t1 ra.stm MUNICIPAL DEVELOPMENT GROUP I 06/10198 04:22:14 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim
Elevation
(ft)
258.02
257.41
258.00
258.00
258.00
258.00
257.75
Sump
Elevation
(ft)
252.00
253.00
255.75
252.53
251 .74
250.85
250.65
Project Engineer. RM
StormCAD v1 .0
Page 1 of 1
Pipe Report
I Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness
Node Node (cfs) (ft) Slope Velocity Size
(%) (ft/s)
I P-7 1-3 J-2 20.357 6.00 4.3333 1.62 48 inch 0.013
P-6 1-2 J-1 50.325 4.00 11.7500 4.00 48 inch 0.013
P-1 1-1 J-1 44.421 14.00 1.7857 14.14 24inch 0.013
I P-2 J-1 J-2 94.746 112.00 0.7054 9.65 30inch 0.013
P-3 J-2 J-3 115.103 126.00 0.7063 11.72 30inch 0.013
P-4 J-3 Outlet 115.103 14.00 0.7143 11.72 30lnch 0.013
I
I
I
I
I
I
I
I
I
I
I
I
I Project Trtle: South Hampton Subdivison
c:\projects\000\2882-south hampton\2882t1ra.stm MUNICIPAL DEVELOPMENT GROUP I 06/10198 04:22:32 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708
Capacity Upstream
(cfs) Invert
Elevation
(ft)
299.001 252.00
492.358 253.00
30.229 255.75
68.893 252.53
68.942 251 .74
69.328 250.85
(203) 755-1666
Downstream Upstream
Invert HGL
Elevation (ft)
(ft)
251.74 256.65
252.53 258.00
255.50 258.54
251.74 258.14
250.85 256.33
250.75 253.53
Project Engineer: RM
StorrnCAD v1 .0
Page 1 of 1
SECTION #5 -CULVERT FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
i:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #10 (AREA 0)(10 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1.33 %
Elevation range: 252.65 ft to 255.90 ft.
Station (ft) Elevation (ft)
0.00 255.90
3.00 255.65
6.00 253.65
12.00 252.65
20.00 253.65
42.00 255.40
Discharge 12.738 cfs
Results
Wtd. Mannings Coefficient 0.030
Water Surface Elevation 253.43
Flow Area 4.22
Wetted Perimeter 10.98
Top Width 10.87
Height 0.78
Critical Depth 253.38
ft
ft2
ft
ft
ft
ft
Critical Slope 0.018614 ftjft
Velocity 3.02 ftls
Velocity Head 0.14 ft
Specific Energy 253.57 ft
Froude Number 0.85
Flow is subcritical.
Notes:
Collects Runoff from Drainage Basin: O+X
Discharges into Drainage Basin: TxDOT R.O .W .
Discharges into Structure Type: Culvert l.D. #10
Start Station
0.00
Municipal Development Group
End Station
42.00
05/1 7/00
11 :58:40 AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1 666
Roughness
0.030
FlowMaster v5.07
Page 1 of 1
I
I
I
SECTION #5 -CULVERT FLOW
Worksheet for Irregular Channel
Project Description
Project File
Worksheet
Flow Element
Method
i:\projects\000\2882-south hampton\2882r3rc.fm2
l.D. #10 (AREA 0)(100 YR)
Irregular Channel
Manning's Formula
Solve For Water Elevation
Input Data
Channel Slope 1 .33 %
Elevation range: 252.65 ft to 255.90 ft.
Station (ft) Elevation (ft)
0.00 255.90
3.00 255.65
6.00 253.65
12.00 252.65
20.00 253.65
42.00 255.40
Discharge 17.170 cfs
Results
Wtd. Mannings Coefficient 0.030
Water Surface Elevation 253.52
Flow Area 5.28
Wetted Perimeter 12.28
Top Width 12.16
Height 0.87
Critical Depth 253.47
ft
ft2
ft
ft
ft
ft
Critical Slope 0.017887 tuft
Velocity 3.25 fUs
Velocity Head 0.16 ft
Specific Energy 253.68 ft
Froude Number 0.87
Flow is subcritical.
Notes:
Collects Runoff from Drainage Basin: O+X
Discharges into Drainage Basin: TxDOT R.O.W.
Discharges into Structure Type: Culvert l.D. #10
Start Station
0.00
Municipal Development Group
End Station
42.00
05/1 7/00
11 :59:16AM Haestad Methods, Inc. 37 Brookside Road W aterbury, CT 06708 (203) 755-1666
Roughness
0.030
FlowMaster v5.07
Page 1of1
I
I
Texas Hydraulic System Culvert Design
SOUTH HAMPTON
000025-2882
BRAZOS
SECTION #5 -CULVERT FLOW
l.D. #10
Shape: I Circular
Material: I concrete
Sp.an : §1.00 ft
Rise: 1.50 ft
Barrels: 1
Discharge Description
IOYR
lOOYR
Q
total
(cfs)
12.74
17.17
*Backwater (BW = HW -TW -S·L)
I:\PROJECTS\000\2882-S-l \2882T3RC.CL V
Length(L): I 74.ool ft
Slope(S): I o.oo5ol
n: 0.0120
Ke: 0.50
Entrance Type: Headwall I ,__~~~~~~~~~
HW TW BW* V Q Inlet Ctl Outlet Ctl
elevation elevation out over road HW depth HW depth
(ft) (ft) (ft) (ft) (cfs) (ft) (ft)
255.62 253.43 1.82 7.21 0.00 3 .05 2.71
256.22 253.52 2.33 8.18 2.72 3.65 3.06
5117100
I
I
I SECTION#6
STORM INLETS FLOW CALCULATIONS
SECTION #6 -STORM INLET FLOW
1.D. #1 DRAINAGE AREA B
Collects Runoff from Drainage Basin: B
(10 YEAR) (100 YEAR)
8.685 cfs 11 .707 cfs
0.31 ft 0.35 ft
CALCULATED
y = 0.69 ft y = 0.85 ft at L = 5 ft
y= 0.62 ft y= 0.75 ft atL= 6 ft
::::::::::::::::~:::ai:I::::::II:i;:::!4i1:::im:::1:::;:::;:::::::::I:::::I:::::m::::::i:::::::11::1::e1:i::::1::=:m:::::i::1~~~m:::;:11:::iI:::m:::::::m1:I::::::::::§.!::g::ffi:::::::::I:m;:::[::::::!:::::::@::::;::;::it:::;i:l
y= 0.44 ft y= 0.53 ft atL= 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note: Grayed portion is the selected curb inlet length.
l.D. #2 DRAINAGE AREA E
Collects Runoff from Drainage Basin: E
(10 YEAR)
010 = 10.970 cfs
010c125%J = 13.713 cfs
0.36 ft
(100 YEAR)
0100 = 14. 788 cfs
010oc125%J = 18.485 cfs
d100 = 0.40 ft
CALCULATED
y = 0.94 ft y = 1.15 ft at L = 5 ft
y = 0.83 ft y = 1.02 ft at L = 6 ft
:1::::::::::M::2;::::::::1::::::;::::::=:Il~§~:i::;::;:;1i::1:::::::::::::iI::::::;::m::::=:::;::::::=:1::5:::::::::::::::::::::::::::::::::::::::1sa::::::::::::;:\fU:::::::1::::::::::::::::::::::1:::::::::::i!~::~:::a::i::::::[::i:::::::::::111MIIB.I:I:I
y= 0.59 ft v= 0.72 ft atL= 10 ft
d = depth in curb at given discharge
y =weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note: Grayed portion is the selected curb inlet length.
Stonn inlet evaluation.xis
I
SECTION #6 -STORM INLET FLOW
1.D. #3 DRAINAGE AREA H
Collects Runoff from Drainage Basin: H
(10 YEAR) (100 YEAR)
0 10 = 13.407 cf s 0 100 = 18.073 cf s
010(125%) = 16.759 cf s 0100(125%) = 22.591 cfs
d10 = 0.38 ft d100 = 0.43 ft
CALCULATED
y= 1.08 ft y= 1.31 ft atL= 5 ft
y = 0.95 ft y = 1.16 ft at L = 6 ft
y = 0.79 ft y = 0.96 ft at L = . 8 ft
:tII!Y.l5l:ltl:lIBilia!l:ltfffl1IIIIIIII:Ifil:}i::en:IIlII@ltt~a.a.mtilfltm:t:IIllllDi.JlMiIII'II:I::111mmilttIE
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note: Grayed portion is the selected curb inlet length.
l.D. #5 DRAINAGE AREA T
Collects Runoff from Drainage Basin: T
(10 YEAR) (100 YEAR)
0 10 = 6 .096 cfs 0 100 = 8.218 cf s
010(125%) = 7.620 cf s 0100(125%) = 10.273 cf s
d10 = 0.29 ft d100 = 0.32 ft
CALCULATED
y= 0.64 ft y= 0.78 ft atL= 5 ft
::;::m::¥::2:::::::::::::::::::::::::::::::::::Pia:::::1:::::::1:::li::::::::::1m::::::::::;:::::::~::::=1=:::¥;5;::m::;:::::[:::rnt:P:s§t1:1:111::;:::::1::::::::1~:II1;:1EKi!;:g:;w,mmmrnM1:11;:::::;;:::::::::tt.::::::::;:]
y = 0.47 ft y = 0.57 ft at L = 8 ft
y = 0.40 ft y = 0.49 ft at L = 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note: Grayed portion is the selected curb inlet length.
Storm inlet evaluation.xls
SECTION #6 -STORM INLET FLOW
1.D. #fJ DRAINAGE AREA U
Collects Runoff from Drainage Basin: T+U+W+Z
(10 YEAR) (100 YEAR)
0 10 = 32.597 cfs 0100 = 43.940 cf s
010(125%) = 40.746 cf s 0100(125%) = 54.925 cf s
d10 = 0.50 ft d100 = 0.65 ft
CALCULATED
y = 1.95 ft y = 2.38 ft at L = 5 ft
y = 1. 72 ft y = 2.10 ft at L = 6 ft
y= 1.42 ft y= 1.74 ft atL= 8 ft
:::=rn::&I~i::IfIIfIIJ.maII!Wfti!IIItlt[fIIIIIlY:f#!IIIIIIIta:~mfIWiftltlrnrn:::=1mrIIIif'j[¥,@\MtiiMi.OWJWEffim:1
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note: Grayed portion is the selected curb inlet length.
l.D. #7 DRAINAGE AREA X
Collects Runoff from Drainage Basin: X
(10 YEAR) (100 YEAR)
13.832 cfs 0100 =
d100 =
36.652 cfs
0.44 ft 0.49 ft
CALCULATED
y = 0.95 ft y = 1.81 ft at L = 5 ft
y = 0.84 ft y = 1.61 ft at L = 6 ft
::::;::1miif:l:l::::::::=:::::;:::::::i!~§~:II:::!::nrn1mm:;;:::::::::r:;:;:;::::::::i:::1::5:I:::::::::::i;I:::::::::::1:~1~Iri:ii1;;;:::::m:::::::;miI:Ili.iilI!MJieilII:IMi:ii!M!iii:im11.IIE
y= 0.60 ft y= 1.14 ft atL= 10 ft
d = depth in curb at given discharge
y = weir flow depth into curb inlet ( max depth = d + 3" for depressed gutter)
Note: Grayed portion is the selected curb inlet length.
Stonn inlet evaluation.xis
SECTION#7
EXISTING TxDOT CALCULATIONS
SECTION #7 -EXISTING TxDOT CALCULATIONS
TxDOT#l: (CAPACITY)
PER TxDOT DRAINAGE AREA MAP:
0 (10) =
0 (50) =
0 (100) =
100 cfs
130 cfs
136 cfs
POST DEVELOPMENT RUNOFF:
Drainage Area 0(10) 0 (50)
D 15.541 20.064
E 10.970 14.163
F 13.634 17.603
G 16.535 21.425
H 26.814 34.619
I 14.365 18.589
TOTAL: 71.348 92.236
OK: O(TxDOT) > Q(POST)
2882-025 Existing TxDOT Structures.xis
0(100)
20.949
14.788
18.379
22.355
36.145
19.399
96.278
TxDOT #2: (CAP A CITY)
PER TxDOT DRAINAGE AREA MAP:
0 (10) =
0(50) =
0(100) =
143 cfs
190 cfs
196 cfs
POST DEVELOPMENT RUNOFF:
Drainage Area 0(10) 0(50)
J 46.063 60.211
K 9.599 12.393
L 27.412 35.391
M 22.982 29.672
N 7.792 10.060
s 20.035 25.978
T 6.096 7.871
u 13.399 17.299
v 6.617 8.543
w 19.198 24.785
y 16.586 21.413 z 4.67 6.029
TOTAL: 200.449 259.645
NOT OK: ~xDOT) < Q(POST)
0(100)
62.885
12.939
36.951
30.980
10.504
27.104
8.218
18.062
8.919
25.878
22.357
6.295
271 .092
SEE FOLLOWING CALCULATIONS FOR
ACTUAL CAPACITY OF TxDOT STRUCTURE
TxDOT#2 STRUCTURE
SUMMARY TABLE
Runoff Exit Inlet
Year 0 Velocity HGL
(cfs) (ft/sec) (ft)
EXISTING TxDOT CONDITIONS
10 143 5.96 254.76
50 190 7.92 255.87
100 196 8.17 -255.93
POST-DEVELOPMENT CONDITIONS
10 200.449 8.35 255.97
50 259.645 10.82 256.63
100 271 .092 11.30 256.78
OK: PONDING(ALLOW) > PONDING(REQDJ
NOTE: HW(min) AT INTERSECTION OF
FRONTAGE RD. AND BAY ST. IS 257.00
-
EA T FRONTAG RD.
8
Project Title: South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07:38:46 PM
STRUCTURE: TxDOT2
(TxDOT 10 YR STORM)
STATE HWY NO. 6
8
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1-1
8
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
256.00
L-~~~~~l-~~~~~-l~~~~~-l~~~~~_j~...-:::::::::::::::::::::::::::=~~~~~E::i=::='.'.::'.'.'.=::::5i~J-~54.oo
0+00 UP. Invert: 244.79 ft DtifttVert: 244.50 ft
Length: 96.00 ft
Section Size: 6 x 4 ft
Project Title: South Hampton Master Plan
c:lprojects\00012882-south hamptonl2882t2ra.stm
06/11/98 07:36:52 PM
1+00 1+50 On Invert~ 79 ft
_l.ength: 1 i;O .00 ft ~~~ize: 4 x 4 ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
54.40 ft
: 250.65 ft
252.00
250.00
248.00
246.00
244.00
3+50
Elevation ft
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 143.00 8.94 254.40
J-1 NIA NIA NIA NIA 0.15 0.15 0.00 0.00 143.00 10.48 255.00
J-2 NIA NIA NIA NIA 0.43 0.43 0.00 0.00 143.00 6.29 251.50
Outlet NIA NIA NIA NIA 0.69 0.69 0.00 0.00 NIA 5.96 250.00
I Project Trtle: South Hampton Master Plan
c:\projects'000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP I 06/11198 07:37:32 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251 .50 244.79
250.00 244.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness
Node Node (cfs) (ft) Slope Velocity Size
(ft/ft) (ft/s)
P-1 1-1 J-1 143.00 81.00 0.008025 8.94 4x4ft 0.013
P-2 J-1 J-2 143.00 160.00 0.032563 9.71 4x 4 ft 0.013
P-3 J-2 Outlet 143.00 96.00 0.003021 6.12 6x4ft O.o13
I Project Title: South Hampton Master Plan
c:\projects'D00\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP I 06/11 /98 07:37:53 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708
Capacity Upstream Downstream Upstream
(cfs) Invert Invert HGL
Elevation Elevation (ft)
(ft) (ft)
163.83 250.65 250.00 254.76
330.01 250.00 244.79 253.41
170.26 244.79 244.50 248.58
(203) 755-1666
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
EA T FRONTAG RD.
Project Title: South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07:40:22 PM
STRUCTURE: TxDOT2
(TxDOT 50 YR STORM)
STATE HWY NO. 6
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1-1
B
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0+00 l.JP. lnvert: 244.79 ft
otifttVert: 244.50 ft
Length: 96.00 ft
Section Size: 6 x 4 ft
Project Title: South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm
06/11/98 07:41 :1 2 PM
1+00 1+50 On lnvert~79 ft
_i..ength : 1 G"0.00 ft ~~ fSize: 4 x 4 ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im:
um
256.00
-1254.00
54.40 ft
: 250.65 ft
252.00
250.00 Elevation ft
248.00
246.00
244.00
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity W atershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 190.00 11 .88 254.40
J-1 NIA NIA NIA NIA 0.11 0.11 0.00 0.00 190.00 11 .88 255.00
J-2 NIA NIA NIA NIA 0.34 0.34 0.00 0.00 190.00 7.92 251.50
Outlet NIA NIA NIA NIA 0.54 0.54 0.00 0.00 NIA 7.92 250.00
!Project Title: South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP
1
06/11/98 07:41 :32 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim · Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251.50 244.79
250.00 244.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness
Node Node (cfs) (ft) Slope Velocity Size
(ft/ft) (ft/s)
P-1 1-1 J-1 190.00 81 .00 0.008025 11 .88 4x4ft 0.013
P-2 J-1 J-2 190.00 160.00 0.032563 11.88 4x4ft 0.013
P-3 J-2 Outlet 190.00 96.00 0.003021 7.92 6x4ft 0.013
I Project Title: South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP I 06/11/98 07:41 :55 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708
Capacity Upstream Downstream Upstream
(cfs) Invert Invert HGL
Elevation Elevation (ft)
(ft) (ft)
163.83 250.65 250.00 255.87
330.01 250.00 244.79 254.00
170.26 244.79 244.50 248.86
(203) 755-1666
Project Engineer. Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
EA T FRONTAG RD.
8
Project Title: South Hampton Master Plan
c:lprojects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07:42:47 PM
STRUCTURE: TxDOT 2
(TxDOT 1 00 YR STORM)
STATE HWY NO. 6
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
1-1
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of 1
0+00 lJP. Invert: 244. 79 ft
otifttttert: 244.50 ft
Length: 96.00 ft
Section Size: 6 x 4 ft
Project Title: South Hampton Master Plan
c:\projects\000\2882-south hampton\2882t2ra.stm
06/11 /98 07:43:25 PM
1+00 1+50
. .
Dn Invert~ 79 ft
_iength: 16"0.00 ft ~tttlBnfSize: 4 x 4 ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im:
um
256.00
.-j254.00
54.40 ft
: 250.65 ft
252.00
250.00 Elevation ft
248.00
246.00
244.00
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Node Report
Node Inlet Inlet Inlet Inlet Upstream System System Total Discharge Velocity Ground
Area c CA TC Flow Flow Intensity Watershed (cfs) (ft/s) Elevation
(acres) (acres) (min) Time Time (in/hr) (CIA) (ft)
(min) (min) (cfs)
1-1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 196.00 12.25 254.40
J-1 NIA NIA NIA NIA 0.11 0.11 0.00 0.00 196.00 12.25 255.00
J-2 NIA NIA NIA NIA 0.33 0.33 0.00 0.00 196.00 8.17 251.50
Outlet NIA NIA NIA NIA 0.52 0.52 0.00 0.00 NIA 8.17 250.00
I Project Trtle: South Hampton Master Plan
c:\projectslD00\2882-south hampton\2882t2ra.stm -MUNICIPAL DEVELOPMENT GROUP I 06/11/98 07:43:46 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Rim Sump
Elevation Elevation
(ft) (ft)
254.40 250.65
255.00 250.00
251.50 244.79
250.00 244.50
Project Engineer. Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Pipe Report
Pipe Upstream Downstream Discharge Length Constructed Average Section Roughness
Node Node (cfs) (ft) Slope Velocity Size
(ft/ft) (ft/s)
P-1 1-1 J-1 196.00 81.00 0.008025 12.25 4x4ft 0.013
P-2 J-1 J-2 196.00 160.00 0.032563 12.25 4x4ft 0.013
P-3 J-2 Outlet 196.00 96.00 0.003021 8.17 6x4ft 0.013
Ip . T" roiect 1tle: South Hampton Master Plan
c:\projectsl/J00\2882-south hampton\2882t2ra.stm MUNICIPAL DEVELOPMENT GROUP I 06/11 /98 07:44:09 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708
Capacity Upstream Downstream Upstream
(cfs) Invert Invert HGL
Elevation Elevation (ft)
(ft) (ft)
163.83 250.65 250.00 255.93
330.01 250.00 244.79 254.00
170.26 244.79 244.50 248.88
(203) 755-1666
Project Engineer. Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
EA T FRONTAG RD.
P-3
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07112100 03:1 4:07 PM
STRUCTURE: TxDOT 2
POST DEVELOPMENT 10 YR STORM)
STATE HWY NO. 6
Th-2.S\.St)
H -=-2~"l. L.t'1
P-2
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
P-1
~ l<lr 2Sl.:JS
f[. l II ~ 2S'Z.. 'Z.S
t-\6L 'Z.. S~ · 8'2..
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
-
0+00 U.P.~ert: 244.79 ft 1+00
oti'ln'Vert: 244.50 ft
Length: 94.00 ft
Section Size: 6 x 4 ft
Project Title: South Hampton Master Plan
l:\projects\000\2882-south hampton\2882t2ra.stm
07/12100 03:14:20 PM
1+50 On Invert: 2~ff 9 ft
~ength : 160.00 ft ~~ze :4x4ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im:
258.00
256.00
1254.00
54.40 ft
250.65 ft
252.00
Elevation ft
250.00
248.00
246.00
244.00
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Node Inlet Inlet Inlet Inlet Upstream
Area c CA TC Flow
(acres) (acres) (min) Time
(min)
1-1 0.00 0.00 0.00 0.00 0.00
1-2 0.00 0.00 0.00 0.00 0.13
1-3 0.00 0.00 0.00 0.00 0.36
Outlet NIA NIA NIA NIA 0.55
Project Title: South Hampton Master Plan
i:\projects\00012882-south hampton\2882t2ra.stm
07/12/00 03:14:28 PM
Node Report
System System Total Discharge Velocity Ground Rim Sump
Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (cfs)
0.00 0.00 0.000 173.251 10.83 257.00 254.40 250.65
0.13 0.00 0.000 183.251 11 .45 256.75 256.75 250.00
0.36 0.00 0.000 193.251 8.05 251.50 251 .50 244.79
0.55 0.00 0.000 NIA 8.05 250.00 250.00 244.50
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
HGL In HGLOut
(ft) (ft)
254.82 254.82
254.82 254.00
249.27 248.87
248.50 248.50
Inlet
Intensity
(in/hr)
0.00
0.00
0.00
NIA
Inlet
Discharge
(cfs)
0.000
0.000
0.000
NIA
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
Pipe Upstream Downstream Discharge Length
Node Node (cfs) (ft)
P-1 1-1 1-2 173.251 82.00
P-2 1-2 1-3 183.251 160.00
P-3 1-3 Outlet 193.251
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07112100 03:14:36 PM
94.00
Pipe Report
Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
0.007927 10.83 4 x 4 ft 0.01 3 162.825 250.65 250.00 255.55
0.032563 11 .45 4 x 4 ft 0.013 330.013 250.00 244.79 254.00
0.003085 8.05 6 x 4 ft 0.013 172.062 244.79 244.50 248.87
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Downstream
HGL
(ft)
254.82
249.27
248.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
EA T FRONTAG RD.
P-3
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07/12/00 03:12:17 PM
STRUCTURE: TxDOT 2
POST DEVELOPMENT 25 YR STORM)
STATE HWY NO. 6
H&L-= '265. Y1 7
1-1
l •c.." z~i... 1 s
P-2
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
ft.. l8 = z.sz. i.5'
l-t~L 25'5 -~1
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
258.00
256.00
0.00 ft
~------+-----+-------~-~..-c::.:::::::=-+-------=m--=========t======~~· 1254.00
0+00 u"'. l,cwert: 244. 79 ft 1 +00 Oti'ln'Vert: 244.50 ft
Length: 94.00 ft
Section Size: 6 x 4 ft
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07/12100 03:12:34 PM
1+50 Dn Invert: 2~6'9 ft
L..ength: 160.00 ft ~:fjjze :4x4ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im: 54.40 ft
250.65 ft
252.00
250.00
248.00
246.00
244.00
3+50
Elevation ft
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
-
Node Inlet Inlet Inlet Inlet Upstream
Area c CA TC Flow
(acres) (acres) (min) Time
(min)
1-1 0.00 0.00 0.00 0.00 0.00
1-2 0.00 0.00 0.00 0.00 0.10
1-3 0.00 0.00 0.00 0.00 0.28
Outlet N/A N/A N/A N/A 0.43
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07/12/00 03:12:44 PM
Node Report
System System Total Discharge Velocity Ground Rim Sump
Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (cfs)
0.00 0.00 0.000 224.532 14.03 257.00 254.40 250.65
0.10 0.00 0.000 237.532 14.85 256.75 256.75 250.00
0.28 0.00 0.000 251 .532 10.48 251 .50 251.50 244.79
0.43 0.00 0.000 N/A 10.48 250.00 250.00 244.50
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
HGL In HGL Out
(ft) {ft)
255.37 255.37
255.37 254.00
249.80 249.12
248.50 248.50
Inlet
Intensity
(in/hr)
0.00
0.00
0.00
NIA
Inlet
Discharge
(cfs)
0.000
0.000
0.000
N/A
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
Pipe Upstream Downstream Discharge Length
Node Node (cfs) (ft)
P-1 1-1 1-2 224.532 82.00
P-2 1-2 1-3 237.532 160.00
P-3 1-3 Outlet 251.532
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07/12/00 03:12:52 PM
94.00
Pipe Report
Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
0.007927 14.03 4 x 4 ft 0.013 162.825 250.65 250.00 256.61
0.032563 14.85 4 x 4 ft 0.013 330.013 250.00 244.79 254.00
0.003085 10.48 6x4ft 0.013 172.062 244.79 244.50 249.12
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Downstream
HGL
(ft)
255.37
249.80
248.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1of1
EA T FRONTAG RD.
P-3
Project Title: South Hampton Master Plan
i:\projects\000\2882-south hampton\2882t2ra.stm
07/12/00 03:39:40 PM
STRUCTURE: TxDOT2
POST DEVELOPMENT 100 YR ST RM)
f"Q1..-~:>o.::::n.l l
1-1
STATE HWY NO. 6
P-2
,_
~ l"6t ~ 1.s\)
L H ~L.-=-2 '-l ~ . i -z_
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
P-1
l TC:.--:: ZS(. :1 S
ti... l '' : 'ZS1. .25
l1~L-2'55.S~
WE T FRONTA E RD.
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
0+00 U,p. l.P,vert: 244.79 ft 1 +OO ott1n'Vert: 244.50 ft
Length: 94.00 ft
Section Size: 6 x 4 ft
Project Title: South Hampton Master Plan
l:\projects\000\2882-south hampton\2882t2ra.stm
07/1 2/00 03:39:52 PM
1+50 Dn Invert: 2446'9 ft
Length: 160.00 ft ~~ze:4x4ft
2+50
MUNICIPAL DEVELOPMENT GROUP
3+00
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
im:
258.00
256.00
1254.00
54.40 ft
250.65 ft
252.00
Elevation ft
250.00
248.00
246.00
244.00
3+50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
Node Inlet Inlet Inlet Inlet Upstream
Area c CA TC Flow
(acres) (acres) (min) Time
(min)
1-1 0.00 0.00 0.00 0.00 0.00
1-2 0.00 0.00 0.00 0.00 0.09
1-3 0.00 0.00 0.00 0.00 0.27
Outlet NIA NIA NIA NIA 0.41
Project Title: South Hampton Master Plan
i:lprojects\00012882-south hampton\2882t2ra.stm
07112/00 03:39:59 PM
Node Report
System System Total Discharge Velocity Ground Rim Sump
Flow Intensity Watershed (cfs) (ft/s) Elevation Elevation Elevation
Time (in/hr) (CIA) (ft) (ft) (ft)
(min) (cfs)
0.00 0.00 0.000 234.432 14.65 257.00 254.40 250.65
0.09 0.00 0.000 248.432 15.53 256.75 256.75 250.00
0.27 0.00 0.000 262.432 10.93 251 .50 251.50 244.79
0.41 0.00 0.000 NIA 10.93 250.00 250.00 244.50
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
HGL In HGL Out
(ft) (ft)
255.50 255.50
255.50 254.00
249.92 249.17
248.50 248.50
Inlet
Intensity
(in/hr)
0.00
0.00
0.00
NIA
Inlet
Discharge
(cfs)
0.000
0.000
0.000
NIA
Project Engineer: Rabon Met
StormCAD v1 .0
Page 1of1
Pipe Upstream Downstream Discharge Length
Node Node (cfs) (ft)
P-1 1-1 1-2 234.432 82.00
P-2 1-2 1-3 248.432 160.00
P-3 1-3 Outlet 262.432
Project Title: South Hampton Master Plan
i:\projectslD00\2882-south hampton\2882t2ra.stm
07/12100 03:40:07 PM
94.00
Pipe Report
Constructed Average Section Roughness Capacity Upstream Downstream Upstream
Slope Velocity Size (cfs) Invert Invert HGL
(ft/ft) (ft/s) Elevation Elevation (ft)
(ft) (ft)
0.007927 14.65 4 x 4 ft 0.013 162.825 250.65 250.00 256.85
0.032563 15.53 4 x 4 ft 0.013 330.013 250.00 244.79 254.00
0.003085 10.93 6 x 4 ft 0.013 172.062 244.79 244.50 249.17
MUNICIPAL DEVELOPMENT GROUP
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
Downstream
HGL
(ft)
255.50
249.92
248.50
Project Engineer: Rabon Metcalf
StormCAD v1 .0
Page 1 of 1
SECTION#8
STANDARD DETAILS
6"
~.· . JfA ··~ 1 • • 1 ....i....----i...._~ .:·----.. · .·~.· • . • ~-~---;-~'-II~' ----.-
-......... "' "' ~ . 4 . .d 4.. . . . . ~ . .
-· • ·. . . #4 BAR LONGITUDINAL · ·•· .. · n
. ·. : / (TYPICAL) · .. · .. • . .d -... :•.....-•• _--+---r-t0
~-· _,.....• •. 4 .· .. . .• ·. . .d "' . . . a . • -4 . . ., .
-. ,id 3" . • . "!.. . 4 . • .
· · I · ·. 4 . · . • · .... . ·-·~ ·~ : . . -.
15"
I"')
N .-
I"')
'
I
I 24" 3"
I
GUTTER DRAIN
TYPICAL CURB 8c GUTTER SECTIONS
N.T.S.
:::::;:: c:i: a: co m m ...-< ..... C\.J "<!' 0 "<!' ...-< tD N c ro -:i c 0 :::.:: c 0 ....... .µ u Cl) cnl .µ Cl) Cl) '-· .µ cnl O"l <TJI .µ c Cl) E Cl) > ro 0.... -(/) (_) D (_) -en __J ,_, c:i: 1-Ll.J Cl -(J) .µ u Cl) ~ 0 '-0.... -u GRADE EXISTING GROUND TO STREET 1·-0· I I I 2·-0· NOTE: FlNISH CROWN SHALL BE 1" ABOVE T/C. 39'-0" 1 1/2" HW.C PROPOSED 6' WIDE CONCRETE SIDEWAU< (BOTH SIDES) SEE DETAIL '?7·'.<2-V· 'Q, (~ '/.AV/-'/-/Z/'/.'<.//('-~ 7• FLEXIBLE BASE OR 5 • 9rT\JMINOU$ BASE l'YPIC" STREET SECTION (39' STREET SECTION) CONCRETE CURB & CUTTER SEE DETAIL
::::i;: < a: CD m m ........ rr1 lD 0 "<T ~ ........ LO C\J c co -:> c 0 :::L co '--..... "O lD (T) CD N / c 0 ..µ Cl. E co :::c .i::: ..µ ::J 0 (fl I N CD CD N / 0 0 0 / (/) ..µ u Cl.l ~ 0 '--CL / u GRADE EXISTING GROUND TO STREET 1'-0" • I I •• I 2'-0" 8" COi.iP.ACTED SUBCRADE NOTE: FINISH CROWN SH>U BE SAME ELEVATION AS T/C. 2a·-o· 1 1/2" HMAC 7" Ft.£><1BLE BASE OR 5" BITVMINOUS BAS£ TYPICAL mra SECTION (28' STREET SECTION) CONCRETE CURB & CUTTER SEE DETAIL
3"
3'-0"
18"
~ . ~ ~ . . . 4·
#4 BARS @ 1 O" O.C.
TYPICAL CONCRETE VALLEY GUITER
(CROSS-SECTION)
co
WVH 866l 20 :90 :sl 92 uer uow eJlP9£82\uo+dweH ~+nos-2882\00o\s+Ja~oJd\ :J
CD
Ol 01 ........
C\J C\J
LO C\J
c ro J
c 0 ::::;::
ro
(_
"D lD ("T")
CD ('\J -c 0 .....,
a. E ro :r:
.c .....,
:::i
0
Cf)
I C\J
CD CD
C\J -0
0 0 -(f) .....,
u
OJ
0 (_
0.... -u
#4 BARS 0 18" O.C.
#3 BARS 0 18" O.C.
LAP 6" (MIN)
6"
#4 BAR, 1
I I 7'-0"
,-_J
\_BLOCK OUT FOR EXTENSION WHERE
REQUIRED
#4 BARS 0 12"
O.C.E.W. (ALL SIDES)
PBOEJLE VIEW
• <O
#4 BARS C 12" O.C.E.W.
•.
TYPICAL RECE$SED CURB INLET
N.T.S.
s·-o· (MIN)
11 '-0" (MIN)
PLAN VIEW
. 0 I 'f-.
0 I 'N
CD m m .......
ru .......
ru .......
0 ru
tD ru
c ro """'.)
c
0 ::::;:
ro
'--.......
-0 l.O
("l"')
CD ru -c
0 ..._,
Cl. E ro :::c
.c ..._,
:::J 0 Cf)
I ru co co ru -0 0
0 -Cf) ..._,
u
Cl.)
0
'--0... -u
TOP OF CURB
6" •.
.....
I
I")
I . -
PROFILE VIEW
#4 BARS C
CONNECT TO
TYPICAL RECESSED
CURB INLET
2'-6"
Pl.AN VIEW
CURB INLET EXTENSION
N.T.S.
C: \Projects\000\2882-South Hampton\2836d1ra Mon Jan 26 20: 41: 31 1998 RAM
-t>:.
I
0
1 '-6"
.. " .
. b. . : .... .. .
o" _r
-l 00 I'I
O.D. + 12"
-------~--------
o<i. ~ I • , .. O.D . t 1 2"
EASEMENT WIDTH VARIES
(20' MIN.)
EXISTING GROUND
PROPOSED GRADE
CONCRETE PILOT CHANNEL
SEE DETAIL, THIS SHEET
STANDARD OPEN CHANNEL
(CROSS-SECTION)
-------
.
2 c 0
I
I I I
·!
Safety Ploe Runners
11 f required>
~ 80 mn Std Pipe! I
<ASTM A53l
{E .
0 .
125 >.tin
Relnf to hove
25 >.tin cover
I
L
,-
Lenqth Vorle 0 PIPE RUNNERS
?E PIPE MAXIMUM MINIMUM REQUIRED
Ea Soo at 600 o. WALL "B" ·o· SLOPE LENGTH THICKNESS SINGLE MULTI PL::
PIPE PIPE
\Q I 1 6 I, 425 No Yes. fer 50 425 >2 pipes
,. ,. ,. rs 57 514 I 1 6 I, 925 No Yes. for
1" ol " >2 pipes I I ii' ii' 11' I ,.1 1·' Yes.· for I' lo 63 600 I 1 6 2.400 No ,,1 .11 I >2 pipes
)0 75 775 I• 6 3.375 No Yes. fer
>2 olpes
PL AN
0 88 964 116 4,400 No Yes
;O 100 I, 138 116 5,375 Yes Yes
150 I 13 I, 314 I 16 I, 314 Yes Yes
•ens Ion ·o· Is ooseo on wo 1 1 tn1c1<ness ·s·. If any other wol 1
c><ness Is used. dimension ·o· 11'\Jst oe oaJusteo occorolnq1 y.
I - - - - --1-- - -- ---
I ~-T,· <125 >.11
ety end treatment for relnforceo concr-e~e pipe moy oe useo
nd Treatment as specified In Item "Safety Eno Treatment·.
End Treatment ootlon snown on this sheet shoulo only
s Indicated In the toOle aoove.
corners snal I De cnanfereo 20 rrm.
of this product snol I conform to reauirer.-:~nts of LONG I TUO I NAL ELEna Treatment" except as ndTed be low • ===============tnJ!l relnforclnQ shol I tle •4 at 150 lllT1 <Groce 300! or •4 OT rrm <Groce 420i each way or 152 X 152 · MW80 X MW80 or
x 127 · IAW65 X IAW65 welOeO wire fabr ic. :rete for precast <steel formeOl sectivns snol 1
: I. "A"
on and exoense of the Contractor the next lorqer size
Treatment may tle furnished, as ionQ as tne ·o· t Is that of the required size of ploe.
lrements for tl"\e treatment of culv.ert enos must
e 'Hlqhwoy Oeslqn Division Ooerot lons one
ual 1-86". , for safety pipe runners shown on this s~ee~ conform to •n~
qn Division Operations and Pr-oceoures Mcnua1 1-66". wn lc"
Dasie oeslqn requlrerrents concer-nlnq culvert enas.
ons are In ml I 1 lmeter-s unless otl"lerwlse noted.
~ Texas [)ep:Jrtrnenl of Tronspartatlan I Onslgn Olvlslon IBrld~
I ______ _____.
PRECAST SAFETY END
TREAT MENT
PARALLEL DRAINAGE
( 125 Min>
END ELEVATION
PSET-SP<M>
t •\.£· ~sers106.oc;rt »• .. ;u, :::c.• <L~ :., •• JT~ ·c(• <.LR 1s1C· 3l(<;1.1
oq,, J.,t.((. ~(2RUAR'!' :c.;'31 ! :HST :l[o t(C; :i::)(:t ... l 410 .-O.;[~T • s-~~;