HomeMy WebLinkAboutDP Folder,. . " Item l 2 3 4 5 6 7 8 9 IO 11 12 13 14 15 16 17 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 10 Engineer's Estimate of Street Construction Description Unit Estimated Quantitv Sitework & Pavement Mobilization/Construction Staking LS I Site Preparation/Clearing and Grubbing AC IO Topsoil Removal & Replacement LS l Excavation/Grading LS l Mixing & incorporation of lime, 6" deep SY 7,710 Hydrated Lime (27 lb/sy) Ton 105 6" Crushed Limestone Base SY 6,871 2" Hot Mix Asphaltic Concrete SY 5,617 Seeding (edge of pavement to ROW & easements) SY 16,160 Unit Price 6,000.00 2,000.00 6,000.00 15 ,000.00 2.20 170.00 l l.00 l l.00 0.30 Sitework and Paving Subtotal Drainage System 8'x6' Box Culvert -structural backfill LF Concrete Headwall EA Silt Fence LF Rock Riprap 4" to 8" SY Rock Riprap 8" to 12" SY Drainage Channel Excavation and Grading LF Construction Exit EA SWPPP Implementation & Maintenance LS l~TREET ESTIMATED CONSTRUCTION TOTAL F-12327 SCHULTZ ENGINEERING, LLC. 48 750.00 2 6,000.00 425 2.50 90 40.00 95 40.00 100 15.00 l 1,000.00 I 1,000.00 Drainage Subtotal Total 6,000 20,000 6,000 15,000 16,962 17,850 75,576 61,787 4,848 $224,023 36,000 12,000 1,063 3,600 3,800 1,500 1,000 1,000 $59,963 $2s319s6I Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 10 Engineer's Estimate of Waterline Construction Description Unit Estimated Quantity Water System 6" C900 Water Pipe -Structural Backfill LF 68 6" C900 Water Pipe -Non-Structural Backfill LF 1252 4" C900 Water Pipe -Non-Structural Backfill LF 599 14" Steel Casing w/ Spacers and End Seals LF 40 14" PVC Casing LF 36 Fire Hydrant Assembly (w/valve, vert. extension) EA 2 6" x 6" M.J. Tee EA 3 6" x 4" M.J. Reducer EA 2 6" M.J. Gate Valve EA 3 4" 45° M.J. Bend EA 3 6" 45° M.J. Bend EA 10 2" Blowoff Assembly EA 2 Connect to Existing Water Line EA 1 l" Water Service -short side EA 1 1" Water Service -in cul de sac EA 2 4" PVC Sleeves LF 108 l.5'' Water Service -short side EA 4 1.5" Water Service -long side EA 3 Waterline Testing LS 1 Meter Boxes EA 16 Unit Price $22 $18 $15 $48 $26 $3,250 $350 $300 $850 $200 $350 $500 $500 $450 $650 $10 $650 $800 $500 $60 ESTIMATED WATERLINE CONSTRUCTION I F-12327 SCHULTZ ENGINEERING, LLC. Total $1,496 $22,543 $8,985 $1,920 $936 $6,500 $1 ,050 $600 $2,550 $600 $3,500 $1,000 $500 $450 $1,300 $1,080 $2,600 $2,400 $500 $960 $61,4701 ENGINEERING COMMENTS NO. 2 1. What is the dotted line along the rear of the lots fronting on Michele Court (sheet 1 )? 2. On sheet 2, the channel downstream of culvert 1001 is shown as a public drainage easement. It is not shown on the final plat. If this is to be public, please verify that the County is willing to maintain . 3. On sheet 3, the spot elevations for the cul -de-sacs are not shown in the plan view. 4. Please provide details for channels 1 &2. 5. Channel 1 is shown as a public drainage easement on the plans but private on the plat. Channel 2 is private on the plans but public on the plat. Please modify as needed and if necessary verify with the County that they are willing to maintain. 6. Please add an additional 6" water line valve. The maximum spacing is 800'. 7. Please provide air relief valves at station 2+79.45 and 6+52.6 on w-1 and at station 5+14.56 on w-2 . 8. The water service for Lot 198, should not be located in the easement in front of Lot 199. 9. Upon completion of construction, please submit a fire flow test to verify the construction meets the BCS minimum design guidelines. 10. Please provide an electrical layout from BTU. Reviewed by : Danielle Singh Date: 2/13/2013 January 28, 2012 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas Office: 979.764.3900 Fax: 979.764.3910 RE: Letter Acknowledging City Standards -Saddle Creek Subdivision -Phase 10, Brazos County, Texas Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water line, roadway and drainage construction for the above-referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual, except as follows: The 6" water main does not connect to an 8" line at each end. The length of 6" pipe from the existing line is 1154 feet and 1070 feet, respectively, to the proposed fire hydrants. An exception to the design guidelines is requested in this situation since the proposed water lines provide adequate pressure and flow as designed. Also, these lines will not be extended in the future. SID~~ Joseph P. Schultz, P.E. Civil Engineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com Sitework & Paving Drainage System Water System Electrical Service SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 10 Engineer's Estimate of Subdivision Cost 16 Lots -26.66 Acres Construction Construction Subtotal 10% Contingency Construction total Surveyin2 Topographic Survey Professional Land Survey for Platting Surveying Subtotal Engineering Construction Drawings, Reports and Platting Permitting Materials Testin Street Signs, Misc. Engineering Subtotal TOT AL • PHASE 9 F-12327 SCHULTZ ENGINEERING. LLC. $224,023 $59,963 $61,470 $35,000 $345,455 $34,546 $380,001 $2,500 $3,000 $5,500 $15,000 $1 ,000 $16,000 $5,000 $1 ,000 ' l Item 1 2 3 4 5 6 7 8 9 lO II 12 13 14 15 16 17 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 10 Engineer's Estimate of Street Construction Description Unit Estimated Ouantitv Sitework & Pavement Mobilization/Construction Staking LS 1 Site Preparation/Clearing and Grubbing AC 10 Topsoil Removal & Replacement LS 1 Excavation/Grading LS I Mixing & incorporation of lime, 6" deep SY 7,710 Hydrated Lime (27 lb/sy) Ton 105 6" Crushed Limestone Base SY 6,871 2" Hot Mix Asphaltic Concrete SY 5,617 Seeding (edge of pavement to ROW & easements) SY 16,160 Unit Price 6,000.00 2,000.00 6,000.00 15,000.00 2.20 170.00 11.00 11.00 0.30 Sitework and Paving Subtotal Drainage System 8'x6' Box Culvert -structural backfill LF Concrete Headwall EA Silt Fence LF Rock Riprap 4" to 8" SY Rock Riprap 8" to 12" SY Drainage Channel Excavation and Grading LF Construction Exit EA SWPPP Implementation & Maintenance LS l~TREET ESTIMATED CONSTRUCTION TOTAL F"-12327 SCHULTZ ENGINEERING, LLC. 48 750.00 2 6,000.00 425 2.50 90 40.00 95 40.00 100 15.00 l 1,000.00 I 1,000.00 Drainage Subtotal Total 6,000 20,000 6,000 15,000 16,962 17,850 75,576 61,787 4,848 $224,023 36,000 12,000 1,063 3,600 3,800 1,500 1,000 1,000 $59,963 $283z9s6I Item l 2 3 4 s 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Saddle Creek Subdivision, Phase 10 Engineer's Estimate of Waterline Construction Description Unit Estimated Quantity Water System 6" C900 Water Pipe -Structural Backfill LF 68 6" C900 Water Pipe -Non-Structural Backfill LF 1252 4" C900 Water Pipe -Non-Structural Backfill LF 599 14" Steel Casing w/ Spacers and End Seals LF 40 14" PVC Casing LF 36 Fire Hydrant Assembly (w/valve, vert. extension) EA 2 6" x 6" M.J. Tee EA 3 6" x 4" M.J. Reducer EA 2 6" M.J. Gate Valve EA 3 4" 45° M.J. Bend EA 3 6" 45° M.J. Bend EA 10 2" Blowoff Assembly EA 2 Connect to Existing Water Line EA I l" Water Service -short side EA I l" Water Service -in cul de sac EA 2 4" PVC Sleeves LF 108 l.S" Water Service -short side EA 4 l.S" Water Service -long side EA 3 Waterline Testing LS I Meter Boxes EA 16 Unit Price $22 $18 $15 $48 $26 $3,250 $350 $300 $850 $200 $350 $500 $500 $450 $650 $10 $650 $800 $500 $60 ESTIMATED WATERLINE CONSTRUCTION I F'-12327 SCHULTZ ENGINEERING, LLC. Total $1,496 $22,543 $8,985 $1,920 $936 $6,500 $1,050 $600 $2,SSO $600 $3,500 $1,000 $500 $450 $1,300 $1,080 $2,600 $2,400 $500 $960 $61,47~ Water System Report for Saddle Creek Subdivision Phase 10 Brazos County, Texas January 24, 2013 Prepared Bv: TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 979. 764.3900 F-12327 SCHULTZ ENGINEERING, LLC. General Information Location: General Note: Land Use : Saddle Creek Subdivision, Phase 10, Lots 190-203, Block 10, Lots 189- 189, Block 9. The water lines to serve these 16 residential lots will be a 6" along Stirrup Drive and 6" & 4" lines along Michelle Court. The 6" line along Stirrup Drive will connect to the 8" line that was constructed in Phase 8 with a reducer. Single family residential Design Criteria/ Analysis Primary Water Supply: Existing 8" water line along Stirrup Drive which connects to a 12" waterline on Saddle Creek Drive. Existing System Pressure Tests: Flow Hydrant -See Exhibit B Flowrate: 1320 gpm Static Pressure: 90 psi Residual Pressure: 60 psi Exhibits: Exhibit A -Location Map Exhibit B -Hydrant Flow Test Results Exhibit C-WaterCAD Analysis Summary-Domestic Demand WaterCAD Analysis Summary -Fire Flow Demand @ FHl WaterCAD Analysis Summary-Fire Flow Demand@ FH2 Fire Flow: Domestic Use 1,000 gpm for Single Family Residential 1.5 gpm per lot for Single Family Residential Total Domestic Demand 16 Lots= 24 gpm The proposed 6" & 4" water lines are in accordance with the BCS Water Design Guidelines except that the 6" water main does not connect to an 8" line at each end. The length of 6" pipe from the existing line is 1154 feet and 1070 feet, respectively, to the proposed fire hydrants. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, (1024 gpm) which produced the lowest pressure in the system. Conclusion Summary of Calculations Pressure 89.8 Domestic Demand Min. Velocity Max 0.2 Pressure 43 Domestic Demand & Fire Min. Hydrant 1 Velocity Max 11.6 Pressure 47.4 Domestic Demand & Fire Min. Hydrant 2 Velocity Max 11.6 The minimum pressure (43.0 psi) for this system occurs when a Fire Flow demand is set at Fire Hydrant Number l. The Max Velocity for this system occurs at the same demand when the velocity in Pipe P-2 has a velocity of 11 .6 fps. All of these pressures exceeds the 20 psi and 35 psi minimum pressure requirements, respectively. The maximum pipe velocities are less than 12 fps. The proposed 6" and 4" water lines meet or exceed all of the design criteria for the City of College Station and the Wellborn Special Utility District except as previously noted. It will provide adequate water pressure, flowrate and velocity for both domestic and fire flow demands. Exhibit A WATER SYSTEM LAYOUT Exhibit B HYDRANT FLOW TEST RESULTS EXHIBIT B SCHULTZ ENGINEERING, LLC FIRM #12327 WATER SY~TEM FIRE HYDRANT FLOW TEST REPORT Date: Water System Owner: _Wellborn SUD __________________ _ Development Project: Saddle Creek Subdivision East of the intersection of Latigo Court and Stirrup Drive Flow Test Location: --------------------------- Nozzle size (in.): _2.5 __ 62 Pitot Reading (psi): __ _ 1320 Flowrate (gpm): ___ _ Discharge Coeff: (c) = 0.90 Flowrate Formula: Q=29.84cd2p1'2 c = discharge coeff. d = orifice size (in) P = pitot pressure (psi) South of the intersection of Saddle Creek Drive and Stirrup Drive Pressure Gauge Location: -------------------------- 90 Static Pressure (psi): 60 Residual Pressure (psi): 2085 Computed Discharge at 20 psi Residual Pressure: QR= ____ _ Note: The flow test and report were prepared in accordance with NFPA 291. Joe Schultz Report Prepared by: Ricky Flores Others Present: Clenden Adams -Wellborn SUD_ _Britt Curless ______ _ Exhibit C W ATERCAD ANALYSIS SUMMARIES Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-res Length (ft) 84 904 166 379 250 278 18 Exhibit C WaterCAD Analysis Summary w/ Minimum Required Line Sizes Pipe Analysis -Domestic Demand Size (in) Material Hazen- Williams C 8 PVC 150 6 PVC 150 6 PVC 150 4 PVC 150 6 PVC 150 4 PVC 150 8 PVC 150 WaterCAD Analysis Summary w/ Minimum Required Line Sizes Junction Analysis -Domestic Demand Junction Junction Elevation Demand (gpm) EX-FH 268.13 0 J-2 267.94 6 J-3 258.9 0 FH-2 258.23 6 J-5 248.93 3 FH-1 261.69 6 J-7 263.54 3 Pressure (psi) 89.8 89.9 93.8 94.1 98.1 92.6 91.8 Flow Velocity (gpm) (ft/s) 24 0.15 18 0.2 9 0.1 3 0.08 9 0.1 3 0.08 24 0.15 Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-res Exhibit C WaterCAD Analysis Summary w/ Minimum Required Line Sizes Pipe Analysis -Fire Flow Demand (FH-1) Length (ft) Size (in) Material Hazen- Williams C 84 8 PVC 150 904 6 PVC 150 166 6 PVC 150 379 4 PVC 150 250 6 PVC 150 278 4 PVC 150 18 8 PVC 150 WaterCAD Analysis Summary w/ Minimum Required Line Sizes Junction Analysis -Fire Flow Demand (FH -1) Junction Junction Elevation Demand Pressure (gpm) (psi) EX-FH 268.13 0 70.8 J-2 267.94 6 70.3 J-3 258.9 0 51.3 FH-2 258.23 6 51.5 J-5 248.93 3 55.6 FH-1 261.69 1,006 43.8 J-7 263.54 3 43 Flow (gpm) 1,024 1,018 9 3 1,009 3 1,024 Velocity (ft/s) 6.54 11.55 0.1 0.08 11.45 0.08 6.54 Pipe Number P-1 P-2 P-3 P-4 P-5 P-6 P-res Length (ft) 84 904 166 379 250 278 18 Exhibit C WaterCAD Analysis Summary w/ Minimum Required Line Sizes Pipe Analysis -Fire Flow Demand (FH-2) Size (in) Material Hazen- Williams C 8 PVC 150 6 PVC 150 6 PVC 150 4 PVC 150 6 PVC 150 4 PVC 150 8 PVC 150 WaterCAD Analysis Summary w/ Minimum Required Line Sizes Junction Analysis -Fire Flow Demand (FH-2) Junction Junction Elevation Demand Pressure (gpm) (psi) EX-FH 268.13 0 70.8 J-2 267.94 6 70.3 J-3 258.9 0 51.3 FH-2 258.23 1,006 47.4 J-5 248.93 3 51.4 FH-1 261.69 6 50 J-7 263.54 3 49.2 Flow Velocity (gpm) (ft/s) 1,024 6.54 1,018 11.55 1,009 11.45 3 0.08 9 0.1 3 0.08 1,024 6.54 Drainage Report for Saddle Creek Subdivision, Phase 10 Brazos County, Texas January 2012 Engineer: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 Developer: Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 Drainage Report for Saddle Creek Subdivision, Phase 10 Brazos County, Texas January 2012 Engineer: Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764-3900 Developer: Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 ENGINEER Schultz Engineering, LLC. P.O. Box 11995 Saddle Creek Subdivision, Phase 10 Drainage Report College Station, Texas 77842 Phone: (979) 764-3900 Fax: (979) 764 OWNER/DEVELOPER Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690-2642 GENERAL DESCRIPTION AND LOCATION Location: Description: • Area: • Proposed Land Use: • #of Lots: • Existing Land Use: • Land Description: Primary Drainage Facility: Flood Hazard Information: FEMA FIRM: Floodplain: Saddle Creek Subdivision, Phase 10, is located on the south west side of FM 2154, off of Stousland Rd. 26.66 acres Single Family Residential 16 lots Vacant The terrain slopes towards the southwest. Boggy Creek # 48041C0375E (May 16, 2012) Un-shaded Zone X HYDROLOGIC CHARACTERISTICS The existing site is predominately pasture land with some wooded areas. The elevations range from 268 to 240, sloping generally in a south westerly direction. The runnoff enters tributaries of Boggy Creek. GENERAL STORMWATER PLAN The drainage plan for this development will involve the construction of ditches, channels and the installation of a box culvert structure. DRAINAGE DESIGN General Information: Stormwater runoff from Phase 10 of the subdivision will be collected in the ditches along Stirrup Drive, and Michelle Court to be discharged into existing or proposed drainage channels. See Exhibits A and B for drainage areas and culvert and channel locations. Page 1of3 Tc Methodology: Tc Minimum Design Storm Event: Box Culvert Materials: Manning's n Value: Runoff Coefficient: TR55 10 minutes 25-year & 100-year -residential street & culvert, drainage channel Pre-Cast or Cast in Place concrete 0.012 0.45 The Rational Equation was used for the ditch and channel design. Due to the size of the drainage basin the HEC-HMS program was used to determine the runoff for culvert 100 I design. Design Results -Culvert Pipe: Design Results -Channel: Applicable Exhibits: Culvert No. 1001 Culvert Size 8'x6' Box Top of Road Elev 253.99 Q2s 390.50 V2s 11.64 HW2s 252.60 Q100 441.60 V100 12.13 ··-HW100 253.24 The data presented above and in the Appendices indicates the culvert size is in accordance with the requirements. The head water elevation for the culvert is less than the top of road elevation for the 100-yr storm runoff. The ditch at the outlet of the proposed culvert will be lined with rock riprap to prevent erosion from high velocities. The velocities in the roadside ditches will be such that grass lined ditches are adequate. Culvert 1001 has a concrete headwall with wing walls at each end. The downstream headwall structure and rock riprap is needed to dissipate outlet velocity. Channel No. I 2 Slope 6.32 2.26 Q25 2.49 8.85 V2~ 3.78 3.95 D2~ 0.14 0.38 Q100 2.95 10.50 V100 3.84 4.10 D100 0.16 0.42 Channels No. I & 2 each have a 4' bottom width, 5H: IV side slopes. The channel will have a minimum depth of 1.5' for adequate freeboard. The design velocity is less than 4.5 fps which allows a grass lined channel. Exhibit A- Exhibit B - Appendix A- Appendix B - Appendix C- Appendix D- Appendix E- Drainage Area Map -Culvert 1001 Drainage Area Map Drainage Area Summary Time of Concentration Pipe Design Summary & Culvert Reports Ditch Design Summary Channel Design Summary and Reports Page 2 of 3 CONCLUSION CERTIFICATION The culverts, roadside ditches, and drainage channel for this subdivision were designed in accordance with appropriate engineering standards. I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase JO, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. F-12327 SCHULTZ ENGINEERING, LLC. Page 3 of3 Exhibit A Drainage Area Map-Culvert 1001 - Exhibit B Drainage Area Map -Ditch Design Appendix A Drainage Area Summary -Saddle Creek Subdivision -Phase 10 Appendix A Drainage Area Summary Area (HEC-HMS) Area, A CN Area# (acres) 10·1 162.900 80 Areas 301-314 (Rational Method) Area, A c Area# (acres) 301 0.49 0.45 302 0.28 0.45 303 0.14 0.45 304 0.13 0.45 305 0.14 0.45 306 0.13 0.45 307 0.21 0.45 308 0.21 0.45 309 0.46 0.45 310 2.21 0.45 311 0.31 0.45 312 1.80 0.45 313 0.05 0.45 314 0.80 0.45 The Rational Method: Q = CIA I = b I {tc+d)8 Percent tc Impervious (min) (min) 25.0 88.0 53.0 tc 25 year storm 125 025 (min) (in/hr) (cfs) 10.0 9.861 2.17 10.0 9.861 1.24 10.0 9.861 0.62 10.0 9.861 0.58 10.0 9.861 0.62 10.0 9.861 0.58 10.0 9.861 0.93 10.0 9.861 0.93 10.0 9.861 2.04 32.0 5.462 5.43 10.0 9.861 1.38 32.0 5.462 4.42 10.0 9.861 0.22 25.0 6.302 2.27 Q =Flow {cfs) tc =Time of concentration {min) A= Area {acres) C =Runoff Coeff. I = Rainfall Intensity {in/hr) Brazos County: 25 vear storm 100 year storm b = 89 b = 96 d = 8.5 d = 8.0 e= 0.754 0= 0.730 lag 025 (hrs) (cfs) 0.88 390.50 100 year storm 1100 0100 (in/hr) (cfs) 11.639 2.57 11.639 1.47 11.639 0.73 11.639 0.68 11.639 0.73 11.639 0.68 11.639 1.10 11.639 1.10 11.639 2.41 6.498 6.46 11.639 1.62 6.498 5.26 11.639 0.26 7.477 2.69 tc = U(V*60) L =Length (ft V = Velocity (ft/sec) 0100 (cfs) 441.60 .. Appendix B Time of Concentration I APPENDIX B POST DEVELOPMENT TIME OF CONCENTRATION COMPUTATIONS Saddle Creek Phase 10 T ,,_ = time of concentration for sheet flow (Iv) L = length (fl) n = Manning's rouglvless P2 = 2-yr rainfall intensity (irVhr) for Brazos Co. = 4.5 in/Iv s =slope (ft/ft) SheetAow o...u.ge n Length Slope T-""-' ft % min. 10-1 o.3 300 1.3 41 . o: .,., .:, r;-~ ·~ , . .< ~· .. .~ .. , -·., ~ ,., ·1 ' . • >· ,;.;.: ~ ' .. - 310 0.3 218 1.8 28 312 Q.3 200 2 25 v .J 314 0.3 200 2.5 23 Concentrated Flow Length Slope Velocity ft % tvsec 114 . 't.7-2.1 ,~300 2 \! 2.3 622 '1..& ··-2.0 ·-. '•c .. . ·~'" ,. ·' ,, t•, ; ,,. ,~ ~ .. c<i ;~, ... " -" 4~ ,. ~-!~ ~ ' "43 1--08 1., < 1,7 "' 112 "1.0S 1.7 TR-55 Method Voonc =water velocity in ditch (ft/sec) s = slope of ditch (ft/ft) v.,_ =water velocity in gutter (ft/sec) S = slope of gutter (ft/ft) Section 201 Gutter Flow -1 T-Length Slope Velocity min ft % fVsec 1 "°4.•· '" ... 2.2 3.0 2 1$4 1 .... ''-2.6 ;.. .3-3 -' . 4 288 22 3.0 335 0.6 1.6 327 -0.8 r; is 386 0.6 1.6 103 4.5 • 4.S 263 -~-3.77 3.9 .334 0.3 1.1 "' 258 0.2 0.9 93 1.5 2.5 180 1.1 2.1 2.31 0.4 1.3 ,. 286 . "Q.5' 1.4 138 " "·"o.s .~. t.&/f. 166 ""2 2.9 106 1 .· 2.0 101 1 2.0 471 0.99 2.0 4 466 1.llJ! 2.8<• ;; ,,· ..... 1 43 , , " 1.0 T-Length min ft 2 y '"• 1 ;<' 1 4 ' 3 4 0 1 '<'.:.:~:;~<;; 5 5 1 1 ... 3 n • 3 1 ' "' 1 1 1 .,, 4 -·· '".: 3 .. " ; ·"'·• 1 .~-- ,. T =travel lime through ditch or gutter (min) L = length of travel path (ft) V = velocity (fVsec) Gutter Flow -2 Slope Velocity T-Total % fVsec min min •F>, 88 ,,,. ~ ,,,_ -' ~J;r ,,,.,, .· ' ,, v ,. .. +· ' . ;, ,, " 32 ~ ,. 32 ·• " . '. 25 Tc Design min 118· ·- -:~ ,, .. . ' . .,,, - 32 32 25 - Appendix C Box Culvert Design Summary & Culvert Reports I Saddle Creek Subdivision -Phase 10 AppendixC Box Culvert Design Summary Pipe Pipe Size Length Slope Contributing 0 25 V25 0 100 V100 No. Drainage (in) (ft) (%) Areas (cfs) (fps) (cfs) (fps) 1001 6'x8' BOX 48 2.00 10-1 390.50 11 .64 441 .60 12.13 Culvert Report ydraflow Express Extension for AutoCAD® Civil 30® 2013 by Autodesk, Inc. Saturday, Jan 26 2013 ox Culvert No. 1001 -25 Yr Storm nvert Elev On (ft) = 244.54 Calculations ipe Length (ft) = 48.00 Qmin (cfs) = 390.50 lope(%) = 2.00 Qmax (cfs) = 441.60 nvert Elev Up (ft) = 245.50 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 72.0 hape = Box Highlighted pan (in) = 96.0 Qtotal ( cfs) = 390.50 o. Barrels = 1 Qpipe (cfs) = 390.50 n-Value = 0.012 Qovertop ( cfs) = 0.00 ulvert Type = Flared Wingwalls Veloc On (ft/s) = 9.58 ulvert Entrance = 300 to 750 wingwall flares Veloc Up (ft/s) = 11 .64 oeff. K,M,c,Y,k = 0.026, 1, 0.0347, 0.81, 0.4 HGL On (ft) = 249.64 HGL Up (ft) = 249.69 Embankment Hw Elev (ft) = 252.60 op Elevation (ft) = 253.99 Hw/O (ft) = 1.18 if op Width (ft) = 24.00 Flow Regime = Inlet Control Crest Width (ft) = 24.00 Elev (ft) Box Culvert No. 1001 -25 Yr Storm 254.00 252.00 250.00 248.00 246.00 2~~.00 242.00 0 10 15 20 26 JO 35 40 50 55 50 66 70 --Box Culvert --HGL --Embank Retch (ft) .. Culvert Report ydraflow Express Extension for AutoCAD® Civil 30® 2013 by Autodesk, Inc. Saturday, Jan 26 2013 ox Culvert No. 1001 -100 Yr Storm Invert Elev On (ft) = 244.54 Calculations ipe Length (ft) = 48.00 Qmin (cfs) = 390.50 lope(%) = 2.00 Qmax (cfs) = 441 .60 nvert Elev Up (ft) = 245.50 Tailwater Elev (ft) = (dc+0)/2 Rise (in) = 72.0 Shape = Box Highlighted Span (in) = 96.0 Qtota I ( cfs) = 441.60 o. Barrels = 1 Qpipe (cfs) = 441.60 n-Value = 0.012 Qovertop ( cfs) = 0.00 Culvert Type = Flared Wingwalls Veloc On (ft/s) = 10.46 ulvert Entrance = 300 to 750 wingwall flares Veloc Up (ft/s) = 12.13 oeff. K,M,c,Y,k = 0.026, 1, 0.0347, 0.81, 0.4 HGL On (ft) = 249.82 HGL Up (ft) = 250.05 Embankment Hw Elev (ft) = 253.24 op Elevation (ft) = 253.99 Hw/O (ft) = 1.29 Top Width (ft) = 24.00 Flow Regime = Inlet Control rest Width (ft) = 24.00 Elev(ft) Box Culvert No. 1001 -100 Yr Stonn 2&4.00~-~-~-~-~ 0 5 10 15 20 25 JO 35 40 45 50 55 60 65 70 --BoxCUlvert --HGL --Embank Reath (ft) ... Appendix D Ditch Design Summary I Saddle Creek Subdivision -Phase 10 Appendix D Ditch Design Summary Street Ditch Location Slope Contributing Q,. v.,,. o.,,. Q, .. v, .. o, .. Stnlet Stations Drainage Areas (Right/Left) (%) (cfs) (fps) (ft) (cfsl (fps) (ft) Stirrup Drive 3+27.08 Left 2.36 307 0.93 2.58 0.30 1.10 2.69 0.32 Stirrup Drive 3+40.23 Right 2.36 308,311 2.31 3.27 0.42 2.72 3.36 0.45 Stirrup Drive 4+20.83 Left 1.23 306,304,302 2.40 2.50 0.49 2.83 2.62 0.52 Stirrup Drive 4+25.16 Right 1.23 305,303,301 3.42 2.83 0.55 4.03 2.89 0.59 Stirrup Drive 5+49.40 Left 4.73 304,302 1.82 3.94 0.34 2.15 4.15 0.36 Stirrup Drive 5+49.40 Right 4.73 303, 301 2.80 4.38 0.40 3.30 4.46 0.43 Stirrup Drive 7+21.52 Left 1.41 302 1.24 2.26 0.37 1.47 2.42 0.39 Stirrup Drive 7+21 .52 Right 2.06 301 2.17 2.56 0.46 2.57 2.68 0.49 Michelle Court 0+00 Left 0.80 313 0.22 1.14 0.22 0.26 1.23 0.23 Michelle Court 0+00 Right 0.80 314 2.27 2.10 0.52 2.69 2.22 0.55 Michelle Court 4+27 left 1.10 311 1.38 2.16 0.40 1.62 2.19 0.43 Michelle Court 4+67.40 Right 0.99 312 4.42 2.78 0.63 5.26 2.84 0.68 Michelle Court 9+31.50 left 1.88 310,312 9.86 4.27 0.76 11.73 4.47 0.81 Michelle Court 9+31.50 Right 1.88 309 2.04 2.89 0.42 2.41 2.98 0.45 Appendix E Channel Design Summary & Reports I Saddle Creek Subdivision -Phase 10 Appendix E Channel Design Summary Streat BoUomWldth Side Slope Slope Contributing a.. V25 0.. a, .. v, .. o, .. (ft) (%) Drainage Areas (cfs) (fps) (ft) (cfsl (fps) (ft) Channel No. 1 4 5:1 6.32 313,314 2.49 3.78 0.14 2.95 3.84 0.16 Channel No. 2 4 5:1 2.26 309,310,311 8.85 3.95 0.38 10.50 4.10 0.42 Channel Report ydraflow Express Extension for AutoCAD® Civil 30® 2013 by Autodesk, Inc. Saturday, Jan 26 2013 Channel No. 1 • 25 yr Storm rapezoidal ottom Width (ft) ide Slopes (z: 1) J otal Depth (ft) Invert Elev (ft) lope(%) N-Value Calculations Compute by: nown a (cfs) = 4.00 = 5.00, 5.00 = 1.50 = 100.00 = 6.32 = 0.024 Known Q = 2.49 Section Highlighted Depth (ft) a (cfs) Area (sqft) Velocity (fUs) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.14 = 2.490 = 0.66 = 3.78 = 5.43 = 0.21 = 5.40 = 0.36 Depth (ft) --.---...-----,.-----.----r---..------.----.-----.---..------.-----.---..-2.00 ,___.-1---1-----------1--1---1----1---1----·-·-.,-, -1----i -------+-----------1---·"i---1---1---1----1-----t 1.00 0.50 o---i---1--i--·t--' 1----1----1----i-----1--t \. I -+--+----+----+--+-~-+----+---+---+---I----+----+--+--0.00 ~------·--·---i------·----i--------· -----·---~-... --r-·--· 1-----1---0----·--------1---1------------~·--r--·-- ---__ .,. ____ -o----· --- _.._ __ ..__ _ _.__ _ ___._ __ _.__ _ __._ _ ___._ __ _.___ _ _._ _ ___, ____ _.___~--~ -0 .50 0 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft) - Channel Report ydraflow Express Extension for AutoCAD® Civil 30® 2013 by Autodesk, Inc. Saturday, Jan 26 2013 Channel No. 1 • 100 yr Storm rapezoidal Bottom Width (ft) Side Slopes (z: 1) Jotal Depth (ft) Invert Elev (ft) lope(%) N-Value Calculations Compute by: nown Q (cfs) = 4.00 = 5.00, 5.00 = 1.50 = 100.00 = 6.32 = 0.024 Known Q = 2.95 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Grit Depth, Ye (ft) Top Width (ft) EGL (ft} = 0.16 = 2.950 = 0.77 = 3.84 = 5.63 = 0.24 = 5.60 = 0.39 Depth (ft} ---.----,-----.-----.---.-----.,.---.------...-----.---.,..----.-------..--....--2.00 -·-----1---1-·--·----l--·--+---1---1----1---->--·- ··----i-----··-----____ ,_ ____ ,__ __ , ___ , ___ .......... ___ ,___ _ _,__ ___ _ 1.00 0.50 ---+----·-·------tr--~---._-+-__ -. __ -..... 1---____ -__ -+--=-~ .. --+-. ,_-__ -___ +-,___-_~. __ f--____ -___ -+ ____ -=.__-__ -+--_ ----------·--+--~---.. ---+._,__...._..._-._-+-__ 1.50 =---r--~:\.-~----~--=~--~-~---~---· __ // ~==--___ ~r\---------/ . -- =----=·--=~=----=-==-=---1:/==-·f----·---=-~--=~-====~ -=~-->---·-----~---=:= ----1---______ \. / --=------=--:r--~-·-------·--,__. __ -----·-------· ------· ~~-·-· -.. v--~·..--· f----· f---·--¥-•N r-----·----------------.-T---=-1'----e-- -+--+----+----+--+---"--+----+----+---+---1----+----+--+-0.00 ---A_N ___ i---~ ----··--·-t-------· ---N ---____ ,_ c---·-·,........_, __ f-·-""""'-~-•J--• w-.--- -----·-··--· ------t--· --------··- ,__,_ --~--l'---"---1'------------~ ---e---·-,__ ----,_ .. - __._ __ ....__ _ __._ _ __._ __ ....__ _ __._ _ _.... __ ......__ _ __._ __ .__ _ _._ _ ____._ __ .._ -0.50 0 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft} - Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2013 by Autodesk, Inc. Saturday, Jan 26 2013 Channel No. 2 -25 yr Storm Trapezoidal Bottom Width (ft) ide Slopes (z: 1) Total Depth (ft) Invert Elev (ft} Slope(%) N-Value Calculations Compute by: Known Q ( cfs) = 4.00 = 5.00, 5.00 = 1.50 = 100.00 = 2.26 = 0.024 Known Q = 8.85 Section Highlighted Depth (ft) a (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.38 = 8.850 = 2.24 = 3.95 = 7.88 = 0.45 = 7.80 = 0.62 Depth (ft) ---.----,------,.-------.-----r----..----,---.---~--~-~----.---~ 2.00 i---•----1---· 1---I----"'---'------1---1----1-----1---1 -----t-__ -____ ··---Ir-~-+=·---=----+--···'---~--I---_____ -+-____ =-_____ +--____ -+-_____ -_____ -+--... ___ --+ _____ -__ -+--lf---·--+---_____ -+--__ ·. 1.50 --=-~-------· ---------}~----· -~ / 1.00 -t----r----t-.....-\.---+---+----+----1---+----+---1-ll__,__ __ -=_:--=---=----=-4-,_-_-_-+--1.00 ,____ -\ -== r=:l--= -- ,._ ___ ,......__ ~------~ v ---'-----'----1--- --+-_-_-_-r--__ -_-__ -+-_ ------~-=-'lr-~---+----+---57_-__ -+ ___ ___,_'-f--··········-····-·····--1-J--_+._-_-_-+._-=-~~---:_-_-_-_-+--, 0.50 i-----"---~I\. ---= --F-/l---... ,__ ___ ,_ __ _ ,__ -,_____ -1--~ . v--'-----'----f--- '---"'--· .........._-~-~, '--1 --- -+--+------+----+--+-----"i...+--~----+-----+---1----1----l---+--0.00 --· ,___ __ ..__. -,___ __ , .._, __ L-----1.-.-w .. - -i-------L----L-------J-.---- _.,. ___ --·~------!---·--~ ,_.__c.__ __ ----·-··.._· ---~-------- ~--~-_....._ _ _.... __ _.__ _ __._ _ ___. __ _..__ _ _,__ _ _..J.__ _ __.___ _ _,__ __ '---0.50 0 2 4 6 8 10 12 14 16 18 20 22 24 -Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 30® 2013 by Autodesk, Inc. Saturday, Jan 26 2013 Channel No. 2 -100 yr Storm Trapezoidal Bottom Width (ft) Side Slopes (z: 1) Total Depth (ft) Invert Elev (ft) Slope(%) N-Value Calculations Compute by: Known Q ( cfs) = 4.00 = 5.00, 5.00 = 1.50 = 100.00 = 2.26 = 0.024 Known Q = 10.50 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Ye (ft) Top Width (ft) EGL (ft) = 0.42 = 10.50 = 2.56 = 4.10 = 8.28 = 0.49 = 8.20 = 0.68 Depth (ft) --r--,-----..----..---.-----.,.-----,---.--~--~-~-~--~ 2.00 ---1-----1---·----·-----!-----+-·--1----+---1--+--------- -+~~~~------1_--+---+--l----t---+--+----+----+.--,L_,,__-1--~-+-1.50 ---~~··· ----··· ----------------·---·--·----------·-{__-·-···--·---- ==~ =-'\ . ----·--~--·-r-----·-=~--1----~·=-=J ~=--= 0.50 ~ -/ 1.00 --r---r----t-'~~----+---+--+----t---+--+---1--cL,__ _--+---+--~ 1.00 ... _"\_ '---/--·-1----l----·'--'\ =-=~'--.==--"·~. ==:·==v---------- , v I 0.00 0.00 --·----'\= ---'-·---· ---------,--f---·-----F ~-----------_ .. __ ------·-=--~ -~-~-----· 1----··---1-------!---·~-,.-. ------------·---- _ _._ ·-·~--------·----->--------·--,. ___ ----~~-- i---·--------·---· ---~ 1-----. -----------,__ __ --'---'-----'----'----'-----'-----L--.J.._-~----1---L--_.J_ _ ___J'----0.50 0 2 4 6 8 10 12 14 16 18 20 22 24 -Reach (ft)